Amsterdam Terminal, located on the Erie Canal, is a component of the nationally significant New York State Barge Canal. It is one of several terminals constructed along the Barge Canal to provide points for freight transfer. Description: Amsterdam Terminal is located on the north side of the channel. The terminal is accessed by an asphalt road that leads to a small gravel parking lot. A metal truss pedestrian bridge provides another way to access the site. This bridge extends from a parking garage over Route 5S and the Thruway exit ramp. The concrete terminal wall has a rubber bumper, as well as metal ladders, cleats, and modern utility hook-ups. Concrete-filled cast-iron bollards line the wall, which is in good condition. The terminal site has undergone extensive alteration.
The original timber buildings at the terminal have been removed, and in the the site was converted into a park (known as Riverlink Park). There is now extensive hardscaping at the site, as well as reproduction lighting. History: The terminal at Amsterdam was not originally stipulated in the legislation authorizing the construction of terminals. Instead, it was a suggested location, depending upon if certain conditions as to filing petitions by local officials and citizens were complied with and if thereafter certain designated canal officials upon due investigation were in favor of granting the petitions.
1 Those conditions were evidently met, because the terminal was built under Contract which called for the construction of a harbor and concrete dockwall on rock-filled cribs on the northerly side of the Mohawk River at Amsterdam. The contract specified construction of a concrete dock wall measuring 13' tall and resting on round timber cribs. The terminal site was located east of a highway bridge.2 1 Noble Whitford, History of the Barge Canal of New York State (Albany: Lyon Company, Printers, 2 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol.
1 (Albany: Lyon Company, NEW YORK STATE BARGE CANAL, AMSTERDAM TERMINAL HAER No. (Page 2) Contract was awarded to the American Pipe and Construction Company of Philadelphia, Pennsylvania, in November The contractor began clearing the site in July and by the end of September, of the proposed of dock wall had been excavated. During the contractor completed the cribs, dock wall, and backfilling. There were problems keeping the dock wall face straight because of the cribs settling unevenly. Excavation of the harbor began October 8, and had been completed by November 27, A fence was built at the terminal under Contract in by Anchor Post Iron Works. 3 The terminal buildings were completed under a separate contract.
In Contract was approved to build temporary wooden warehouses at Troy, Mechanicville, Fort Edward, Port Henry, Schenectady, Amsterdam, Fonda, Fort Plain, Little Falls, Ilion, and Frankfort. The contract was awarded to Byron, Forman, and Riggs Inc. of Cohoes, New York, on March 12, It was later assigned to Kennedy & Scullen Construction Company on April 23, An extra work order was issued on July 2, to install galvanized wire screens over the windows and doors of the warehouses.4 A frame freight house was also built at the site under Contract which included laying pavement. Kennedy & Scullen won this contract and began work under the supervision of State Assistant Engineer A.P. Mussi on May 20, The freight house would supplement the warehouse.
The structure was specified as having concrete piers and foundations, frame structure, siding, and sliding doors on a metal track.5 The terminal buildings were moved to Fonda because of periodic flooding at this site after (see HAER Fonda Terminal and Shops).