The Fire Station was built in as part of the original group of public works buildings within the administrative area of the China Lake Pilot Plant facility. It is a key contributing element of the China Lake Pilot Plant Historic District because it exemplifies the restrained International Style given to the administration area by the project architect, Palmer Sabin. This building along with three others located in the administrative area represent the architectural core of the part of the base. The group contrasts with the utilitarian character of the rest of the pilot plant. Naval Ordnance Test Station Inyokern, China Lake Pilot Plant, Fire Station & Marine Barracks (Naval Air Weapons Station, China Lake Pilot Plant, Fire Station & Marine Barracks) HABS No. CA-2774-D (Page 2) PART 1.
HISTORICAL INFORMATION A. Physical History 1. Date of erection: 2. Engineers and Consulting Architect: The design of China Lake Pilot Plant facility was not handled under the master architect-engineer contract with Stafford, Davies, and Gogerty, designers of most of the Naval Ordnance Testing Stations. Instead, the Navy hired the engineering firm of Holmes and Narver and in collaboration with Oliver G. Bowen, consulting engineer and Palmer Sabin, consulting architect, both hired by California Institute of Technology (CalTech), they produced the design of the facility. Published histories of the construction of the plant emphasize the degree to which CaITech scientists controlled the design process for this plant. The design of Building is attributed to Oliver G.
Bowen who, as noted, was under contract with CalTech for design of buildings associated with the university's work in the Navy's rocket program. Minutes from meetings indicate that Palmer Sabin was also involved in this design work. Palmer Sabin was a private architect who worked from an office in Pasadena. Credited chiefly with the design of residential buildings, Sabin was under contract with CalTech throughout its work with the Navy during World War II. It is likely that Sabin was most heavily involved in developing the architectural theme or program for the administrative complex. 3. Original and subsequent use: The building was constructed for use as a fire station with quarters for Marine.
Office space was added to the building shortly after construction and the building today serves as office space. 4. Builder: Haddock, 5. Original plans and construction: Two sheets of construction drawings included at the end of this report show that the original appearance of the fire station. 6. Alterations and additions: As mentioned above, shortly after construction, the building was remodeled to accommodate office space and the vehicle doors were infilled on the north and south side. The windows used are Naval Ordnance Test Station Inyokern, China Lake Pilot Plant, Fire Station & Marine Barracks (Naval Air Weapons Station, China Lake Pilot Plant, Fire Station & Marine Barracks) HABS No.
CA-2774-D (Page 3) consistent with the type of windows seen at China Lake, one over one double hung wood sash windows. B. Historical Context The China Lake Pilot Plant was established in to replace a smaller test plant at Eaton Canyon near Pasadena that was operated by the California Institute of Technology (CalTech) to test manufacturing method for ballistite, a material used as a solid propellant for rockets. Although not intended for large-scale production, the test plant in Pasadena actually produced tons of propellant between and The new facility at China Lake was set up to make an even greater production, while avoiding safety problems associated with an ordnance assembly plant in an urban area.
The China Lake Pilot Plant was also designed for research into new materials and production methods, other than the established materials and methods used in large-scale production of rocket motors. The history of this facility is presented in greater detail in HABS No. CA-2774. Building built in is one of four contributing resources in the China Lake Pilot Plant Historic District. The plant was sufficiently distant from the Main site (located a mile east of this building) that it was necessary to construct a small administrative and support complex at the entrance of the plant area.
Sixteen buildings were planned for the area including office buildings, warehouses, a carpenters shop, machine shop, maintenance shop, fire station, a solvent building, Marine barracks, a lunch room, a laundry room, a battery building, and a telephone building. These buildings functioned as a "village" and are not substantially different from the administrative and service buildings at the Main Site at China Lake. Most of the buildings in this service area, including Building were constructed of wood frame with exterior stucco walls. They were structurally and architecturally different from buildings constructed in the industrial sector, which were almost always built of reinforced concrete cast in place around the machinery.
Naval Ordnance Test Station Inyokern, China Lake Pilot Plant, Fire Station & Marine Barracks (Naval Air Weapons Station, China Lake Pilot Plant, Fire Station & Marine Barracks) HABS No. CA-2774-D (Page 4) PART II. ARCHITECTURAL INFORMATION A. General Statement: 1. Architectural character: Building is one of four buildings at the pilot plant that best represents the restrained International Style design exhibited in the administrative area. 2. Condition of Fabric: Although this building has been altered, it still retains a high degree of integrity despite the infill of the original vehicle doors. B. Description of Exterior: 1. Overall dimensions: The fire station is roughly T-shaped in plan with a three story hose tower located on the northwest side.
At its longest, the building measures approximately ninety-two feet long with five bays across the length on its north and south sides. 2. Foundation: The fire station rests on a poured concrete slab foundation with unfinished floors. 3. Walls: The walls are finished with stucco although the construction drawings and field investigation did not determine the method of attaching the stucco. Additionally, the construction drawings for this building originally specified exterior plaster, although it appears that stucco was applied. 4. Structural system, framing: Wall framing consists of 2" by 6" wood studs at 16"on center. The roof framing consists of wood joists with cross bracing. 5. Openings: a.
Doorways and doors: The fire house originally had two types of doors: vehicle doors and single leaf doors. The vehicle doors have been infilled. The single leaf doors are wood panel and located on the north side. b. Windows: The windows in this building are consistent with the types of windows found at the administrative complex at China Lake, double hung wood sash windows. There are banks of Naval Ordnance Test Station Inyokern, China Lake Pilot Plant, Fire Station & Marine Barracks (Naval Air Weapons Station, China Lake Pilot Plant, Fire Station & Marine Barracks) HABS No. CA-2774-D (Page 5) windows located in the infilled vehicle doors on the north and south sides of the building. 6. Roof: a. Shape, covering: Flat roof covered with an unknown sheathing material. b.
Cornice, eaves: The roof has flush eaves. C. Site: 1. General setting and orientation: The China Lake Pilot Plant was sited in the area of the base for reasons of safety. The buildings are widely dispersed for the same reason. Because the buildings are spread out over such a wide area, the boundaries of this historic district include many acres of undeveloped land. This land has always been used for miscellaneous purposes, chiefly the storage of equipment and material used in the experiments and production facilities. 2. Historic landscape design: There is no evidence that the original planners of the China Lake Pilot Plant made any attempt to develop a formal landscape in the plant area.
Instead, some minor efforts were made to beautify the administrative area, although most of these appear to post-date the period of significance for the historic district. Within the processing area, the focus was on the widely-dispersed siting of the processing buildings as well as the provision of safe corridors for moving the processed material. 3. Outbuildings: There are no outbuildings associated with Building PART ill: SOURCES OF INFORMATION A. Architectural Drawings: Architectural drawings for the four subject buildings were provided by the NAWS China Lake Public Works Directorate and have been reproduced for this report. B. Early Views: None C. Interviews: None D.