Harris, The Catholic Church in Utah, Salt Lake City, Hansen, Clyde W. A History of the Development of Non- Mormon ItenoMnational Schools in Utah, Masters The- sis, University of Utah. The Intermountain Catholic Register, January ik, Utah Historical Quarterly, Vol. XXVIII, No. 2, April, I960. Woodbury, J. Weston. A History of the Park City School District, Thesis, University of Utah, i960. Worlds' Fair Ecclesiastical History of Utah. George Q. Cannon & Sons, Publishers, D. Likely Sources not yet Investigated: ^ History in Catholic Education in Utah. Sister M. des Vic- toires, Masters Thesis, University of Notre Dame. Prepared by John L. Guisti, AIA September U, # ST. MARY'S OF THE ASSUMPTION CHUECH HABS No. U-35 (Page 3) # PART II. ARCHITECTURAL INFORMATION A. General Statement: 1.
Architectural interest: This is an early Catholic Church in a Utah mining town. 2. Condition of fabric: Good, hut much altered. B. Description of Exterior: 1. Over-all dimensions: The church is a single-story 35* 6" x 82' rectangle. 2. Foundations: Limestone 3. all construction;, finish and color: Buff colored lime- stone, coursed range ashlar. h. Structural system, framing: Masonry hearing walls with wood framed floor and roof. 5 Openings: a. Doorways and doors: The entrance is a pair of wood, five cross panel, doors. The gothic arch is outlined with three soldier courses of "brick starting at the springline; a cross Is incised In the stone keystone. The tympanum is filled with glass in a rectangular grid of muntins. b. Cornice: Simple cornice with returns. c.
Tower: The present belltower Is smaller than the one shown in early pictures. C. Description of Interior: 1. Little of historic interest remains. t>* Site and Surroundings: 1. Orientation: The entrance faces Park Avenue on the north- east. A high retaining wall raises the site above the street and the mountainside rises steeply behind the site to the southwest. ST. MARY'S OF THE ASSUMPTION CHURCH HABS No. U-35 (Page k) 2. Outbuildings: St. Mary of the Assumption School is adjacent on the southeast. 3. Landscaping and walks, enclosures: A concrete walk crosses in front of the church and steps at two locations lead down to the street. Prepared hy Paul Goeldner, AIA Supervisory Architect Utah Project July 18, PART III.
PROJECT INFORMATION This record is part of a Utah Survey conducted in the summers of and under joint sponsorship of the Historic American Buildings Survey of the Office of Arcehology and Historic Preservation of the National Park Service and the Utah Heritage Foundation. Field work, historic research and record drawings were done under the direction of Project Supervisor Paul Goeldner, AIA (Texas Tech Univer- sity) assisted hy Project Historian John L. Giusti, AIA (University of Utah). Photographs were made hy P. Kent Fairbanks of Salt Lake City. Student Assistant Architects on the team were Rohert M. Swanson and Charles W. Barrow, (University of Texas) and Kenneth L. Lambert and Keith Sorenson, (University of Utah). Student Assistant Architects were Keith Sorenson, Charles D.
Harker and Rohert Schriever, (University of Utah) and Donald G-. Prycer, (Texas A. & M. University).