From the record

“Constructed in Launch Complex 14 at Cape Canaveral Air Force Station (CCAFS) was designed to support the Atlas missile program, the United States first operational ICBM.”

Written record, HAER FL-8-7 survey. Machine-read text.

Surveyed by the federal HAER program as HAER FL-8-7 · the record runs 13389 words · one of 123 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

50 words

Source document Quoted word for word from HAER FL-8-7. Not written, edited or summarised by this site.

East side of ICBM Road, 1.3 miles north of intersection with Central Control Road Cape Canaveral Brevard County Florida USGS Cape Canaveral Quadrangle, Universal Transverse Mercator Coordinates: Date of Construction: Engineer/Architect: - U.S. Army Corps of Engineers; - Maurice H. Connell & Associates, Inc.; - Pan American World Airways, Inc.

Significance

13251 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HAER FL-8-7. Not written, edited or summarised by this site.

Constructed in Launch Complex 14 at Cape Canaveral Air Force Station (CCAFS) was designed to support the Atlas missile program, the United States first operational ICBM. Complex 14 was the site of the first Atlas launch in The complex was modified in when it was assigned to Project Mercury, the United States first effort to send a man into space. All four of the Project Mercury manned orbital flights were launched from Complex 14. At the close of Project Mercury in the complex was again modified for the Atlas-Agena configuration.

Complex 14 was utilized to launch all of the unmanned Gemini Target Vehicles which NASA used to practice rendezvous and docking techniques during the Gemini Program between and The facility was deactivated in and abandoned in place in Report Prepared by: Kimberly Hinder Architectural Historian, Archaeological Consultants, Inc. Blaikie Court, Suite A, Sarasota, Florida Updated Dr. Susan Enscore U.S. Army Engineer Research and Development Center Construction Engineering Research Laboratory Newmark Drive, Champaign, IL Date: June (updated by Dr. Enscore February CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 2) HISTORICAL

Overview of Cape Canaveral Air Force Station

Rocketry in the United States originated with the pioneering work of Robert H. Goddard, who launched the first liquid-propelled rocket in Across the Atlantic, German engineers were simultaneously developing their own rocket science program. Encouraged by the Nazi regime during World War II, the Germans developed the V-1 buzz bomb and the V-2 ballistic missiles which they used against Allied cities in Although the Allied forces had experimented with missiles powered by rocket engines, they lacked the technology to compete with the V-2 against which there was little defense. As a result, the U.S. Army, Navy, and Air Force (USAF) each initiated their own missile programs to fulfill their particular roles in national defense. Following the war, the U.S.

Army brought 115 German rocket engineers and scientists, including Dr. Wernher von Braun, to the United States to develop their program. These engineers conducted experiments to refine the German V-2 and develop long-range surface-to-surface guided missiles. Initially stationed at Fort Bliss, Texas, the team assisted the Army in testing rockets at the White Sands Proving Grounds beginning in May This site, however, was geographically constrained and posed a danger to civilians when rockets misfired.1 Increasingly concerned with Soviet missile and nuclear development after World War II, the Department of Defense created and charged the Committee on Long Range Proving Grounds to select a suitable missile test site in October Cape Canaveral was selected for several critical reasons.

Missiles could be launched over the Atlantic Ocean and tracked from islands. The isolated location of the Cape enhanced security for research and development. The government already owned land at the Cape, and the undeveloped nature of the remaining land made it less expensive to acquire. The launch area was accessible via water easing the transportation logistics of heavy rockets and building supplies. The warm weather also allowed year round operation of a missile site at the Cape.2 In President Harry S. Truman signed legislation which established the Joint Long Range Proving Ground at Cape Canaveral, with Patrick Air Force Base (originally the Banana River Naval Air Station) selected as the support base. Although the entire facility was initially under 1 Charles D. Benson and William B.

Faherty, Moonport: A History of Apollo Launch Facilities and Operations (National Aeronautics and Space Administration, Scientific and Technical Information Office, reprint as Gateway to the Moon: Building the Kennedy Space Center Launch Complex and Moon Launch! A History of the Saturn-Apollo Launch Operations, Gainesville: University Press of Florida, 1 (page references are to reprint edition). 2 David Barton and Richard S. Levy, An Architectural and Engineering Survey and Evaluation of Facilities at Cape Canaveral Air Force Station, Brevard County, Florida (Resource Analysts, Inc., 16 March Benson and Faherty, 4. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No.

(Page 3) the cooperative use of the Army, Navy, and USAF, by a directive of the Department of Defense the USAF ultimately assumed responsibility for the range. The Joint Long Range Proving Ground was renamed the Air Force Missile Test Center, the first of many subsequent name changes. Although the Army continued its operation of the White Sands Proving Grounds in New Mexico and the Navy continued to fund its missile testing center at Point Mugu, California, both military branches continued to play an active role at Cape Canaveral.3 Construction and Missile Development at Cape Canaveral Between April and June of land was acquired at the Cape through negotiation and condemnation proceedings.

During this period, the United States Army Corps of Engineers was designated as the construction agency. The Jacksonville District of the Corps opened an office at Patrick Air Force Base in to oversee construction at Patrick Air Force Base and the Air Force Missile Test Center at Cape Canaveral. By December the office had managed million of construction contracts. For each construction project, the agency (Army, Navy, or USAF) would submit project specifications, a deadline for completion, and authorization to begin construction to the Corps. The Corps would then negotiate and award a contract to an architectural/engineering firm for preparation of the construction plans.

Once the plans were submitted, the Corps advertised and selected a contractor who was required to complete the project within the time frame or pay penalties.4 As the United States entered peacetime and reduced military funding during the late the various branches of the military sought to determine their roles in missile research and design. The Army continued refining the German with the assistance of the team led by Wernher von Braun and 300 carloads of V-2 missile components seized during World War II. The Army conducted the first successful launch at Cape Canaveral on July 24, An Army General Electric Corporation California Institute of Technology team launched Bumper No. 8, a modified V-2 rocket, from Launch Pad 3.

The Army team continued to use Pad 3 to conduct additional launches through 3 E.R. Bramlitt, History of Canaveral District (South Atlantic Division, US Army Corps of Engineers, 1 2; Benson & Faherty, 3, 7. 4 Bramlitt, 1 2, 33. 5 Benson and Faherty, 1, 6 7. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 4) During the late and early USAF activities at Cape Canaveral focused on winged cruise missile research and development as a deterrent force in the weapons race between the United States and the Soviet Union. Constrained by a reduced budget, the USAF chose to fund research and testing on the cruise missile, projected to be operational before the ten years anticipated for the development of the ballistic missile.

These winged missiles resembled unmanned airplanes and fell into four different categories: air-to-air, air-to-surface, surface-to-air, and surface-to-surface. These missiles were restricted to the Earth s atmosphere because they required oxygen for engine combustion. The earliest launch pads, used for firing experimental winged missiles including the Lark, Matador, Snark, Bomarc, Bull Goose, and Mace, were located at the tip of the Cape, and included Launch Complexes and Support buildings, including a communications building, a water plant, a fire fighting unit, electrical substations, a skid strip for the landing and reuse of the missiles, and Hangars C and O, were constructed near the original launch pads.

As explosive power increased, and missiles necessarily grew larger, support activities were relocated farther from the launch pads to an Industrial Area which was situated along the western shore of the Cape.6 After the Soviets detonated their first atomic device in and following the outbreak of war in Korea in the United States government reassessed the military cutbacks of the late With increased funding and the development of relatively lightweight nuclear warheads, the USAF and Army decided to pursue ballistic missile research and development. Faster and more accurate than the winged cruise missiles, ballistic missiles, with their own oxygen source, could leave the Earth s atmosphere. The ballistic missiles were divided into two categories based on the distance they could travel.

The intercontinental ballistic missiles (ICBM) had a range of over miles. Intermediate range ballistic missiles (IRBM) had a range of miles. The USAF, which remained focused primarily on the development of cruise missiles, initiated a ballistic missile study which resulted in the Atlas missile.7 To advance its research and development of ballistic missiles, the Army Ballistic Missile Agency moved their team of German engineers from Fort Bliss, Texas, to the Redstone Arsenal in Huntsville, Alabama. Soon after the move to Huntsville, the launch team, known as the Missile Firing Laboratory established facilities at Cape Canaveral.

With the first launch of the Redstone missile on August 20, at Launch Pad 4, the MFL inaugurated the testing of 6 Barton and Levy, 6, 25; Bramlitt, 5 8; Jacob Neufeld, The Development of Ballistic Missiles in the United States Air Force, (Washington, Office of Air Force History, United States Air Force, 7 Neufeld, 98, Benson and Faherty, 1, 3, 7. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 5) ballistic missiles, an event which foreshadowed the construction of numerous launch facilities for ballistic missiles at the Cape.8 Both the detonation of the first thermonuclear device in and intelligence reports indicating that the Soviet Union was developing long-range missiles and thermonuclear warheads led to advancements in ballistic missile development.

In the USAF formed a panel of U.S. scientists to examine their Snark, Navaho, and Atlas missile programs. The panel recommended accelerating development of the Atlas ICBM.9 By USAF officials convinced President Eisenhower to assign the ICBM development program the highest national priority. Accordingly, the USAF initiated programs for the design and testing of the ICBM Titan in and the ICBM Minuteman in As the USAF ICBM program grew, intelligence reports indicated that the Soviet Union would have ICBMs with nuclear warheads operational by Fearing that the United States could not match the Soviet ICBM threat, the Department of Defense decided to fund the development of IRBMs because they would be operational sooner and would act as a deterrent based out of Europe.

In the Department of Defense approved two IRBM programs, the USAF Thor and the Army/Navy Jupiter, which developed simultaneously and were assigned an equal national priority as the ICBM programs.10 The constant drive to develop more accurate and powerful weapons during the Cold War led to the construction of numerous launch complexes along the Cape. Although many of the early launch complexes were adapted to new uses as support structures, complexes constructed for one type of missile were rarely reused to launch another type of missile because they were not configured structurally, electronically, or for safety concerns for the new larger and more powerful missile. Economically, it was more cost effective to design and build a new complex than to reconfigure and adapt an old complex.

Explosive hazards, the dangers of launching over other complexes or inhabited areas, and maintaining a line of site between the launch vehicle and the launch control center (blockhouse) determined the choice of sites and distance between launch complexes. Each missile had similar ground requirements at the launch complex including a launch pad, a gantry service tower, a blockhouse for on-site command and control of 8 Benson and Faherty, 1, 3, 7. 9 Neufeld, 98 David N. Spires, The Air Force and Military Space Missions: The Critical Years, in The U.S. Air Force in Space: to the Century, Proceedings Air Force Historical Foundation Symposium, Andrews AFB, Maryland, September ed. R. Cargill Hall and Jacob Neufeld (Washington, DC: USAF History and Museums Program, United States Air Force, 34 35.

10 ibid., 241 CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 6) the launch, and a network of power, fuel, and communication links.11 The government maintained programs for both ICBMs and IRBMs concurrently and facilities for both types of missiles were constructed at Cape Canaveral. Over time, the area south of the tip was developed for launching IRBMs (Redstone, Pershing, Polaris/Poseidon, and Thor) and included launch complexes 17, 18, 25, 26, 29, and The area north of the tip was developed for launching ICBMs and space launch vehicles (Atlas, Titan, Saturn) and included Launch Complexes 11 16, 19, 20, 34, 36, and Throughout the early and mid-1950s, the focus of activities at Cape Canaveral remained on missile development for defense against the Soviets.

In November the Secretary of Defense divided the responsibilities for research and development of missiles among the armed forces. The USAF received responsibility for all intermediate and long-range missiles, both IRBMs and ICBMs, while the Army was restricted to missiles with a range of 200 miles or less.

The Navy was limited to developing submarine and ship-based IRBM missile systems.13 Cape Canaveral and the United States Space Program In President Eisenhower announced that the United States would launch an unmanned satellite as part of the nation s participation in the International Geophysical Year which extended from July through December The Army, Navy, and USAF immediately initiated planning for their own satellite programs.14 When the Soviets launched the satellite Sputnik I in October of the attention of the public turned to space exploration. The following month, the Soviets placed the Sputnik II satellite carrying a dog into orbit around the Earth. The launch caused a furor among Americans who feared that the U.S.

was losing not only the space race, but also that a missile gap existed between the U.S. and the Soviets, who it was believed had hundreds of operational ICBMs. The President initially assigned responsibility for the U.S. space program to the Department of Defense. The Army s Development Operations Division led by 11 Benson and Faherty, 8 10. 12 Barton and Levy, 4, 9; Denise P. Messick, Cynthia G. Rhodes, and Charles E. Cantley, Space Wing Cultural Resource Management Plan, Technical Report No. 386 (Stone Mountain, Georgia: New South Associates, 95; James N. Gibson, Nuclear Weapons of the United States: An Illustrated History (Atglen, PA: Schiffer Publishing, Hartmann 13 Neufeld, Barton and Levy, 17. 14 R. Cargill Hall, Civil-Military Relations in America s Early Space Program, in The U.S.

Air Force in Space: to the Century, Proceedings Air Force Historical Foundation Symposium, Andrews AFB, Maryland, September ed. R. Cargill Hall and Jacob Neufeld (Washington, DC: USAF History and Museums Program, United States Air Force, 25. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 7) Wernher von Braun shifted their focus to the use of missiles to propel payloads, or even a man, into space.15 After several failures on the launch pad, the United States entered the space race with the launch of the Army s scientific satellite Explorer I on January 31, using a four stage Jupiter C missile named Juno I. With the threat of a growing fleet of operational Soviet ICBMs, the branches of the U.S.

military initiated the development of photographic reconnaissance satellites which were operational by Realizing that the military s involvement in the space program would jeopardize the goal of using space for peaceful purposes, the President s Science Advisory Committee urged that a centralized agency be created to oversee the scientific exploration of space. The new agency, the National Aeronautics and Space Administration (NASA), established October 1, was to be a civilian agency with the mission of carrying out scientific aeronautical and space exploration, both manned and unmanned.

The Department of Defense, especially the USAF, would continue with defense related missile and satellite development.17 Soon after the creation of NASA, Navy personnel and facilities associated with Project Vanguard and over 400 scientists from the Naval Research Laboratory were reassigned to NASA. The California Institute of Technology s Jet Propulsion Laboratory, affiliated with the Army, was also transferred to NASA.

Initially working with NASA as part of a cooperative agreement, President Eisenhower officially transferred a large portion of the Army s Development Operations Division with the team led by Wernher von Braun to NASA in March At the same time, Eisenhower named the Huntsville NASA installation the Marshall Space Flight Center, and designated the MFL at Cape Canaveral as the Launch Operations Directorate of NASA. The Launch Operations Directorate, led by Dr. Kurt Debus, managed the overall integration, testing, and the launch operations of NASA.18 NASA soon organized a National Launch Vehicle Program to identify and analyze which missiles would be the most effective in exploring space.

As a result, the Scout, Thor-Delta, Atlas, Titan, and Saturn, and modified versions of these rockets, were selected as boosters for manned and unmanned missions. Unmanned activities have included suborbital, orbital, and lunar satellite and vehicular missions to gather scientific information often relating to physics and 15 Benson and Faherty, 1 2. 16 ibid. 17 Hall, 30; Barton and Levy, 20; Spires, 39. 18 Spires, 39; Benson and Faherty, 15. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 8) astronomy.

Although some were conducted to prepare for manned launches, most of the missions were intended simply to gain scientific knowledge with which to better understand Earth.19 Already upstaged by the Soviets, one of NASA s first goals was to put a man in orbit around the Earth.

At its creation, the USAF s manned space projects were transferred to NASA, which NASA combined under the name Project Mercury in December NASA selected the first seven astronauts for the manned space program in April The goals of Project Mercury included sending a man into space to orbit the Earth, testing his ability to perform in a weightless environment, and to recover both man and capsule.20 The program included two manned suborbital flights powered by a modified Redstone missile and four manned orbital flights powered by an Atlas missile topped by the Mercury capsule. The first suborbital flight occurred on January 31, with the launch of Ham, a chimpanzee.

The United States was again upstaged when the Soviet Union launched Vostock I with cosmonaut Uri Gagarin to orbit the Earth in April The launch of Alan Shepard the following month on a Mercury suborbital flight proved anticlimactic.21 Realizing the impact of the Soviet advancements on the American psyche, President John F. Kennedy appointed Vice President Lyndon Johnson, in cooperation with representatives from NASA and the associated industries, to develop a space program that would surpass the Soviet program. The panel recommended a ten-year phased approach which would include manned space flight, planetary exploration, and the development of new rockets and satellites.

Accepting the recommendations, President Kennedy presented the following before a joint session of Congress on May 25, I believe this nation should commit itself to achieving the goal, before this decade is out, of landing a man on the Moon and returning him safely to the Earth. No single space project in this period will be more impressive to mankind, or more important for the long-range exploration of space, and none will be so difficult or expensive to accomplish.22 19 Barton and Levy, 20 27. 20 Spires, 39; Exploring Space Project Mercury (U.S. National Aeronautics and Space Administration) 3, Kennedy Space Center Archives, Kennedy Space Center, Sweetsir Collection Box 12. 21 Harry Butowsky, Man in Space (Reconnaissance Survey) (Denver: National Park Service, 4.

22 ibid., Man in Space, 4 5. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 9) With widespread support, the public and Congress embraced the goal and the program proceeded rapidly. Circling the Earth three times, John Glenn completed the first manned orbital flight of the United States on February 20, in a capsule propelled by an Atlas rocket from Launch Complex 14. Followed by three more manned orbital flights, the Mercury program concluded as a success on May 15, NASA initiated planning for Project Gemini in late as the intermediate step in sending a man to the moon.

Officially announced in the project was operational by The goals of Project Gemini included testing man s performance during extended periods in space, both within and outside of the spacecraft, development of rendezvous and docking techniques, and perfection of controlled reentry and landing techniques. The larger, more maneuverable capsule, designed to hold two men, was propelled by a Titan II rocket. Following the first unmanned Gemini launch on April 8, Gemini 3 was the first manned flight of the program in March Gemini 12, launched in November successfully completed the program.24 Apollo, the final step in landing astronauts on the moon, immediately followed Project Gemini.

Studies to build the Saturn rocket, which would propel man to the moon, actually started in with the team led by Wernher von Braun under the Army s jurisdiction.25 Ten times more powerful than the Atlas rocket and twenty times more powerful than the Jupiter, the size and power of the Saturn required the construction of Launch Complexes 34 and 37 at Cape Canaveral. Test flights of the Saturn rocket started at Launch Complex 34 in October In January NASA announced that the Saturn would be the moon launch vehicle. The goal of Apollo was to launch a team of three astronauts into orbit around the moon. While one astronaut remained in orbit, the other two would then take an attached spacecraft to land on the moon and then redock with the primary vessel before returning to Earth.

The initial missions were Earth orbital (unmanned and manned) followed by lunar missions to orbit and, later, land on the moon.26 NASA utilized Launch Complexes 34 and 37 for research and development of the Saturn rocket. Continued modifications to the Saturn to increase its power to propel man to the moon led to a 23 Barton and Levy, 28. 24 Ibid., William A. Lockyer, A Summary of Major NASA Launchings: October 1, 1958-September 30, KSC Historical Report No. 1 (John F. Kennedy Space Center: KSC Historical Services, IX-1-8. 25 Benson and Faherty, 26 ibid., 37, 60 64; Barton and Levy, 30 31. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 10) larger rocket with new blast and acoustic hazards.

With these factors in mind, combined with the stepped-up launch schedule necessary to land a man on the moon by the end of the decade, it was apparent by that the Apollo program required a new launch complex.27 Cape Canaveral, with over 22 launch complexes, did not have room for another complex. NASA officials solved the dilemma by acquiring land on Merritt Island, west and north of the existing missile launching area at the Cape. The first acquisitions of land started in with the majority under federal ownership by Initially known as the Merritt Island Launch Area, the land was acquired for use predominantly in support of the Manned Lunar Landing Program (Apollo) and was placed under NASA s exclusive jurisdiction.

With the new facilities, NASA s offices at the Cape, led by Kurt Debus, expanded and relocated to the Merritt Island Launch Area. The newly independent installation, on par with Marshall Space Flight Center, was renamed the John F. Kennedy Space Center in November after the death of the president.28 During land acquisition and construction of the Kennedy Space Center, NASA continued manned space flight under the Mercury and Gemini programs and preparations for Apollo.

During a simulation flight at Launch Complex 34, three astronauts, Virgil Grissom, Edward White, and Roger Chaffee, lost their lives in an oxygen fire in the cockpit on January 27, Apollo 4 (November 9, through Apollo 6 (April 4, were unmanned Earth orbital missions to test the Saturn rocket and the Command and Service modules. The October 11, Apollo 7 launch was the first manned Apollo launch which placed astronauts into Earth s orbit for a ten-day mission.

Apollo 8, the first launch at the newly completed Kennedy Space Center, achieved the first lunar orbit in December The goal of landing man on the moon was achieved with Apollo 11 on July 20, and was followed by six additional lunar missions which gathered extensive scientific information culminating in Apollo 17 in December Subsequent manned space programs included the Skylab, Apollo-Soyuz, and the Space Shuttle, which took its inaugural flight on April 12, The Space Shuttle program ended on July 21, History of Complex 14 As the first of four launch complexes constructed at Cape Canaveral to serve the Atlas ballistic missile program, Launch Complex 14 played a significant role in closing the perceived missile 27 Benson and Faherty, 65 68. 28 ibid., 133 146 48.

29 Barton and Levy, 31; Butowsky Man in Space, 5 6. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 11) gap of the Cold War with more than a dozen launches testing the United States first ICBM missile. The arms race between the United States and the Soviet Union to develop more powerful and accurate weapons was a defining feature of the Cold War era. After the Atlas missile was declared operational, Launch Complex 14 proved pivotal in the development of the United States manned space program through the Mercury and Gemini programs. From to the USAF and NASA launched 32 Atlas missiles and space launch vehicles in a variety of configurations from Launch Complex 14.

Launch Complex 14 was one of four complexes constructed for the Atlas ballistic missile program, the first U.S. ICBM. The Atlas originated in October when the U.S. Army Air Technical Service Command solicited proposals on the design of an unmanned vehicle capable of carrying a weapons payload 20 to miles. Consolidated Vultee Aircraft Corporation (Convair) of San Diego, California, submitted several designs for consideration. In January the USAF awarded Convair a contract to begin preliminary design work on a missile capable of delivering a weapons payload of miles or greater. In April the company received approximately $2 million to build ten missiles for flight testing under the Hiroc (High-Altitude Rocket) designation.

Although design work was initiated in June the program was canceled by the USAF in July As the United States entered peacetime and reduced military spending during the late the USAF chose to fund research and testing on the cruise missile, projected to be operational before the ten years anticipated for the development of an operational ballistic missile.30 Although the program was cancelled, some of the funding for the remained available and Convair was given permission to build and test-launch three of the ten missiles originally authorized. The first missile was completed in October with test firings conducted at Convair s Ft.

Loma facility between November and May The first was launched at the White Sands Missile Range on July 13, The second and third missiles were launched in September and December Despite the conclusion of the project, Convair continued ballistic missile research and design work without USAF funding. Convair and its associates developed several innovations which would carry through to the Atlas missile, including the one-and-one-half stage propulsion system, single-wall stainless steel construction, a separating nose cone, and a gimbaled engine exhaust nozzle.31 30 Neufeld, Clifford J. Lethbridge, Atlas Program Background, Spaceline.org, Spaceline, Inc., 31 Lethbridge, Atlas Program Background ; Neufeld, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No.

(Page 12) Following the detonation of the first Soviet atomic device in and the outbreak of war in Korea in the United States government reassessed the military cutbacks of the late With increased funding, the USAF decided to again pursue ballistic missile research and development. On January 23, the USAF awarded Convair a long-range missile study contract designated Convair already had detailed ballistic missile design proposals which had been refined in-house following the conclusion of The company submitted design proposals for both pure ballistic and semi-ballistic concepts, for which Convair engineer Karel J. Bossart proposed the name Atlas, perhaps referring to Greek mythology or in honor of the Atlas Corporation, the parent company of Convair.

The USAF approved of the Atlas name in August and concluded in September that Convair s pure ballistic missile approach would be the best choice for an ICBM. The USAF authorized the continued development of the Atlas, but funding remained at lower levels than for the Snark and Navaho cruise missile programs.32 Both the detonation of the first thermonuclear device in and intelligence reports indicating that the Soviet Union was developing long-range missiles and thermonuclear warheads led to advancements in ballistic missile development.

In May Convair received approval from the USAF to develop two series of Atlas test missiles, the first designated and the second designated Modifications to the missile s design, including a reduction in size with smaller nuclear weapons payloads, continued in and In October the USAF formed a panel of U.S. scientists to examine their Snark, Navaho, and Atlas missile programs. The panel, officially known as the Strategic Missiles Evaluation Group and unofficially as the Teapot Committee, recommended accelerating development of the Atlas ICBM.33 In the spring of the USAF accelerated the Atlas program and gave it the highest developmental priority with the goal of reaching operational status by June In December the USAF and Convair publicly announced that Atlas production was underway.

After a series of intensive inspections, the USAF issued Convair a contract for the long-term continuation of the Atlas program on January 14, Convair received approval from the USAF for the construction of the first operational test missiles in mid-1955. The first completed missile, intended for static systems testing in California, was delivered in August In 32 ibid. 33 Neufeld, Spires, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 13) October, a dummy missile arrived at Cape Canaveral to test the compatibility of the Atlas body with launch systems. The first flight-ready Atlas arrived at Cape Canaveral in December 34 Launch Complexes 11, 12, 13, and 14 were constructed for the USAF s Atlas ballistic missile program between January and August (Figure 1).

As the construction agency for the USAF at Cape Canaveral, the U.S. Army Corps of Engineers initiated construction on Complex 14 in March The initial construction costs for the brick and mortar totaled Although the complex reached beneficial occupancy status in January the plans and completed construction were officially approved by the Corps in August Complex 14 was the first of the four Atlas complexes completed, with the first launch of an Atlas missile at Cape Canaveral on June 11, Utilizing the Atlas A, Atlas B, Atlas D, Atlas-Able, Atlas-Agena A, Atlas-Agena D, and Mercury- Atlas configurations, Complex 14 supported 32 launches of the Atlas missile, including the four manned Mercury missions. Originating as the the first missile launch at Complex 14 was part of the Atlas A series.

Because the intent of the Atlas A prototype was to test the airframe and propulsion system of the Atlas, testing of the missile required a relatively short range of only 600 miles. The first missile launched on June 11, was destroyed by the Range Safety Officer after less than one minute into its flight when it strayed off of its intended course. Of the eight Atlas A missiles launched at Cape Canaveral, five of them were launched from Complex 14. Only three of the eight missiles completed their planned flight, but these tests provided sufficient information to determine that the Atlas airframe was strong enough to withstand low-altitude air, and that the launch system and gimbaled engine flight control system worked effectively.

These initial launches of the Atlas, completed with the final launch of an Atlas A on June 3, occurred under the auspices of the USAF.36 Despite the high priority placed on the Atlas program, the Eisenhower Administration reduced its budget in and had planned further cuts for fiscal year when the Soviets launched Sputnik I in October of Public outcry of a missile gap between the Soviets and the U.S. prompted the Administration to reverse its budget cuts and again accelerate the USAF s ICBM 34 Neufeld, Lethbridge, Atlas Program Background. 35 Real Property Cards, Cape Canaveral Air Force Station; Eastern Test Range Launch Complexes, Cleary, Eastern Range Launches; Cleary, Space Wing. 36 Clifford J. Lethbridge, Cape Canaveral Rocket and Missile Box Scores ; Clifford J.

Lethbridge, Atlas A Fact Sheet, Spaceline.org, Spaceline, Inc., Cleary, Eastern Range Launches. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 14) program.37 Originating as the the second Atlas prototype, the B series, was designed to test booster and nose cone separation as well as the overall propulsion system. This required a long range flight of miles and a one-and-one-half stage booster/sustainer engine combination. The first of nine Atlas B launches occurred on July 19, Of the three Atlas B missiles launched from Complex 14, the second, launched on November 28, was the first successful full-range test flight of miles.

After nine launches, the final Atlas B launch completed the testing of this prototype on February 4, Initially a prototype, the Atlas D was designed to test all of the Atlas operating systems and was the first fully operational Atlas missile. Due to the missile gap perception, the USAF initiated construction of operational Atlas launch sites even before the first test flight of the Atlas D in order to accelerate the time frame in which the ICBM could be deployed in an operational mode. With a range of miles, test flights for the Atlas D were designed to simulate operational conditions of a deployed and activated ICBM. The first three launches of the Atlas D, occurring between April and June exploded less than three minutes into flight.

The fourth test flight, launched on July 28, was a success and led to the USAF declaring the Atlas an operational missile on September 9, after which missiles were deployed to various USAF bases across the United States. Although declared operational in testing of the Atlas D continued through January with 33 completed test flights.39 Soon after the creation of NASA in October one of the organization s initial unmanned scientific efforts involved plans to explore the moon. The Pioneer Program consisted of a lunar satellite or probe as a payload launched by an Atlas-Able combination. The Atlas-Able was a four-stage rocket utilizing the Atlas D as the first stage and Able upper stages adapted from the Vanguard (Navy) rocket program.

The Atlas-Able was designed to carry a 1,500-pound payload to low-Earth orbit, a 500-pound payload to lunar impact, or a 300-pound payload to Earth-escape trajectory. In an attempt to send the lunar probe Pioneer to the moon, the first Atlas-Able launch occurred on November 26, from Complex 14. The first launch failed when the shroud covering the payload detached prematurely forty-five seconds into the launch. The second effort of the Pioneer program exploded during static firing. When this loss was followed by two 37 Neufeld, 241 38 Clifford J. Lethbridge, Atlas-B Fact Sheet ; Lethbridge, Cape Canaveral Rocket and Missile Box Scores ; Cleary, Eastern Range Launches. 39 Clifford J.

Lethbridge, Atlas-D Fact Sheet, Spaceline.org, Spaceline, Inc., Lethbridge, Cape Canaveral Rocket and Missile Box Scores. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 15) additional unsuccessful launches, testing of the combination was discontinued in December As part of the missile defense program, the USAF tested the Atlas-Agena A configuration early in The Atlas-Agena A consisted of the combination of an Atlas D missile as a first stage and the Lockheed Agena A as a second stage. Capable of projecting a 5,000-pound payload into low-Earth orbit, the vehicle was used as part of the Missile Defense Alarm System (MIDAS) program to launch early warning satellites.

The satellites of the MIDAS program were designed to utilize infrared sensors to detect missile plumes and provide an early warning of a ballistic missile attack. Using the Atlas-Agena A configuration, the USAF launched two MIDAS satellites into orbit in February and May of from Launch Complex 14 (Figure 2). Following the final MIDAS launch at Complex 14 in May of additional MIDAS launches were conducted from Vandenberg Air Force Base. Because the Atlas-Agena A had to be individually manufactured for each launch, the cost was prohibitive and production of the vehicle was discontinued.41 Soon after the organization of NASA in October the agency organized a National Launch Vehicle Program to identify and analyze which missiles would be the most effective in exploring space.

Due to its reliability and versatility, the Atlas was one of the missiles selected as the core booster for space launch vehicles.

Although Atlas-D based space launch vehicles were classified as Space Launch Vehicle-3 the projects were also known by the name combination of the missile and associated upper stages or mission assignments.42 As NASA was charged with the mission of carrying out manned and unmanned scientific aeronautical and space exploration, the USAF s manned space projects were soon transferred to the new agency, which NASA combined under the name Project Mercury in December The USAF provided NASA facilities at Cape Canaveral, including space at Complex 14, in order to continue the development and implementation of Project Mercury.43 The goals of Project Mercury included sending a man into space to orbit the Earth, testing his ability to perform in a weightless 40 Clifford J.

Lethbridge, Atlas-Able Fact Sheet, Spaceline.org, Spaceline, Inc., Mark Wade, Atlas Able, astronautix.com/lvs/atlas able.html, SpaceBank.com, 41 Clifford J. Lethbridge, Atlas-Agena A Fact Sheet, Spaceline.org, Spaceline, Inc., Lethbridge, Cape Canaveral Rocket and Missile Box Scores ; Cleary, Eastern Range Launches; Butowsky, National Register Nomination, 7:7 11; Cleary, The Missile and Space Launches Through 158 42 Lethbridge, Atlas D Fact Sheet ; Barton and Levy, 43 Spires, 39. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 16) environment, and to recover both man and capsule.

NASA selected the first seven astronauts for the manned space program in April The Mercury program consisted of a two-pronged approach which first involved sending a man on suborbital flights followed by orbital flights around the Earth. Although NASA launched a number of test flights, the official Mercury flights included two manned suborbital flights powered by a modified Redstone missile and four manned orbital flights powered by an Atlas missile topped by the Mercury capsule. NASA initiated testing of the Atlas configuration topped by a Mercury test capsule from Complex 14 on September 9, The capsule reached an altitude of 100 miles and was recovered after reentry.

Throughout the USAF continued testing the Atlas D missile at Complex 14, while NASA tested the Mercury production capsule from the complex in July In November and December NASA focused on testing the Redstone missile configuration for suborbital flights from Launch Pad 5. The first suborbital flight occurred on January 31, with the launch of Ham, a chimpanzee, from Launch Pad Although the Soviet Union launched their first manned orbital flight in April the United States soon followed. Continued testing of the Redstone configuration led to the first U.S. suborbital flight manned by astronaut Alan Shepard, Jr. on May 5, from Launch Pad The second manned suborbital flight on July 21 completed the suborbital phase of Project Mercury.

While progress continued on the suborbital phase of the project early in NASA also continued testing the Atlas-Mercury capsule configuration exclusively utilizing Complex 14 for this purpose. Launches in February and April led to the first successful orbital flight of the capsule in September (Figure 3). On November 29, a capsule, carrying the chimpanzee Enos, successfully orbited the Earth twice. Circling the Earth three times, John Glenn completed the first manned orbital flight of the United States on February 20, in a capsule propelled by an Atlas rocket from Launch Complex 14. Glenn was followed by three more manned orbital flights, all launched from Complex 14. On May 24, M. Scott Carpenter orbited the earth three times, and was succeeded by Walter M. Schirra, Jr.

who orbited 44 Spires, 39; Exploring Space Project Mercury. 45 Lockyer, VIII-1-2; Cleary, Eastern Range Launches. 46 Butowsky, Man in Space, 4; Lockyer, VII-3. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 17) the earth nearly six times. After 22 orbits, the flight of L. Gordon Cooper brought a successful conclusion to the Mercury program on May 15, As the intermediate step in sending a man to the moon, NASA initiated planning for Project Gemini in late Officially announced in the project was operational by The goals of Project Gemini included testing man s performance during extended periods in space, both within and outside of the spacecraft, development of rendezvous and docking techniques, and perfection of controlled reentry and landing techniques.

The larger, more maneuverable capsule, designed to hold two men, was propelled by a Titan II rocket and launched from Complex 19. Following the first unmanned Gemini launch on April 8, Gemini 3 was the first manned flight of the program in March Complex 14 was utilized to launch all of the unmanned Gemini Target Vehicles which the astronauts used to practice rendezvous and docking techniques. At the close of the Mercury program, Launch Complex 14 was modified in and to launch the Atlas-Agena D, an improved version of the Atlas-Agena A. At that time, a set of as-built drawings of the complex were prepared by the As-Built Section of the Facilities Engineering Department in the Guided Missiles Range Division of Pan American World Airways, Inc. and Maurice H. Connell & Associates, Inc.

of Miami. The Atlas-Agena D consisted of the combination of an Atlas E or F missile (essentially an upgraded Atlas D) as a first stage and the Lockheed Agena D as a second stage. The Agena D stage was modified to serve as a docking target. The first Atlas-Agena launch on October 25, disintegrated at the time of ignition of the main Agena engine. The second Target Vehicle launch on March 16, proved a success when the astronauts of Gemini 8 rendezvoused with the vehicle. Target Vehicles were utilized to practice rendezvous and docking procedures for the Gemini 9, 10, 11, and 12 missions (Figure 4). Gemini 12, launched in November successfully completed the program.

All of the seven Gemini Target Vehicles were launched from Complex 14 with the final Gemini Target Vehicle Launch on November 11, serving as the final launch from the complex.49 47 Lockyer, VII-2-7; Barton and Levy, 28; Cleary, Eastern Range Launches. 48 Barton and Levy, Lockyer, IX-1-8. 49 Cleary, Eastern Range Launches; Lockyer, IX-1-8; Clifford J. Lethbridge, Atlas-Agena D Fact Sheet, Spaceline.org, Spaceline, Inc., Clifford J. Lethbridge, Atlas-Agena A Fact Sheet ; Clifford J. Lethbridge, Atlas E Fact Sheet, Spaceline.org, Spaceline, Inc., Clifford J. Lethbridge, Atlas F Fact Sheet, Spaceline.org, Spaceline, Inc., Pan American World Airways, Inc., Drawings and Maurice H. Connell & Associates, Inc., Drawing CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No.

(Page 18) Launch Complex 14 was deactivated in and abandoned in place October 31, The Service Structure, Umbilical Mast, and northern portion of the Launch Stand were razed in December due to excessive rust and deterioration (Figure 5). Launch Complex 14 was listed as part of the Cape Canaveral Air Force Station National Historic Landmark District on April 16, The Blockhouse (Facility No. was restored and converted to meeting space in to commemorate the Anniversary of the final Mercury flight. The Ready Building (former Facility No.

was converted to offices for contract personnel before being demolished.50 Overall, the Launch Stand, Umbilical Mast, Service Structure, Water Storage Tank, original Sentry House, the Ready Building, the Hazard Storage Shelter, the Liquid Oxygen (LOX) tank, the Cable Tray System, and the storage and transfer machinery have been removed, along with smaller elements such as diesel tanks, tracking equipment, and cameras. The Flume and Skimming Basin (Facility No. Water Demineralization Station (Facility No. Subcable Hut and Vault (Facility No. the Blockhouse (Facility No. the Launch Ramp (Facility No. Area and Blast Wall (Facility No. the Liquid Oxygen/Gaseous Nitrogen Storage Area and Blast Wall (Facility No. the Propellant Transfer Unit Enclosure (Facility No.

and the Hazardous Storage Building (Facility No. remain in place in a good to a deteriorated condition. Noting the significance of Launch Complex 14, three markers to the Mercury Program have been erected at or near the complex. These include: a Historic Site Kiosk (Facility No. a Mercury Memorial Monument (Facility No. and a Mercury Memorial (Facility No. The Mercury Monument is located on ICBM Road at the entrance to Launch Complex 14. This high stainless-steel astronomical symbol for the Planet Mercury was erected at the close of Project Mercury in to honor the astronauts who participated in the program. Situated at the south end of the Launch Ramp, the Mercury Memorial Monument is a monument to John Glenn, the first American to orbit the Earth in (Figure 6).

The Historic Site Kiosk was erected in immediately east of the Blockhouse.51 50 Harry Butowsky, National Register of Historic Places Nomination Form/National Historic Landmark Federal Agency Nomination: Cape Canaveral Air Force Station (Washington, National Park Service, Master Planning, CCAFS Basic Information Guide; Real Property Cards, Cape Canaveral Air Force Station; Eastern Test Range Launch Complexes, Cleary, Space Wing. 51 Master Planning, CCAFS Basic Information Guide; Butowsky, National Register Nomination, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 19) ARCHITECTURAL DESCRIPTION OF LAUNCH COMPLEX 14 The U.S.

Army Corps of Engineers initiated the construction process for Launch Complex 14 in March The complex reached beneficial occupancy status in January which was followed by the first launch of an Atlas missile in June. The Corps officially approved the plans and completed construction in August Initially designed to support the Atlas missile program, Launch Complex 14 was modified in and to support Project Mercury s orbital flights which were powered by an Atlas missile topped by the Mercury capsule. At the close of Project Mercury, the complex was again modified in and to launch the Atlas-Agena.

Thirty-two launches, utilizing the Atlas A, Atlas B, Atlas D, Atlas-Able, Atlas-Agena A, Mercury-Atlas, and Atlas-Agena D configurations, occurred at Launch Complex 14, including the four manned Mercury missions.53 Launch Complex 14 consisted of a concrete Launch Stand and Ramp (Facility No.1684B) and associated structures serviced by one Blockhouse (Facility No.10905) and a Ready Building (no longer extant). Although simply noted as Launch Pad 14 in the Basic Information Guide, a Nose Cone Test Tower and Transponder Tower were noted along the entrance road, but were not included in the edition. This corresponds to the testing period of the Atlas B missile, the second Atlas prototype, which was designed to test nose cone separation among other systems.

The first of nine Atlas B launches occurred on July 19, and the final launch completed the testing of this prototype on February 4, The following ancillary structures were noted in the Basic Information Guide: Sentry House, Water Demineralization Station (now the Compressor Building; Facility No.10915), Water Storage Tank, Area and Blast Wall (Facility No. LOX Storage Area and Blast Wall (Facility No.

Subcable Hut and Vault (now the Communications Cable 52 Real Property Cards, Cape Canaveral Air Force Station, Space Wing Office of History, Patrick AFB; Eastern Test Range Launch Complexes, Cape Canaveral AFS, Space Wing Office of History, Patrick AFB, 16 April Mark Cleary, Eastern Range Launches, Space Wing Office of History, Patrick AFB, 11 December Mark Cleary, Space Wing: Its Heritage, History & Honors Launch Facilities & Programs: Complexes 11, 12, 13, and 14 Space Wing Office of History, Patrick AFB, 53 Clifford J. Lethbridge, Cape Canaveral Rocket and Missile Box Scores, Spaceline.org, Spaceline, Inc., Cleary, Eastern Range Launches; Cleary, Space Wing. 54 Clifford J.

Lethbridge, Atlas B Fact Sheet, Spaceline.org, Spaceline, Inc., Lethbridge, Cape Canaveral Rocket and Missile Box Scores ; Pan American World Airways, Inc., Basic Information Guide, Pan American World Airways, Inc., Basic Information Guide, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 20) Building; Facility No.10907), Flume and Skimming Basin (Facility No. Petroleum, Oil and Lubricants (POL) Building (now the Hazardous Storage Building; Facility No.8602), two Fuel Oil Storage Tanks (one 500 gallon capacity and one gallon capacity; no longer extant), and Septic Tanks to serve the Blockhouse, Launch Stand, and Ready Building (two extant, Facility No. and No. The Propellant Transfer Unit (now the Propellant Conditioning Facility; Facility No.

the Hazardous Storage Shelter (no longer extant), the Mercury Memorial Monument (Facility No. the Mercury Memorial (Facility No. and the Historic Site Kiosk (Facility No. were subsequently constructed at the complex.55 The Launch Stand served as the hub of the complex, around which the remaining facilities were located. The Launch Stand area included the Launch Stand and Ramp, Flume and Skimming Basin, POL Building, Propellant Transfer Unit, Launch Pad Building, Mobile Service Structure, Umbilical Mast, and other major firing accessories. Other elements of the complex were separated from the launching area by distances dictated by propellant explosive hazards.

Access to facility interiors (with the exception of the Blockhouse and the Propellant Transfer Unit Building) was not possible due to safety concerns. Launch Stand and Ramp Area Launch Stand and Ramp (Facility No. Constructed in the Launch Stand and Ramp (Facility No. was approximately long and could be visually divided into twelve bays (Figure 7). Constructed at a cost of approximately the Ramp consisted of the southernmost eleven bays, while the Launch Stand was the northernmost bay. The Ramp was approximately 24' wide and gradually increased to a height of 22' over the northern six bays. The Launch Stand was wider than the Ramp at approximately 60' wide x 78' long, and supported the Umbilical Mast.

The Launch Stand had a hold-down capability provided by two steel arms which attached to the base of the launch vehicle. These arms released through air pressure when sufficient thrust built during a launch. Utilized to cool the launch stand, water deluge and spray systems were mounted on the launch stand and released approximately gallons of water per minute during engine operation. The southernmost bay of the Ramp was approximately long and was constructed on earthen fill paved with concrete slabs. The remaining portion of the Ramp and Launch Stand was supported by a steel frame topped by a concrete slab with a balustrade along the edges constructed of 1- " standard pipe rail.

Utilizing canvas screen and corrugated asbestos cement 55Pan American World Airways, Inc., Basic Information Guide, Pan American World Airways, Inc., Basic Information Guide, Pan American World Airways, Inc., Basic Information Guide, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 21) siding, the area under the Ramp was enclosed with two different levels to serve as space for Administration Control, Machine Shop, Storage, General Terminal and Transfer Room, Instrumentation Room, a Restroom, and Locker Room. These rooms held the hydraulic and pneumatic pressure units, electrical junctions and power supplies, equipment for pre-launch checkouts, landline instrumentation, air-conditioning equipment, and shops.

In general, the rooms themselves had a concrete foundation and floor with walls and ceilings of gypsum board and exposed metal. The northern portion of the Launch Stand was razed in December due to excessive rust and deterioration.56 The concrete-block Launch Pad Building, which was approximately 57' x extended under the Ramp approximately 6' south of the Launch Stand. The building held an Instrumentation Room and a General Terminal & Transfer Room. A small Compressor Room, approximately 20' x was located on the east side of the Ramp approximately north of the southeast corner. Tunnels and a cable tray containing circuitry extended from under the Launch Stand to the Blockhouse (Figure Propellant Transfer Unit (PTU) Enclosure/Propellant Conditioning Facility (Facility No.

The Propellant Transfer Unit (PTU) Enclosure, now the Propellant Conditioning Facility (Facility No. was approximately 40' x 40' with square feet of space and was located immediately east of the Launch Pad Building. Constructed around for the Mercury program, the building was originally considered part of the Storage Area. The concrete- block building had a concrete foundation and a flat roof.58 Petroleum, Oil and Lubricants Building (POL) Building/Hazardous Storage Building (Facility No. The Petroleum, Oil and Lubricants (POL) Building, now the Hazardous Storage Building (Facility No.

was constructed in south of the Storage Area and approximately 56 Pan American World Airways, Inc., Cover Sheet and Drawings and Master Planning, CCAFS Basic Information Guide; Butowsky, National Register of Historic Places Nomination, United States Air Force, Property Cards and Launch Complex 14 files. 57 Pan American World Airways, Inc., Cover Sheet and Drawings and Master Planning, CCAFS Basic Information Guide; Butowsky, National Register Nomination, United States Air Force, Property Cards and Launch Complex 14 files.

58 Pan American World Airways, Inc., Drawing Master Planning, CCAFS Basic Information Guide; Bramlitt, 98; United States Air Force, Property Cards and Launch Complex 14 files; Photographs 63-ma9- 93 and University of Central Florida, Florida Space Coast History Project, scanned copy provided courtesy of Al Hartmann. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 22) 80 east of the Launch Stand and Ramp. This concrete-block building, with 120 square feet of space, rested on a concrete foundation and had a flat roof.59 Flume and Skimming Basin (Facility No. The Flume and Skimming Basin was a ditch lined with poured concrete which extended from under the Launch Stand north beyond the access road to a collection pond lined with poured concrete.

This structure provided for the runoff and collection of water and propellant overflow (Figure Umbilical Mast and Service Structure The Umbilical Mast (also referred to as Umbilical Tower) and Service Structure were also part of the complex (Figure The Umbilical Mast supported the missile, both of which rested on the Launch Stand. The Umbilical Mast provided various electrical cables, pneumatic lines, checkout consoles, cryogenic replenishing lines, liquid nitrogen cooling tanks, mechanical refrigeration units, air conditioning ducts, valve complexes, and other systems necessary to service the booster and upper stages.

Constructed of ten levels of steel framing, the Umbilical Mast was an open truss steel structure which rose 84 -6 above the Launch Stand.61 Similarly, the Service Structure consisted of 14 movable decks of steel framework trapezoidal in shape which rose 154 -8 . The Service Structure, which provided work platforms for the assembly, checkout, and servicing of the launch vehicle, was an inverted U-shaped, rigid box truss frame design. The Service Structure was mounted on rails which moved it to a rail-mounted transfer table. The table carried the Service Structure from the Launch Stand area east to the Service Structure Parking Area, approximately 300 east of the Launch Stand.

Representing a shift from use exclusively for the Atlas ICBM to use as a site for launching a Space Launch Vehicle, the Service Structure was modified in for Project Mercury. The Service Structure 59 Pan American World Airways, Inc., Drawing Pan American World Airways, Inc., Basic Information Guide, Master Planning, CCAFS Basic Information Guide; United States Air Force, Property Cards and Launch Complex 14 files. 60 Pan American World Airways, Inc., Cover Sheet and Drawings and Master Planning, CCAFS Basic Information Guide. 61 Pan American World Airways, Inc., Drawings and Maurice H. Connell & Associates, Inc., Drawing Master Planning, CCAFS Basic Information Guide. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No.

(Page 23) and the Umbilical Mast were razed in December as a result of excessive rust and deterioration.62 Fuel Storage Areas Liquid Oxygen Storage Area and Blast Wall (Facility No. The Liquid Oxygen (LOX) and Gaseous Nitrogen storage area was situated approximately 500 east of the Ready Building, between the Ready Building and the Launch Stand and Ramp. This fuel storage area, which consisted of a LOX tank, a LOX Sub-cooler, and storage for GN2 bottles/tanks, was situated on a concrete slab foundation. Nitrogen was utilized to purge fuel and LOX lines, engine and instrument compartments, and to operate certain pneumatic components. Initially supplied by trucks, three Nitrogen tanks were subsequently installed at the facility.

The 28,000-gallon capacity LOX tank was constructed of steel with an aluminum inner liner. The LOX flowed through stainless steel lines to the vehicle at a rate of gallons per minute transferred by two pumps with flow control maintained by 150 pounds per square inch air pressure. A reinforced concrete blast wall, approximately long x 30' wide with earthen fill on the east side, bordered this fuel storage area on the east to separate the fuel from the Launch Stand and Ramp.63 Only one tank remains at Facility No.1684M, but it is not in its original position. Jet Propellant-4 Storage Area (Facility No.

Approximately east of the Launch Stand and Ramp, the Jet Propellant-4 storage area consisted of a gallon storage tank which was separated from the launch area on the north by a reinforced concrete blast wall approximately 50' long (Figure The tank has been removed from the site, probably soon after the facility was deactivated. 62 Pan American World Airways, Inc., Drawings and Butowsky, National Register Nomination, 63 Pan American World Airways, Inc., Drawings Master Planning, CCAFS Basic Information Guide; Butowsky, National Register Nomination, Al, Hartmann, volunteer, Air Force Space and Missile Museum, interview by author, 30 April, 28 May, and 16 June, CCAFS, notes from interview and e-mail, Archaeological Consultants, Inc., Sarasota.

CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 24) Blockhouse and Ready Building Blockhouse (Facility No. Located approximately west of the Launch Stand and Ramp, the domed Blockhouse (Facility No. operated as the launch control center housing the communications, instrumentation, and control consoles. For the construction of the Blockhouse in a large area was excavated and partially filled with sand onto which the reinforced concrete foundation was poured (Figure The 12-sided, dome-shaped portion of the building consisted of three different layers. The inner dome was constructed of reinforced concrete, poured thick at the base surrounded by 40' of sand. A retaining wall around the base held the sand in place.

At the apex of the dome, the inside dome was reinforced concrete poured thick, covered by approximately 7' of sand. The earthen fill was covered with a four inch thick layer of gunite- concrete. A special blast proof door further insulated the structure to withstand the blast pressure should a missile explode on the pad or near the launch site. With square feet of space, the building was constructed at a cost of approximately These insulating layers provided the Blockhouse with an interior floor-space diameter of approximately 60' (Figure Although the Control Room occupied most of the space, the Blockhouse also had a Mechanical Equipment Room, a Restroom, and a small glass enclosed Observation Room.

The floor had inset cabling trenches covered with vinyl flooring, while the base of the walls was covered with rubber and the top by gypsum board and acoustic tile. Two oval-shaped air intake and exhaust openings in the northeast wall of the Blockhouse provided fresh air to the mechanical equipment room which was separated from the control room by an acoustic wall. Wall mounted lights illuminated the room. An opening in the floor led to the electrical pit and tunnels containing electrical wiring which connected the Blockhouse to the Launch Stand. An escape hatch led from the Control Room to the lower of two connected observation platforms on the east side of the Blockhouse roof. Four periscopes in the control room provided views of the launch.

These periscopes and most of the interior finishes remain intact, although the floor is now covered with carpet.65 64 Bramlitt, History of Canaveral District 17; Master Planning, CCAFS Basic Information Guide; Pan American World Airways, Inc., Drawings and United States Air Force, Property Cards and 1684A, Launch Complex 14 files. 65 Bramlitt, 17; Pan American World Airways, Inc., Drawings and 01- Master Planning, CCAFS Basic Information Guide; United States Air Force, Property Cards and 1684A, Launch Complex 14 files. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No.

(Page 25) The dome of the Blockhouse extended to cover a breezeway on the west side of the building which separated the domed area from a one-story rectangular extension of the Blockhouse called the Equipment Shelter. This extension was constructed of concrete-block and wood frame clad with corrugated asbestos cement and topped by a flat roof. The Equipment Shelter included a power room, office, equipment shelter, transformer and switch gear room, and restroom.66 Ready Building/Contractor Support Building Situated south of the Blockhouse and the Sentry House, the Ready Building (later the Contractor Support Building), had square feet of space. Set on a concrete foundation, the Ready Building was constructed in of wood frame, clad with corrugated asbestos cement, and topped by a flat roof.

The floor plan for the building incorporated a Briefing Room, Workshop, Test Conductor s office, Office, Conference Room, Heater Room, Storage, and a Men s and Women s Restroom. The public rooms had asphalt tile floors, walls clad with wood and gypsum board, and an acoustic board ceiling. Windows were originally four- and eight-light pivot windows, but were replaced by one-over-one single-hung sash windows.67 The Ready Building was razed between and Ground Support Equipment Electrical, water, and fire suppression systems supported the activities at Launch Complex 14. In addition to the primary support structures, cabling and pipeline connected the structures to form a cohesive complex.

Cabling and pipeline included of water mains, of hydro- pneumatic lines, of lines for the nitrogen system, of lines for the LOX system, of lines for the helium system, of pipeline for the liquid fuel system, and of cable ducts, as well as the cable tray system itself.68 Water Demineralization Station/Compressor Building (Facility No. and Water Storage Tank According to the Basic Information Guide, the Water Demineralization Station and Water Storage Tank were located at the entrance to the complex, west of the Blockhouse and Ready 66 Pan American World Airways, Inc., Drawings and United States Air Force, Property Cards and 1684A, Launch Complex 14 files.

67 Pan American World Airways, Inc., Drawings Pan American World Airways, Inc., Basic Information Guide, Master Planning, CCAFS Basic Information Guide; United States Air Force, Property Cards and Launch Complex 14 files. 68 United States Air Force, Property Card Launch Complex 14 files. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 26) Building. The Water Demineralization Station, constructed in is now the Compressor Building which is not presently in use (Facility No. The concrete-block Compressor Building has 386 square feet of space, a flat roof, and a concrete slab foundation. The steel Water Storage Tank was a 500 gallon hydro-pneumatic tank installed in to support the demineralized water system at the complex.

It was removed and salvaged in Septic Tanks (Facility No. and No. and Fuel Oil Storage Tanks Two Septic Tanks and Fuel Oil Storage Tanks were identified in the Basic Information Guide near the Blockhouse and the Ready Room. Both Septic Tanks (Facility No. and No. remain, but the Fuel Oil Storage Tanks (later the Diesel Fuel Tanks; former Facility No. were removed between and Subcable Hut and Vault/Communications Cable Building (Facility No. The Subcable Hut and Vault (now the Communications Cable Building; Facility No. is located immediately west of the Blockhouse. This small building, built in with only 315 square feet of space, was constructed of concrete-block set on a concrete slab foundation with a flat roof.71 Hazard Storage Shelter (Facility No.

A metal Hazard Storage Shelter (Facility No. with 550 square feet of space was a metal enclosure with a metal roof set on a concrete slab foundation. A gallon tank owned by Glover Oil Company was contained in the enclosure. Located west of the Ready Room near the entrance to the complex, it was constructed in The facility was razed between and Sentry House (Facility No. A small, wood frame Sentry House is located between the Blockhouse and the Ready Building.

The original Sentry House was surfaced with aluminum and asbestos cement siding and topped 69 United States Air Force, Property Cards and Launch Complex 14 files; Pan American World Airways, Inc., Basic Information Guide, 70 Master Planning, CCAFS Basic Information Guide; Pan American World Airways, Inc., Basic Information Guide, Pan American World Airways, Inc., Basic Information Guide, United States Air Force, Property Cards and Launch Complex 14 files. 71 Pan American World Airways, Inc., Drawings and Master Planning, CCAFS Basic Information Guide; United States Air Force, Property Cards and Launch Complex 14 files. 72 United States Air Force, Property Card Launch Complex 14 files. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 27) by a flat roof.

It was removed around The existing Sentry House was moved to its current location in approximately It is a wood frame rectangular structure with Dutch door on north and south sides. The upper section of the facility is composed single-pane fixed and jalousie windows. The facility is topped with a flat builtup roof, with an aluminum gravel coping. A section of security fence has been set up directly to the west of the Sentry House and directly west of the fencing is a commemorative installation of four parking spaces with concrete stops labeled with the names JOHN H. GLENN JR. LT COL., M. SCOTT CARPENTER WALTER M. SCHIRRA JR. L. GORDON COOPER MAJ., and LAUNCH DIRECTOR.

A sign on the fencing provides Welcome to Complex 14, Launch Site of Free World s First ICBM; Free World s First Man In Orbit. Modifications and Deactivation Designed to support the Atlas missile program, Complex 14 received only minor modifications in and when the complex was assigned to serve Project Mercury (Figure Modifications included the construction of an emergency egress tower, changes to the configuration of the top of the gantry to accommodate the escape rocket tower, construction of the Propellant Transfer Unit (PTU) (Facility No.

and the installation of a white room in the upper two decks of the Service Structure (Figure The white room, which housed the spacecraft, featured a controlled environment in order to minimize the effects of humidity and dust on the delicate components of the spacecraft. The emergency egress tower provided the astronaut with a means to evacuate the spacecraft by way of a platform which extended to the door of the spacecraft. An external egress crew could utilize the tower if the astronaut was incapacitated.74 At the close of Project Mercury, Launch Complex 14 was further modified between and to launch the Atlas-Agena, with alteration costs totaling over million.

At this time, the emergency egress tower was dismantled, and a new Umbilical Tower was constructed to serve the specific needs of the Agena. Other modifications included alterations to the white room in the Service Structure to house the Agena fuel and pressure servicing units for pre- launch checks of the spacecraft, installation of a new LOX storage tank, and alterations to the 73 Pan American World Airways, Inc., Drawings and Master Planning, CCAFS Basic Information Guide; United States Air Force, Property Cards and Launch Complex 14 files; United States Air Force, Real Property Voucher, Voucher No. Space Gateway Support Company, GIS Real Property Office, John F. Kennedy Space Center. 74 Butowsky, National Register Nomination, Mark C.

Cleary, The Missile and Space Launches Through Space Wing Office of History, Patrick AFB, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 28) Launch Stand (Facility No. Blockhouse (Facility No. and Ready Room. New facilities at the Launch Stand and Ramp included additional cable trenches for the Agena, a Lockheed and McDonnell equipment room, and a mechanical shop.75 Launch Complex 14 was deactivated in and abandoned in place October 31, After October property records reveal continuing modifications to the complex with the removal of consoles, machinery, cabling, pipeline, and power, safety, lighting, and cooling systems. Most of these items were reused in other complexes.

The Sentry House was removed around Following the abandonment of the complex in the facilities at the complex were no longer maintained. Between and the LOX tank was transferred to NASA and was later removed. The LOX piping and the Cable Tray System were removed in due to excessive rust and deterioration. During a restoration project repaired the ramp surface, replaced handrails, removed light fixtures, and added temporary support structures to the Launch Ramp structural system. Most of the structure of the Launch Ramp, as well as the accompanying Launch Pad Building, remain intact, but are in poor condition. With the exception of a few concrete-block walls, little evidence remains of the rooms under the Launch Stand and Ramp and all of the electrical equipment has been removed.

The Water Storage Tank was removed in The Hazard Storage Shelter (Facility No. was added to the complex in but was razed between and The PTU facility was refurbished in including replacement of doors and a new roll-up door on the south facade. The Blockhouse was restored and converted to meeting space in During the same period, the existing Sentry House, similar to the original, was moved to its current location. Although the machinery associated with the program was removed from the Blockhouse, the original periscopes and many of the original finishes remain intact.

In the Blockhouse concrete roof and perimeter wall was repaired, and this work was continued in A restoration program for the periscopes was undertaken in the late The Blockhouse, Flume and Skimming Basin, Water Demineralization Station, and Subcable Hut and Vault remain in fair-to-good condition. Portions of the Launch Stand and Ramp, Area and Blast Wall, the LOX Storage Area and Blast Wall, the PTU Enclosure, and the POL Building remain in place but are in a very deteriorated condition.76 75 ibid.; Pan American World Airways, Inc., Drawing Master Planning, CCAFS Basic Information Guide; Bramlitt, 98. 76 United States Air Force, Property Cards and Launch Complex 14 files; United States Air Force, Voucher Nos.

and Photograph University of Central Florida, Florida Space Coast History Project, scanned copy provided courtesy of Al Hartmann; Butowsky, National Register Nomination, Master Planning, CCAFS Basic Information Guide; Real Property Cards, Cape Canaveral Air Force Station. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 29) Launch Complex 14 was listed as part of the Cape Canaveral Air Force Station National Historic Landmark District on April 16, Noting the significance of Launch Complex 14, three markers to the Mercury Program have been erected at or near the complex. These include: a Historic Site Kiosk (Facility No. a Mercury Memorial Monument (Facility No. and Mercury Monument (Facility No.

The Mercury Monument is located on ICBM Road at the entrance to Launch Complex 14. This 13 -0 high stainless steel astronomical symbol for the Planet Mercury surrounding the number seven was erected at the close of Project Mercury in to honor the astronauts who participated in the program. Situated at the south end of the Launch Ramp, the Mercury Memorial Monument is a monument to John Glenn, the first American to orbit the Earth in The marble monument was installed in The Historic Site Kiosk is located immediately east of the Blockhouse and was installed in 77 Master Planning, CCAFS Basic Information Guide; Butowsky, National Register Nomination, United States Air Force, Property Cards and Launch Complex 14 files. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 30)

Bibliography

Barton, David and Richard S. Levy. An Architectural and Engineering Survey and Evaluation of Facilities at Cape Canaveral Air Force Station, Brevard County, Florida. Resource Analysts, Inc., 16 March Benson, Charles D. and William B. Faherty. Moonport: A History of Apollo Launch Facilities and Operations. National Aeronautics and Space Administration, Scientific and Technical Information Office, reprint as Gateway to the Moon: Building the Kennedy Space Center Launch Complex and Moon Launch! A History of the Saturn- Apollo Launch Operations, Gainesville: University Press of Florida, Bramlitt, E.R. History of Canaveral District South Atlantic Division, US Army Corps of Engineers, Butowsky, Harry.

Man in Space (Reconnaissance Survey) Denver: National Park Service, National Register of Historic Places Nomination Form/National Historic Landmark Federal Agency Nomination: Cape Canaveral Air Force Station. Washington, National Park Service, Cleary, Mark. Space Wing: Its Heritage, History & Honors Launch Facilities & Programs: Complex 14. Space Wing Office of History, Patrick AFB, The Missile and Space Launches Through Space Wing Office of History, Patrick AFB, Eastern Range Launches, 11 December Eastern Test Range Launch Complexes, Cape Canaveral AFS. Space Wing Office of History, Patrick AFB. 16 April Exploring Space Project Mercury. U.S. National Aeronautics and Space Administration. Sweetsir Collection Box 12. Kennedy Space Center: Kennedy Space Center Archives. Gibson, James N.

Nuclear Weapons of the United States: An Illustrated History. Atglen, PA: Schiffer Publishing, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 31) Hall, R. Cargill. Civil-Military Relations in America s Early Space Program. In The U.S. Air Force in Space: to the Century, Proceedings Air Force Historical Foundation Symposium, Andrews AFB, Maryland, September ed. R. Cargill Hall and Jacob Neufeld, Washington, DC: USAF History and Museums Program, United States Air Force, Hartmann, Al, volunteer, Air Force Space and Missile Museum. Interview by author, 30 April, 28 May, and 16 June CCAFS. Notes from interview and e-mail. Archaeological Consultants, Inc., Sarasota. Lethbridge, Clifford J. Atlas A Fact Sheet.

Spaceline.org, Spaceline, Inc., Atlas-Able Fact Sheet, Spaceline.org, Spaceline, Inc., Atlas-Agena A Fact Sheet. Spaceline.org, Spaceline, Inc., Atlas-Agena D Fact Sheet. Spaceline.org, Spaceline, Inc., Atlas-B Fact Sheet, Spaceline.org, Spaceline, Inc., Atlas-D Fact Sheet, Spaceline.org, Spaceline, Inc., Atlas E Fact Sheet. Spaceline.org, Spaceline, Inc., Atlas F Fact Sheet. Spaceline.org, Spaceline, Inc., Atlas Program Background. Spaceline.org, Spaceline, Inc., Cape Canaveral Rocket and Missile Box Scores. Spaceline.org, Spaceline, Inc., Lockyer, William A., Jr. A Summary of Major NASA Launchings: October 1, 1958-September 30, KSC Historical Report No. 1. John F. Kennedy Space Center: KSC Historical Services, Master Planning. CCAFS Basic Information Guide: Facilities at CCAFS and KSC 2.

Kennedy Space Center: Space Gateway Support, October Maurice H. Connell & Associates, Inc. Complex 14 Modifications. Drawing Research Planning/Design Engineering Office, Kennedy Space Center. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 32) Messick, Denise P., Cynthia G. Rhodes, and Charles E. Cantley. Space Wing Cultural Resource Management Plan. Technical Report No. Stone Mountain, Georgia: New South Associates, Neufeld, Jacob. The Development of Ballistic Missiles in the United States Air Force, Washington, Office of Air Force History, United States Air Force, Pan American World Airways, Inc. Air Force Eastern Test Range: Complex 14. Cover Sheet and Drawings and 01- Research Planning/Design Engineering Office, Kennedy Space Center.

Basic Information Guide, Cape Canaveral Missile Test Annex, Research Planning/Design Engineering and Real Property Offices, Kennedy Space Center. Basic Information Guide, Cape Canaveral Missile Test Annex, Research Planning/Design Engineering and Real Property Offices, Kennedy Space Center. Basic Information Guide, Cape Canaveral Missile Test Annex, Research Planning/Design Engineering and Real Property Offices, Kennedy Space Center. Basic Information Guide, Cape Canaveral Air Force Station, Research Planning/Design Engineering and Real Property Offices, Kennedy Space Center. Photographs. Space Wing History Office, Patrick Air Force Base. Scanned copy provided courtesy of Al Hartmann. Photographs. University of Central Florida, Florida Space Coast History Project.

Scanned copy provided courtesy of Al Hartmann. Real Property Cards, Cape Canaveral Air Force Station. Space Wing Office of History, Patrick AFB. Spires, David N. The Air Force and Military Space Missions: The Critical Years, in The U.S. Air Force in Space: to the Century, Proceedings Air Force Historical Foundation Symposium, Andrews AFB, Maryland, September ed. R. Cargill Hall and Jacob Neufeld, Washington, DC: USAF History and Museums Program, United States Air Force, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 33) United States Air Force. Real Property Accountable Record-Inventory Detail. Launch Complex 14 files. Property Cards 1684A, and Space Gateway Support Company, GIS Real Property Office, John F. Kennedy Space Center. Real Property Voucher. Voucher Nos.

and Space Gateway Support Company, GIS Real Property Office, John F. Kennedy Space Center. Wade, Mark. Atlas Able. Astronautix.com/lvs/atlas able.html, SpaceBank.com,

Historic Drawings

As of the technical drawings used for research in this study have not been cleared for release to the public domain. It is, therefore, not possible to reproduce in this document the drawings used to gather information about the design, construction, and use of facilities at Launch Complex 14, CCAFS. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 34) APPENDIX: FIGURES FROM DATA PAGES Figure 1. Location of Launch Complex 14, CCAFS. Air Force Space and Missile Museum. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 35) Figure 2. Preparation for launch of an Atlas-Agena A with MIDAS payload, May 24, Photograph ETR Atlas located at San Diego Aerospace Museum. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 36) Figure 3.

Launch of the first successful orbital flight of Mercury capsule, Mercury 4, September 13, Photograph ETR Atlas located at San Diego Aerospace Museum. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 37) Figure 4. Launch of Gemini Target Vehicle 9A utilizing Atlas-Agena D configuration, June 1, Photograph ETR Atlas located at San Diego Aerospace Museum. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 38) Figure 5. Demolition of Service Structure, December 1, Photograph U.S. Air Force, located at University of Central Florida, Florida Space Coast History Project. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 39) Figure 6.

Senator John Glenn at the Dedication of the Mercury Memorial Monument, February 20, Photograph NASA, located at University of Central Florida, Florida Space Coast History Project. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 40) Figure 7. Launch Stand and Ramp and Rails for Mobile Service Structure under construction, ca. Photograph located at University of Central Florida, Florida Space Coast History Project. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 41) Figure 8. Mercury-Atlas 9 in preparation for launch, May 15, Note Launch Stand and Ramp, Umbilical Mast behind Ramp, Service Structure to left of Ramp, and LOX and GN2 Storage Area in foreground. Photograph located at San Diego Aerospace Museum.

CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 42) Figure 9. Preparation for Mercury-Atlas 9, May 10, Mercury-Atlas on Launch Stand with Umbilical Mast. Flume and Skimming Basin in front of Launch Stand. Service Structure at extreme left of photograph. PTU Enclosure and Storage Area to left of Launch Stand. Photograph 63-ma9-93, NASA, located at University of Central Florida, Florida Space Coast History Project. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 43) Figure 10. Preparation for launch of an Atlas-Able, November 26, Mobile Service Structure left of Launch Stand and Umbilical Mast on the right. Photograph ETR Atlas located at San Diego Aerospace Museum. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 44) Figure 11.

Preparation for Atlas A Launch, December 17, Note Storage Area in foreground. Photograph located at San Diego Aerospace Museum. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 45) Figure 12. Launch Complex 14 Blockhouse under construction, Photograph RCA, U.S. Air Force, located at Space Wing History Office, Patrick Air Force Base. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 46) Figure 13. Interior of Launch Complex 14 Blockhouse under construction, Photograph RCA, U.S. Air Force, located at Space Wing History Office, Patrick Air Force Base. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 47) Figure 14.

Preparation for launch of an Atlas B, November 29, Launch Stand, Umbilical Tower on right, and Mobile Service Structure on left prior to modifications for project Mercury. Photograph ETR LC- 14, Atlas located at San Diego Aerospace Museum. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 14 HAER No. (Page 48) Figure 15. Preparation for launch of an Atlas D, May 19, Test Stand and Umbilical Mast in center, and Mobile Service Structure in parking area on left, following modifications for project Mercury. Photograph ETR Atlas 7D, located at San Diego Aerospace Museum.

In context

Cape Canaveral, Florida The place record: every map, photograph and survey of this town.
Brevard County, Florida 134 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Cape Canaveral

24 of 118 records shown

The federal surveyors worked through Cape Canaveral building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Cape Canaveral Air StationHAER FLA,5-CACAN,1-32,823 words
Cape Canaveral Air Force StationHAER FL-8-1232,234 words
Cape Canaveral Air Force StationHAER FL-8-AO27,461 words
Cape Canaveral Air Force StationHAER FL-8-11-B25,294 words
Cape Canaveral Air Force StationHAER FL-8-11-F22,264 words
Cape Canaveral Air Force StationHAER FL-8-11-O19,777 words
Cape Canaveral Air Force StationHAER FL-8-AV18,663 words
Cape Canaveral Air Force StationHAER FL-8-618,475 words
Cape Canaveral Air Force StationHAER FL-8-11-M17,593 words
Cape Canaveral Air Force StationHABS FL-581-A17,410 words
Cape Canaveral Air Force StationHAER FL-8-11-G17,133 words
Cape Canaveral Air Force StationHAER FL-8-11-J16,548 words
Cape Canaveral Air Force StationHABS FL-581-B14,684 words
Cape Canaveral Air Force StationHAER FL-8-11-L13,962 words
Cape Canaveral Air Force StationHABS FL-583-A13,824 words
Cape Canaveral Air Force StationHAER FL-8-11-R13,738 words
Cape Canaveral Air Force StationHABS FL-581-C13,646 words
Cape Canaveral Air Force StationHAER FL-8-A12,671 words
Cape Canaveral Air Force StationHAER FL-8-11-D12,041 words
Cape Canaveral Air Force StationHAER FL-8-11-K12,011 words
Cape Canaveral Air Force StationHAER FL-8-11-A11,934 words
Cape Canaveral Air Force StationHAER FL-8-11-P11,823 words
Cape Canaveral Air Force StationHAER FL-8-11-S11,622 words
Cape Canaveral Air Force StationHAER FL-8-11-C11,607 words

Provenance

  • Written history. Quoted verbatim from HAER FL-8-7. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.