Rome Terminal, located on the Erie Canal, is a component of the nationally significant New York State Barge Canal. It is one of several terminals constructed along the Barge Canal to provide points for freight transfer. Description: Rome Terminal is located on the north bank of the canal, just west of the Mill Street Bridge.1 The terminal is accessed by an asphalt road that leads to a circular driveway and asphalt parking area adjacent to the warehouse. A gravel drive runs behind the warehouse. The 1,044'-long concrete capped dock wall sits on steel sheet piling. It is located on the north side of a x turning basin. The wall is lined with timber pilings, as well as concrete- filled cast-iron bollards, modern utility hook-ups, reproduction light fixtures, and modern pipe railings.
The terminal area has been transformed into the Bellamy Harbor Park, so there is modern hardscaping and benches. A wood dock is located at the west end of the dock wall. Overall, the terminal is in good condition. Centered on the dock wall is the 32' x freight house, which is original to the site.2 The building is a rectangular frame structure that sits on concrete piers. It is clad in shiplap siding and has an asphalt gable roof with exposed rafter tails and an interior brick chimney. The window openings have been boarded up, and the doors are of beadboard. The freight doors are wood, and some have been equipped with wood ramps. The shed extension on the south side has a poured concrete foundation. The freight house is in fair condition.
The base of a 15-ton electrically-powered lattice boom derrick is located east of the freight house. The other structure on the site is the storehouse, which is a single-story concrete block building. The hipped roof has exposed decorative rafter tails and is covered with asphalt shingles. The building has a steel door, and the original window bays have been filled in with concrete blocks. The storehouse is in good condition. 1 Description of current conditions is based on a site visit made by the HAER recording team in summer 2 Series New York State Archives, Albany, New York, Middle Division, Erie Canal, Section 5, Sta. to Sta. approved November 21, 27. NEW YORK STATE BARGE CANAL, ROME TERMINAL HAER No.
Page 2 A retention dam is located at the west end of the Rome Terminal on the north bank of the canal. The single-span concrete dam has concrete abutments designed to simulate stonework and a 220'-long spillway. A bow-arched pony truss pedestrian bridge erected ca. carries the Erie Canal over the dam. Both the dam and bridge are in good condition. History: The contract to build the terminal at Rome was part of Contract awarded on November 19, to M.A. Talbott Company and under the supervision of A.W. Smith, State Assistant Engineer. It included the construction of linear feet of steel and concrete dock wall adjacent to Mill Street, excavation of a turning basin measuring x and the grading of the approach from the street to the terminal site and the terminal itself.
Work started in December and was slated to be completed a year later. By September 30, the steel sheet piling had been placed, which would be covered with concrete and form the wall. Hydraulic dredge Stanwix was kept busy excavating the turning basin, which was half complete at that time. The contractor was not able to fulfill the required timeframe, but by May the dock wall was nearly complete aside from the fenders. The paving was completed under a separate contract, Contract E. Brown Baker won the contract for macadam paving in June The freight house was built under Contract which called for the construction of a frame freight house at both Rome and Utica. The contract was awarded to William R. Kimmey on March 14, The dam was built under Contract 43, ca.