Lock E22, located on the Erie Canal, is a component of the nationally significant New York State Barge Canal. Description: Lock E22 is 1 mile west of Lock E21 and is the last lock before the Erie Canal reaches Oneida Lake.1 Lock E22 is accessed by a narrow asphalt road extending from the end of Wood Creek Road. The access road ends in an asphalt parking lot with an additional gravel parking area at the western end of the lock. There are also picnic tables in this area. The lock site consists of the lock and associated structures, lockhouse, and tool shed; it was serviced by the powerhouse located at Lock E21. The lock has a lift to the east (one of only three on the system) with normal pool elevations of above and below (the level of Lake Oneida).
The concrete chamber walls are spalling and vegetation is growing in the cracks of the concrete. Cast-iron quarter-round coping has been installed along the north edge of the chamber. There are double-leaf, steel miter lock gates at each end of the chamber operated by spars and gear trains powered by DC electro- mechanical gate machinery. The flow of water through the culverts in the chamber walls is controlled by valves also operated by DC electro-mechanical machinery. Control stand shelters are located at the downstream and upstream ends of the north side of the lock. The shelters are single-story frame buildings with horizontal wood siding. They have hipped asphalt roofs. There are one-over-one-light vinyl casement windows, and each has a modern pane-and-panel door.
The chamber is lined with concrete-filled cast-iron bollards on concrete pads and a post- and-rail fence with pipe railings at the lock ends. Modern light fixtures illuminate the site. At the west end of the lock is a pair of concrete stairs with pipe railings. A truss footbridge and utility bridge in good condition spans the downstream end of the lock.2 The lock and control stand shelters are in good condition. The lockhouse, sitting on the downstream end of the north side of the chamber, is a single-story concrete building on a concrete foundation. The gable-front roof is covered with asphalt shingles, and there is a concrete chimney. The gable ends are clad in shiplap vertical siding.
1 Description of current conditions is based on a site visit by the HAER recording team in summer 2 This probably dates to when the Annual Report states a new steel box girder bridge was erected at the lock to serve as a cable crossing and foot bridge. See State of New York, Department of Public Works, Annual Report of the Superintendent for the Year (Albany: Williams Press, Inc., 50 NEW YORK STATE BARGE CANAL, LOCK E22 HAER No. Page 2 The fenestration is comprised of one-over-one-light vinyl windows and two-light steel windows with steel mesh coverings. The entrances are aluminum pane-and-panel doors. The lockhouse is in good condition. The tool shed sits behind the lockhouse and near the parking area. The shed is a single-story concrete building that sits on a poured concrete foundation.
The gable roof is covered with asphalt shingles. There are no windows, and the entrance is a steel double door. The shed is in good condition. Adjacent to this building is a riveted-steel machinery cabinet on a concrete foundation. It appears to be in good condition. The northeast guide wall is steel and concrete with cast-iron quarter-round coping. It is in good condition. The northwest guide wall is concrete, with modern pipe railing installed near a picnic area on the wall. There are also concrete-filled cast-iron bollards and a modern guide light. This wall is in good condition. The southeast guide wall is steel and concrete with a timber bumper. It is in fair condition. Finally, the southwest guide wall consists of steel I-beams with concrete infill and a timber bumper.
Concrete-filled cast-iron bollards are located a short distance away from the wall s edge along with modern light fixtures. The guide wall is in good condition. History: Scott Brothers built Lock E22 as part of Contract 44. The work was under the direction of State Assistant Engineer Foster B. Crocker, and the contract was awarded on January 8, On June 28, an alteration had to be made to the contract (Alteration No. 3) to facilitate the work. By September 30, Lock E22 and the upper approach wall had been completed. Remaining work at the site included construction of the lower approach wall and installation of the lock gates. Lock E22 was finished in Later alterations and repairs were made at the site. In the valves were replaced and new steel rails were installed.
In addition, the gates were repainted, and new fenders were attached. Contract US105 involved unspecified work on the sills and gates in This may have been related to a initiative by the Department of Public Works, who had embarked on a project to lower approximately thirty-two lock sills so as to provide a minimum 13' depth and to alter the lock gates to fit.4