0.2 miles west of Trial Lake Campground, Wasatch National Forest Kamas vicinity, Summit County, Utah UTM: Quad: Mirror Lake Date of Construction: Builder/Designer: Provo Reservoir Company and Sego Irrigation Company, Provo, Utah Wasatch Irrigation Company and Timpanogos Irrigation Company, Heber City, Utah
Significance
447 words
The headings the report itself prints. Each one jumps to where it begins.
Source document
Quoted word for word from HAER UTAH,22-KAM.V,1-L-.
Not written, edited or summarised by this site.
Trial Lake is the second largest body of water to be reservoired in the Bonneville Unit of the Central Utah Project. Its dam, built cooperatively by four of the principal regional irrigation companies, is the oldest man- made structure to reservoir a natural lake in the upper Provo River drainage, along with the dams on Wall and Washington lakes. Although standard in its sloped profile and steel outlet works, the dam is technologically notable as having a concrete core beneath its earth-fill construction. An easily accessible structure with a high visibility, Trial is one of the most significant of the Bonneville Unit dams. Inventoried by: Clayton Fraser and James Jurale Fraserdesign Loveland, Colorado October 17, High Mountain Dams in Bonneville Unit, Trial Lake Dam HAER No.
UT-41-L (Page 2)
Historical Information
The Provo River originates from Trial Lake, the second largest of the reservoired lakes in the Bonneville Unit. In May the National Forest Service granted permission to the Provo Reservoir Company and the Sego Irrigation Company of Provo, Utah, and to the Wasatch and Timpanogos Irrigation companies of Heber City, Utah, to dam Trial and four other lakes in the area for irrigation water storage. A pair of medium-scale dams was completed later that year across the natural outlet for Trial Lake at its southern end. Six hundred feet long and 40 feet high, the primary dam consisted of compacted earth fill over a concrete core, with 18" of stone riprap on its sloped upstream and downstream faces.
The outlet was an 18" diameter riveted steel pipe, with a slide headgate at the pipe inlet and a 20" Ludlow gate valve on the downstream toe. The dam and outlet works remain in good condition. It is proposed that the dam be reconfigured, the spillway lowered and new outlet works installed to lower the level of the lake.
Architectural Information
Dam length: 600 feet Dam height: 40 feet Dam width: 18 feet Construct: Earth fill dam with stone riprap facing Lake size: acres; acre-foot maximum capacity; 36 vertical foot maximum drawdown Outlet: 18" steel pipe with gate BIOGRAPHICAL INFORMATION "Preliminary Engineering Report: Stabilization of High Mountain Lakes, Provo River Drainage, National Forest Service Report, page 57. Trial Lake Reservoir File Kamas Ranger Station, Wasatch National Forest, Kamas, Utah E. W. Kramer, "District Engineer's Report on the Applications of the Provo, Timpanogos, Wasatch and Sego Irrigation Companies," Salt Lake City, Provo Reservoir Company Files, W-CNFSO, Federal Building, Salt Lake City, Utah.
Field inspection by Clayton Fraser, July 21, For additional information, see Irrigation Canals in the Uinta Basin, HAER No. UT-30. High Mountain Dams in Bonneville Unit, Trial Lake Dam HAER No. UT-41-L (Page 3) MAXIMUM DFSAUJDOUJN PAf-rs>
The federal surveyors worked through Kamas building by building. These are the other structures
they measured and filed a report on, longest report first.
Written history. Quoted verbatim from HAER UTAH,22-KAM.V,1-L-. United States federal work, no copyright under 17 U.S.C. 105.
Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.