Lock E18, located on the Erie Canal, is a component of the nationally significant New York State Barge Canal. The lock is significant for its powerhouse, which retains the original operating equipment. Description: Lock E18 is located at the lower end of a 4-mile long land cut section of the Erie Canal.1 The Mohawk River parallels this section of the canal to the north. The lock site is accessed by an asphalt road that extends north from Lock 18 Road and then turns east and runs alongside the berm upstream of the lock. It leads to the asphalt parking area south of the chamber. The lock site consists of the lock and associated structures, powerhouse, lockhouse, tool shed, and spillway. Lock E18 has a 20' lift to the west with normal pool elevations of below and above.
The chamber walls are concrete with cast-iron quarter-round coping. There are double-leaf, steel miter lock gates at each end of the chamber, operated by spars and gear trains powered by replacement AC driven hydraulic actuators. The flow of water through the culverts in the chamber walls is controlled by butterfly valves also operated by AC driven hydraulic actuators. Control stand shelters are located on the south side of the chamber. These are single-story frame buildings clad in horizontal vinyl siding. They have gable-front asphalt roofs. Fenestration consists of vinyl casement windows, and each has a modern pane-and-panel door. Concrete- filled cast-iron bollards sitting on concrete pads line the chamber walls.
Railings consist of post- and-rail fence set back from the lock chamber and a mixture of modern steel railings and pipe railings at the lock ends. Modern light fixtures illuminate the lock. Both the lock and the control stand shelters are in good condition. Open-grated steel stairs with pipe railing are located at the downstream end of the lock. A riveted steel I-beam utility bridge spanning the chamber is also located at the downstream end. Both structures are in good condition. The single-story powerhouse is banked into a hill at the southeast corner of the lock chamber. The concrete building has a hipped asphalt-covered roof. The entrance is wood beadboard double doors with a four-light transom that is missing its glazing.
The enclosed entry to the basement consists of a frame structure clad in vertical board siding and covered with a gable, 1 Description of current conditions based on a site visit by the HAER recording team in summer and a historical map from Series New York State Archives, Albany, New York, Eastern Division, Erie Canal, Section 4, Sta. to Sta. approved March 29, NEW YORK STATE BARGE CANAL, LOCK E18 HAER No. Page 2 asphalt roof. The steel three-light windows under the eaves have been filled in, while the rest of the fenestration consists of fixed steel multi-light windows, some of which pivot. The powerhouse retains the original hydroelectric turbines, generators, governors, and slate control panels.
At the time of the site visit in summer the lock operator noted that the glazing was broken during the removal of asbestos and that the windows would be re-glazed. The powerhouse is in fair condition, but the machinery is in good condition and near operable. The lockhouse is a single-story concrete building centered on the south side of the chamber. It sits on a concrete foundation and has a gable-front roof covered with asphalt shingles. Horizontal wood siding is located in the gable ends. Fenestration consists of one-over-one-light vinyl windows that are obviously replacements because the original window openings were much larger; as a result, the space around the new windows had to be filled in with vertical boards.
One window bay has been entirely closed, while another has a steel, two-light pivot window. The entrances are modern hollow wooden doors. The lockhouse is in fair condition. The tool shed, located to the south of the lockhouse, is a single-story concrete building on a concrete foundation. The gable-front roof is covered with asphalt shingles, and vertical board panels are located in the gable ends. The entrance is metal hinged doors. It is in good condition. A riveted steel storage cabinet, sitting on a concrete foundation, is located adjacent to the tool shed. It appears to be in good condition. The concrete guide walls are all in good condition since they appear to have new concrete and all have buffer dam insets with cross-hatch covers.
The northeast one appears to be of newer concrete and consequently shows little sign of spalling. There are two concrete-filled cast-iron bollards on the wall. The northwest guide wall also appears to be of newer concrete and has concrete-filled cast-iron bollards, modern ladders, and modern lighting fixtures. There are no auxiliary structures on the southeast guide wall. Finally, the southwest guide wall exhibits signs of heavy spalling and cracking in that section nearest the lock gate, but the remaining sections are in good condition. A spillway is located at the northwest guide wall. It consists of a concrete runner with a riprap slope down to the outlet at the Mohawk River. The spillway is in good condition.
History: Lock E18 was built as part of Contract 30, which included construction of guard gates and a movable dam at Herkimer, retaining dam at Frankfort, five bridges, retaining walls, and incidental work. The contract was let on July 16, to Acme Engineering & Contracting Company of Herkimer, New York, and work began in October.2 The power plant was part of Contract 92. In Section 4, this contract covered three hydro-electric power stations to be built at locks E17, E18, and E19. The contract was let to MacArthur 2 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, NEW YORK STATE BARGE CANAL, LOCK E18 HAER No. Page 3 Brothers Co. & Lord Electric Co.
on February 17, with State Assistant Engineer Kline supervising. By the work had been completed, including testing of the equipment.3 Alterations and additions were made at Lock E18 after its completion. A storehouse is shown south of the chamber on a map of the site, but it is no longer extant. The first record of repairs is in the Annual Report in which it is noted that the gates and valves were rebuilt. Additionally, a steel box girder bridge was erected at the lower end of the lock for use as a cable crossing and foot bridge. In Contract US92 was let to alter the sills and gates. This was probably part of a initiative by the Department of Public Works to lower approximately thirty-two lock sills so as to provide a minimum 13' depth and to alter the lock gates to fit.
In unknown maintenance work was done at the lock as part of Contract