This documentation was prepared as mitigation for the Advisory Council on Historic Preservation (ACHP) s Program Comment Issued for Streamlining Section 106 Review for Actions Affecting Post-1945 Concrete and Steel Bridges, noticed in the Federal Register on November 16, The Federal Highway Administration (FHWA) and ACHP are the project sponsors and retained the Louis Berger and Mead & Hunt, Inc. (Mead & Hunt) team to prepare this document. It was prepared by senior cultural resources planner Richard E. Mitchell of Mead & Hunt. Dietrich Floeter completed the photography.
1 Mead & Hunt, Inc., Survey Forms for National Register Eligible Bridges: Texas Historic Bridge Inventory, Evaluation of Bridges, prepared for the Texas Department of Transportation, August WEST MARTIN STREET AT ALAZAN CREEK BRIDGE / BRIDGE NO. HAER No. Page 2 Part I. Historical Information A. Physical History: 1. Date(s) of construction: 2. Engineer: Francis (Frank) T. Drought, Consulting Engineer of San Antonio, Texas. Drought was born in into a prominent and socially connected San Antonio family. He was a locally well-known engineer who had close ties to the San Antonio River Authority (SARA), the agency responsible for construction of the bridge.
Research indicates that Drought was most prolific in providing water and wastewater engineering services to municipal clients in south- central Texas, but maintained a generalist practice that included bridge design. Drought died in 3. Builder/Contractor/Supplier: Ben Gresham (Contractor) of San Antonio, Texas. 4. Original plans and construction: Photocopies of the original plan sheets are available at the Texas Department of Transportation s San Antonio District office. The plan sheets are undated. They indicate that the bridge was designed and plans checked by a Frank T. Drought employee with the initials Plan sheets were drawn by A.K. and H.A.T.
Plans were approved and sealed by Frank Drought.2 Specifications for the bridge s construction were completed in November The SARA board of directors approved the construction bid of Ben Gresham on December 18, The bridge was completed by October 24, when SARA held an official groundbreaking for the Alazan Creek Unit IV Part II flood control project. The bridge was mentioned in the ceremony s opening remarks as of one of eight bridges completed by SARA as a prerequisite to the channel improvements.5 5. Alterations and additions: The bridge is unaltered.
The bridge s original prestressed slab superstructure, concrete substructure, deck curbing/sidewalks, and open metal railing all remain 2 Drought, Frank T., Multiple Box Culvert Across Channel of the Alazan Creek at West Martin Street, San Antonio, Texas, Project Construction Plans, Job available in Bridge Inspection File, Texas Department of Transportation District Office, San Antonio, Texas. 3 Specifications for Multiple Box Culvert Across the Channel of Alazan Creek at West Martin Street for San Antonio River Authority, Project No. November available in Box 72, MS San Antonio River Authority Records, The University of Texas at San Antonio Libraries Special Collections. 4 San Antonio River Authority, Resolution No.
available in Box 72, MS San Antonio River Authority Records, The University of Texas at San Antonio Libraries Special Collections. 5 Remarks of Martin C. Giesecke at Alazan Creek Ground-Breaking Ceremony, 23 October available in Box 48, MS San Antonio River Authority Records, The University of Texas at San Antonio Libraries Special Collections. Martin St.docx WEST MARTIN STREET AT ALAZAN CREEK BRIDGE / BRIDGE NO. HAER No. Page 3 intact. The asphalt roadway surface is presumably periodically sealed and replaced, but represents an in-kind replacement of the bridge s original materials. B. Historical Context: Historical background From a historical perspective, the West Martin Street at Alazan Creek Bridge is best understood as part of the multi-decade effort of the SARA and U.S.
Army Corps of Engineers (USACE) to control flooding on the San Antonio River and several tributary creeks in San Antonio and Bexar County. Originally established in to develop a commercial barge canal, SARA revised its mission to focus solely on flood control projects following a major flood in September 6 In the USACE s Fort Worth District issued a report recommending rechannelization and other flood control improvements to the San Antonio River and its tributaries, including Alazan Creek, in the city of San Antonio. This project, named the San Antonio Channel Improvement Project (SACIP), received funding from the United States Congress in with SARA as the local sponsor for the USACE-designed project.
As part of the overall SACIP agreement, SARA was responsible for construction of new bridges and dams within the reconfigured floodways, as well as right-of-way acquisition and utility relocation. 7 SACIP work began on February 28, with the overall project divided into eight distinct work units, with each unit further subdivided into phases. 8 Most SACIP projects in the and focused on widening and straightening channels and floodways. The West Martin Street at Alazan Creek Bridge was constructed as part of SACIP Unit which consisted of channel reconstruction and floodway improvements for Alazan Creek from Buena Vista Street northward to the Martinez Creek confluence, a distance of about 2.3 miles.
For this SACIP unit, SARA purchased 259 parcels of land within the floodway, relocated utilities, and constructed eight vehicular bridges, including the West Martin Street at Alazan Creek Bridge.9 Design and construction of the West Martin Street Bridge was designated as Local Interests Project within the overall SACIP Unit Plans and specifications for the bridge were completed by the firm of Frank T. Drought, Consulting Engineer of San Antonio, in November Drought had a particularly close and complicated working relationship with SARA.
He served on the agency s Board of Directors from July until October and was its Chairman of the Board from until while providing engineering services to the 6 Vivian Elizabeth SAN ANTONIO RIVER AUTHORITY, Handbook of Texas Online, (accessed 23 May published by the Texas State Historical Association. 7 San Antonio River Authority, A Brief History of the San Antonio River Authority, http://www.sara- (accessed 29 April 8 Ground Breaking Ceremonies Alazan Creek, October 23, brochure, available in Box 48, MS San Antonio River Authority Records, The University of Texas at San Antonio Libraries Special Collections. 9 Remarks of Martin C. Giesecke at Alazan Creek Ground-Breaking Ceremony. Martin St.docx WEST MARTIN STREET AT ALAZAN CREEK BRIDGE / BRIDGE NO. HAER No. Page 4 agency.
10 For a time in the the offices of SARA and Drought were apparently located adjacent to one another in the AAA Life Building in downtown San Antonio. With the appearance of a conflict of interest, U.S. Representative Henry B.
Gonzalez used his political clout at the local and state levels to expand SARA s service area to downstream counties and to fully reorganize its board in While Drought was ousted from his formal relationship with SARA, he continued to provide consulting engineering services to the agency through the 11 While Drought s specifications for the West Martin Street at Alazan Creek Bridge were formally titled as Specifications for Multiple Box Culvert, the structure was designed and specified as a post-tensioned, prestressed-concrete slab bridge.12 In contrast, the nearby San Jacinto Street at Alazan Creek Bridge was designed as a continuous-span, reinforced-concrete slab bridge by Mitchell and Associates of San Antonio.13 It is unknown why Drought s firm chose to employ the prestressed design on the West Martin Street Bridge, other than the general need to reduce the bridge s profile, given the propensity of Alazan Creek to flash flood during heavy rain events.
SARA published the invitation for bids on the bridge s construction on November 27, and the agency received five bids from prospective contractors. On December 18, SARA s Board of Directors approved Ben Gresham as the contractor for construction of the West Martin Street at Alazan Creek Bridge, based on his low bid of for the specified work.14 Gresham was apparently a long-time San Antonio contractor, but research uncovered little information about his professional career. A advertisement in a small-town, central Texas newspaper touted Gresham s services for Concrete Construction, including Concrete Reservoirs, Stock Tanks, Troughs, and any other agricultural concrete construction.
15 Gresham also bid unsuccessfully to construct the adjacent San Jacinto Street at Alazan Creek Bridge, which was built concurrently with the West Martin Street Bridge. 16 10 Fred Pfeiffer, interview by Martha Doty Freeman, 18 June available in San Antonio River Authority Records, The University of Texas at San Antonio Libraries Special Collections.; San Antonio River Authority, Past Board Members, in River Reach, The Community Newsletter of the San Antonio River Authority, Summer 11 Eugene Pinto Beene, interview by Martha Doty Freeman, 24 March available in San Antonio River Authority Records, The University of Texas at San Antonio Libraries Special Collections. 12 Frank T.
Drought, Specifications for Multiple Box Culvert Across the Channel of Alazan Creek at West Martin Street for San Antonio River Authority, Project November available in Box 72, MS San Antonio River Authority Records, The University of Texas at San Antonio Libraries Special Collections. 13 Mitchell and Associates, Proposal and Specifications for Construction of Local Interests Project No. D- 008 Consisting of San Jacinto Street Bridge over Alazan Creek, October available in Box 72, MS San Antonio River Authority Records, The University of Texas at San Antonio Libraries Special Collections. 14 San Antonio River Authority, Resolution No. 18 December available in Box 72, MS San Antonio River Authority Records, The University of Texas at San Antonio Libraries Special Collections.
15 [The] Bartlett Tribune and News (Bartlett, Tex.) 57, no. 37, ed. 1, 9 June Bartlett, Texas, available from The Portal to Texas History, (accessed 29 May 16 San Antonio River Authority, Resolution No. 18 December available in Box 72, MS San Antonio River Authority Records, The University of Texas at San Antonio Libraries Special Collections. Martin St.docx WEST MARTIN STREET AT ALAZAN CREEK BRIDGE / BRIDGE NO. HAER No.
Page 5 Specific details regarding construction progress are unclear; however, the bridge was completed by October 23, when SARA formally turned over the floodway to the USACE and its general contractor, Martin Brothers, for construction of the channel improvements.17 Based on the current appearance of the bridge in comparison with the construction plans and project groundbreaking photographs, the bridge is essentially unaltered from its original construction. Engineering background The West Martin Street at Alazan Creek Bridge is an example of a post-tensioned, prestressed-concrete slab bridge. Prestressed-concrete bridges were first developed in Europe in the by pioneering designers such as Eugene Freyssinet and Gustave Magnel.
These engineers became interested in the possibility of dramatically increasing concrete s strength by applying a compressive, or vise-like, stress to the concrete during its construction. The prestressing allowed concrete to withstand much greater tensile forces without cracking or permanently bending. 18 Two distinct methods of prestressing were developed. In post-tensioning, the concrete is cast around ductwork that carries the steel cables or wire strands, known as tendons, in an unstressed state. Once the concrete has partially cured, the steel tendons are stretched and tensioned using jacks at either end of the concrete beam.
With pre-tensioning, the steel tendons are tensioned at anchorages at the start of the fabrication process, and the concrete is then poured into the casting in direct contact with the steel. Once the concrete has cured and hardened, the stress is gradually released from the end anchorages and transferred into the concrete. The use of prestressed concrete bridges in the U.S. was delayed until after World War II. Magnel s Walnut Lane Memorial Bridge, completed for the City of Philadelphia in late was the first prestressed concrete bridge to be used on a major U.S.
roadway.19 With the advent of the Interstate Highway system and other limited-access freeways, the use of prestressed-concrete bridges quickly expanded during the and Prestressed concrete provided the ability to fabricate stronger, lighter, and longer structural members than typical reinforced concrete, while also offering reduced construction costs. In the U.S., pre-tensioning became the dominant method for prestressing concrete bridges.20 17 Ground Breaking Ceremonies Alazan Creek, October 23, ; Photographs, Public Relations, Events, Alazan Creek Groundbreaking, Photographs taken 23 October prints available in Box 16, MS San Antonio River Authority Records, The University of Texas at San Antonio Libraries Special Collections. 18 David P.
Billington, Historical Perspective on Prestressed Concrete, PCI Journal 49 (January-February 20; Shri Bhide, et.al., The Interstate Highway System and the Development of Prestressed Concrete Bridges, in Transportation Research Board, 50 Years of Interstate Structures: Past, Present, and Future, Transportation Research Circular E-C104, September 52. 19 Norman L. Scott, Reflections on the Early Precast/Prestressed Concrete Industry in America, PCI Journal 49, no. 2 (March-April Charles C. Zollman, Part 1 Magnel s Impact on the Advent of Prestressed Concrete, in Reflections, Bhide, et.al., 20 Billington, Martin St.docx WEST MARTIN STREET AT ALAZAN CREEK BRIDGE / BRIDGE NO. HAER No.
Page 6 I-beams or bulb-tee beams became established as the most common member type for superstructures of prestressed-concrete bridges. However, other types of superstructure members were also developed, such as box girders, channel beams, double tee beams, and slabs.
The Prestressed Concrete Institute (PCI) published industry specifications for prestressed concrete in the mid- and late In the PCI worked with the American Association of State Highway Officials (AASHO) to issue a comprehensive series of standards for a variety of prestressed concrete shapes for bridges, including slabs for spans up to 55 -0 in length.21 The Texas Highway Department and local bridge owners in Texas were relatively early adopters of the new prestressed technology in the The first prestressed bridge in Texas was a post-tensioned, pan-formed girder: the State Highway 60 at San Bernard River Bridge in Austin County, built in The first post-tensioned concrete slab bridge in the United States was the Waugh Drive at Memorial Drive Bridge, constructed in in Houston, Texas.
This city-owned bridge, which remains in use today, employed a constant-depth voided-slab design.23 The thickness of a constant-depth slab remains the same across an entire span. Voided slabs, also known as hollow-core slabs, have cylindrical voids positioned lengthwise along the slab. The prestressed-concrete slab was never in widespread use in Texas. Instead, Texas Highway Department-designed, precast, pretensioned beam shapes became the dominant prestressed member type by the late while reinforced-concrete, pan-formed girders were a common type used for short-span crossings.24 Prestressed-concrete slabs were used only in special situations where superstructure depth was critical or aesthetic design was a consideration.
25 Indeed, the West Martin Street at Alazan Creek Bridge in San Antonio and the Waugh Drive at Memorial Drive Bridge in Houston are the only two known extant prestressed-concrete slab bridges in Texas to have been constructed before 21 Mead & Hunt, Inc., Final Evaluation Report and Historic Context, Minnesota Bridges, prepared for the Minnesota Department of Transportation, March 88; Joan E. Hartman, Directory of United States Standardization Activities, National Bureau of Standards Miscellaneous Publication 288 (Washington, Institute for Applied Technology, National Bureau of Standards, 22 Mead & Hunt, Inc., Historic Context for Texas Bridges, prepared for the Texas Department of Transportation, August 52. 23 Tadius J.
Gutt, Part 5 Prestressed Concrete Developments in the Western United States, in Reflections on the Beginnings of Prestressed Concrete in America (Chicago: Prestressed Concrete Institute, 24 Mead & Hunt, Inc., Historic Context for Texas Bridges, 25 Texas Department of Transportation, Bridge Design Manual (Austin, Texas: Texas Department of Transportation, December Martin St.docx WEST MARTIN STREET AT ALAZAN CREEK BRIDGE / BRIDGE NO. HAER No. Page 7 Part II. Structural/Design Information A. General Statement: 1. Character: The West Martin Street at Alazan Creek Bridge (Bridge No. is a post-tensioned, prestressed slab bridge and is a representative example of this post- concrete bridge type. 2. Condition of fabric: Very good. B.
Description: The West Martin Street at Alazan Creek Bridge is a five-span, continuous, post- tensioned concrete slab bridge. The bridge is aligned in an east-west direction, and the Alazan Creek channel is aligned from northwest to southeast at the bridge s location. The bridge s end spans are each long and the three interior spans are each 36 -0 long, for a total length of . Concrete approach slabs, 20 -0 in length, are located on both ends of the bridge as a transition from the West Martin Street roadway. The roadway width at the bridge is 42 -0 . The bridge has raised 4 -0 -wide concrete sidewalks and 1 -0 -wide concrete railing anchorages on both sides of the roadway, for a total bridge width of 52 -0 .
The bridge s superstructure is aligned at a skew of 47 degrees, 27 minutes to the bridge s substructure, which is aligned parallel to the Alazan Creek channel. The bridge s superstructure is a post-tensioned, prestressed concrete slab. The deck slab is 1 -0 in depth. At the piers and abutments, the slab extends downward 6 additional inches, forming a tee that ties into steel reinforcement extending upward from the substructure elements. The sidewalks are poured monolithically with the deck slab. Prestressing of the concrete slab is achieved using 24 post-tensioned steel tendons, arranged longitudinally from end to end of the bridge and spaced at 2 -0 intervals. Each tendon is composed of 18-wire strand, with each wire in diameter.
Each tendon is draped in a parabolic curve across each span, highest within the slab at the supports and lowest within the span at mid-span, to evenly counter the expected applied loads and deflections. Tendon anchorages are located on both sides of the bridge slab above the abutments, with anchorage fittings encased in concrete. The deck slab also has typical steel reinforcement, with bars generally arranged in two grid patterns, one near the top of the slab and one near the bottom of the slab. A railing is present on both sides of the bridge. The railing is composed of two tubular aluminum rails, bolted into curved H-section aluminum posts that are bolted into the concrete railing anchorages.
Concrete parapets, sloping downward from the railing to grade level, terminate the bridge railings at each corner of the bridge. Steel pipe drains are inserted through the deck slab, with eight drains on each side of the deck at the roadway-sidewalk interface. Stormwater catch basins are also located along the curbs at either side of both approach slabs. The bridge s substructure consists of thin, solid, reinforced-concrete piers and abutments that directly support the deck slab without bent caps. The piers and abutments are labeled as culvert walls in construction plans. A reinforced concrete floor serves as a foundation. Wingwalls, designed as retaining walls, extend outward from the abutments.
The northwest, southwest, and northeast retaining walls sweep back and step downward to the channel at a 30-degree angle from the abutments, while the southeast retaining wall sweeps back and steps downward at an angle just over 47 degrees and is Martin St.docx WEST MARTIN STREET AT ALAZAN CREEK BRIDGE / BRIDGE NO. HAER No. Page 8 positioned parallel to the bridge, along the edge of south approach slab and sidewalk. The retaining walls have separated slightly from the abutments. C. Site Information: The West Martin Street Bridge spans Alazan Creek in San Antonio, Bexar County, Texas. It is located about 1.5 miles west-northwest of downtown San Antonio. Alazan Creek, as a named stream, begins at Woodlawn Lake, about 1.5 miles north of the bridge.
However, the creek s watershed extends further upstream along smaller tributaries for several miles into northwest San Antonio. Alazan Creek continues southward from the West Martin Street Bridge for about 1.6 miles, where it joins Apache Creek. At the bridge s location, the Alazan Creek channel consists of a main pilot channel with a wider floodway channel spanned by the bridge. The channel, with its relatively shallow slope, is grassy with scattered rocks at the surface. No trees are present in the channel. The bridge is located in an urban area, with early- to mid-twentieth-century, single-family residential and commercial uses surrounding the bridge. At this location, West Martin Street carries four lanes of vehicular traffic, two in each direction.
Martin St.docx WEST MARTIN STREET AT ALAZAN CREEK BRIDGE / BRIDGE NO. HAER No. Page 9 Part III. Sources of Information A. Primary