SCE is planning to decommission the project's two power plants and part of their appurtenant water conveyance system. Some of the project components are scheduled to be decommissioned and removed, decommissioned and abandoned in place, or transferred to new ownership. The hydroelectric generators and other pieces of hardware and equipment will be removed from the powerhouse buildings, but the buildings will remain. Components slated for removal will be demolished using bulldozers and other components will be removed using hand crews where there is no present vehicle access. The San SAN GORGONIO HYDROELECTRIC SYSTEM, FLOWLINE NO.2, TANK NO. 2 & PENSTOCK HAER NO. CA-2278-H (PAGE 2) Gorgonio Pass Water Agency plans to acquire those project facilities that are not decommissioned.
The transferred facilities would no longer be used for the generation of power. As a result of this project the San Gorgonio Hydroelectric System was documented with Historic American Engineering Records. The entire system was documented in an overview report, San Gorgonio Hydroelectric System HAER No. CA-2278 and each contributing element of the system was documented with separate supporting reports as follows: San Gorgonio Hydroelectric System, East Fork Dam and Intake, HAER No. CA-2278-A; San Gorgonio Hydroelectric System, South Fork Dam and Intake, HAER No. CA-2278-B; San Gorgonio Hydroelectric System, Powerhouse No. 1, HAER No. CA-2278-C; San Gorgonio Hydroelectric System, Tank No. 1 and Penstock No. 1, HAER No.
CA-2278-D; San Gorgonio Hydroelectric System, Operator's Bungalow, HAER No. CA-2278- E; San Gorgonio Hydroelectric System, Operator's Garage, HAER No. CA- San Gorgonio Hydroelectric System, Powerhouse No. 2, HAER No. CA-2278-G; San Gorgonio Hydroelectric System, Flowline No. 2, Tank No. 2, & Penstock No. 2, HAER No. CA-2278-H. SAN GORGONIO HYDROELECTRIC SYSTEM, FLOWLINE NO.2, TANK NO. 2 & PENSTOCK HAER NO. CA-2278-H (PAGE 3) Part I: Historical Information Physical History The San Gorgonio Hydroelectric System was constructed from to Tank No. 2 and its associated Penstock was completed by The architect and engineer are not known as original plans no longer remain. However, it is likely that Chief Engineer Charles O. Poole supervised their design and construction.
Additionally, the contractor for Flowline No. 2, Tank No. 2 and its Penstock was CD. Sotiras. There have been no physical alterations or addition since its construction in aside from in- kind replacements. Historic Context In the Consolidated Reservoir and Power Company began construction on an irrigation system to provide water for the City of Banning and W.E. Pedley was hired as the contractor for the project. By the irrigation system was complete and by the system was providing enough water to irrigate the entire farming tract in Banning Heights, which was planted with apple and cherry orchards. Likely due to financial trouble, the reorganized as the San Gorgonio Power Company in and made immediate plans to construct hydroelectric power plants along the existing irrigation system.
The existing concrete irrigation conduits became utilized as Flowlines No. 1 and No. 2 for the San Gorgonio Hydroelectric System. Charles O. Poole of the was the chief engineer for the project and CD. Sotiras was the primary contractor. The Crane Company of Chicago furnished of steel pipe for both Penstock No. 1 and Penstock No. 2. By September of construction began on Powerhouses No. 1 and No. 2. Since the San Gorgonio Hydroelectric System was originally designed to produce power utilizing both powerhouses, the contributing elements to Powerhouse No. 1 and Powerhouse No. 2 were constructed simultaneously and completed in Powerhouse No. 2 and its contributing elements including Flowline No. 2, Tank No. 2, and Penstock No. 2 were placed into service 12 days after Powerhouse No.
1, on December 17, In as a result of the economic depression of the the fell under the ownership of the San Gorgonio Electric Company. In massive flooding affected areas of both Riverside and San Bernardino counties (in addition to Los Angeles and Orange counties) when the Santa Ana River, which is linked with the Whitewater River, jumped its banks.__ The flooding washed out sections of Flowline No. 1 near the east and south fork intakes. The damaged sections were immediately repaired with spiral weld 1 "Whitewater River Makes Greater Banning." The Banning Record, September 4, p. 1. 2 Robinson, John W. The San Bernardinos. Arcadia, CA: Big Santa Anita Historical Society, p. 3 Weber, Carmen A. and Richard Starzak. A Historical Assessment of the San Gorgonio Hydroelectric System.
Irvine, CA: Chambers Group, Inc., p. 3. 4 "Power Plants Going In," The Banning Record, September 28, p. 1. 5 Mount and H. L. Fryer. "Southern/Hoover Hydro Generation Division History," Southern California Edison Manuscript, May 21, 6 "Plane Trip Shows Scene of Desolation," Los Angeles Times, March 4, p. 1. SAN GORGONIO HYDROELECTRIC SYSTEM FLOWLINE NO.2, TANK NO. 2 & PENSTOCK HAER NO. CA-2278-H (PAGE 4) steel pipes that were reinforced to withstand any future flooding or landslides.
On January 9, the San Gorgonio Electric Company sold the plant to the California Electric Power Company and on December 31, the San Gorgonio Hydroelectric system became part of the Southern California Edison Company by license transfer (this occurred when California Electric Power merged with the Southern California Edison Company). SCE continued to use the former power generating facilities until they were finally shutdown in the property remains under ownership of SCE. The irrigation system remains in operation (as of and the water rights are still owned by the Banning Heights Water Company; the system is owned and maintained by SCE. Please see the Historic Context section in the Historic American Engineering Record for the San Gorgonio Hydroelectric System (HAER No.
CA-2278) for additional information. Part II: Description: Structural/Design Information Flowline No.2 runs from Powerhouse No. 1 southwest to Tank No. 2. The flowline is made up of a 30" in diameter steel pipe and transitions into a concrete flume approximately 100 feet from Powerhouse No.l. Flowline No. 2 remains a concrete flume for the remainder of the distance to Tank No. 2. Tank No. 2 has a capacity of cubic feet and measures 40' in diameter and is 6" high. The water tank has a concrete foundation and it is constructed of numerous rectangular steel plates curved to form the circumference of the tank. The edges of each plate are riveted with steel rivets; a number of vertical rivets were installed in rows of three. The water tank is not covered.
Attached to the northwest side of the tank is a metal ladder that gives access to the interior. On the east side of the tank near the base is an approximately 18-inch plug that has been riveted to the tank. Water from Powerhouse No. 1 via a concrete flowline leads to a sand/screen box constructed of poured concrete. The box is located approximately 50 feet northeast from the Tank No. 2 and is at an equal elevation as the top of the tank. Water from the sand/screen box leads to the tank via a 24 inch steel pipe flowline. The water goes through a metal screen located inside of the tank, from which an 18 inch steel pipe penstock leads to Powerhouse No. 2 located approximately 1.3 miles southwest of Tank No.
2; two 18 inch gate valves, which control the flow of water through the penstock, are located near the west side of the tank. Penstock No. 2 also has a steel vent pipe with metal rivets located at the west side of the tank. The vent pipe extends up to the top of the tank and is attached to the side of the tank with metal supports. A squared concrete flowline measuring 29" wide and 16" deep carries water to Powerhouse No. 2. Near the west side of the tank a few inches from the base is a rectangular concrete slab that has been inscribed with the following "Chas H. Bigley SGPCo Oct. 19 7 Southern Sierras Service Bulletin, Vol.
2, Number 11 August 8 Timothy Smith, "Water Restoration Plan Passes 1st Vote," Record Gazette , November 29, website accessed November SAN GORGONIO HYDROELECTRIC SYSTEM, FLOWLINE NO.2, TANK NO. 2 & PENSTOCK HAER NO. CA-2278-H (PAGE 5) Condition The overall condition of Flowline No. 2, Tank No. 2, and Penstock No. 2 are good. Tank No. 2 appears to be structurally sound; however a portion of the lower edge of the tank, at the east side, has flaked off due to corrosion. Site Information Tank No. 2 and its associated Penstock are located approximately miles southwest of San Gorgonio Powerhouse No. 1 and approximately 1.1 miles northeast of San Gorgonio Powerhouse No. 2 The tank is located at an elevation of feet above sea level.
Part HI: Sources of Information "Big Contract Let," Los Angeles Times, May 5, p. Brown, John. History of San Bernardino and Riverside Counties. Madison, Wisconsin: The Western Historical Association, "Company is Formed to Harness Whitewater," Los Angeles Times, September 21, p. "Deal in Water Rights," Los Angeles Times, April 10, p. "File on Water of Whitewater," Los Angeles Times, October 20, p. Garrett, Automatic Hydro-Electric Plant of the San Gorgonio Power Company. The Electric Journal, Vol. XXII, No. 6. "Giant Engineering Feat is Accomplished," Los Angeles Times, April 31, p. "Gives New Turn to Enterprise: Contract for Conduit Let by Power Company," Los Angles Times, May 3, p. Ill 1. "Great Project Nears Finish," Los Angeles Times, May 27, p.
"Growing Fine Almonds, Apricots and Peaches around Banning," Los Angeles Times, March 1, p. Historic American Engineering Record (HAER), National Park Service, U.S. Department of the Interior, "Bishop Creek Hydroelectric System," HAER No. CA-145. "Important Water Claims Filed," Los Angeles Times, June 8, p. 7. SAN GORGONIO HYDROELECTRIC SYSTEM, FLOWLINE NO.2, TANK NO. 2 & PENSTOCK HAER NO. CA-2278-H (PAGE 6) Mount, BJ. and H. L. Fryer. "Southern/Hoover Hydro Generation Division History," Southern California Edison Manuscript, May 21, Myers, William A. Iron Men and Copper Wires: A Centennial History of the Southern California Edison Company, Glendale, CA: Trans-Anglo Books, "New Power Project," Los Angeles Times, July 1, p. "Palm Springs (advertisement)," Los Angeles Times, October 8, p. 7.
"Plane Trip Shows Scene of Desolation," Los Angeles Times, March 4, p. 1. "Power Houses Now Ready in Local Canyon," The Banning Record, November 29, p. 1. "Power Plants Going In," The Banning Record, September 28, p. 1. "Reservoir and Power Company Secures Privileges in White Water River," Los Angeles Times, April 10, p. "Riverside Utility to Buy L.A. Unit," Los Angeles Times, July 16, p. 10. Robinson, John W. "Cyrus Baldwin Southern California Hydroelectric Pioneer," The Branding Iron The Westerners Los Angeles Corral (Spring Robinson, John W. The San Bernardinos: The Mountain Country from Cajon Pass to Oak Glen: Two Centuries of Changing Use, Arcadia, CA: Big Santa Anita Historical Society, Schuiling, Walter C.
San Bernardino County: Land of Contrasts, Woodland Hills, CA: Windsor Publications, Inc., "Settlers Worry About River," Los Angeles Times, April 27, p. Smith, Timothy. "Water Restoration Plan Passes 1st Vote," Record Gazette , November 29, website accessed November Southern Sierras Service Bulletin, Vol. 2, Number 11 August "Three After Water," Los Angeles Times, April 25, p. "To Harness Snow Creek," Los Angles Times, May 28, p. SAN GORGONIO HYDROELECTRIC SYSTEM, FLOWLINE NO.2, TANK NO. 2 & PENSTOCK HAER NO. CA-2278-H (PAGE 7) "Unduly Alarmed," Los Angeles Times, May 17, p. Ill 1. "Water Claims," Los Angeles Times, January 4, p. 13. Weber, Carmen A. and Richard Starzak. "A Historical Assessment of the San Gorgonio Hydroelectric System". Prepared by Chambers Group, Inc.
and prepared for Southern California Edison, Rosemead CA. November "Where Water Pumps Water for Banning Orchards," Los Angeles Times, September 4, p. "Whitewater River Makes Greater Banning." The Banning Record, September 4, P. i. "Whitewater River Utilized," Los Angeles Times, July 19, p. SAN GORGONIO HYDROELECTRIC SYSTEM, FLOWLINE NO.2, TANK NO. 2 & PENSTOCK HAER NO. CA-2278-H (PAGE 8) \ \ Reduced size overview map of the San Gorgonio Hydroelectric System. Map courtesy of Southern California Edison Company SAN GORGONIO HYDROELECTRIC SYSTEM, FLOWLINE NO.2, TANK NO. 2 & PENSTOCK HAER NO. CA-2278-H (PAGE 9) Reduced size plan of Flowline No.2, Penstock No.2, Transmission Line and Powerhouse No.2 site. Original drawing courtesy of Southern California Edison Company.
Full size image available in the Field Records Section of the HAER for the San Gorgonio Hydroelectric System, HAER No. CA-2278. SAN GORGONIO HYDROELECTRIC SYSTEM, FLOWLINE NO.2, TANK NO. 2 & PENSTOCK HAER NO. CA-2278-H (PAGE 10) Detail of Tank No.2 site taken from previous reduced size plan. Note Tank No.2 is identified as No.2 Forebay Tank in the above detail. Original drawing courtesy of Southern California Edison Company. SAN GORGONIO HYDROELECTRIC SYSTEM, FLOWLINE NO.2, TANK NO. 2 & PENSTOCK HAER NO. CA-2278-H (PAGE 11) / '$ r'-l-'i t isi J * / Reduced size plan of Tank No.l and Tank No.2. Plan dated Original drawing courtesy of Southern California Edison Company. Full size image available in the Field Records Section of the HAER for the San Gorgonio Hydroelectric System, HAER No.
CA-2278. SAN GORGONIO HYDROELECTRIC SYSTEM, FLOWLINE NO.2, TANK NO. 2 & PENSTOCK HAER NO. CA-2278-H (PAGE 12) Reduced size plan drawing of Tank No.l and Tank No.2 with their associated water conduits. Original drawing courtesy of Southern California Edison. Full size image available in the Field Records Section of the HAER for the San Gorgonio Hydroelectric System, HAER No. CA-2278. SAN GORGONIO HYDROELECTRIC SYSTEM, FLOWLINE NO.2, TANK NO. 2 & PENSTOCK HAER NO. CA-2278-H (PAGE 13) Reduced size drawing of Sand trap, Bypass, & Tank No. 2 Intake. Original drawing courtesy of Southern California Edison Company. SAN GORGONIO HYDROELECTRIC SYSTEM, FLOWLINE NO.2, TANK NO. 2 & PENSTOCK HAER NO. CA-2278-H (PAGE 14) Reduced size plan and cross-section for the Sand trap for Tank No.2.
Original drawing courtesy of Southern California Edison Company. SAN GORGONIO HYDROELECTRIC SYSTEM, FLOWLINE NO.2, TANK NO. 2 & PENSTOCK HAER NO. CA-2278-H (PAGE 15) v _. 3.W i S- L* * / ' k;-^i : I Au < 1 f ;!si'^ . '^i' . ili. -ii. ^ t Reduced size drawing of Penstock No.2. Original drawing courtesy of Southern California Edison. Full size image available in the Field Records Section of the HAER for the San Gorgonio Hydroelectric System, HAER No. CA-2278. SAN GORGONIO HYDROELECTRIC SYSTEM, FLOWLINE NO.2, TANK NO. 2 & PENSTOCK HAER NO. CA-2278-H (PAGE 16) Sketch map for Tank No.2. Sketch map created by Galvin Preservation Associates,