Naval Air Weapons Station Siunilicance: Building constructed in is identical in appearance to Building and served as a maintenance shop. Constructed as part of the original group or public works buildings within the administrative area or the China Lake Pilot Plant facility. this building is a contributing structure in the historic district. The building retains a good degree of integrity (with the exception of minor additions and changes to vents and fenestration) and is consistent with the general design of this part of the pilot plant. Naval Ordnance Test Station Inyokern, China Lake Pilot Plant Maintenance Shop (Naval Air Weapons Station, China Lake Pilot Plant. Maintenance Shop) HABS No. CA-2774-B (Page 2) PART I. HISTORICAL INFORMATION A. Physical History l .
Date of erection: ' Engineers and Consulting Architect: Most of the Naval Ordnance Testing Stations (NOTS) were designed by Stafford, Davies, and Gogerty and handled by the Navy under a master architect-engineer contract. Howver. the design of China Lake Pilot Plant facility was not handled under this contract because the plant was something of an afterthought in the overall site planning for NOTS. Instead, the Navy hired the engineering firm of Holmes and Narver and in collaboration with Oliver G. Bowen, consulting engineer and Palmer Sabin, consulting architect both hired by California Institute of Technology (Ca!Tech), they produced the design of the facility.
Published histories of the construction of the plant emphasize the degree to which CalTech scientists controlled the design process for this plant. The design of Building is attributed to Oliver G. Bowen who, as noted, was under contract with CalTech for design of buildings associated with the university's work in the Navy's rocket program. Minutes from meetings indicate that Palmer Sabin was also involved in this design work. Palmer Sabin was a private architect who worked from an office in Pasadena. Credited chiefly with the design of residential buildings, Sabin was under contract with CalTech throughout its work with the Navy during World War Il. It is likely that Sabin was most heavily involved in developing the architectural theme or program for the administrative complex. 3.
Original and subsequent use: The building has been used as a maintenance shop since its construction. 4. Builder: Haddock, 5. Original plans and construction: A complete set of construction drawings does not exist for this building. The drawings that do exist include a footing plan, a floor plan, and sections of the walls, and window and door schedule. This building is similar in appearance to Building 6. Alterations and additions: An addition was constructed on the southeast side of the building. It is a one-story addition, with a side gable roof, and exterior walls clad in stucco. Naval Ordnance Test Station Inyokern, China Lake Pilot Plant, Maintenance Shop (Naval Air Weapons Station, China Lake Pilot Plant, Maintenance Shop) HABS No. CA-2774-B (Page 3) B.
Historical Context The China Lake Pilot Plant was established in to replace a smaller test plant at Eaton Canyon near Pasadena that was operated by the California Institute of Technology (CalTech) to test manufacturing method for ballistite, a material used as a solid propellant for rockets. Although not intended for large-scale production, the test plant in Pasadena actually produced tons of propellant between and The new facility at China Lake was set up to make an even greater production, while avoiding safety problems associated with an ordnance assembly plant in an urban area. The China Lake Pilot Plant was also designed for research into new materials and production methods, other than the established materials and methods used in large-scale production of rocket motors.
The history of this facility is presented in greater detail in HABS No. CA-2774. Building is one of four contributing resources in the China Lake Pilot Plant Historic District and was built as part of the original group of public works buildings. The plant was sufficiently distant from the Main site (located a mile east of this building) that it was necessary to construct a small administrative and support complex at the entrance of the plant area. Sixteen buildings were planned for the area including office buildings, warehouses, a carpenters shop, machine shop, maintenance shop, fire station, a solvent building, Marine barracks, a lunch room, a laundry room, a battery building, and a telephone building.
These buildings functioned as a "village" and are not substantially different from the administrative and service buildings at the Main Site at China Lake. Most of the buildings in this service area, including Building were constructed of wood frame with exterior stucco walls. They were structurally and architecturally different from buildings constructed in the industrial sector, which were almost always built of reinforced concrete cast in place around the machinery. Naval Ordnance Test Station Inyokern, China Lake Pilot Plant, Maintenance Shop (Naval Air Weapons Station, China Lake Pilot Plant, Maintenance Shop) HABS No. CA-2774-B (Page 4) PART II. ARCHITECTURAL INFORMATION A. General Statement: 1.
Architectural character: Building is simple in design with little detail and a Modem aesthetic similar to the other service buildings at the China Lake Pilot Plant site. 2. Condition of Fabric: Building retains a high degree of integrity and a high condition of historic fabric. B. Description of Exterior: 1. Overall dimensions: The maintenance shop is rectangular in plan with a small addition located on the southeast side. The main building measures approximately 100 feet long with five bays located on the front side and is 30 feet wide with two bays on both the west and east side. It is one story in height approximately 20 feet high. 2. Foundation: The machine shop rests on a poured concrete foundation with unfinished floors. 3.
Walls: The walls are finished with stucco although the construction drawings and field investigation did not determine the method of attaching the stucco. Additionally, the construction drawings for this building originally specified exterior plaster, although it appears that stucco was applied. 4. Structural system, framing: Wall framing consists of 2" by 6" wood studs at 16"on center. Roof framing consists of 2" by 6" joists at 16" on center. 5. Openings: a. Doorways and doors: There are three exterior doors, one single leaf and a pair of double leaf wooden industrial doors. b. Windows: There are three one-over-one double hung sash windows, thirty-two fixed panes with six divided lights with a transom arranged in groups of four along the north and south sides of the building.
There are rough hewn lintels above the groups of windows. On the east side of the building, the windows are paired. Naval Ordnance Test Station Inyokern, China Lake Pilot Plant, Maintenance Shop (Naval Air Weapons Station, China Lake Pilot Plant, Maintenance Shop) HABS No. CA-2774-B (Page 5) 6. Roof: a. Shape, covering: Flat roof covered with an unknown sheathing material. b. Cornice, eaves: The building has no cornice and has flush eaves. C. Site: 1. General setting and orientation: The China Lake Pilot Plant was sited in the area of the base for reasons of safety. The buildings are widely dispersed for the same reason. Because the buildings are spread out over such a wide area, the boundaries of this historic district include many acres of undeveloped land.
This land has always been used for miscellaneous purposes, chiefly the storage of equipment and material used in the experiments and production facilities. 2. Historic landscape design: There is no evidence that the original planners of the China Lake Pilot Plant made any attempt to develop a formal landscape in the plant area. Instead, some minor efforts were made to beautify the administrative area, although most of these appear to post-date the period of significance for the historic district. Within the processing area, the focus was on the widely-dispersed siting of the processing buildings as well as the provision of safe corridors for moving the processed material. 3. Outbuildings: There are no outbuildings associated with Building PART Ill: SOURCES OF INFORMATION A.
Architectural Drawings: Architectural drawings for the four subject buildings were provided by the NAWS China Lake Public Works Directorate and have been reproduced for this report. B. Early Views: None C. Interviews: None Naval Ordnance Test Station Inyokem, China Lake Pilot Plant, Maintenance Shop (Naval Air Weapons Station, China Lake Pilot Plant, Maintenance Shop) HABS No. CA-2774-B (Page 6) D.