Hill Field, Depot Supply Warehouses Nos. 2-3, 7278 Fourth Street, Layton

Hill Field, Depot Supply Warehouses Nos. 2-3, 7278 Fourth Street, Layton, Davis County, UT. Surveyed as HAER UTAH,6-LAY.V,2F-, with a 1,480-word written history.

From the record

“These Depot Supply Warehouses housed principal storage activities at Hill Field (now Hill Air Force Base) during and after World War n.”

Written record, HAER UTAH,6-LAY.V,2F- survey. Machine-read text.

Surveyed by the federal HAER program as HAER UTAH,6-LAY.V,2F- · the record runs 1480 words · one of 99 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

1369 words

Source document Quoted word for word from HAER UTAH,6-LAY.V,2F-. Not written, edited or summarised by this site.

These Depot Supply Warehouses housed principal storage activities at Hill Field (now Hill Air Force Base) during and after World War n. This building provides particularly vivid images of the processes involved in the storage and issue of general supplies to the U.S. Army Air Corps in support of the Pacific and European theaters of military operation during World War n. In addition, the reconfiguration of this building renders a unique picture of the accommodations needed for sensitive electronic equipment like early computers.

History: Building is comprised up of the former Depot Supply Warehouses (also called Buildings 103 and which were merged into a single building in the late and early Originally, Building 103 was used by the Purchasing and Contracting Offices, and Building 104 held general warehouse storage space. These buildings were primary warehouse facilities at the Ogden Air Materiel Command during World War EL Each building was a long, narrow structure that was accessed by railroad tracks that ran between them. HILL FIELD, DEPOT SUPPLY WAREHOUSES HAER No. UT-85-F Page 2 The first shipment of supplies was received at Ogden Air Depot in January and was followed by additional shipments in February and March. By May Ogden Air Depot was receiving an average of 20 train carloads of material per day.

Building 100 had not yet been completed, and all available warehouse space was soon filled to capacity. Many overflow supplies were hauled by truck to a leased warehouse in Bountiful, and material that could be stored safely outdoors under tarpaulins covered over square feet. A desperately needed square feet of additional warehouse space was expected to be completed in October. Building 100 was completed in July and provided approximately square feet of indoor storage space. As fast as warehouses could be completed, they were filled with supplies. The December attack on Pearl Harbor brought a more intense flood of supplies to Ogden Air Depot as military goods were brought inland as a precaution against possible coastal bombing.

Because of the shortage of indoor storage space, even more items were stacked outdoors and covered with tarpaulins. No packing lists or shipping tickets were attached to the packing cases, so items could not be identified without unpacking them. Since the shipping crates were stored outside, they were not unpacked unless absolutely necessary. Several unsuccessful attempts were made to obtain the original packing lists from the manufacturers who shipped the materials. Most available personnel on the Base were processing incoming aircraft, so few workers were available to catalog the incoming supply shipments. Only 16 of employees in the Depot Supply division had more than one year of experience with supply operations.

To complicate matters further, most of the people who aided in the work had never seen aircraft parts like ailerons (movable flaps that were mounted to the wings of airplanes), or superchargers (compressors used to supply high pressure air to engine cylinders), which were prevalent among the incoming supplies. Thus many items could not be readily identified or cataloged, even when they were unpacked. Requests for items listed as "not in stock" were often present, but the items could not be issued because they had not been identified, inspected, or recorded. Aircraft repair quotas set by Air Command were rarely met in the beginning months of World War II because needed materials were often difficult to procure, and the majority of special tools were unobtainable.

Without other options, many of these items were designed and manufactured on the Base. As the war HILL FIELD, DEPOT SUPPLY WAREHOUSES HAER No. UT-85-F Page 3 progressed, these obstacles began to subside. A shortage of special parts, tools, equipment, and adequate working space continued to present challenges, but in gradually reduced proportion. Many items continued to be manufactured by the depot shops as the needs for them became sufficiently urgent. A Special Parts Control Unit (later renamed Expediting Branch) was established in February to anticipate, evaluate, and minimize shortages of goods that were needed to complete aircraft repair, winterization, and modification projects. Specialized sub-depots were placed within each division to optimize accessibility.

All non-expendable material for the engineering shops was requisitioned to the General Supply Department through expeditors, who maintained follow-up on material that could not be readily furnished by the Supply Department. At first, each individual shop was represented by an expeditor who traced materials required for each job. This involved investigations into all classes of supplies, and resulted in considerable confusion and duplication. After a few months, each expeditor was assigned certain property classes for all projects, which was much more efficient. As the shops became specialized, production increased, and more parts and materials were secured from sources off the Depot.

Close coordination was needed between stock tracers in the General Supply Department and the Expediting Branch in order to have material availability information always on hand for each shop. Standard methods for obtaining (and maintaining) this information involved a "Kardex System" that gave perpetual figures on the number of reparable items received in the shops and those completed, both daily and cumulative. The Kardex indicated whether each hem left the shop serviceable, reparable, or condemned. During the and Hill Field supplied items to military installations world-wide. Supply administrators continuously sought improved methods of operation that would increase efficiency and decrease labor demands.

Project "WISE" ("Worldwide Implementation of Supply Economy") was implemented in which encouraged individual bases all over the world to develop and test methods of increased mechanization in warehouses. In roller skates were introduced to warehouses like Building 100 that contained lighter items of stock. On a 30-day service test basis, eight airmen wore clamp-on skates with steel wheels while collecting stock from the bins and shelves to fill orders. At the end of the trial period, storekeepers found that the airmen wearing skates filled shipping vouchers approximately three times faster HILL FIELD, DEPOT SUPPLY WAREHOUSE #2 HAERNo. UT-85-F Page 4 than those who walked. The warehouse supervisor and other personnel generated considerable enthusiasm over this project.

Difficulty was encountered, however, in the rapid deterioration of the clamp-on roller skates. The service was discontinued pending receipt of shoe-type, rubber-wheel skates. Also in a new system to expedite the movement of freight from warehouses to packing and shipping points was initiated. Signs reading "yes" or "no" were placed outside the warehouses so truck drivers would know at a glance whether or not to stop or to proceed to the next point. Greater efficiency resulted, since trucks moved in a continuous circuit with no unnecessary stops. Reconfiguration These supply warehouses were reconfigured in the late and early to provide accommodations for sensitive machinery and parts, including early computers and electronic equipment.

Building 100 was formed when buildings 103 and two distinct buildings, were merged together by a two-story addition that filled in the railroad track area between the buildings. The maintenance directorate converted the warehouses into offices and research space. In the late the facility's environmental control system filtered airborne contamination particles down to 0.3 micron size at 99% efficiency. Temperature was controlled at degrees Fahrenheit and the humidity held at a maximum of Several bays of the original buildings were modified to handle a special fire control system. This space was the site of Bomarc and Snark workload output. This building also contained and CIM-10 weapons systems support facilities, Titan work loads, and instrument and camera systems.

Building 103 housed the first base "clean room" (completed in October an air conditioned and dust-free room for sensitive machinery and parts, including early computers and electronic equipment. HILL FIELD, DEPOT SUPPLY WAREHOUSES HAER No. UT-85-F Page 5 General Description: Building a very large one-story building, measures x The massing consists of two shallow gable/monitor roofs, joined side by side by a covered central loading area. The structure was originally two warehouse buildings on either side of the railroad tracks. The warehouse layout was similar to that for Building 5. Two additional bays were built in the space between the two buildings when the tracks were removed and the buildings, connected.

These center bays housed lavatories, offices, and functions required by the warehouse spaces on each side. The warehouse area consists of 6 bays on each side, containing approximately square feet each.

In context

Layton, Utah The place record: every map, photograph and survey of this town.
Davis County, Utah 86 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Layton

24 of 94 records shown

The federal surveyors worked through Layton building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Ogden ArsenalHAER UTAH,6-LAY.V,1-30,989 words
Hill FieldHAER UTAH,6-LAY.V,2-18,424 words
Hill FieldHAER UTAH,6-LAY.V,2O-2,426 words
Hill FieldHAER UTAH,6-LAY.V,2Q-2,050 words
Hill FieldHAER UTAH,6-LAY.V,2AC-1,680 words
Hill FieldHAER UTAH,6-LAY.V,2T-1,647 words
Hill FieldHAER UTAH,6-LAY.V,2S-1,624 words
Hill FieldHAER UTAH,6-LAY.V,2B-1,347 words
Ogden ArsenalHAER UTAH,6-LAY.V,1AO-1,067 words
Hill FieldHAER UTAH,6-LAY.V,2M-992 words
Ogden ArsenalHAER UTAH,6-LAY.V,1BL-951 words
Ogden ArsenalHAER UTAH,6-LAY.V,1BK-943 words
Ogden ArsenalHAER UTAH,6-LAY.V,1AN-939 words
Hill FieldHAER UTAH,6-LAY.V,2V-935 words
Ogden ArsenalHAER UTAH,6-LAY.V,1AU-934 words
Hill FieldHAER UTAH,6-LAY.V,2N-891 words
Ogden ArsenalHAER UTAH,6-LAY.V,1AV-861 words
Ogden ArsenalHAER UTAH,6-LAY.V,1L-848 words
Ogden ArsenalHAER UTAH,6-LAY.V,1K-846 words
Ogden ArsenalHAER UTAH,6-LAY.V,1N-846 words
Ogden ArsenalHAER UTAH,6-LAY.V,1T-844 words
Ogden ArsenalHAER UTAH,6-LAY.V,1Q-837 words
Hill FieldHAER UTAH,6-LAY.V,2Y-822 words
Hill FieldHAER UTAH,6-LAY.V,2A-801 words

Provenance

  • Written history. Quoted verbatim from HAER UTAH,6-LAY.V,2F-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.