Whitehall Terminal, located on the Champlain Canal, is a component of the nationally significant New York State Barge Canal. It is one of several terminals constructed along the Barge Canal to provide points for freight transfer. Description: The Whitehall Terminal consists of a concrete terminal wall and the 33' x terminal warehouse, now housing the Skenesborough Museum. It is located on the Champlain Canal near Lock The concrete terminal wall is located on the west side of the canal and has modern steel cleats and ladders, modern utility hookups, and bollards. The park-like area around the terminal wall has modern hardscaping, including concrete and brick pavers, steel benches and modern reproduction lighting. The north end of the terminal warehouse is two stories and houses offices.
The southern part of the building consists of a raised one-story open area. Clay tiles cover the hipped roof. One- over-one wood windows (some with reinforced glazing) light the office spaces. A modern steel door sheltered by a hipped overhang with a decorative tin ceiling and brackets is located on the north end of the structure. Steel multi-pane windows with reinforced glazing are located under the eaves in the southern section. Freight door bays have been replaced by one modern steel multi-pane window and wood paneling in-fill. A modern one-story flat-roof addition is appended to the west side of the structure. North of the warehouse and terminal is a boat launch consisting of concrete studs inserted into the ground.
History: Chapter 746 of the Laws of authorized the issuing of bonds in the amount of for the purpose of constructing terminals for the Barge canal system throughout the state. The State Engineer, State Surveyor, and Superintendent of Public Works were tasked with choosing terminal locations, which would ultimately be approved by the Canal Board. By the board had approved terminals for Ithaca, Albany, Little Falls, Utica, Gowanus Bay 1 Description of current conditions is based on a site visit made by the HAER recording team in summer and historical maps from Series New York State Archives, Albany, New York. See Eastern Division, Champlain Canal, Section 2, Sta. 28 + 00 to Sta. approved April 2, NEW YORK STATE BARGE CANAL, WHITEHALL TERMINAL HAER No.
(Page 2) (South Brooklyn), Schuylerville, Schenectady, Rome, Lockport, Mechanicville, Fonda, Fort Edward, Greenpoint (North Brooklyn), Amsterdam, Erie Basin (Buffalo), Herkimer, Ilion, Troy Constantia, Syracuse, Cleveland, Watkins, Port of Call (New York City), and Dresden. There was great interest in completing the terminals quickly so that the people may avail themselves of the use of this means of transporting their products and place the greater percentage of the people of the state of New York in water communication, not only with one another, but with the neighboring states and those bordering upon the Great Lakes and along the Atlantic coast. 2 The construction of the Whitehall Terminal was covered under Contract T6, which was let to Albert M.
Banker of Gloversville, New York, with State Assistant Engineer Holmes overseeing the work. The contract included the construction of the harbor and dock wall on the west side of the Champlain Canal, south of Saunders Street Bridge in Whitehall. Work began in November and harbor excavation (except the rock) had been completed that same month. The dock wall had to be shortened by 55' because the rock was too close to the surface. The contractor built the wall in thirty sections, and all concrete work had been finished in August. By that time, the contract was estimated to be 91 percent complete and expected to be finished by November The warehouse at the terminal was built in as part of Contract which also included construction of a warehouse at the Albany Terminal.
The contract was awarded to J.A. Laporte and signed January 2, This was a permanent warehouse, like those at Albany, Fort Plain and Little Falls, rather than the typical frame warehouses built at other terminal sites.4