BlockBefore

New York State Barge Canal, Lock C3, 888 Knickerbocker Road, Mechanicville

New York State Barge Canal, Lock C3, 888 Knickerbocker Road, Mechanicville, Saratoga County, NY. Surveyed as HAER NY-351, with a 1,669-word written history.

From the record

“Lock C3, located on the Champlain Canal, is a component of the nationally significant New York State Barge Canal and is typical of the lock sites built along the canal system.”

Written record, HAER NY-351 survey. Machine-read text.

Surveyed by the federal HAER program as HAER NY-351 · the record runs 1669 words · one of 44 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

1117 words

Source document Quoted word for word from HAER NY-351. Not written, edited or summarised by this site.

Lock C3, located on the Champlain Canal, is a component of the nationally significant New York State Barge Canal and is typical of the lock sites built along the canal system. Description: Located on the Champlain Canal about 2 miles north of Lock C2, Lock C3 consists of a lock and related structures and operating machinery, and a fixed and movable crest dam.1 The lock site is accessed by an asphalt access road that leads to an asphalt and gravel circular driveway adjacent to the lock with parking located informally around the drive. A grass picnic area is located within the circular drive. The lockhouse is located on the east bank of the canal, adjacent to the storehouse, and is in good condition.

The one-story frame lockhouse is clad in modern cedar siding and sits on a concrete foundation. Asphalt shingles cover the gable-front roof. One-over-one vinyl windows and a vinyl awning window light the building. Gabled side-enclosed entry porches shelter the modern pane-and-panel doors. The rear porch has an extension with a modern door. The storehouse is a concrete one-story building with a hipped modern standing-seam metal roof with two gabled ventilation dormers and exposed rafter tails. The windowless structure has steel sliding pocket doors. The interior has been retrofitted for work space, but the building remains in good condition. A shed sits to the rear of the storehouse. The frame structure has shiplap wood siding and sits on a concrete foundation.

A concrete-block chimney rises from the asphalt-shingle covered, side- gabled roof with exposed rafter tails. Plywood covers the window and door openings. The building is in good condition. The powerhouse was originally located on the west wall of the lock chamber, near the dam, but the deteriorated concrete foundation is all that remains of the structure. The lock has a with normal pool elevations 48' below and above. The concrete chamber walls show signs of spalling, but the lock as a whole is in generally good condition. 1 Description of current conditions based on a site visit made by the HAER recording team in summer and historical maps from Series New York State Archives, Albany, New York. See Eastern Division, Champlain Canal, Section 1, Sta. 925 + 00 to Sta.

894 approved April 2, 20. NEW YORK STATE BARGE CANAL, LOCK C3 HAER No. (Page 2) Cast-iron pins and vertical cut-outs for pipe mooring aides can be seen in the chamber walls. The lock also features wood plank and diamond plate covers, open-grate catwalks, and concrete stairs. There are double-leaf, steel miter lock gates at each end of the chamber. The original DC operating machinery was replaced with AC operators and EIM butterfly valve mechanisms ca. The electrical equipment is housed in modern cabinets. The controls for the lock gates and valves are housed in two control stand shelters. These frame structures have fiber-cement horizontal board siding, asphalt-shingle hipped roofs, vinyl sliding windows and modern pane- and-panel doors.

Extending from the northwest side of the lock across the Hudson River is a three-span concrete fixed dam with a movable crest that was added ca. A dam had been built prior to the construction of the Barge Canal for an adjacent paper mill company in this location, and stone remnants of the original dam can be seen in the form of abutment remains. The current dam has a concrete apron topped with Obermeyer pneumatic crest gates, which consists of steel flashboards and inflatable bladders between concrete piers. New York State Electric & Gas (NYSEG), a subsidiary of Energy East Corporation, owns and operates the movable crest in conjunction with their adjacent hydroelectric plant.

Concrete approach walls are located at the northwest (which is in good condition) and the southwest (which is in good to fair condition). There is also a crane pad located at the southeast corner of the lock, with access provided by gravel driveway. A concrete retaining wall with large bolts separates this driveway from the hillside at the upper level of the lock. The deck of the steel frame platform of the crane pad is filled in with gravel and vegetation and it sits on a concrete foundation that exhibits spalling. Pipe railing lines the water-side of the platform. Concrete guide cribs are located southeast of the crane pad site and are in poor condition. History: Shanley-Morrissey, Inc.

was awarded Contract 68, encompassing the construction of Champlain Canal locks 3, 4, and 5 and prism, on November 17, The contract also included building three storehouses and two office buildings. State Assistant Engineer A.C. Richards oversaw the construction of Lock C3, which began almost immediately after the contract was awarded. In the Annual Report noted that the limestone core of the eastern end of the dam built to service the paper mill originally at the site had been cut to facilitate construction of the lock chamber. Concrete was later poured over the remains of the limestone dam as part of the lock construction. Lock C3 was completed on April 15, The total final cost of the contract was The powerhouse was built as part of Contract 92, awarded on February 17, to MacArthur Bros.

Co. & Lord Electric Co. The contract covered construction of power plants and the installation of electrical equipment at multiple locks along the Erie and Champlain canals, 2 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Noble E. Whitford, History of the Barge Canal of New York State (Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Argus Company, 74; Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, NEW YORK STATE BARGE CANAL, LOCK C3 HAER No. (Page 3) including Lock C3.

State Assistant Engineer Kenyon managed the contract, which had been completed by A contract to construct concrete guide cribs near Champlain Canal locks 3, 5, and 6 was let to the firm of Bronk & Kimmey on July 29, In under Contract M5, a concrete pier and timber booms were constructed. In the dam and lock were rehabilitated. A new dam apron was built as part of Contract The lock walls were relined, the gate and valve operating machinery were replaced, butterfly valves were installed, and electrical work was completed as part of Contract A new upper approach wall was built in (Contract and repairs were made to the river wall as well as other misc. work in under Contract

Sources

278 words

Source document Quoted word for word from HAER NY-351. Not written, edited or summarised by this site.

Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Argus Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Hay, Duncan. New York State Barge Canal.

National Register of Historic Places Registration Form, Series New York State Archives, Albany, New York. Eastern Division, Champlain Canal, Section 1, Sta. 925 + 00 to Sta. 894 approved April 2, 20. Whitford, Noble E. History of the Barge Canal of New York State. Albany: Lyon Company, 3 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 4 Whitford, History of the Barge Canal, 5 Information from Canal Corporation Maintenance Contract records. NEW YORK STATE BARGE CANAL, LOCK C3 HAER No. (Page 4) Historians: Laura S. Black and Jami Babb, summer

Written history

175 words

Source document Quoted word for word from HAER NY-351. Not written, edited or summarised by this site.

The Historic American Engineering Record (HAER) is a long- range program that documents and interprets historically significant engineering sites and structures throughout the United States. HAER is part of Heritage Documentation Programs (Richard O Connor, Manager), a division of the National Park Service, United States Department of the Interior. The New York State Barge Canal Survey was undertaken in summer in cooperation with the Erie Canalway National Heritage Corridor (ERIE), Beth Sciumeca, Executive Director. Justine Christianson, HAER Historian, and Duncan Hay, ERIE, served as project leaders. The staff of the New York State Canal Corporation provided access to the sites. Craig Williams of the New York State Museum provided research materials and assistance.

The HAER field team consisted of Jami Babb and Laura Black. NEW YORK STATE BARGE CANAL, LOCK C3 HAER No. (Page 5) Appendix: Images of Current Conditions Image 1: View of dam. Field photograph taken by HAER recording team, summer Image 2: View of lockhouse on left and storehouse on right with shed behind. Field photograph taken by HAER recording team, summer

In context

Mechanicville, New York The place record: every map, photograph and survey of this town.
Saratoga County, New York 233 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Mechanicville

2 records

The federal surveyors worked through Mechanicville building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
New York State Barge CanalHAER NY-3492,255 words
New York State Barge CanalHAER NY-3501,285 words

Provenance

  • Written history. Quoted verbatim from HAER NY-351. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.