New York State Barge Canal, Lock C2, 933A Hudson River Road, Mechanicville

New York State Barge Canal, Lock C2, 933A Hudson River Road, Mechanicville, Saratoga County, NY. Surveyed as HAER NY-349, with a 2,255-word written history.

From the record

“Lock C2, located on the Champlain Canal, is a component of the nationally significant New York State Barge Canal.”

Written record, HAER NY-349 survey. Machine-read text.

Surveyed by the federal HAER program as HAER NY-349 · the record runs 2255 words · one of 44 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

1626 words

Source document Quoted word for word from HAER NY-349. Not written, edited or summarised by this site.

Lock C2, located on the Champlain Canal, is a component of the nationally significant New York State Barge Canal. The lock still has the original DC electro-mechanical gate and valve operating machinery. Description: Located 4 miles north of Lock C1 on the Champlain Canal, Lock C2 consists of a lock and related structures, a powerhouse, and a fixed crest dam.1 A winding asphalt roadway that crosses over the Hudson River on a four-span bridge provides access to the site from the west. The access bridge has a steel pony truss superstructure, an open-grate deck, modern steel guardrails, and large concrete block abutments. It is carried on concrete piers. The access road ends at an asphalt parking lot located at a lower level than the top of the lock chamber.

A modern retaining wall constructed of large concrete blocks is located at the perimeter of the parking lot adjacent to the lock. The powerhouse and lockhouse are located on a strip of land to the west of the lock chamber that separates the lock from a powerhouse operated by another company. The lockhouse sits at the northwest corner of the lock chamber. It is a one-story, concrete-block structure with a gable- front roof covered with asphalt shingles. In June the existing cedar siding was being replaced with fiber-cement horizontal board siding. The lockhouse has a concrete block chimney. It is lit by one-over-one vinyl windows and entered via a modern pane-and-panel door. The building is in good condition.

To the south of the lockhouse is the powerhouse, a concrete structure that is larger than other buildings at the site. Its raised concrete foundation is partially exposed. The hipped tile roof is sheathed in clay tiles. Nine-over-nine single-hung wood windows and three-pane hopper windows under the eaves light the building. Modern wood double doors and storm doors provide access. Both the operational machinery, including the vertical-shaft DC generators, and a crane are intact. The structure is in good condition. 1 Description based on a site visit made by the HAER recording team in summer and historical maps from Series New York State Archives, Albany, New York. See Eastern Division, Champlain Canal, Section 1, Sta. + 00 to Sta.

+ 00, approved April 2, 15, and Eastern Division, Champlain Canal, Section 1, Sta. + 00 to Sta. + 00, approved April 2, 16. NEW YORK STATE BARGE CANAL, LOCK C2 HAER No. (Page 2) A bypass is located between Lock C1 and what is indicated on an historic map as the Co Power House. Concrete walls channel the water into a tail race, with a concrete dam equipped with a sluice gate extending across the narrow channel. The concrete retaining wall of the bypass is in good to poor condition, with some sections of spalling and breakage. The wall is partially reinforced with concrete at its base. The concrete dam is in good to poor condition, with sections of spalling and breakage. The sluice gate appears to be constructed of timber and metal and is attached to a crane by chains.

A floor stand is located to the east of the sluice gate. The lock has an lift with normal pool elevations of below and 48' above. The chamber walls are built of scored concrete that is in good condition. There is cast-iron quarter round coping along the chamber walls, as well as steel pins and vertical cut-outs for cable mooring aides. There are double-leaf, steel miter lock gates at each end of the chamber operated by spars and gear trains powered by the original DC electro-mechanical gate machinery. This machinery, along with the valve operating machinery used to control the flow of water through the culverts in the chamber walls, is housed in steel cabinets on the chamber walls. There are also modern electrical boxes.

The lock has open-grate covers over the machinery and valve wells, catwalks, and stairs. Two control stands shelter the controls for the lock gates and valves. They are frame structures with cedar siding, asphalt-shingle pyramidal roofs, vinyl sliding windows, and modern pane-and-panel doors. The lock is in generally good condition. A small shed in the vicinity of the powerhouse and lockhouse provides access to a basement oil tank connected to the powerhouse. This frame shed has an asphalt-shingle shed roof with exposed rafter tails, cedar siding and a door. To the east of the lock chamber and down the bank is a storehouse built during the initial construction of the lock. The concrete one-story building has a hipped standing-seam metal roof with two gabled ventilation dormers.

The windowless structure has hinged steel doors. The interior has been retrofitted for work space, but the building is in good condition. Concrete approach walls are located at both ends of the lock. The northeast wall is in poor condition with excessive spalling, but the northwest approach wall is in good to fair condition, with some spalling. The southeast approach wall and the abutments for the approach bridge have been built of large concrete blocks and are in good condition. The southwest approach wall is in good condition. Extending from the northwest approach wall are concrete and steel cribs, followed by timber cribs. A breakwater off the northeast approach consists of a stone peninsula with minimal vegetation that is in good condition.

Along the east of the perimeter of the lock site is a concrete retaining wall built in sections with conditions ranging from severely deteriorated to good to fair. The concrete retaining wall along the west side of the lock site was built in three sections that are also in various states of repair. A concrete fixed crest dam built prior to the construction of the Barge Canal extends across the Hudson River to the east of the lock site. The northeast end appears to be partially constructed of large concrete blocks. The structure appears to be in good condition with modern additions. NEW YORK STATE BARGE CANAL, LOCK C2 HAER No. (Page 3) History: The Canal Board awarded Contract 69, covering construction of Lock C2 to I.A. Hodge & Co.

on December 11, Work began at the site with the construction of a temporary trestle over the tail race of an already existing power plant located on an island in the Hudson River. Excavation of the lock began on January 25, A storehouse and office building were noted as being original contract items of work. State Assistant Engineer Crowell managed the contract until when State Assistant Engineer Kenyon took over management. That same year, the lock, powerhouse and truss bridge over the nineteenth-century power plant and southern end of the new lock were completed. The storehouse had been completed by January On February 17, Contract 92 was let to MacArthur Bros. Co. & Lord Electric Co.

to construct power plants and install electrical equipment at multiple locks along the Erie and Champlain canals, including Lock C2. State Assistant Engineer Kenyon managed this contract. Lock C2 was completed on March 1, The total final cost of construction was determined to be Installation of machinery and electrical equipment had been completed by A spring flood in caused the concrete wall on the east bank of the Hudson River next to Lock C2 to fall over, resulting in that portion being rebuilt in the summer. In addition, the Annual Report noted the dam adjacent to the lock was an old structure which was raised with a new ogee crest about thirty-four years ago. The concrete was disintegrating and sections of it have become so broken that it is necessary to renew the crest.

In a crew rebuilt 150 of the crest, with an additional 88 of new construction added in The twelve electrically- operated flood gates at the west end of the dam were replaced a year later. The work on the dam had been finished in The dam was damaged again in January when two sections were destroyed. Repair work consisted of installing steel sheeting, filling it in with concrete, and topping it with a new reinforced concrete cap.5 In guide railings were installed at the site, as part of Contract That contract covered the furnishing and installing of guide railings and miscellaneous work at the approaches to twelve canal bridges in Schenectady, Saratoga, and Washington counties.

The dam underwent 2 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 76, 92; Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Noble E. Whitford, History of the Barge Canal of New York State (Albany: Lyon Company, p. 3 Annual Report, Annual Report, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol.

1 (Albany: Lyon Company, 4 Department of Public Works, State of New York, Annual Report of the Superintendent for the Year (Albany: Lyon Company, 17. 5 Department of Public Works, State of New York, Annual Report of the Superintendent for the Year (Albany: Lyon Company, 19; Department of Public Works, State of New York, Annual Report of the Superintendent for the Year (New York: Publishers Printing Company, 24; Department of Public Works, State of New York, Annual Report of the Superintendent for the Year (publication information unknown), NEW YORK STATE BARGE CANAL, LOCK C2 HAER No. (Page 4) rehabilitation in under Contract Additional work was done on the lock chamber in under Contract TAA93-63C, including a new concrete lining.6

Sources

315 words

Source document Quoted word for word from HAER NY-349. Not written, edited or summarised by this site.

Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Argus Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1.

Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Department of Public Works, State of New York. Annual Report of the Superintendent for the Year Albany: Lyon Company, Annual Report of the Superintendent for the Year Albany: Lyon Company, Annual Report of the Superintendent for the Year New York: Publishers Printing Company, Annual Report of the Superintendent for the Year Publication information unknown. Hay, Duncan. New York State Barge Canal. National Register of Historic Places Registration Form, Series New York State Archives, Albany, New York. Eastern Division, Champlain Canal, Section 1, Sta. + 00 to Sta. + 00, approved April 2, 15.

Eastern Division, Champlain Canal, Section 1, Sta. + 00 to Sta. + 00, approved April 2, 16. 6 Information from Canal Corporation Maintenance Contract records. NEW YORK STATE BARGE CANAL, LOCK C2 HAER No. (Page 5) Whitford, Noble E. History of the Barge Canal of New York State. Albany: Lyon Company, Historians: Laura S. Black and Jami A. Babb, summer

Written history

214 words

Source document Quoted word for word from HAER NY-349. Not written, edited or summarised by this site.

The Historic American Engineering Record (HAER) is a long- range program that documents and interprets historically significant engineering sites and structures throughout the United States. HAER is part of Heritage Documentation Programs (Richard O Connor, Manager), a division of the National Park Service, United States Department of the Interior. The New York State Barge Canal Survey was undertaken in summer in cooperation with the Erie Canalway National Heritage Corridor (ERIE), Beth Sciumeca, Executive Director. Justine Christianson, HAER Historian, and Duncan Hay, ERIE, served as project leaders. The staff of the New York State Canal Corporation provided access to the sites. Craig Williams of the New York State Museum provided research materials and assistance.

The HAER field team consisted of Jami Babb and Laura Black. NEW YORK STATE BARGE CANAL, LOCK C2 HAER No. (Page 6) Appendix: Images of Current Conditions Image 1: Powerhouse at left, control stand in center, and lockhouse at right. Field photograph taken by HAER recording team, summer NEW YORK STATE BARGE CANAL, LOCK C2 HAER No. (Page 7) Image 2: Powerhouse at right with sluice gate in center. Field photograph taken by HAER recording team, summer NEW YORK STATE BARGE CANAL, LOCK C2 HAER No. (Page 8) Image 3: Fixed crest dam. Field photograph taken by HAER recording team, summer

In context

Mechanicville, New York The place record: every map, photograph and survey of this town.
Saratoga County, New York 233 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Mechanicville

2 records

The federal surveyors worked through Mechanicville building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
New York State Barge CanalHAER NY-3511,669 words
New York State Barge CanalHAER NY-3501,285 words

Provenance

  • Written history. Quoted verbatim from HAER NY-349. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.