A Report to the Board of Commissioners of the Okeechobee Flood Control District, - prepared by Ben Herr, Okeechobee Flood Control District, Tebeau, Charles W., A History of Florida, Coral Gables, Florida: University of Miami Press, U.S. Army, Report of Chief of Engineers, U.S. Army, __ , Report of Chief of Engineers, U.S. Army, HURRICANE GATE SIHJCIURE HRER No- (Bage 7) U.S. Army Corps of Engineers, "Copies of Specifications and Completed Contracts", Principal Engineer J. R. Peyton, (Available, U.S. Army Corps of Engineers, Jacksonville District). U.S. Army Corps of Engineers, Jacksonville District, Specifications for Constructing Four Hurricane Gate Structures, Lake Okeechobee, Florida, U.S.
Army Corps of Engineers , Specifications for Constructing Hurricane Gate Operators Houses, Lake Okeechobee, Florida, U.S. Army Corps of Engineers, , Index Maps, U.S. Army Corps of Engineers, , Project Maps, U.S. Army Corps of Engineers, , Hurricane Gates No. 2, 3, 4, and 5. Periodic Inspection Report No. 1 (September Appendix III - Pre-Inspection Brochure, U.S. Army Corps of Engineers, , Periodic Inspection and Continuing Evaluation of Completed Civil Works Structures, Periodic Inspection Report No. 2, U.S. Army Corps of Engineers, , An Environmental Assessment Related to the Construction, Use and Maintenance of the Okeechobee Waterway, Florida, (c.
, Central and Southern Florida Project for Flood Control and Other Purposes, Part IV, Supplement 33, General Design Memorandum, Lake Okeechobee and Outlets, Spillway Structure 351 Serial No. U.S. Army Corps of Engineers, June , Central and Southern Florida Project for Flood Control and Other Purposes, Part IV, Supplement 34, Detail Design Memorandum, Lake Okeechobee and Outlets, Spillway Structure 351 Serial No. 29, U.S. Army Corps of Engineers, June U.S. House, Comprehensive Plan for the Central and Southern Florida Control Project, House Document No. Congress, Second Session, U.S. Senate, Caloosahatchee River and Lake Okeechobee Drainage Areas, Florida. Letter from the Chief of Engineers, United States Army to the Chairman of the Committee on Commerce, U.S. Senate Presented by Mr.
Fletcher, January 6 (March 71*i Congress, Second Session, Senate Document No. , Caloosahatchee River and Lake Okeechobee Drainage Areas, Florida. A Report to the U.S. District Engineer, Jacksonville Florida Submitted by Okeechobee Flood Control District of Florida, pre- sented by Mr. Fletcher, December 3, 7L5i Congress, Third Session, Senate Document No. HDRRICKNE GKEE STKJCIURE HAER No. EL-5 (Page 8) War Department, "Proposal No. Standard Government Form of Invitation for Bids (Construction Contract)", U.S. Engineers Office, Jacksonville, September 7, (Available, U.S. Army Corps of Engineers, Jacksonville District). Will, Lawrence E., Qkeechobee Hurricane and the Hoover Dike: An Eyewitness Account of the Nation's Third Largest Calamity, St.
Petersburg, Florida: Great Outdoors Publishing Company, , A Cracker History of Qkeechobee, St. Petersburg, Florida: Great Outdoors Publishing Company, D. Supplemental Material: Prepared by: (1) Rona Mazer, Anthropologist U.S. Army Corps of Engineers, Jacksonville District, Planning Division January 17, (2) Charles B. McManus, P.E. Structural Engineer U.S. Army Corps of Engineers, Jacksonville District, Engineering Division January 17, PART IV: Project Information This project involves replacing Hurricane Gate Structure 4 with a - spillway containing three 20-foot bays will be located imme- diately downstream (landside) of the extant hurricane gate. The spillway will utilize a major portion of HGS 4 but will necessitate removal of its east wall and the sector gates.
This work is necessary because of changes in the Lake Okeechobee regulation schedule which entailed raising lake levels to to feet, in May Prior to this time, the lake was regulated seasonally with schedules ranging from to feet, During January the necessary irrigation releases from HGS 4 caused erosion of the downstream canal banks and bottom, and of the riprapped bottom of the structure chamber itself. This experience demonstrated the inadequacy of the HGS to operate satisfactorily under the changed conditions. The new spillway will accommodate the high rate of flow and will have the capability to discharge the full authorized regulatory and irrigation releases to Hillsboro and North New River Canals with the new lake regulation schedule.
Conversion of HGS 4 to a spillway is associated with the Comprehensive Plan for the Central and Southern Florida Control Project, originally presented in House Document No. 80L !1 Congress, Second HURRICANE GATE SBUdUKE HftER No- (Page 9) Session, and authorized by the Flood Control Act aproved 30 June Congress, Second Session). This plan provided for raising the Herbert Hoover Dike (levee system) around lake Okeechobee to conserve the water for use during dry periods and to provide protection during severe hurricanes. Modification of Hurricane Gate Structure 4 is required to satisfy those needs without causing erosion and damage. was designed by the U.S. Army Corps of Engineers and will be operated and maintained by the Corps. It will be constructed by a contrac- tor.
The South Florida Water Management District is authorized to represent local interest and is responsible for 15% of the estimated construction cost. The will also provide all lands, easements, and rights-of-way (to be furnished in the name of and held by the U.S. Government). HURRICANE GATE SIHJCIUKE HAER N6. EL-5 (Bage 10) u UJ f 1 UJ <0 a: m ^ o s* X 1 a J u LU UJ m o