In February the Metropolitan Transportation Authority (MTA) Board of Directors approved the Final Supplemental EIS/Final Subsequent EIR (FSEIS/FSEIR) for the Gold Line Eastside Extension Project. The Build Alternative selected by the MTA Board of Directors features a dual- track light rail transit system approximately 6 miles (mi) kilometers long with 8 stations. The Gold Line Eastside Extension Project would commence at a downtown connection with the recently JAMES K. HILL AND SONS PICKLE WORKS (Santa Fe Lofts) HABS No. CA-2792 (Page No. 3) opened Gold Line Station at Union Station and extend to Atlantic Boulevard via Alameda Street, 1st Street, Indiana Street, 3rd Street, and Pomona Boulevard.
Deployment of the Gold Line Eastside Extension Project, with dual rail tracks along the center of the 1st Street Viaduct, would result in the reduction of lanes to one lane in each direction on the viaduct, which currently has two lanes eastbound and westbound plus left-tum pockets at Mission Road and Vignes Street. The LABOE and the Los Angeles Department of Transportation (LADOT) have determined that this proposed condition would significantly impact the function of 1st Street as one of three major highways to downtown from the eastside.
In addition to the forthcoming Gold Line Eastside Extension Project, the City evaluated the 1st Street Viaduct under the federal Highway Bridge Replacement and Rehabilitation Program and found sufficient deficiencies to place the viaduct on the eligible bridge list (EBL) for receipt of funds. The application for funding support was submitted in February and was approved by FHWA and the Caltrans. This project will widen the viaduct, moving the existing centerline of 1st Street and the 1st Street Viaduct to the north to accommodate a 26-ft-wide (7.9-m-wide) center median, as well as two eastbound and two westbound lanes.
In the eastbound direction, the inside lane will serve as a collector for left-tum movements onto northbound Mission Road, while the outside lane will continue onto 1st Street east and provide a right turn at Mission Road. In the westbound direction, the inside lane will be a through-left lane allowing left-tum movement at Vignes Street, and the outside lane will be a through-right lane allowing a right turn at Vignes Street. A mountable curb will separate the 26-ft-wide (7.9-m-wide) center LRT median from the 2 inside lanes. The existing 6-ft-wide (1.8-m-wide) sidewalks on both sides of the viaduct would be maintained, and shoulders ft m] on the south and 5 ft m] on the north side) will also be included.
Major elements of the project include the following: Demolition of the north side of the viaduct, construction of substructure and superstructure elements for the additional roadway width, and reconstruction of the north side of the viaduct approximately 26 ft (7 .9 m) north of its present location. The widening will include additional concrete support arches and viaduct columns to replicate the historic features, and all demolished elements of the existing architectural and functional features of the viaduct, including the railings, pilasters, and stairs, will be replicated. JAMES K. HILL AND SONS PICKLE WORKS (Santa Fe Lofts) HABS No. CA-2792 (Page No. 4) This project will require partial demolition and refacing of the southern end of the building located at East 1st Street (James K.
Hill and Sons Pickle Works Building).
James .K. Hill & Sons Pickle Works, East tiif Street Located adjacent to tl1e I <: Street Viaduct weslbowid lanes. d1is buikling was detem1ined eligible under Critt.>rion C by FTA based on the Supplemental Cultural ReSl.'lUrces Technical Report dated October J.ett~r from SHPO to MTA, dated December 5. The building is clig-iblc at the !oc~l lcvel of significance a11d has a period of significance from The property boundaries oonsi.st ~1f the building footprint. As stated in the OHP 1,..-oncurrence letter dated December 5, 200 I the building "is. as an in<:reasingly l"<lre example of a Victorian- era brick. ind11o;.trial building in the heart of Los Angeles' former warehouse district''.
Con."itrncted in !he Pick le Works Building is described and sh.own in the photograph below: With its south elevation Jost fuet from th Street Viaduct. this Victorian brick vemacular indu:Strial building is tVvo stories with a raised basement and an irregular footprint: !is ea.s.i waU i!i angled to f<1llow 1he coun.e ofan adjacent rail alignment The sinu,, is cuvere<l hy a parapeted flat mof 10 which several aorth.~light windows have been added. An understated corbel rablu at the parapet linu provides the only relief in the planes. Fenestration in the Uj>per story Cl111sisfs Clfsmall segmental arched windows with brick sills, most of which retain their original four-light casement sash.
Windows in the ground floor are mixed flat headed and archt:d mtt:--~wer nne double hung sash interspersed with personnel doors and freighl bays, both original and modem. \\'"here otikes were add;,.>d at lhc southwest comer of th~ building ht there are large .square .fixt..>d :Sa.'ih \Vindows sumwunted by operable transoms. As noted above. this building: is a rare example of industrial oonstructkm in the \\'arehonse distrii..1 and exhibit.:; many of the chamcler-defining fealllres of this type of building:. Located in the Flats, lhis building was one of four that predated the construction of tlle I"' Stn..-el Viaduc1 nnd represent.'> the earliest constructi<m in the warcl1otts.e di:i.irkt.
Significa.11t fealures of the building include its setting and location, mainly the close proximity Lo the rail yards. and the irregular plan the building influenced by the locati..)n of the 1n1el..s. me use of brick as a construction material and the judiciou5 use of omamentatiojl at the roo.t1ine, a-; well as at the \\<i11dows, are also character defining. The building also retaim its original wood sash windowi.. The widening of the bridge during Phase 3 of !he prqject. will require the removal of approximately 33 feet of the existing building. The National Park Service Historic Amerkan Buildings Sun'ey (HABS)lllistoric American Engineering Record {HAER)progmm was contacted to dctennine the le\"el of recordation for the building.
llte building will be documented to l IABS!HAER standards prior lo the partial demolition of the building. Following is a co11ceptual design indicating the proposed solulion to demolish the end of the existing: buiW.ing an.d install a new ofovatio.n that wi.11 replicate the historic fe-.t.tures \If the ex-isling elevation. Due the coofigunitfon of lhe existing floor plan_ it is anticipa.te<1 the new elevation can be replicated to match 1he existing ~levation ex.ai..'tly. fhe Pickteworks building is currently privately {l\\.'t1ed. final design efforts for the building with the existing 0\\--ner shall be coordinated with the oonceptual de;ign provided and the Slate Historfo Preservation Offfoer during the right of way acquisitWn process. JAMES K.
HILL AND SONS PICKLE WORKS (Santa Lofts) HAHS No. CA-27(!2 (Page No. 5) PORTiONOF EXISTING 8!JllDING 10 SE REhV)VED AND THE BUILDING WtLSE RECONF\GURED EXISTING REMA\N < .,, EDGE OF EXISTING EXISTING 'iO REMAIN BRIDGE < I FIELD VERIFY JAMES K. HILL AND SONS PICKLE WORKS (Santa Fe Lofts) HABS No. CA~2792 (Page No.6)