BlockBefore

SS Petersburg, National Defense Reserve Fleet, Suisun Bay, Benicia

SS Petersburg, National Defense Reserve Fleet, Suisun Bay, Benicia, Solano County, CA. Surveyed as HAER CA-2332, with a 3,637-word written history.

From the record

“SS Petersburg is significant as the last tanker with an Offshore Petroleum Discharge System in the Ready Reserve Force.”

Written record, HAER CA-2332 survey. Machine-read text.

Surveyed by the federal HAER program as HAER CA-2332 · the record runs 3637 words · one of 191 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

157 words

Source document Quoted word for word from HAER CA-2332. Not written, edited or summarised by this site.

National Defense Reserve Fleet-Suisun Bay, Benicia, Solano County, California The National Defense Reserve Fleet is located at latitude: longitude The point was obtained from Google Earth in There is no restriction on its release to the public.

Type: Oil tanker with offshore petroleum discharge system MARAD Design No.: T-AOT-9101 Principal Measurements: Length (overall): Length (between perpendiculars): Beam (molded): Draft: Gross registered tonnage: long tons Net registered tonnage: lt Maximum continuous horsepower: (The listed dimensions are as built, but it should be noted that draft, displacement, and tonnages are subject to alterations over time as well as variations in measurement.) Propulsion: Bethlehem Steel single-screw turbine Date of Construction: Launched: April 2, Delivered: June 28, Designer: Sinclair Oil Corporation Original Owner: Dover Tanker Corporation, Charles Kurz Company, Inc. Current Owner: Maritime Administration, U.S. Department of Transportation Disposition: Part of the Ready Reserve Force in the U.S.

Military Sealift Command s Prepositioning Program SS PETERSBURG HAER NO. CA-2332 Page 2

Significance

68 words

Source document Quoted word for word from HAER CA-2332. Not written, edited or summarised by this site.

SS Petersburg is significant as the last tanker with an Offshore Petroleum Discharge System in the Ready Reserve Force. It carries its own Single Anchor Leg Mooring platform that can be raised and lowered from its deck as necessary. The ship was originally built for Sinclair Oil and named ST Sinclair Texas before the Maritime Administration acquired the vessel in and placed it in the Ready Reserve Force.

Written history

2121 words

Source document Quoted word for word from HAER CA-2332. Not written, edited or summarised by this site.

The SS Petersburg Documentation Project is part of the Historic American Engineering Record (HAER), a long-range program to document historically significant engineering and industrial works in the United States. The Heritage Documentation Programs of the National Park Service, U.S. Department of the Interior, administers the HAER program. The project was prepared under the direction of Todd Croteau (HAER Maritime Program Coordinator) for the Maritime Administration (MARAD) in Wesley Hale wrote the historical report under the supervision of Justine Christianson, HAER Historian. Jarob Ortiz produced the large-format photographs. Drawings were prepared by Diana Serrano in SS PETERSBURG HAER NO. CA-2332 Page 3 Part I. Historical Information A. Physical History 1.

Date of Construction: SS Petersburg was launched on April 2, and delivered on June 28, 2. Designer/Naval Architect: Sinclair Oil Corporation designed a vessel that would meet the requirements for a modern oil tanker and embrace automation. The resulting vessel was the largest tanker at the time with a capacity of barrels of oil, nearly three- and-a-half times that of the standard T-2 tankers. 3. Builder: Sinclair contracted Bethlehem Steel s Sparrow Point Shipyard in Maryland to build the ship for approximately 4.

Original Plans and Construction: The original design of SS Petersburg (which was classified as a Chesapeake class tanker) differed from contemporary standard tankers because the traditional midship superstructure and navigation bridge were repositioned to the stern, along with the crew quarters. One of the largest oil tankers of its time, Sinclair Texas was the first equipped with automatic cargo-handling systems. All the pumps and pump room valves were hydraulically controlled from the deck. The automation meant personnel did not have to enter the pump room during operations, and cargo could be unloaded in fourteen hours.

The ship was also the first to be Dimecoated, referring to the application of a zinc coating that was intended to eliminate the need for painting, a major chore for crews on traditionally painted vessels.3 The tanker was laid out so that the navigation bridge and crew quarters were located above the propulsion plant and machinery spaces in the stern. The aftermost of the ship held most of the crew living and below-deck work spaces. The crew quarters were arranged in a horseshoe on the main deck around a centerline structure that contained the machinery and boiler casings with storage compartments at the aft end. The deck crew was housed on the starboard side while the engine crew was on the port side.

The bosun s stores and maintenance locker were in the forward section of the crew deck at the centerline. The cordage room, soiled linen locker, and steward s stores were at the aftermost end of the horseshoe. Below the crew accommodations were four void tanks just aft of the fuel-oil settling tanks that separated the engine and crew spaces from the oil cargo spaces. The potable water tanks were near the machinery space and crew quarters. The steering machinery space sat atop the aft peak ballast and just abaft of the potable water tanks. 1 Edward A. Morrow, New Tanker Seen as Sea Pipeline , New York Times, April 3, Note that although the vessel was first called ST Sinclair Texas, this report will utilize the tanker s current name. 2 Morrow, New Tanker. 3 Morrow, New Tanker.

SS PETERSBURG HAER NO. CA-2332 Page 4 The forward part of the vessel was dedicated to transporting oil. Seventeen compartments were divided between seven holds and retained the oil being transported. Two heeling/ballast tanks were on the port and starboard sides of the cargo center tanks 4 and 5. Just forward of hold 1 were the port and starboard fuel-oil deep tanks and the ballast deep tank. The chain locker was situated between the ballast deep tank and the fore peak ballast section. The enclosed foc s le deck featured a port and starboard storage locker, a forward crane pedestal, and a work crane with a 70' radius and capacity of pounds The windlass and port and starboard anchors were also located on the foc s le deck.4 5.

Modifications: In the early the tanker was modified with the addition of the Offshore Petroleum Distribution System (OPDS), comprised of the Single Anchor Leg Mooring (SALM) stored amidships, a 59-ton crane on top of the OPDS deckhouse, eight reels (four on the starboard side and four on the port side), and five utility boats. When deployed, SALM provided a semi-permanent platform for fuel discharge operations. Additional information about the operation of the system is in the Operational History section of this report.5 6. Names: Initially the vessel was known as ST Sinclair Texas. When Dover Tanker Company sold the ship to Charles Kurz and Company, Inc. in it was renamed SS Petersburg and has since operated under that name. B.

Historical Context Sinclair Oil Corporation designed SS Petersburg to meet shifting demands in America s oil market in the At the time of its launch in April it was the largest tanker built to date roughly three-and-a-half times the size of the standard T-2 tankers then ubiquitous in the maritime oil industry. The increased size and cargo capacity were Sinclair s answer to the challenges shipping companies faced with the rise of pipeline transportation for oil. The pipeline s construction worried shipbuilding executives and maritime labor leaders, who saw it as a threat to domestic tanker transportation. A New York Times article noted it has been estimated that as many as 90 T-2 tanker equivalents will be displaced by the pipeline. O.

Pendleton Thomas with Sinclair Oil stated the company was embracing automation and greater efficiency to help domestic shippers retain a competitive edge against the new pipelines. In terms of the Colonial pipeline, Thomas insisted our Marine Department regards the pipeline only as a challenge. Our marine men believe that improved ships can compete. James H. Morris, General Manager of Bethlehem Steel s Shipbuilding Division, described the launch of SS Petersburg as a major step forward in United States tanker construction.6 4 Bethlehem Steel Company, Shipbuilding Division, Plan No. Alt. No. 9, General Arrangement, May 8, updated February 8, Ref. #5, Drawing 1 of 1. 5 Haiti: How to fuel disaster recovery? U.S. Naval Institute Blog, January 20, available at accessed August 10, Plan No.

H- Alt No. 9, General Arrangement ; Marine Design and Operation, Petersburg, Capacity Plan, Drawing No. Ref. #8, Drawing 1 of 1, handwritten date 6 All quotes from Morrow, New Tanker. SS PETERSBURG HAER NO. CA-2332 Page 5 In the early the Maritime Administration undertook the OPDS program at the request of the U.S. Navy. The project resulted in modified tankers capable of supplying fuel to beach units from an offshore position up to 4 miles away via conduit.

The first vessel converted was SS Potomac in followed by SS American Osprey, and then SS Chesapeake in and SS Petersburg in with SS Mount Washington the last in (See USNS Potomac, HAER and Chesapeake, HAER for additional information.) Petersburg and Chesapeake are the only remaining tankers from this class, with Chesapeake laid up in the Beaumont Reserve Fleet and used primarily to provide parts to keep Petersburg in operation. MV Vice Admiral Wheeler, completed in is the newest tanker addition to the U.S. Navy s Military Sealift Command, having been acquired in It has greater pumping capacity and can transfer fuel from 8 miles offshore.7 C.

Operational History Although built for Sinclair Oil Corporation, the Dover Tanker Corporation operated the tanker between Texas and East Coast ports until when it sold the ship to Charles Kurz and Company, Inc. In the Maritime Administration acquired the vessel through its Ship Exchange Program and placed it in the Ready Reserve Force. During its career, SS Petersburg participated in several missions with the Military Sealift Command, including Operation Desert Storm and Operation Enduring Freedom.

The Maritime Administration developed a new refueling system that could be used anywhere in the world and had greater pumping capacity to accommodate increasing fuel requirements to replace the World War II-era Pipeline Under the Ocean (PLUTO) system consisting of 3" pipelines on the ocean floor between Great Britain and France. The new Offshore Petroleum Discharge System (OPDS) could be set up within forty-eight hours and pump 1.2-million gallons of petroleum to land from 4 miles offshore. The OPDS allowed tankers to establish a semi- permanent fueling platform in areas with damaged or underdeveloped fuel transferring capability. The system was comprised of 4 nautical miles of conduit stored on eight reels, a Single Anchor Leg Mooring (SALM), and beach termination units (BTUs).

On Petersburg, the OPDS is stowed amidships and positioned at an angle toward the port side when underway. The SALM is essentially a towable barge designed to carry the buoy, chain leg assembly, product swivel and submarine hose as a compact, self-contained unit. The steel compartment barge measuring long x 57' wide x 12' deep is stored on the main deck or towed if necessary. A linear puller on the starboard side lowers the SALM to the water where it sinks to the ocean floor to a maximum depth of Once it has reached the bottom, the SALM mooring buoy, a diameter, 30'-tall cylinder, floats to the surface and the tanker can be secured to it. Conduits either 6" or 8" in diameter extend from the tanker, down through the SALM, and then up to the 7 Haiti: How to fuel disaster recovery? ; VAdm.

Wheeler (T-AG-5001), Naval History and Heritage Command, available at t-ag-5001-.html, accessed October Maritime Administration Annual Report (U.S. Department of Transportation, Maritime Administration, April 3. SS PETERSBURG HAER NO. CA-2332 Page 6 beach to the beach termination unit (BTU). The BTU casing is long x high x 6' tall and serves as the valve station.8 A article described the process of setting up the system on ST Chesapeake, which was also a Chesapeake Class tanker. Once the tanker had been positioned, the tanks were flooded to lower the hull in the water. The starboard tanks were next filled so the ship listed 12 degrees to match the listing of the SALM and allow it to freely float away.

Once the flooding was complete, the SALM was released to the edge of the ship, and tugs pulled it into the water. After the SALM was sunk to the ocean floor, the mooring buoy floated to the surface, and Chesapeake was secured to it. Hoses from the ship s manifold on the main deck were then run down to the SALM and to the shore, 4 miles away. Once the components were in position, water or fuel could be pumped to shore.9 SS Petersburg was stationed for ten years in Guam. In the ship participated in Valiant Shield, the largest military war game conducted in the Pacific since the Vietnam War. The exercise focused on the cooperation of military branches and on the detection, tracking, and engagement of units at sea, in the air, and on land.

In November Petersburg was relieved of its duty station in Guam and relocated to California where it was deployed to the Suisun Bay Reserve Fleet in California. Petersburg can be activated for service within five days. SS Petersburg participated in Operation Unified Response, the earthquake relief effort in Haiti. Many of Haiti s fuel receiving terminals were damaged by the 7.0 magnitude earthquake, which caused catastrophic damage to the island nation. Though the United States sent several vessels and equipment to the island to provide relief, their use was limited without fuel.

In an effort to respond to the challenges presented by the damaged infrastructure, the Maritime Administration activated Petersburg so that the OPDS could be deployed to meet the fuel requirements of the relief effort. However, before the activation had been completed, the tanker was deactivated and was never actually deployed to Haiti.

As of the ship can be activated for the Military Sealift Command s prepositioning program.10 8 Quote from Brightwell, Exell, and Furness, An Offshore Petroleum Discharge System (OPDS) Application of Commercial Technology to Military Operational Requirements, presented at the Annual Offshore Technology Conference, Houston, Texas, May 49; Chapter 5, Offshore Petroleum Discharge System, in Concepts and Equipment of Petroleum Operations, Field Manual (Washington, DC: Headquarters, Department of the Army, April 2, available online at accessed October 9 Chesapeake and OPDS Team Excel in Korea, Sealift, August available at accessed August 10, 10 The Maritime Administration s Haiti Earthquake Response, MARAD website, available at accessed August 10, Shane Tuck, Valiant Shield Provides Valuable Joint Training Among U.S.

Military Forces, Navy Newsstand, June 20, available at accessed August 10, Jessie Leon Guerrero, SS Petersburg Heading for New Home, Navy Newsstand, November 9, available at accessed August 9, SS PETERSBURG HAER NO. CA-2332 Page 7

PART II

1222 words

Source document Quoted word for word from HAER CA-2332. Not written, edited or summarised by this site.

STRUCTURAL/DESIGN INFORMATION A. General Description 1. Overall: Petersburg is a bridge-aft bulk oil tanker. It has a single deck, an enclosed forecastle, and a single deckhouse at the stern. Its profile is defined by the SALM, 59-ton crane, five utility boats, and hose reels. The crew quarters are positioned in a horseshoe arrangement below the superstructure. The vessel s hull is made of welded steel manufactured by Bethlehem Steel, the same company that owned the shipyard in which it was constructed. 2. Decks: The superstructure consists of four decks, with the crew quarters located on the main deck. There is a lookout tower on the house top, just forward of the exhaust funnel. The navigation bridge deck is the uppermost deck to provide a clear view of the vessel above the SALM.

The chart and gyro room are aft of the wheelhouse. Just below the bridge is the captain s deck where the captain s office and stateroom are located. Next to the captain s quarters are the radio room and the quarters for the radio operator. The pilot s quarters and ship s hospital are also located on this deck, which wraps around the uptake casing. The boat deck contains the officer s lounge and the quarters for the chief, second, and third officers as well as a compartment for one cadet. Outside the deck on the stern are spaces for refrigerated containers and diesel tanks. Lifeboats hang from davits on the port and starboard sides. Each lifeboat can accommodate fifty-three people, more than adequate for a crew of thirty-five.

Below the boat deck is the poop deck, where the galley and crew recreation room is located. Both mess halls are on this deck, with the officer s mess on the starboard side and the crew mess on the port. The offices and staterooms for the engineering officers are on the poop deck along with the cargo control room. Outside of the deckhouse on the stern are the port and starboard mooring and towing winches. The crew quarters are arranged in a horseshoe on the main deck, wrapping around the engine and boiler casing. The bosun s stores, maintenance locker, and pump house are at the forward end of this space. The steward s stores, soiled linen locker, and cordage room are at the stern.

The forward section of the main deck is devoted to the ship s working areas, including the SALM, utility boats, hose reels, and three cranes. The largest work crane is 59 tons and is situated amidships. It is used to deploy and recover utility boats as needed. The smaller cranes are used for various tasks, including loading and unloading cargo and supplies. 3. Cargo Holds: The ship s seven cargo holds are divided into seventeen compartments for the storage of oil. Each hold is made up three compartments, except for holds 4 and 5, which are at the vessel s centerline with heeling/ballast tanks port and starboard. A cofferdam divides the cargo tanks from the stern work area. Tank capacities are listed in the Appendix to this report. SS PETERSBURG HAER NO. CA-2332 Page 8 4.

Safety: Two motorized lifeboats are stowed on davits on either side of the boat deck. At regular intervals throughout the ship there are various types of life rafts to meet any type of emergency. Fire and smoke detection and extinguishing systems are located throughout the vessel. B. Mechanical Features 1. Engine Plant: The ship s propulsion is comprised of two cross-compound combustion high- and low-pressure steam turbines built by Bethlehem Steel. The turbines drive a single propeller through double-reduction Falk gears capable of maximum shaft horsepower of The five-blade propeller has a pitch of and a diameter. 2. Boilers: There are two Foster Wheeler oil-fired water tube boilers providing a service pressure of pounds of steam per hour at 700 pounds per square inch (psi). 3.

Electrical System: The ship features two De Laval generator turbines designed to operate at a maximum rotations per minute and 580 psi. 4. Cargo-Handling Arrangements: Much of the vessel s liquid cargo is unloaded via hoses located on several reels on the main deck. The pump house located just forward of the superstructure provides the motive power for moving the liquid cargo. There are three cranes to take on containers and other cargo. SS PETERSBURG HAER NO. CA-2332 Page 9 Part III: Sources of Information A. Primary Sources Bethlehem Steel Company, Shipbuilding Division, Plan No. Alt 9. General Arrangement. May 8, updated February 8, Ref #5, Drawing 1 of 1. Marine Design and Operation, Petersburg, Capacity Plan. Drawing No. Ref. #8, Drawing 1 of 1. Handwritten date Morrow, Edward A.

New Tanker Seen as Sea Pipeline. New York Times. April 3, B. Secondary Sources Brightwell, Exell, and Furness. An Offshore Petroleum Discharge System (OPDS) Application of Commercial Technology to Military Operational Requirements. Presented at the Annual Offshore Technology Conference, Houston, Texas, May Chesapeake and OPDS Team Excel in Korea. Sealift, August Available at accessed August 10, Concepts and Equipment of Petroleum Operations, Field Manual Washington, DC: Headquarters, Department of the Army, April 2, Available at accessed October Guerrero, Jesse Leon. SS Petersburg Headed for New Home. Navy Newsstand, November 9, Available at accessed August 9, Haiti: How to fuel disaster recovery? U.S.

Naval Institute Blog, January 20, Available at accessed August 10, Maritime Administration Annual Report. U.S. Department of Transportation, Maritime Administration, April The Maritime Administration s Haiti Earthquake Response, MARAD website. Available at response/, accessed August 10, SS PETERSBURG HAER NO. CA-2332 Page 10 Tuck, Shane. Valiant Shield Provides Valuable Joint Training Among U.S. Military Forces. Navy Newsstand, June 20, Available at accessed August 9, VAdm Wheeler (T-AG-5001). Naval History and Heritage Command. Available at wheeler--t-ag-5001-.html, accessed October SS PETERSBURG HAER NO. CA-2332 Page 11 Appendix: Tank Capacities From Marine Design and Operations, Inc., SS Petersburg, Capacity Plan, No.

1, Ref #8, Dwg 1 of 1, no date but handwritten annotation of Center Cargo Tanks Tank Frame Location Gallons Barrels Center Tank 1 102 107 Center Tank 2 93 102 Center Tank 3 85 93 Center Tank 4 77 85 Center Tank 5 73 77 Center Tank 6 65 73 Center Tank 7 61 65 Total Center Tanks Wing Cargo Tanks Tank Frame Location Gallons Barrels Wing Tank 1 Port 102 107 Wing Tank 1 102 107 Wing Tank 2 Port 93 102 Wing Tank 2 93 102 Wing Tank 3 Port 85 93 Wing Tank 3 85 93 Wing Tank 6 Port 65 73 Wing Tank 6 65 73 Wing Tank 7 Port 61 65 Wing Tank 7 61 65 Total Wing Tanks SS PETERSBURG HAER NO. CA-2332 Page 12 Fuel-Oil Tanks Tank Frame Location Gallons Barrels Settling Tank Port 58 60 Settling Tank 58 60 Wing Tank Port 58 60 Wing Tank 58 60 Deep Tank No.

2 Port 107 120 Total Fuel Oil Tanks Ballast Tanks Tank Frame Location Cubic Feet Tons Fore Peak 130 FP Deep Tank 1 Port 120 130 Deep Tank 1 120 130 Heeling/Ballast Tank Port 73 85 Heeling/Ballast Tank 73 85 Total Ballast Tanks ADDENDUM TO: HAER CA-2332 SS PETERSBURG HAER CA-2332 (ST Sinclair Texas) (T-AOT-9101) National Defense Reserve Fleet, Suisun Bay Benicia Solano County California DIGITAL PHOTOGRAPHS HISTORIC AMERICAN ENGINEERING RECORD National Park Service U.S. Department of the Interior C Street NW Washington, DC

In context

Benicia, California The place record: every map, photograph and survey of this town.
Solano County, California 258 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Benicia

24 of 57 records shown

The federal surveyors worked through Benicia building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
American RacerHAER CA-34614,934 words
USNS CometHAER CA-3489,619 words
Benicia State CapitolHABS CAL,48-BENI,2-5,680 words
US Coast Guard Icebreaker GlacierHAER CA-3415,404 words
Esso GettysburgHAER CA-3545,367 words
WichitaHAER CA-3565,295 words
St. Paul's Episcopal ChurchHABS CAL,48-BENI,15A-4,754 words
General Edwin D. PatrickHAER CA-3444,661 words
Alaska StandardHAER CA-3474,624 words
Benicia ArsenalHABS CAL,48,BEN1,4-S-4,440 words
SperryHAER CA-3424,323 words
TalugaHAER CA-3364,106 words
General John PopeHAER CA-3433,965 words
Mission Santa YnezHAER CA-3373,807 words
BolsterHAER CA-3553,326 words
Benicia ArsenalHABS CAL,48-BENI,4T-2,980 words
Crooks HouseHABS CAL,48-BENI,7-2,938 words
Riddell Fish HouseHABS CAL,48-BENI,8-2,747 words
Winthrop VictoryHAER CA-3452,735 words
MispillionHAER CA-3382,700 words
Benicia ArsenalHABS CAL,48-BENI,4P-2,542 words
Fischer-Hanlon HouseHALS CA-272,442 words
Carr HouseHABS CAL,48-BENI,6-2,067 words
Benicia ArsenalHABS CAL,48-BENI,4J-1,951 words

Provenance

  • Written history. Quoted verbatim from HAER CA-2332. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.