Truckee-Carson Irrigation District, Lower Diagonal No. 1 Drain, Bounded by West Gate Road & Weapons Delivery Road, Naval Air Station Fallon, Fallon
Truckee-Carson Irrigation District, Lower Diagonal No. 1 Drain, Bounded by West Gate Road & Weapons Delivery Road, Naval Air Station Fallon, Fallon, Churchill County, NV. Surveyed as HAER NEV,1-FALL,1K-, with a 1,267-word written history.
From the record
“The Truckee-Carson Irrigation District is listed on the National Register of Historic Places as a National Register Thematic District.”
Written record, HAER NEV,1-FALL,1K- survey. Machine-read text.
Surveyed by the federal HAER program as HAER NEV,1-FALL,1K- · the record runs 1267 words · one of 18 surveyed structures published for this county.
Source document
Quoted word for word from HAER NEV,1-FALL,1K-.
Not written, edited or summarised by this site.
Lower Diagonal no. 1 Drain between the culvert under the West Gate Road and the culvert under Weapons Delivery Road on Naval Air Station Fallon, Fallon, Churchill County, Nevada USGS Grimes Point Quadrangle, UTM Coordinates: West Gate Road Culvert 11 Weapons Delivery Road Culvert 11 Date of Construction: This section of Lower Diagonal no. 1 Drain was contracted for in and completed by Engineer: United States Reclamation Service, Taylor Builder: Unknown
Significance
1097 words
The headings the report itself prints. Each one jumps to where it begins.
Source document
Quoted word for word from HAER NEV,1-FALL,1K-.
Not written, edited or summarised by this site.
The Truckee-Carson Irrigation District is listed on the National Register of Historic Places as a National Register Thematic District. The District includes Lake Tahoe Dam, Boca Reservoir Dam, Derby Diversion Dam, Lahontan Dam, Lahontan Power plant, Carson River Diversion Dam, 69 miles of main canals, 312 miles of laterals and 345 miles of open drains. The Lower Diagonal no. 1 Drain is of those 345 miles of open drains. Of mat, the section of the Lower Diagonal no. 1 Drain that will be realigned is feet. It has not been determined which canals, drains, ditches and laterals are contributing elements to the District, so this section of the Lower Diagonal no. 1 Drain will be treated as a contributing element until these determinations have been made.
Report Prepared By: G Cliff Creger Natural Resources/Real Estate Division Public Works Naval Air Station Fallon Pasture Road Fallon, Nevada Date: August TRUCKEE-CARSON IRRIGATION DISTRICT LOWER DIAGONAL NO. 1
Drain Haerno
Page 2 /
Description
The Lower Diagonal no. 1 Drain is a dirt-walled drain of approximately miles in total length that drains tail water from agricultural fields along its length south and southeast of Fallon. The Lower Diagonal no. 1 Drain (Fig. 1) ends in the Lower Diagonal Deep Drain which terminates in the Stillwater Point Reservoir. The section that will be realigned is feet long meters) and has had alterations only to the ends as culverts buried in the drain for the roads [Photographs The Drain is 42 feet wide (13 meters) and 16 feet deep (5 meters). No other features are located in this section of the Lower Diagonal no. 1 Drain other than a field drain feeds into the Lower Diagonal no. 1 Drain west of the Weapons Delivery Road culvert. n. ARCHrTECTURAL
And Engineering Information
The Truckee-Carson Irrigation District (TCID) was designed by Taylor of the U.S. Reclamation Service who was in charge of the Nevada Office [Townley, Francis G. Newlands had hired two men who did preliminary work that Newlands used to get the Reclamation Act through Congress [Townley, William Hammond Hall did a preliminary sketch of the project and Bence surveyed the area. Architectural and engineering information was gathered from the Truckee-Carson Irrigation District Thematic nomination form [Wieprecht etal., Work began on the District in Lahontan Dam was finished in and the laterals and drains were finished by [Townley, This section of the Lower Diagonal no. 1 Drain (Fig.
2) was contracted for in [TCID, June This was the time period when the first contract was written for excavation of the first 150 miles of drainage ditches [Townley, Excavation of the drainage ditches for the first contract was completed by When completed, the Lower Diagonal no. 1 Drain was miles long, 42 feet across at the ground surface and 16 feet deep. The slope of the sediments on the sides of the drain are 33 degrees. No concrete or rocks were used to strengthen the sides of the drain. Work on this section of the drain since its construction amounts to minimal maintenance to keep the drain clear of obstructions and vegetation. It is unknown how the Lower Diagonal no. 1 Drain was excavated, but laterals and drains of that time period were excavated with drag lines.
A field drain connected to the Lower Diagonal no. 1 Drain just west of the Weapons Delivery Road culvert The southern section of the field drain south of the Weapons Delivery Road will be piped and connected to the realigned drain pipe. IH. HISTORICAL INFORMATION Historical information for the Truckee-Carson Irrigation District was gathered from the Thematic nomination form [Wieprecht etal., and Townley The Newlands Reclamation Project (Truckee-Carson Irrigation District) was begun in and was one of the first projects authorized in by the Director of the Reclamation Service under the Newlands Reclamation Act. The Truckee- Carson Irrigation District was the first reclamation project to be constructed. It was designed and constructed to conserve water and deliver it for beneficial uses.
Electrical power was both generated and delivered as a by product of this project. TRUCKEE-CARSON IRRIGATION DISTRICT, LOWER DIAGONAL NO. 1 DRAIN HAERNO. Page 3 iX\ 4 True North FIGURE 1. LOCATION OF LOWER DIAGONAL NO. 1 DRAIN. GRIMES POINT. NV 7.5 SCALE 000 1 Mil o 00 FEeT tooo WO 3M0 2P 1 KILOMCTCP QUADRANGLE LOCATION TRUCKEE-CARSON IRRIGATION DISTRICT ~^ ^^^ LOWER DIAGONAL NO. 1 DRAIN, HAERNO. Page 4 / FIGURE 2. SKETCH MAP OF REALIGNED LOWER DIAGONAL NO.1 DRAIN NORTH * i -i\ FENCE ROAD o TREE CULVERT TO REALIGNED PIPE CONNECTION ( CULVERT TRUCKEE-CARSON IRRIGATION DISTRICT LOWER DIAGONAL NO. 1 DRAIN HAERNO.
Page 5 / The District was designed as the result of investigations by the United States Geological Survey in The first feature of the Newlands reclamation project constructed in was Derby Dam. Later in construction on the Carson River Diversion Dam, the V Canal, the T Canal was completed with the completion of the Truckee Canal following in The Lahontan Power plant was finished November 11, Electrical power generated from the fall of the Truckee Canal water to the Carson River was used to power the construction equipment for construction of the Lahontan Dam. Electricity powered the main borrow pit shovel, a dragline excavator, a belt conveyor, the sand-cement batching plant, a cable way for transporting concrete and numerous pumps, blowers, drills and conveyors.
The Lake Tahoe Dam was completed in Lahontan Dam in and Boca Dam in In poor drainage caused a high water table on much of the irrigated land [Townley, From the District constructed a new drainage system to alleviate the high ground water table and poor drainage on the District. The drainage system was excavated in stages. The first 150 miles was excavated from to for the first TCID contract in It was during this time that the Lower Diagonal no. 1 Drain was constructed. In another US Reclamation Service report stated that additional drains were necessary. Congress appropriated money for the project and TCID approved in Excavation continued from The original scope of the Truckee-Carson Irrigation District was to irrigate acres.
This number was reduced in the Omnibus Adjustment Act of and recently about acres are irrigated. TRUCKEE-CARSON IRRIGATION DISTRICT, LOWER DIAGONAL NO. 1 DRAIN HAERNO. Page 6 / Reference Townley, John M., Turn This Water Into Gold. Reno: Nevada Historical Society, TCID, Personal Communication with Joanne Corkill, Truckee-Carson Irrigation District, Fallon, Nevada, June Wieprecht, Wilbur E., Wendell Bell, and Donald Abbe, The Newlands Reclamation Project (Truckee- Carson Project). National Register Thematic Form. On File at the Nevada State Historic Preservation Office, Carson City, Nevada,
The federal surveyors worked through Fallon building by building. These are the other structures
they measured and filed a report on, longest report first.
Written history. Quoted verbatim from HAER NEV,1-FALL,1K-. United States federal work, no copyright under 17 U.S.C. 105.
Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.