New York State Barge Canal, Lock C12, 21 Main Street, Whitehall

New York State Barge Canal, Lock C12, 21 Main Street, Whitehall, Washington County, NY. Surveyed as HAER NY-367, with a 2,274-word written history.

From the record

“Lock located on the Champlain Canal, is a component of the nationally significant New York State Barge Canal.”

Written record, HAER NY-367 survey. Machine-read text.

Surveyed by the federal HAER program as HAER NY-367 · the record runs 2274 words · one of 25 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

1760 words

Source document Quoted word for word from HAER NY-367. Not written, edited or summarised by this site.

Lock located on the Champlain Canal, is a component of the nationally significant New York State Barge Canal. The Tainter gate on the movable crest dam at the lock site was the largest on the system. Description: Lock C12 is located on the Champlain Canal just a mile south of Lake Champlain and the canal s terminus, and consists of the lock and associated structures and operating machinery, lockhouse, powerhouse, movable crest dam, and spillway.1 The lock is accessed from Main Street in Whitehall, with visitor parking located along the roadway. A gravel driveway accesses a small asphalt parking area reserved for the lock operator. The lockhouse, dating to is located on the west side of the lock chamber.

The one-story concrete block building with horizontal wood siding in the gable ends sits on a concrete foundation. Asphalt shingles cover the gable-front roof. One-over-one vinyl windows and a sliding window light the building. Pane-and-panel doors with gabled hoods allow access. A shed-roof frame addition has been appended to the rear of the building and is clad with vertical- panel siding. The addition is accessed via plywood doors. The addition s roof is covered with asphalt sheeting. The building is in good condition. The powerhouse is a one-story concrete structure at the northeast corner of the lock chamber and appears to be original. It is shorter than other extant powerhouses on the Champlain Canal due to its location under the Clinton Avenue Bridge.

Asphalt shingles cover the hipped roof. The window bays have been modified so that the upper sashes of most of the one-over-one wood windows have been covered with plywood. Those on the east side of the building have been closed completely, while the two-pane hopper windows on the south side are still open, except for one bay that has been closed. Modern paneled wood double doors provide access. An entry transom is closed. An open-grate platform extends from the concrete deck of the lock and wraps around the powerhouse to provide access to the east side of the building. The powerhouse has an extant crane, but the equipment has been removed. The building is in good condition.

1 Description of current conditions is based on a site visit made by the HAER recording team in summer and historical maps from Series New York State Archives, Albany, New York. See Eastern Division, Champlain Canal, Section 2, Sta. 28 + 00 to Sta. approved April 2, NEW YORK STATE BARGE CANAL, LOCK C12 HAER No. (Page 2) The lock has a lift to the south with normal pool elevations of below and above. Its concrete chamber walls feature cast-iron quarter-round coping, cast-iron pins, and vertical cut-outs for pipe mooring aides and are in good condition. The west wall of the lock, according to the lock operator, is a solid rock ledge.

Rather than excavating into the solid rock to create recesses for the valve and gate operating machinery, as was standard, the contractors constructed a wider east chamber wall and located all the operating equipment on the east side of the lock. A utility trench extends along the east chamber wall connecting the machinery. The double-leaf steel miter lock gates at each end of the chamber are operated with direct-acting hydraulic cylinders, and the valves are the butterfly type. Electrical equipment is housed in modern cabinets. The lock features diamond-plate, cross-hatch plate, and open-grate covers, open-grate catwalks, and concrete and open-grate stairs. There are modern light panels and light fixtures.

Control stand shelters housing the gate and valve controls are located on the west side of the lock chamber. The three-sided shelters are steel-frame structures with partially transparent plexiglass panels. The third side of the shelters has been incorporated into the sides of the electrical equipment cabinets with control panels located directly on these cabinet sides. The lock is generally in good condition. East and perpendicular to the lock is a movable crest dam with a concrete apron and thrust blocks and a Tainter gate with a rack and pinion system. An open-grate walkway along the crest provides access to the machinery on the east end of the dam needed to operate the Tainter gate.

Adjacent to the dam and oriented parallel to the west side of the lock is a concrete spillway with two sluice gates. The Residency Map describes this as a siphon spillway. 2 A modern electrical equipment cabinet set on an I-beam frame is located on top of each gate. A needle dam is noted on the original site plan as extending east from the main dam (notated as Dam No. 5), but appears to have been removed and replaced with a bar to prevent access. A retaining wall sits between the western lock wall and the Main Street roadway above, while another is located around the western approach to the Clinton Avenue Bridge. Both walls are built of cobblestone and are deteriorating or shifting. The northeast approach wall has a set of eighteen tightly compressed concrete cribs surrounded by steel.

The cribs have concrete bollards and rubber bumpers hung from chains. The southwest approach wall exhibits severe spalling in areas and is in poor condition. A retaining wall along the east side of the river consists of sections of different materials, including stone, concrete, and interlocking concrete panels. Older sections are deteriorating or have been covered by vegetation. History: Atlantic, Gulf & Pacific Company built Lock C11 as part of Contract 15, which covered 6.8 miles between Lake Champlain at Whitehall and Wood Creek. It included excavating the channel and building Lock C11 and dam and Lock C12 and Dam, as well as a spillway, two masonry culverts, and five bridges with piers and abutments.

Work began at Lock C12 in March and by the end of the river wall was approximately two-thirds complete. The dredge Champlain excavated the channel in this vicinity. The contractor worked 2 Noble E. Whitford notes the siphon spillway is a structure particularly fitted to localities where there is not room for the usual long overflow spillway but where it is essential nevertheless automatically to regulate the surface-level of a body of water within fixed limits and prevent it from rising much beyond a given elevation, see History of the Barge Canal of New York State (Albany: Lyon Company, NEW YORK STATE BARGE CANAL, LOCK C12 HAER No. (Page 3) on the east river wall of the lock and on installing a timber crib north of the lock until the end of January when operations ceased for the winter.

Work resumed in the spring, and the wall was completed by May. The southeast approach wall was 79 percent complete at the end of the fiscal year. In order to complete Lock C12 quickly, the contractor instituted three eight-hour shifts at the site. By the end of fiscal year half of the west lock wall had been completed, the lower gates and needle-beam were in place, and the southeast approach wall had been finished. Lock C12 was completed in after navigation ceased on the old Champlain Canal.3 The powerhouse for Lock C12 was built as part of Contract 90, along with locks C9 and The contract was let on April 12, to D Olier Engineering Company of Philadelphia, Pennsylvania, with oversight by State Assistant Engineer A.R. Morse.

By the end of fiscal year the floor was in place, and the forms almost completed for the walls. The contractor had also installed the turbines and generators, conduit, and control panels and cabinets on the lock walls. In addition, the lamp poles, checkered cover plates and hand operating machinery for the valves and gates were complete, and the gate and valve operating machinery and capstans were nearly finished.

Hand operating machinery was installed at locks C11 and 12 because canal traffic was already using the new barge canal by May By the powerhouse had been completed, with turbines, generators, switchboard, cabinets, panels, and gate operating machinery installed and successfully operating.4 Noble Whitford, State Senior Engineer, pointed out the dam s 90' long Tainter gate was one of the largest on the Barge Canal.5 In addition, he also noted the siphon spillway was a new structure type that incorporated the siphon principle, resulting in a cost-savings since the structure was much smaller than an ordinary spillway.

As Whitford described, siphons are inclosed in a concrete wall, which, except for openings in its faces, differs little in outward appearance from any wall that might be built to separate two streams having different surface levels. The siphon is simply a cavity in the wall. Its inlet is placed well below the surface of the stream to be regulated; its outlet is as low as the stream that carries away the flow will permit; its crown rises to the elevation at which it is desired that the discharge of water shall begin .The bottom of the crown is at the low- water level and at this elevation vents pierce the wall from outer face to siphon. When 3 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol.

1 (Albany: Lyon Company, Whitford, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 92; Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, and Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol.

1 (Albany: Lyon Company, 4 Annual Report, Annual Report, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 5 Whitford, NEW YORK STATE BARGE CANAL, LOCK C12 HAER No. (Page 4) the water has been drawn down to this level, air enters through these vents and stops the flow through the siphon.6 Later work at Lock C12 included installation of a new Tainter gate at the dam in under Contract The lock and Tainter gate were rehabilitated in under Contract

Sources

180 words

Source document Quoted word for word from HAER NY-367. Not written, edited or summarised by this site.

Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Department of Public Works, State of New York. Annual Report, Hay, Duncan. New York State Barge Canal. National Register of Historic Places Registration Form, Series New York State Archives, Albany, New York.

Eastern Division, Champlain Canal, Section 2, Sta. 28 + 00 to Sta. approved April 2, 110 Whitford, Noble E. History of the Barge Canal of New York State. Albany: Lyon Company, Historians: Laura S. Black and Jami A. Babb, summer

Written history

237 words

Source document Quoted word for word from HAER NY-367. Not written, edited or summarised by this site.

The Historic American Engineering Record (HAER) is a long- range program that documents and interprets historically significant engineering sites and structures throughout the United States. HAER is part of Heritage Documentation Programs (Richard O Connor, Manager), a division of the National Park Service, United States Department of the Interior. The New York State Barge Canal Survey was undertaken in summer in cooperation with the Erie Canalway National Heritage Corridor (ERIE), Beth Sciumeca, Executive Director. Justine Christianson, HAER Historian, and Duncan Hay, ERIE, served as project leaders. The staff of the New York State Canal Corporation provided access to the sites. 6 Whitford, 7 Canal Corporation Maintenance Contract records. NEW YORK STATE BARGE CANAL, LOCK C12 HAER No.

(Page 5) Craig Williams of the New York State Museum provided research materials and assistance. The HAER field team consisted of Jami Babb and Laura Black. Appendix: Images of Current Conditions Image 1: Overview of lock and dam. Field photograph taken by HAER recording team, summer NEW YORK STATE BARGE CANAL, LOCK C12 HAER No. (Page 6) Image 2: Lockhouse in background. Note conduit recess in lock wall. Field photograph taken by HAER recording team, summer Image 3: Powerhouse under bridge. Field photograph taken by HAER recording team, summer NEW YORK STATE BARGE CANAL, LOCK C12 HAER No. (Page 7) Image 4: Dam with Tainter gate at right and spillway at left. Field photograph taken by HAER recording team, summer

In context

Whitehall, New York The place record: every map, photograph and survey of this town.
Washington County, New York 259 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Whitehall

3 records

The federal surveyors worked through Whitehall building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
New York State Barge CanalHAER NY-3661,200 words
Saunders Street BridgeHAER NY,58-WHIT,1-972 words
New York State Barge CanalHAER NY-368410 words

Provenance

  • Written history. Quoted verbatim from HAER NY-367. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.