Lock E21, located on the Erie Canal, is a component of the nationally significant New York State Barge Canal. Description: Lock E21 is at the western end of the Rome summit level and the first of two locks that lower boats to the level of Oneida Lake.1 Lock E21 is accessed by an asphalt road that leads to an asphalt and gravel parking area next to the lockhouse. The Lock Road Bridge, at the downstream end of the lock, is closed to traffic. The lock site consists of the lock and associated structures, powerhouse, lockhouse, storage shed, and a nearby spillway. Lock E21 has a 25' lift to the east (one of only three on the system) with normal pool elevations of above and below. The concrete chamber walls have been lined with mild steel plates and cast-iron quarter-round coping.
There are double-leaf, steel miter lock gates at each end of the chamber operated by spars and gear trains powered by DC electro-mechanical gate machinery. The flow of water through the culverts in the chamber walls is controlled by valves also operated by DC electro-mechanical machinery. Control stand shelters are located at the upstream and downstream corners of the south side of the chamber. The shelters are single-story frame buildings clad in horizontal wood siding. They have hipped asphalt roofs and one-over- one hinged wood windows. The doors are the pane-and-panel type and are modern. Concrete- filled cast-iron bollards line either side of the chamber, and there is a post-and-rail fence set back from the chamber walls.
Pipe railings are located at the ends of the lock, and modern light fixtures illuminate the site. The lock and control stand shelters are in good condition. At the west end of the lock is a pair of concrete stairs lined with pipe railings that appear to be in good condition. A truss footbridge and utility bridge spans the downstream end of the lock and is also in good condition. The powerhouse is a single-story concrete building on a concrete foundation that is situated on the southwest corner of the lock chamber. It powered both locks E21 and E22. The hipped roof is covered with asphalt shingles, and there is a concrete chimney. The fenestration consists of multi-light windows with fixed and pivot sashes on the lower level, and three-light steel windows on the upper floor.
The entrances are beadboard double doors with four-light transoms. 1 Description of current conditions is based on a site visit made by the HAER recording team in summer NEW YORK STATE BARGE CANAL, LOCK E21 HAER No. Page 2 The two vertical-shaft hydroelectric generators have been removed from the building, but it is otherwise in good condition. The lockhouse is a single-story wood-frame building on a concrete foundation with horizontal wood siding. It is centered on the south side of the chamber. The building has a hipped roof covered with asphalt shingles, and there is a brick chimney. The fenestration consists of six- over-six-light wood windows, and the entrances are wood pane-over-panel doors with a shed overhang.
The lockhouse is in good condition and is one of the earliest lockhouses on the system. Behind the lockhouse and near the parking lot is the storage shed, a modern single-story building with corrugated-metal siding and roof. The building sits on a concrete block and poured concrete foundation. Four-light steel windows pierce the walls. The shed is in good condition. On the southwest side of the lockhouse is a riveted-steel machinery cabinet that sits on a concrete foundation. It is in good condition. The concrete guide walls are in various conditions. The concrete of the northeast guide wall is heavily spalling, so the wall is consequently in fair to poor condition. There are modern light fixtures, including a modern guide light, on the northeast wall.
The northwest guide wall, on the other hand, is in good condition. The concrete wall is equipped with concrete-filled cast-iron bollards and a modern guide light. The southeast guide wall is concrete, and there is heavy spalling in some areas. The section nearest the lock gate has been clad in metal sheeting and coping. Concrete-filled cast-iron bollards are located along this wall, and there is a modern ladder. It is in fair to poor condition. Finally, the southwest guide wall is built of steel I-beams with concrete infill and a timber bumper. It is in good condition. A spillway is located upstream of the lock on the north wall of the canal. The single-span spillway has two concrete aprons and is flanked by concrete walls that exhibit minor spalling.
A steel I-beam catwalk spanning the spillway sits on concrete abutments and has a rusted, open- grate deck. The spillway is in good condition. History: Lock E21 was built as part of Contract 44, along with Lock E22. Awarded on January 8, to Scott Brothers, the contract was under the supervision of Foster B. Crocker, State Assistant Engineer. Work began in early March Alterations had to be made to the original contract, including changes to the plans of the lock s foundation, due to the type of material encountered during excavation. By September the construction of the lock had been completed, including the approach walls and lock gates.2 2 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol.
1 (Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, NEW YORK STATE BARGE CANAL, LOCK E21 HAER No. Page 3 The power plant was built as part of Contract 93, along with those at locks E20, E22, E23, and E25. It was awarded to MacArthur Brothers Co. & Lord Electric Co. on August 12, Various alterations and repairs were made to the lock after its initial completion. In wrought iron plating was installed on the chamber walls.
A portion of the upper south approach wall was deteriorating so badly that the Department of Public Works had to install about 384 linear feet of steel sheet piling anchored to piling dead men with steel chains and rods from During that same time period, work was undertaken on the gates at the lock under Contract US96 and on the sills and gates under Contract US105. This was probably part of a initiative by the Department of Public Works, who had embarked on a project to lower approximately thirty-two lock sills so as to provide a minimum 13' depth and to alter the lock gates to fit. The lower approach wall between locks E21 and E22 had to be reconstructed in under Contract