BlockBefore

Ogden Arsenal, Warehouse-Assembly & Loading Line Building, 6325 Poplar Lane, Layton

Ogden Arsenal, Warehouse-Assembly & Loading Line Building, 6325 Poplar Lane, Layton, Davis County, UT. Surveyed as HAER UTAH,6-LAY.V,1BL-, with a 951-word written history.

From the record

“Anti-tank ammunition was assembled in Building which provides particularly vivid images of the processes involved in the manufacture of munitions at Ogden Arsenal during World War II.”

Written record, HAER UTAH,6-LAY.V,1BL- survey. Machine-read text.

Surveyed by the federal HAER program as HAER UTAH,6-LAY.V,1BL- · the record runs 951 words · one of 99 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

828 words

Source document Quoted word for word from HAER UTAH,6-LAY.V,1BL-. Not written, edited or summarised by this site.

Anti-tank ammunition was assembled in Building which provides particularly vivid images of the processes involved in the manufacture of munitions at Ogden Arsenal during World War II. This building, along with other structures at the base, renders a unique picture of the U.S. Army build-up which occurred on the eve of and during World War II. History: Building the Loading & Assembly Line Building, was one of two buildings in the East Loading Plant that were used for the final assembly of Anti-tank ammunition produced at Ogden Arsenal. Inert ammunition bodies were disassembled and inspected in Building and then loaded with the tracer, igniter, and bursting charges'.

These partially completed shells were then transferred to Building where the shells were loaded with smokeless powder and tetryl and then packed for shipment. x For a description of these components, see the Individual Building Report for Building the Tracer & Igniter Pelleting Building. Ogden Arsenal, Warehouse/Assembly & Loading Line Building HAER No. UT-84-BL Page 2 Due to the highly volatile nature of the chemicals used in shells, this building was designed to enforce minimal damage to adjacent rooms (and workers & equipment) in the event of an explosion in one room. Each room was separated from the others by concrete fire walls that extend a few feet beyond the roofline, and each room was accessible only from the exterior.

An outdoor balcony along the east facade allowed workers to circulate between rooms on the upper floor. An elevator was added on the east side exterior in to facilitate access to upper level rooms in the central bay. Each room contains an exterior door that is large enough to accommodate forklift trucks and pallets. Immediately before packing loaded and assembled shells, the completed rounds were gauged for alignment. Due to the heavy weight and awkward shape of the completed shells, women were seldom employed in this capacity. To overcome this difficulty, a profile and alignment gauge ejecting fixture was designed which made the job relatively simple, and this operation was performed by blind male operators. The fixture consisted of a gooseneck bracket with attached lever.

A replaceable fabric composition head was machined to fit in a steel socket on one end of the lever. This fixture was mounted on the gauge in such a manner that it had no bearing upon the gauging operation itself, but its effect was put into use in the ejecting operation. This device increased the speed of this part of the inspection operation and made an awkward task much more manageable. In Building completed rounds of ammunition were placed inside cylindrical fiber containers and a cover attached. The closed containers were submerged in wax for sealing before being placed in shipping containers. The joint left between the cover and the container before the waxing process necessitated the development of a process to tape the cover to the container before waxing.

A device was developed which completed a neater and much faster job than could have been done by hand-taping alone. A special machine for dipping the complete rounds in paraffin after they had been sealed in fiber containers was developed in early This machine processed about 125 rounds per minute and was much superior to the former practice of hand dipping. Completed and packed rounds of ammunition were shipped by rail to storage igloos in other areas at Ogden Arsenal. The building was originally placed along existing rail lines to facilitate its function as an ammunition shipping point. In the M26 hand grenades were manufactured in Building Ogden Arsenal, Warehouse/Assembly & Loading Line Building HAER No.

UT-84-BL Page 3 General Description: Building x is a two-story gable roofed building located in the original East Loading Plant area. It is composed of a series of individual rooms separated by concrete firewalls and the red hollow tile infill characteristic of the Arsenal style. The fire walls extend up through the roof and maintain a continuous slope parallel to the roof pitch. The overall structure, composed in three segments, contains a two story central section and a one and one half story clerestory-lit space on either side. The concrete shear walls define 13 bays along the length of the building. The central 5 bays have two distinct floors and a balcony along the east facade.

The remaining space on each side consists of an open plan lit by clerestory windows with six-pane awning type lights. The northernmost section contains one large storage room, while the south side section contains a two-bay wide area that includes restroom facilities. Each bay on the west facade contains a double loading door flanked by 9-pane awning windows that face the loading dock and railroad tracks. Most of the bays contain large metal rolling doors on the east facade. The building meets grade on the north facade and is elevated approximately four feet above excavated grade on the south facade. This elevation contains a continuous concrete loading dock that runs parallel to railroad tracks.

In context

Layton, Utah The place record: every map, photograph and survey of this town.
Davis County, Utah 86 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Layton

24 of 94 records shown

The federal surveyors worked through Layton building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Ogden ArsenalHAER UTAH,6-LAY.V,1-30,989 words
Hill FieldHAER UTAH,6-LAY.V,2-18,424 words
Hill FieldHAER UTAH,6-LAY.V,2O-2,426 words
Hill FieldHAER UTAH,6-LAY.V,2Q-2,050 words
Hill FieldHAER UTAH,6-LAY.V,2AC-1,680 words
Hill FieldHAER UTAH,6-LAY.V,2T-1,647 words
Hill FieldHAER UTAH,6-LAY.V,2S-1,624 words
Hill FieldHAER UTAH,6-LAY.V,2F-1,480 words
Hill FieldHAER UTAH,6-LAY.V,2B-1,347 words
Ogden ArsenalHAER UTAH,6-LAY.V,1AO-1,067 words
Hill FieldHAER UTAH,6-LAY.V,2M-992 words
Ogden ArsenalHAER UTAH,6-LAY.V,1BK-943 words
Ogden ArsenalHAER UTAH,6-LAY.V,1AN-939 words
Hill FieldHAER UTAH,6-LAY.V,2V-935 words
Ogden ArsenalHAER UTAH,6-LAY.V,1AU-934 words
Hill FieldHAER UTAH,6-LAY.V,2N-891 words
Ogden ArsenalHAER UTAH,6-LAY.V,1AV-861 words
Ogden ArsenalHAER UTAH,6-LAY.V,1L-848 words
Ogden ArsenalHAER UTAH,6-LAY.V,1K-846 words
Ogden ArsenalHAER UTAH,6-LAY.V,1N-846 words
Ogden ArsenalHAER UTAH,6-LAY.V,1T-844 words
Ogden ArsenalHAER UTAH,6-LAY.V,1Q-837 words
Hill FieldHAER UTAH,6-LAY.V,2Y-822 words
Hill FieldHAER UTAH,6-LAY.V,2A-801 words

Provenance

  • Written history. Quoted verbatim from HAER UTAH,6-LAY.V,1BL-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.