From the record

“The Vehicle Assembly Building (VAB) was listed in the National Register of Historic Places on January 21, It is considered significant under Criterion A in the area of Space Exploration, and under Criterion C in the area of Engineering.”

Written record, HAER FL-8-11-B survey. Machine-read text.

Surveyed by the federal HAER program as HAER FL-8-11-B · the record runs 25294 words · one of 123 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

203 words

Source document Quoted word for word from HAER FL-8-11-B. Not written, edited or summarised by this site.

VAB Road, east of Kennedy Parkway North John F. Kennedy Space Center Cape Canaveral Brevard County Florida U.S.G.S. minute Orsino, Florida, quadrangle, Universal Transverse Mercator coordinates: Date of Construction: (modifications for Space Shuttle Program) Architect: URSAM (Max Urbahn [architectural]; Roberts and Schaefer [structural]; Seelye, Stevenson, Value and Knecht [civil, mechanical and electrical]; and Moran, Proctor, Mueser and Rutledge [foundations]), New York Builder: The foundation and flooring were built by the Blount Brothers Corp., Birmingham, Alabama; steel framework by American Bridge Division of U.S. Steel, Atlanta; and building construction by the firms of Morrison- Knudsen Co., Inc., Perini Corp., and Paul Hardeman, Inc., all of California.

Modifications by Frank Briscoe Company, Inc., East Orange, New Jersey. VAB Road, east of Kennedy Parkway North John F. Kennedy Space Center Cape Canaveral Brevard County Florida The VAB1 Utility Ann ex is located to th e west of the VAB at la titude: longitude: The Barge Term inal Facility is located to the southeast of the VAB at latitude: longitude: which represent the so utheast corner of the Barge Term inal Facility s wharf. These coordinates were obt ained on January 8, and February 12, respectively, through Google Earth . The coordinates datum are North American Datum

Present Use

51 words

Source document Quoted word for word from HAER FL-8-11-B. Not written, edited or summarised by this site.

Aerospace Facility-vehicle integration and check-out The VAB Utility Annex houses the prim ary utility equ ipment for the VAB, OPFs, and Therm al Protection System Facility, as well a s support buildings within the LC 39/VAB Area. The Barge Term inal Facility is used as a dock and pier for boats.

Significance

15722 words

Source document Quoted word for word from HAER FL-8-11-B. Not written, edited or summarised by this site.

The Vehicle Assembly Building (VAB) was listed in the National Register of Historic Places on January 21, It is considered significant under Criterion A in the area of Space Exploration, and under Criterion C in the area of Engineering. Because the VAB has achieved significance within the past 50 years, Criteria Consideration G applies. Originally nominated in the context of the Apollo Program, ca. through the VAB has since gained importance in the context of the Space Shuttle Program, ca. to The period of significance for the VAB is from when the first Space Shuttle vehicle was assembled, through the designated end of the Space Shuttle Program. The Space Shuttle Program is the longest running CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F.

Kennedy Space Center) HAERNo. Page 2 American space program to date. Unlike the Mercury, Gemini and Apollo programs, the emphasis was on cost effectiveness and reusability, as well as the construction of a space station. The VAB is a unique facility, which supports the integration and stacking of the complete Space Shuttle vehicle on the Mobile Launcher Platform Under Criterion C, the VAB contains four large high bays; two of which contain a platform system designed for the size of the Space Shuttle vehicle, and two that contain platforms shaped around the external tank (ET). Each system contains a combination of stationary and moveable platforms, set at various levels, which provide access to specific components.

In addition, the VAB is one of the world's largest buildings by volume at cubic feet. The VAB is of exceptional importance to the Space Shuttle Program, and because it is less than 50 years in age, Criteria Consideration G applies. Report Prepared Patricia Slovinac, Architectural Historian by: Archaeological Consultants, Inc. Blaikie Court, Suite A Sarasota, Florida Date: July CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 3 HISTORICAL INFORMATION NASA's John F. Kennedy Space Center The John F. Kennedy Space Center is National Aeronautics and Space Administration's (NASA) primary Center for launch and landing operations, vehicle processing and assembly, and related programs in support of manned space missions.

It is located on the east coast of Florida, about 150 miles south of Jacksonville, and to the north and west of Cape Canaveral, in Brevard and Volusia Counties, and encompasses almost acres. The Atlantic Ocean and Cape Canaveral Air Force Station (CCAFS) are located to the east, and the Indian River is to the west. Following the launch of Sputnik I and Sputnik II, which placed Soviet satellites into Earth's orbit in the attention of the American public turned to space exploration. President Dwight D. Eisenhower initially assigned responsibility for the U.S. Space Program to the Department of Defense (DoD). The Development Operations Division of the Army Ballistic Missile Agency (ABMA), led by Dr.

Wernher von Braun, began to focus on the use of missiles to propel payloads, or even a man, into space. The United States successfully entered the space race with the launch of the Army's scientific satellite Explorer I on January 31, using a modified Jupiter missile named Juno I. With the realization that the military's involvement in the space program could jeopardize the use of space for peaceful purposes, President Eisenhower established the NASA on October 1, as a civilian agency with the mission of carrying out scientific aeronautical and space exploration, both manned and unmanned.

Initially working with NASA as part of a cooperative agreement, President Eisenhower officially transferred to NASA a large portion of the Army's Development Operations Division, including the group of scientists led by Dr. Werner von Braun, and the Saturn rocket program. NASA became a resident of Cape Canaveral in when the Army Missile Firing Laboratory then working on the Saturn rocket project under the direction of Kurt Debus, was transferred to the agency. Several Army facilities at CCAFS were given to NASA, including various offices and hangars, as well as Launch Complexes 5, 6, 26, and 34.

The MFL was renamed Launch Operations Directorate (LOD) and became a branch office of Marshall Space Flight Center As LOD responsibilities grew, NASA granted the launch team increased status by making it a field center called the Launch Operations Center (LOC), and separating it from 1 Charles D. Benson and William B. Faherty. Gateway to the Moon. Building the Kennedy Space Center Launch Complex. (Gainesville, University Press of Florida, 2 Benson and Faherty, 15. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 4 In May President John F. Kennedy charged NASA and the associated industries to develop a space program that would surpass the Soviet program by landing a man on the moon by the end of the decade.

With the new, more powerful Saturn V rocket and the stepped-up launch schedule, it was apparent that a new launch complex was required, and CCAFS, with twenty-two launch complexes, did not have the space for new rocket facilities. Merritt Island, an undeveloped area west and north of the Cape, was selected for acquisition, and in the Merritt Island Launch Area (MILA, which, with the LOC would become was born. In that year, NASA requested from Congress authority to purchase acres of property, which was formally granted in The U.S.

Army Corps of Engineers (ACOE) acted as agent for purchasing land, which took place between and NASA began gaining title to the land in late taking over acres by outright purchase, which included several small towns, such as Orsino, Wilson, Heath and Audubon, many farms, citrus groves, and several fish camps. Negotiations with the State of Florida provided submerged lands, resulting in the acquisition of property identified on the original Deed of Dedication. Much of the State-provided land was located south of the Old Haulover Canal and north of the Barge Canal. The American program to put a man in space and land on the Moon proceeded rapidly with widespread support. In November the LOC and MILA were renamed John F. Kennedy Space Center to honor the late President.

The space program was organized into three phases: Mercury, Gemini, and Apollo. Project Mercury, initiated in was executed in less than five years. Begun in Project Gemini was the intermediate step toward achieving a manned lunar landing, bridging the gap between the short-duration Mercury flights and the long-duration missions proposed for the Apollo Program. Apollo, the largest and most ambitious of the manned space programs, had as its goal the landing of astronauts on the moon and their safe return to Earth. Providing the muscle to launch the spacecraft was the Saturn family of heavy vehicles. Saturn IB rockets were used to launch the early unmanned Apollo test flights and the first manned flight, Apollo 7, which carried astronauts on a ten-day earth orbital mission.

Three different launch vehicles were used in Apollo: Saturn I, Saturn IB and Saturn V; and three different launch complexes were involved: LC 34 and LC 37 on CCAFS, and LC 39 on KSC (only LC 39 is still active). Altogether, thirty-two Saturn flights occurred (seven from LC 34, eight from LC 37, and seventeen from LC 39, including Skylab and the Apollo-Soyuz Test Project) during the Apollo era. Of the total thirty-two, fifteen were manned, and of the seven attempted lunar landing missions, six were successful. No major launch vehicle failures of either 3 Harry A Butowsky. Reconnaissance Survey: Man in Space. (Washington, National Park Service, 5; Benson and Faherty, 4 Butowsky, 5. 5 Butowsky, 5. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F.

Kennedy Space Center) HAERNo. Page 5 Saturn IB or Saturn V occurred. There were two major command/service module failures, one on the ground (Apollo 1) and one on the way to the Moon (Apollo The unmanned Apollo 4 mission, which lifted off on November 9, was the first Saturn V launch and the first launch from LC 39 at On July 21, the goal of landing a man on the moon was achieved when Apollo 11 astronauts Armstrong, Aldrin, and Collins successfully executed history's first lunar landing. Armstrong and Aldrin walked on the surface of the moon for twenty-two hours and collected twenty-one kilograms of lunar material. Apollo 17 served as the first night launch in December An estimated people saw the liftoff which was the final launch of the Apollo Program.

Skylab, an application of the Apollo Program, served as an early type of space station. With cubic feet of work and living space, it was the largest habitable structure ever placed in orbit, at the time. The station achieved several objectives: scientific investigations in Earth orbit (astronomical, space physics, and biological experiments); applications in Earth orbit (earth resources surveys); and long-duration spaceflight. Skylab 1 orbital workshop was inhabited in succession by three crews launched in modified Apollo (Skylab 2, 3 and 4). Actively used until February Skylab 1 remained in orbit until July 11, when it re-entered Earth's atmosphere over the Indian Ocean and Western Australia after completing orbits.

The Apollo-Soyuz Test Project (ASTP) of July the final application of the Apollo Program, marked the first international rendezvous and docking in space, and was the first major cooperation between the only two nations engaged in manned space flight. As the first meeting of two manned spacecraft of different nations in space, first docking, and first visits by astronauts and cosmonauts into the others' spacecraft, the ASTP was highly significant. The ASTP established workable joint docking mechanisms, taking the first steps toward mutual rescue capability of both Russian and American manned missions in space.

On January 5, President Nixon delivered a speech in which he outlined the end of the Apollo era and the future of a reusable space flight vehicle, the Space Shuttle, which would provide "routine access to space." By commencing work at this time, Nixon added, "we can have the Shuttle in manned flight by and operational a short time after that." The Space Task Group previously established by President Nixon in February to recommend a future course for the U.S. Space Program, presented three choices of long-range space plans. All 6 National Aeronautics and Space Administration (NASA). Facts: John F. Kennedy Space Center. 82. 7 NASA, Facts, 8 NASA, Facts, 91. 9 NASA, Facts, 96. 10 Marcus Lindroos.

"President Nixon's Announcement on the Space Shuttle." (NASA Office of Policy and Plans, NASA History Office, updated April 14, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 6 included an Earth-orbiting space station, a space shuttle, and a manned Mars expedition. Although none of the original programs presented was eventually selected, NASA implemented a program, shaped by the politics and economic realities of its time, that served as a first step toward any future plans for implementing a space station.

On January 5, President Richard Nixon instructed NASA to proceed with the design and building of a partially reusable space shuttle consisting of a reusable orbiter, three reusable main engines, two reusable solid rocket boosters and one non-reusable external liquid fuel tank (ET). NASA's administrators vowed that the shuttle would fly at least fifty times a year, making space travel economical and safe. NASA gave responsibility for developing the shuttle orbiter vehicle and overall management of the Space Shuttle Program to the Manned Spacecraft Center now Johnson Space Center in Houston, based on the Center's experience. in Huntsville, Alabama was responsible for development of the Space Shuttle Main Engine (SSME), the ET, and for all propulsion-related tasks.

Engineering design support continued at and NASA's Langley Research Center (LaRC), in Virginia, and engine tests were to be performed at NASA's Mississippi National Space Technology Laboratories later named Stennis Space Center and at the Air Force's Rocket Propulsion Laboratory in California, which later became the Santa Susana Field Laboratory NASA selected KSC as the primary launch and landing site for the responsible for designing the launch and recovery facilities, was to develop methods for shuttle assembly, checkout, and launch operations. On September 17, the full-scale Orbiter Vehicle (OV) prototype Enterprise (OV- was completed.

Designed for test purposes only and never intended for space flight, structural assembly of this orbiter had started more than two years earlier in June at Air Force Plant (AFP) 42 in Palmdale, California. Although the Enterprise was an aluminum shell prototype incapable of space flight, it reflected the overall design of the orbiter. As such, it served successfully in as the test article during the Approach and Landing Tests (ALT) aimed at checking out both the mating with the Boeing 747 Shuttle Carrier Aircraft (SCA) for ferry operations, as well as the orbiter's unpowered landing capabilities.

The first orbiter intended for space flight, Columbia (OV-102J, arrived at KSC from the shuttle assembly facility in Palmdale, California in March Originally scheduled to lift off in late 11 National Aeronautics and Space Administration (NASA), History Office, NASA Headquarters. "Report of the Space Task Group, 12 Dennis R. Jenkins. Space Shuttle, The History of the National Space Transportation System. The First 100 Missions. (Cape Canaveral, Florida: Specialty Press, 99. 13 Jenkins, 14 Linda Neuman Ezell. NASA Historical Databook Volume III Programs and Projects The NASA History Series, NASA (Washington, NASA History Office, Table Ray A. Williamson. "Developing the Space Shuttle." Exploring the Unknown: Selected Documents in the History of the U.S.

Civil Space Program, Volume IV: Accessing Space. (Edited by John M. Logsdon. Washington, U.S. Printing Office, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 7 the launch date was delayed by problems with both the SSME components as well as the thermal protection system Columbia spent 610 days in the Orbiter Processing Facility (OPF), another thirty-five days in the Vehicle Assembly Building (VAB) and 105 days on Pad 39A before finally lifting off on April 12, the first orbital test flight and first Space Shuttle Program mission, ended with a landing on April 14 at Edwards Air Force Base (AFB) in California.

This launch demonstrated Columbia's ability to fly into orbit, conduct on-orbit operations, and return safely. Columbia flew three additional test flights in and all with a crew of two. The Orbital Test Flight Program ended in July with 95 percent of its objectives completed. After the end of the fourth mission, President Ronald Reagan declared that with the next flight the Shuttle would be "fully operational." A total of 122 Space Shuttle missions have been launched from the KSC between April and March From April until the Challenger accident in January between two and nine missions were flown yearly, with an average of four to five per year. The milestone year was when nine flights were successfully completed.

The years between and were the most productive, with seven or eight yearly missions. Since in addition to its unique responsibility as the shuttle launch site, KSC also became the preferred landing site. Over the past two decades, the SSP has launched a number of planetary and astronomy missions including the the Galileo probe to Jupiter, Magellan to Venus, and the Upper Atmospheric Research Satellite. In addition to astronomy and military satellites, a series of Spacelab research missions were flown which carried dozens of international experiments in disciplines ranging from materials science to plant biology. Spacelab was a manned, reusable, microgravity laboratory flown into space in the rear of the Space Shuttle cargo bay.

It was developed on a modular basis allowing assembly in a dozen arrangements depending on the specific mission requirements. The first Spacelab mission, carried aboard Columbia began on November 28, Four Spacelab missions were flown between and Following a hiatus in the aftermath of the Challenger disaster, the next Spacelab mission was not launched until In total, twenty-four Space Shuttle missions carried Spacelab hardware before the program was decommissioned in In addition to astronomical, atmospheric, microgravity, and life sciences missions, Spacelab was also used as a supply carrier to the HST and the Soviet space station Mir. In a joint U.S./Russian Shuttle-M/r Program was initiated as a precursor to construction of the International Space Station (ISS).

Mir was launched in February and remained in orbit 15 Jenkins, 16 National Aeronautics and Space Administration (NASA). NASA Shuttle Reference Manual. 17 which landed on May 3, was the final Spacelab mission. National Aeronautics and Space Administration (NASA). "Shuttle Payloads and Related Information." KSC Factoids. Revised November 18, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 8 1 Q until March The first approach and flyaround of Mir took place on February 3, the first Mir docking was in June During the three-year Shuttle-M/r Program (June 27, to June 2, the Space Shuttle docked with Mir nine times. All but the last two of these docking missions used the Orbiter Atlantis. In Dr.

Norman Thagard was the first American to live aboard the Russian space station. Over the next three years, six more U.S. astronauts served tours on Mir. The Shuttle served as a means of transporting supplies, equipment and water to the space station in addition to performing a variety of other mission tasks, many of which involved earth science experiments. It returned to Earth experiment results and unneeded equipment. The Shuttle-M/r program served to acclimate the astronauts to living and working in space. Many of the activities carried out were types they would perform on the ISS. On December 4, Endeavour launched the first component of the ISS into orbit.

As noted by Williamson, this event marked, "at long last the start of the Shuttle's use for which it was primarily designed - transport to and from a permanently inhabited orbital space station." launched on May 27, marked the first mission to dock with the ISS. Since that time, most Space Shuttle missions have supported the continued assembly of the space station. As currently planned, ISS assembly missions will continue through the life of the Space Shuttle Program. The SSP suffered two major setbacks with the tragic losses of the Challenger and Columbia on January 28, and February 1, respectively. Following the Challenger accident, the SSP was suspended, and President Ronald Reagan formed a thirteen-member commission to identify the cause of the disaster.

The Rogers Commission report, issued on June 6, which also included a review of the concluded "that the drive to declare the Shuttle operational 91 had put enormous pressures on the system and stretched its resources to the limit." In addition to mechanical failure, the Commission noted a number of NASA management failures that contributed to the catastrophe. As a result, among the tangible actions taken were extensive redesign of the upgrading of the Space Shuttle tires, brakes, and nose wheel steering mechanisms; the addition of a drag chute to help reduce speed upon landing; the addition of a crew escape system; and the requirement for astronauts to wear pressurized flight safety suits during launch and landing operations.

Other changes involved reorganization and decentralization of the NASA moved the management of the program from JSC to NASA Headquarters, with the aim of preventing communication deficiencies. Experienced astronauts were placed in key NASA management positions, all documented waivers to existing flight Tony Reichhardt (editor). Space Shuttle, The First 20 Years. (Washington, Smithsonian Institution, 85. 19 Judy A. Rumerman, with Stephen J. Garber. Chronology of Space Shuttle Flights (Washington, NASA History Division, Office of Policy and Plans, October 3. 20 Williamson, 21 Columbia Accident Investigation Board (CAIB). Report Volume 1. (August 25. 22 CAIB, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo.

Page 9 safety criteria were revoked and forbidden, and a policy of open reviews was implemented. In addition, NASA adopted a Space Shuttle flight schedule with a reduced average number of launches, and discontinued the long-term practice of launching commercial and military payloads.24 The launch of Disco very from KSC Pad 39B on September 29, marked a Return to Flight after a thirty-two-month hiatus in manned spaceflight following the Challenger accident. In the aftermath of the Columbia accident, a seven month investigation ensued, concluding with the findings of the Columbia Accident Investigation Board (CAIB), which determined that both technical and management conditions accounted for the loss of the orbiter and crew.

According to the CAIB Report, the physical cause of the accident was a breach in the thermal protection system on the leading edge of the left wing, caused by a piece of insulating foam, which separated from the ET after launch and struck the wing. NASA spent more than two years researching and implementing safety improvements for the orbiters, and ET. Following a two-year hiatus, the launch of on July 26, marked the first Return to Flight since the loss of Columbia. On January 14, President George W. Bush outlined a new space exploration initiative in a speech given at NASA Headquarters. Today I announce a new plan to explore space and extend a human presence across our solar system . . . Our first goal is to complete the International Space Station by . .

The Shuttle's chief purpose over the next several years will be to help finish assembly of the International Space Station. In the Space Shuttle after nearly 30 years of duty will be retired from service. . . Our second goal is to develop and test a new spacecraft, the Crew Exploration Vehicle, by and to conduct the first manned mission no later than . . Our third goal is to return to the Moon by as the launching point for missions beyond... Following the President's speech, NASA released The Vision for Space Exploration, which outlined the Agency's approach to the new direction in space exploration. In NASA announced the start of the Constellation Program, which included development of the Crew Exploration Vehicle (CEV) and a launch vehicle to place the CEV into space.

As part of this initiative, NASA will continue to use the Space Shuttle to complete assembly of the ISS. The 23 Cliff Lethbridge. "History of the Space Shuttle Program." 4. 24 Lethbndge, 5. 25 CAIB, 9. 26 The White House. "A Renewed Spirit of Discovery - The President's Vision for Space Exploration." (January 27 National Aeronautics and Space Administration (NASA), Headquarters. "The Vision for Space Exploration." (February CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 10 Shuttle will not be upgraded to serve beyond and, after completing the ISS, the Space Shuttle Program will be retired.

The next generation of human-rated spacecraft, the CEV, named Orion, will transport humans to low Earth orbit for missions to support the ISS, and will also be the vehicle used to carry a crew to lunar orbit. The Constellation Program will develop the new class of exploration vehicles to launch both crew and cargo and associated infrastructure in exploring the Moon, Mars, and beyond. Development of LC 39 and VAB Areas Today, KSC maintains operational control over acres, all located in Brevard County. The major facilities are located within the Industrial Area, the LC 39 Area, the VAB Area, and the Shuttle Landing Facility Area. The LC 39 and VAB Areas were developed primarily to support launch vehicle operations and related launch processing activities.

They contain the VAB, the Launch Control Center the OPF, the two Launch Pads, A and B, and other support facilities. Following completion of the Apollo-Soyuz Test Project in the facilities of KSC were modified to support the Space Shuttle Program. KSC was originally one of three possible launch sites evaluated, along with Vandenberg AFB in California and the White Sands Missile Range in New Mexico. Compared with the other two locations, KSC had the advantage of approximately $1 billion in existing launch facilities. Thus, less time and money would be needed to modify existing facilities at KSC rather than to build new ones at another location. The estimates of to million to modify the existing KSC facilities was roughly half the cost of new construction.

In addition, only KSC had abort options for a first revolution return of the low TO cross-range orbiter. To help keep costs down, beginning ca. KSC engineers adapted and modified many of the Apollo launch facilities to serve the needs of the Space Shuttle Program. Among the key facilities undergoing change were the VAB, the and LC 39 Pads A and B. New facilities were constructed only when a unique requirement existed. The major new structures included the SLF and the OPFs. Multi-million dollar contracts for design and construction were awarded to both national and local firms, including Reynolds, Smith and Hills of Jacksonville, Florida; the Frank Briscoe Company, Inc. of East Orange, New Jersey; the Algernon Blair Industrial Contractors, Inc.

of Norcross, Georgia; the Holloway Corporation of Titusville, Florida; and W&J Construction Corporation of Cocoa, Florida. Alterations to the VAB included modification of two of the four high bays for assembly of the Space Shuttle vehicle, and changes to the other two high bays to accommodate the processing and stacking of the and ET. The north doors were widened by almost 40' to permit entry Jenkins, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 11 of the towed orbiter. Work platforms shaped to fit the shuttle configuration were added to High Bay 3 where shuttle assembly takes place, and internal structural changes were also made to High Bay 4, where the ETs are processed.

Major changes were made to LC 39, Pads A and B. Modifications were completed in mid-1978 at Pad A and in at Pad B. With the exception of the six fixed pedestals which support the Mobile Launcher Platform all of the structures on the hardstands of each pad were removed or relocated. Fuel, oxidizer, high-pressure gas, electrical, and other service lines were rerouted.

New hypergolic fuel and oxidizer support areas were constructed at the southwest and southeast corners, respectively, of the pads; the unneeded Saturn fuel support area was removed, a new Fixed Service Structure was erected using the original Apollo-era Launch Umbilical Tower (LUT), a Rotating Service Structure was added, the Saturn flame deflectors were replaced, and a Payload Changeout Room and Payload Ground Handling Mechanism were added. A sound suppression water system was installed on the pads to reduce the acoustical levels within the orbiter's payload and thus, to protect it and its payloads from damage. A related system, the Overpressure Suppression System, was installed to reduce the pressure pulse at SRB ignition.

Additional changes were made to Pad A and Pad B in the aftermath of the Challenger accident; other modifications followed the Return to Flight in Among the modifications were the installation of new weather protection structures to supplement the improvements in temperature and humidity controls at the PCR of the upgrades to the emergency exit system, including the addition of two slidewire baskets; installation of new elevators on the and improvements to the pad communications system. Changes were first made at Pad B, followed by identical changes at Pad A. The Vehicle Assembly Building Construction The VAB was originally built to support the vertical assembly of the Saturn launch vehicles used for the Apollo, Skylab and the Apollo-Soyuz programs.

It was designed by a combination of four New York architectural and engineering firms, organized in as URSAM. Initially, URSAM was hired to compile detailed design criteria for the VAB; their first proposal was 29 VAB was originally an acronym for Vertical Assembly Building. On February 3, it was officially renamed the Vehicle Assembly Building, because "[t[he new name, it was felt, would more readily encompass future as well as current programs and would not be tied to the Saturn booster." The name change, however, was not formally approved by the Office of Manned Space Flight until September of that year.

Benson and Flaherty, 30 This acronym was created using the first letter in each company's name: Max Urbahn [architectural]; Roberts and Schaefer [structural]; Seelye, Stevenson, Value and Knecht [civil, mechanical and electrical]; and Moran, Proctor, Mueser and Rutledge [foundations]. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 12 presented to KSC in September In October of that year, URSAM presented the final manual, entitled "Criteria for C-5 Vertical Assembly Building" to the ACOE, and in December, IT the firm was awarded the design contract. Due to the location and necessary size of the structure, URSAM faced many design challenges.

One concern was that acoustical pressures decibels) from the launch of the Saturn rockets could damage the surface; therefore the exterior skin had to be capable of resisting those pressures. The firm analyzed various materials, and decided to use insulated aluminum panels fastened to steel girders. Another concern, according to architect Max Urbahn, was "the fascinating possibility that the shape of the building might make it react like an immense box kite," causing it to "blow away in a high wind." The solution was to design a pile foundation that would prevent this from happening. High windloads can also cause sidesways in extremely tall buildings, and Florida was subject to hurricanes for five months out of a year.

Therefore, substantial cross-bracing was necessary for the building's structural stability. This presented a very unique problem with regard to the functional design of the building. The work flow was designed to proceed with individual rocket segments entering the Low Bay and being placed in one of the eight check-out cells for processing. Once that was completed, the segment would be moved into the High Bay and stacked in one of the four integration bays. Therefore, the transfer aisle had to be clear of all obstructions at ground level, and large openings were required between the transfer aisle and the four high bays.

As a result, URSAM positioned the openings from the aisle to the high bays above the level, allowing two continuous steel frameworks along the north-south axis to stabilize the structure. The final design of the VAB was approved by NASA and the ACOE on September 23, Site preparation for construction of the VAB began on October 31, when the Gahagan Dredging Corporation of Tampa, Florida, began to clear the land. They completed their task in September after dredging approximately 618 acres in total. On July 11, an $8 million contract was awarded to the Blount Brothers Construction Corporation to provide the foundations and flooring.

On August 2, about one month before dredging operations were complete, the first two foundation piles were driven into the ground, to a depth of approximately 31 Benson and Flaherty, 32 URSAM. "Data Manual for Vertical Assembly Building Associated Facilities and Site Work." (9 June Section II.A.l, p. 1. The final design contract amounted to which included not only the VAB, but the LCC and other nearby facilities. Benson and Flaherty, 33 "Building Presents Many Architectural Challenges." Spaceport News (3, 3) 16 January 3; Benson and Flaherty, 34 "Architectural Challenges." 35 Benson and Flaherty, 36 Benson and Flaherty, 37 Benson and Flaherty, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo.

Page 13 By the time the foundation was completed, in May more than piles were driven into the ground, and slightly less than 1.4 million cubic feet of concrete were poured. On July 9, the American Bridge Division of U.S. Steel Corporation, Atlanta, Georgia, and NASA signed a million contract for metric tons of structural steel, and the erection of the VAB's skeletal framework. While Blount Brothers prepared the foundation, U.S. Steel was busy fabricating the various structural members for the building.

American Bridge began erecting the VAB framework for the Low Bay area in January around the same time that a million contract was awarded to three California construction-engineering firms, Morris on-Knuds en Co., Inc., Perini Corp., and Paul Hardeman, Inc., for construction of the building proper. By April of that year, the skeletal work had progressed far enough to allow Morris on-Knuds en, Perini, and Paul Hardeman to begin their work. On April 14, American Bridge positioned the last structural member, a beam that was painted white and signed by all of the NASA and Corps of Engineers employees and all construction workers who had a hand in the VAB's construction. By interior work, including the construction of the extensible work platforms, had begun.

By the time the VAB was completed, construction costs reached In while the Apollo-Soyuz Program was coming to a close, the engineering firm of Seelye Stevenson Value & Knecht, Inc. prepared drawings to retrofit the VAB High Bays for the use of the Space Shuttle Program. On September 29, a million contract was awarded to the Frank Briscoe Company, Inc.

of East Orange, New Jersey for construction of an ET Processing Support System in and a SRB Processing Storage Facility in and Subsequently, on January 6, Briscoe received additional contracts for construction and modification in including the installation of piping systems for air and gases; cable trays for electrical, operational communication systems and instrumentation lines; as well as electrical and operational communication system cables. Also covered under the contract were numerous smaller access platforms for the extensible platforms. On November 1, Briscoe was awarded a million contract to reconfigure the shuttle work platforms in to install ET 38 Benson and Flaherty, "Work on 52-Story VAB Begins." Spaceport News (2, 34) 22 August 1.

39 This combine would eventually take over control of the contracts between NASA and both the American Bridge Company and Blount Brothers, bringing the contract amount to million. Benson and Flaherty, 40 "Steel Beam Tops Out VAB Work." Spaceport News (4, 15) 15 April 1. 41 "VAB: It Wasn't Always Just There." Spaceport News 8) 10 April, 4. 42 Seelye Stevenson Value & Knecht Inc., New York. "Vehicle Assembly Building Modifications." March Engineering Documentation Center, Kennedy Space Center. They were part of the original design team for the VAB, see page 11. 43 Frank E. Jarrett. "Chronology of KSC and KSC Related Events for 1 November 41. 44 The access platforms were reshaped and relocated to fit the Space Shuttle configuration under another contract. Frank E. Jarrett.

"Chronology of KSC and KSC Related Events for 1 November 1. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 14 checkout cells in and to modify the Low Bay cells. All modifications were scheduled for completion in In May NASA awarded a contract to Sverdrup & Parcel and Associates, Inc. of Jacksonville, Florida to prepare drawings for the conversion of the VAB Low Bay into an SRB facility. On January 10, a million contract was awarded to Holloway Corporation of Titusville for the construction of the SRB Refurbishment Facility.

The contract called for modification of existing facilities in the Low Bay area to serve as shops and work areas related to the refurbishment of expended for reuse, and the removal/modification of the work platforms in four Low Bay cells. All of the modifications in the Low Bay were finished in January Since the initiation of the Space Shuttle Program, the VAB has undergone a few additional alterations. The first occurred in when the American flag and the NASA "worm" logo were painted on the south elevation in honor of the United States' Bicentennial celebration. In the lighting system in the VAB received a major overhaul, mainly due to the different requirements for the space shuttle, and the modern idea of energy conservation.

Designed by NASA and Russell Axom Architects and Engineers of Daytona Beach, the lighting system received an award from the Illuminating Engineering Society of North America for excellence in design and technical engineering, the approach toward efficiency, and the safety factor maintained during installation. Additionally, in was hired to create plans for CO transforming the ET holding cells in and into check-out cells. In further work was carried out with regard to the VAB's role as a "safe haven" for the stacked vehicle. During hurricane season, KSC implemented their "safe haven" plan, which called for the return of a stacked vehicle at the launch pad to the VAB if sustained winds were 69 miles per hour or greater.

This usually meant a return to or and a hold on any scheduled stacking operations. In Rush Construction Corporation of Titusville, Florida, was hired to extend the crawlerway to and restore a buried portion into The contract also called for the addition of MLP pedestals and the removal of cranes and catwalks in enabling this cell to harbor a fully stacked vehicle on an became a safe haven for a horizontal orbiter. 45 Jarrett. "Events for 67. 46 Jarrett. "Events for 75. 47 Jarrett. "Events for 23. 48 Jarrett. "Events for 2. 49 Jarrett. "Events for 75. 50 In the flag was repainted, and the "worm" logo was replaced with the "meatball" logo. 51 "VAB's Ligthing System Wins Engineering Awards." Spaceport News 3) 5 February 4. 52 Reynolds, Smith and Hills, Inc., Jacksonville.

"VAB & 4 ET Holding Cells Upgrade to Checkout Cells." February Engineering Documentation Center, Kennedy Space Center. 53 'safe haven' makes room for more." Spaceport News 17) 20 August CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 15 After forty years of service and a thorough inspection in the doors of the VAB underwent restoration. Between through each vertical lift door section was individually removed, repaired (which included the replacement of siding, buffers and limit switches), sandblasted, and repainted. Finally, in KSC initiated minor modifications on and to support the new space program, Constellation.

VAB Shuttle Component Processing/Vehicle Integration Functions Currently, and which face east, are used for the integration and stacking of the complete Space Shuttle vehicle atop the and located on the west side of the building, are used for storage and processing of the Shuttle's ET. Additionally, and serve as safe havens for the Shuttle and orbiter, respectively. External Tank Processing and Inspection The ET is manufactured at the Michoud Assembly Facility in New Orleans and is shipped to KSC on a barge. It arrives at the Barge Terminal Facility, which sits to the southeast of the VAB, and is off-loaded using a special transporter device that travels between the two facilities. It is then towed overland to the VAB, to which it enters through the south transfer aisle door.

The tank is rolled through the transfer aisle into the High Bay area, and is positioned next to either or Here, two cranes are attached to the tank using special slings designed to interface with the tank's structure. The largest crane, rated at 325-tons, is connected to the forward end; the other crane, rated at 175-tons, is attached to the aft end. Together, these two cranes lift the ET off of the transporter and rotate the tank to the vertical position (Photo A-8). Then, the 175-ton crane is disconnected, and the 325-ton crane lifts the tank over the level, through the diaphragm for or and into one of two ET cells (West or East). While the ET is being positioned within a cell, all extendible platforms are in the retracted (storage) 56 position.

Once the tank is in place, all of the extendible platforms are moved into position, using cranes or winches, following a specific sequence due to their shape. A deviation in the sequence could cause damage to the platforms or the ET itself. The tank is then inspected from top to bottom for any damage that might have occurred during the shipping process. Following the initial inspection, the ET is either stored for future use, or processed for integration as part of a space shuttle vehicle. Generally, if the tank is to be stored, it is placed in the West Cell, which is Linda Herridge. "Vehicle Assembly Building doors getting a face-lift." Spaceport News 21) 27 October 1 and 5. 55 All cranes are operated by the Cranes, Doors and Platforms Division, an independent contractor. Mike Saltsman.

Interview with Patricia Slovinac, Vehicle Assembly Building, 14 October 56 KSC Ground Operations. "USA Processing of Space Shuttle External Tank." On file, ET/SRB Operations Office, 57 Ed Carillion. Interview with Patricia Slovinac, Vehicle Assembly Building, 15 October CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 16 equipped with the minimal amount of extendible platforms necessary for the initial inspection. If the tank is to be processed immediately, it is placed in the East Cell, which contains a full set of extendible platforms on all levels. After the ET is cleared for processing, a series of tasks is performed in preparation for the tank to be mated to the and orbiter.

First, the internal liquid hydrogen and liquid oxygen tanks are prepped for check-out (filled with inert gaseous nitrogen and gaseous helium), and the pneumatic press and sense lines are installed. Then, the Ground Umbilical Carrier Assembly (GUCA) is installed, using a pyrotechnic bolt, and spray foam is applied to the aft hard point close-out area. Subsequently, the GUCA undergoes a leak check. Following this, an electrical test is conducted on all systems to verify that all sensors and wiring paths are performing to specification. Next, the hydrogen and oxygen vent valves are installed and a series of pneumatic checks is conducted to verify their performance.

In addition, the hydrogen and oxygen umbilicals are inspected and set for proper interfacing with the orbiter half, and then TPS closeouts are installed on these umbilicals. Finally, a top-to-bottom inspection is carried out to confirm that the ET is ready to be mated to the Once the ET processing is complete (it generally takes ten to fifteen working days), the extendible platforms are retracted, and the tank is prepared either to be stored, or to be moved into or for mating. Space Shuttle Vehicle Integration and Check-out Integration of the complete space shuttle vehicle occurs in either or The first step in this process is the delivery of the MLP to the proper bay, through the combination sliding and lifting door on the east elevation, by the crawler transporter.

The crawler transporter places the MLP on the six support pedestals in the proper bay, before retracting and exiting the VAB, after which the bay's door is closed. Once the MLP is in place, the four hold down posts for each SRB are optically aligned to ensure stability, and the two lower extendible platforms (Platforms D and B) are in place, stacking of the vehicle can commence. The first part of the shuttle to be stacked is either the starboard or port SRB aft motor, which is brought to the VAB from the Rotation, Processing, and Surge Facility through the north transfer aisle door. The motor is aligned with the proper bay and lifted using the 58 Carillion; KSC Ground Operations; NASA. "NASA Centers and Responsibilities." News Reference Manual. 59 KSC Ground Operations; Anonymous.

"ET Processing at On file, ET/SRB Operations Office, 60 Ron Tucker. Interview with Patricia Slovinac, Vehicle Assembly Building, 13 May Seelye Stevenson Value & Knecht, Inc. Data Manual for Design of Vehicle Assembly Building Modifications, Submittal. 31 March On file, KSC Archives. 61 Since the fueled SRB segments have been received from their manufacturer in Utah at the Rotation, Processing, and Surge Facility, to the north of the VAB. Here, they are rotated to vertical, inspected, processed, and then stored in one of the surge buildings, until their turn in the Space Shuttle stacking procedure. ACT Survey and Evaluation of NASA-owned Historic Facilities and Properties in the Context of the U.S.

Space Shuttle Program; CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 17 overhead crane. The motor is then carried through the diaphragm and placed on the hold down posts on the designated side, where it is attached using pyrotechnic bolts. Then, either the next segment for that or the second aft motor is brought in for integration from the The SRB stacking operations follow these procedures until each is four segments high, with the joint seals being visually inspected when every segment is mated (Photos A-9 and A-10). Once all four segments for each SRB are in place, a leak check and decay test is performed to verify integrity.

After verification, the forward skirt/nose assemblies are brought to the VAB from the SRB Assembly and Refurbishment Facility (ARF) for integration. Like the segments, they are lifted and maneuvered through the diaphragm, lowered into their proper positions, and attached. Then, an alignment check is performed, and the integrated and automated systems are tested using the Launch Processing System to simulate the ET and the orbiter. This entire process generally takes eighteen to twenty-two working days to complete, assuming no problems. When stacking and testing of the two is complete, the ET can be brought in for mating. The tank is lifted out of storage in or via the 325-ton overhead crane and moved into the transfer aisle.

It is then positioned alongside the bay where the vehicle is being stacked, lifted over that particular bay's diaphragm, and lowered into place (Photos A-ll and A-12). As with the SRB stacking procedure, Platforms D and B are extended. The ET is then mated to the after which an interface test is conducted to ensure that the and ET are communicating with each other properly. Typically, the ET mating process takes place during one working day, and the close-out and interface tests require two to three working days. Once this is complete, and all extendible platforms have been retracted, mating of the orbiter can begin. The shuttle's orbiter (Discovery, Atlantis, or Endeavour) enters the VAB through the north transfer aisle door, following a specific path denoted with painted lines.

While in the transfer aisle, the two overhead cranes are attached to the orbiter with special slings, the 325-ton at the forward end and the 175-ton crane at the aft end. The orbiter is then rotated to a vertical position, John F. Kennedy Space Center Brevard County, Florida. On file, NASA Appendix C; "Rotation/Processing Building." 62 The inert or non-propellant SRB elements, which include the forward skirt/nose cone assemblies, as well as the aft skirts and frustums, are processed at the SRB Assembly and Refurbishment Facility. On some occasions, the forward skirt/nose assembly are delivered to the VAB well in advance of stacking procedures, and stored in one of the Low Bay cells. ACI, Appendix C, Assembly and Refurbishment Facility;" Ron Tucker.

Interview with Patricia Slovinac, Vehicle Assembly Building, 13 October 63 Tucker, 13 May "NASA Centers and Responsibilities." 64 Tucker, 13 May "NASA Centers and Responsibilities." 65 The orbiter is processed in one of three bays of the OPF, which sits to the northwest of the VAB. As with the SRB segments, the orbiter is not transported to the VAB until its turn in the stacking procedure. ACI, Appendix C, "Orbiter Processing Facility." During the initial evaluation of the use of the VAB for the Space Shuttle Program, it was discovered that the orbiter's wheel loads were too great for the general expanse of the transfer aisle floor. However, as long as the wheels were rolled along over existing beams, the floor would hold. Reynolds Smith and Hills.

Preliminary Engineering Report, Vehicle Assembly Building Modifications. 31 August On file, KSC Archives. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 18 after which the aft crane is removed. While in the vertical position, photographs are taken of the wing leading edges and the underside of the orbiter. The 325-ton crane then lifts the orbiter above the level and rotates it 45 degrees, following a guide-line painted on the floor. The orbiter is then carried through the diaphragm opening and lowered into position. Platforms D and B are then extended so that the orbiter can be attached to the ET, first at the aft end, and then at the forward end. This process generally takes seven working days.

Afterwards, the upper two extendible platforms (Platforms E and C) are moved into place, and check-out procedures are begun. As part of this process, all umbilicals are connected, and then electrical and mechanical verification tests are conducted to verify all connections. Following this, all vehicle and vehicle- to-ground interfaces are checked using the Finally, the ordnance devices are installed on the vehicle. Once everything is complete, the platforms are retracted, the crawler transporter is brought in, and the space shuttle and MLP are moved to the launch pad (Photos A-13 through A- Miscellaneous Shops and Laboratories Within the Low Bay area of the VAB are a few labs, which directly relate to the Space Shuttle Program.

The first of these is the Imaging Lab, which collects and assembles video data from all launch sequences. The video is then viewed here to determine if there were any anomalies during the launch procedures. This lab has gained new importance since the Columbia accident in The second Low Bay facility is the Kennedy Avionics Test Set (KATS) Laboratory. Here, the main engine control box and all on-board computers are tested to be sure that they are functioning properly. Although the panel housing is left over from the Apollo Program, all consoles were specifically built for the shuttle. A third Low Bay facility is the Shuttle Wheel and Tire Shop All orbiter tires come to this facility from the OPF.

The main tires (aft end) are generally good for one flight; the nose tires are good for two flights. Once the tires reach the a bead breaker is used to remove the tire from the rim, which is then split and cleaned. The old tire is sent to the Logistics Facility 66 This action was initiated in response to the Columbia accident. Once in space, the orbiter conducts a roll-over, which allows the astronauts in the International Space Station to photograph the same areas. These images are then sent to where they are compared with those taken in the VAB, to ensure the TPS is intact. Tucker, 13 May 67 During stacking operations, the top of the orbiter faces west towards the transfer aisle.

However, the diaphragm is narrower than the full wingspan of the orbiter, and the cost of widening the opening was prohibitive. Thus, this rotation is necessary to enable the orbiter to enter the high bay cells for integration. Tucker, 13 May 68 The final ordnance connection and flight close-out occurs at the launch pad. "NASA Centers and Responsibilities." 69 Tucker, 13 May "NASA Centers and Responsibilities." 70 Tucker, 13 October 71 Tucker, 13 October CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 19 for scrap, and the new tire is brought in from Logistics and installed on the rim. After this, the tire undergoes an initial inflation and a twenty-four hour pressure check.

If it passes, an electrical check is performed on the tire, followed by a second pressure check that lasts for forty-eight hours. If all goes well, the tire is then placed in a large freezer for 96 hours, after which it is checked for air and nitrogen loss. This freezer test is highly important since it mimics conditions in space, and ensures that the tires are capable of being used for landing after a mission. Once all of this is completed, three longer term checks are performed on the tires to certify them for flight. All of this takes roughly sixty days. Once certified, the tires are taken back to the OPF for installation on the orbiter. Another Low Bay facility is the Flight Crew Systems, which processes all flight kits for every shuttle mission.

Originally, this lab was located in Hangar S at CCAFS. At an unknown date, it moved to the Operations and Checkout (O&C) Building; and then to the VAB in The process of assembling a flight kit, considered a "Critical 1" application, is relatively simple. The pieces for the kit come into the lab, where they are individually cleaned, inspected, and assembled. After assembly, the kit is taken to a back corner of the room where electricians confirm that everything is functioning properly. Once the electrical check is complete, the kit is placed in a wood box and taken to the check-out area. Here, the kit undergoes final testing procedures prior to being installed in the orbiter. The Flight Kits laboratory also disassembles all flight kits after the mission is completed.

The final Low Bay laboratory is the Remote Manipulator System lab. Here is where all sections of the RMS are delivered from their Canadian manufacturing plant for assembly. The pieces are shipped individually in canisters, and enter the lab through one of the rolling doors (canisters can be seen in Photos 42 and An overhead crane lifts the lid, and then the arm piece is removed, and tested (Photo A-19). Once it is confirmed that each segment is working properly, they are assembled into a complete The entirety is then tested prior to being delivered to the OPF for installation into the orbiter. Additionally, prior to being returned to the manufacturing plant, the RMS lab performs maintenance on the various canisters. 72 Larry Griek.

Interview with Patricia Slovinac, Vehicle Assembly Building, 13 October 73 "Flight kits are groups of instruments that provide power, coolants and fittings for shuttle payloads. The flight kits are designed to make these payloads adaptable to the orbiter." Ken Nail, Jr. and Elaine Liston. "Chronology of KSC and KSC Related Events for 1 March Critical 1" means that the mission cannot occur without the necessary flight kits. Herb Kanady, Jr. Interview with Patricia Slovinac, Vehicle Assembly Building, 13 October 74 Kanady. 75 Pat Manning. Interview with Patricia Slovinac, Vehicle Assembly Building, 13 October Anna Heiney. "Lending a Hand, an Arm... and a Boom." Spaceport News 5) 4 March 3. All of the testing equipment in the lab is new.

CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 20 Physical Description The VAB, one of the largest buildings in the world, covers a ground area of roughly acres and has a volume of cubic feet. It is an Industrial Vernacular style building that measures approximately in length (north-south), in width (east-west), and in height, overall. The steel-frame building, designed to withstand winds of up to 125 miles an hour, is clad with insulated metal sheeting, and has a flat roof consisting of a cast in place reinforced concrete deck with a neoprene covering.

Its poured concrete slab floor rests on more than 16"-diameter, open-end steel pipe pilings, which were driven down into bedrock at a depth of Spatially, the VAB is divided into two main areas, the Low Bay area and the High Bay area. For clarity of discussion, each area will be described separately. Low Bay Area Exterior The Low Bay area comprises the south end of the VAB, and has approximate overall dimensions of in length, in width, and in height. The south end of the Low Bay serves as the main access point for the entire facility (Photo 1). This elevation is nearly symmetrical, and reveals the complex massing of the Low Bay area. In the center of the elevation is a 135'-wide section that stands approximately ft high and corresponds to the transfer aisle.

At its center is a 56'-wide by 94'-high sliding door with a series of louvered openings for ventilation (Photo This door is framed by translucent panels, with a rolling door on the east. To either side of this central section is a 37'-wide extension with a height of approximately which corresponds to the internal check-out cells. Further projecting to both the west and east is a wide, 57' high portion that has a set back 16' from the remainder of the facade. These sections correspond to the four-story office/laboratory areas. In the center of the west projection is a metal rolling door; the east projection has two metal rolling doors, and one metal swing door for personnel.

The east elevation of the Low Bay (Photo 2) has two metal rolling doors, three pairs of metal swing doors, and two single metal swing doors at the ground level. Above, there is a pair of metal swing doors that opens onto the roof of the 57'-high area, and ventilation louvers at each end. The high central bay has four metal swing doors that exit to the roof of the check-out cells. All of these upper level doors are mirrored on the west elevation of the Low Bay (Photo 9). The ground floor level of the west facade, however, differs slightly, having two pairs of metal swing doors and one single metal swing door. The Low Bay does not have a north elevation, because the entirety of the bay projects from the south elevation of the High Bay area.

CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 21 Interior Internally, the Low Bay is divided into west and east halves by the 95'-wide transfer aisle that extends for its entire length (Photo A-7; Photos 20 and Lighting for the aisle is provided by the translucent panels on the south elevation and various floodlights positioned throughout the structure. Just below the ceiling level is a bridge crane, rated at 175-tons, which extends through the High Bay portion of the transfer aisle (Photos 21 and In the Low Bay, on either side of the transfer aisle, are four check-out cells, each of which measures approximately 50' in length and width, and in height.

The cells on the west side of the aisle are numbered 1, 2, 3, and 4, from north to south (Photos 26 and those on the east side are numbered 5, 6, 7, and 8 from north to south (Photos 28 and Structurally, the cells are grouped into pairs, each of which is separated by a roughly 24'-wide steel tower with a staircase to access the various levels. Within each pair, the cells are separated by an 8'-wide steel tower that mainly serves as a support column. Presently, Cell 1 has one pair of Apollo-era moveable platforms at the 95' level; Cell 2 has a similar pair of platforms at the same height (Photo At ground floor level, however, Cell 2 contains an environmentally-controlled space, constructed with insulated metal panels.

On the rooms' east wall is a large rolling door for equipment, with a metal swing door to its north for personnel. Internally, it is one large room, with none of the original equipment remaining. Continuing along the west side of the transfer aisle, Cells 3 and 4 are defined only by their structural towers (Photo On the east side of the transfer aisle, Cells 5 and 6 each contain three pairs of Apollo-era moveable platforms, at the 65\ and 95' levels (Photo Additionally, on the ground floor of Cell 5, there is an environmentally-controlled room, similar to the one in Cell 2, although not as high. The walls and ceiling are formed with insulated metal panels, and there is one rolling door on the west wall.

On the ground level of Cell 6, there is a storage shop at the ground floor, with an enclosed office area above. The office area is accessed by two sets of metal steps; one along the west wall and one on the north wall. The remaining two cells on the east side of the transfer aisle, Cells 7 and 8, are exactly like Cells 3 and 4 (Photo Behind each pair of cells, there are multi-level support areas, constructed of concrete block.

Area K sits behind Cells 1 and 2; Area L behind Cells 3 and 4; Area M behind Cells 5 and 6; and Area N behind Cells 7 and 8 (Photo Each of these areas measures approximately in length (north-south) and in width, and contains three floor levels, plus one mezzanine level (Photo These areas serve mostly as office space and laboratories, with a few SSP-specific facilities, described below. This room supported processing of the Extended Duration Orbiter pallet until when the pallet was destroyed in the Columbia accident. Tucker, 13 October CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 22 On the third floor of Area K is an Imaging Lab, which is composed of three rooms.

The first room has a raised tile floor, acoustic tile ceiling with 2x4 fluorescent lights, and exposed concrete block walls (Photo Within this room are various panels and computers, which collect and store video. Next to this room is a small office with gypsum board walls, a carpeted floor, and an acoustic tile ceiling. Next to this room is the projection and viewing area. Covering one wall is a vinyl movie screen with brown curtains (Photo The other walls are faced with gypsum board; the floor is carpeted; and the ceiling is composed of acoustic tile, painted black (Photo Hanging from the ceiling, near the center of the room, is a projector; and there is additional video equipment in a partitioned area along the rear wall.

Area M contains two shuttle-specific departments: the KATS lab on the mezzanine level, and the on the ground floor. The KATS facility consists of a group of four rooms. Opening off of the main hallway is the general reception area, with two small offices along the rear wall. To the right side of this cluster of rooms is a large room with a raised tile floor, gypsum board walls, and an acoustic tile ceiling (Photo Within this room are multiple groups of consoles, which replicate the shuttle's avionics system, the instrumentation for the SSMEs, and the cockpit controls. The consists of a cluster of four rooms. The first room serves as the office area, with a row of three cubicles along one wall, and tire racks on the opposite wall.

To the left is a slightly smaller room, which contains a tire rack and inflation cage along the rear wall, and tire racks on the left and front walls (Photos 34 and To the rear of this area is a large, nearly square room. Along the left wall of this room are additional tire racks; along the front wall is a bead breaker machine and a pressure monitor panel (Photo Within the right rear corner of this space is a large freezer, and on the right wall is a gaseous nitrogen panel (Photo To the right of this space is the fourth room in this complex. Within this room, there are work benches on the front and right walls, a vent hood along the rear wall, and a wheel lift in the front right quadrant (Photo Finally, Area N contains two shuttle specific areas, both located on the ground level.

The first of these is the Flight Crew Systems, Flight Kits area. This is a large room that encompasses roughly two-thirds of the ground floor of Area N, with a row of steel columns along the centerline that divides the room into two areas. To the east of the columns is a storage area; to the west are the desk cubicles and an electronics testing area at the north (Photos The last shuttle specific area within the Low Bay is the RMS lab, which sits to the west of the Flight Kits area. Most of this room consists of open floor space for the storage of the various RMS components (Photos 42 and The testing equipment sits within the northeast corner (Photo CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo.

Page 23 High Bay Area Exterior The High Bay area comprises the north end of the VAB, and has approximate overall dimensions of in length, in width, and in height. The primary access to the High Bay for personnel is through the above-de scribed Low Bay, extending from its south elevation (Photo 1). Additionally, the south elevation of the High Bay contains two pairs of metal swing doors at both the west and east ends, flanking the Low Bay. Above the doors on the west end is a bridge to the utility annex; above the doors on the east end is a bridge to the In the upper area of the south elevation, centered on the highest roof of the Low Bay, is a 92' x section of translucent panels. To the west of these panels is a painted American flag; to the east is a painted NASA "meatball" logo.

The north elevation of the High Bay serves as the point of entry for the shuttle orbiter (Photo 6). Centered on the elevation is a 16'-deep projection, with a width of and a height of Attached to this is the 4'-deep canopy for the north transfer aisle door, which consists of a two- panel sliding door, with a small vertical lift door above (Photos The west panel of the door is original to the VAB and measures approximately 60' x The east panel, added ca. to accommodate the width of the orbiter, has rough dimensions of 37' in width and 60' in height, and contains a small rolling door in the middle. The vertical lift door, also added in due to the height of the orbiter's vertical stabilizer, measures approximately 13' x 7'.

Above the door system, a group of translucent panels fills out much of the remainder of the projection. With regard to the rest of the north elevation, there is a 92' x section of translucent panels that sits above the central projection, and no additional openings. The east and west elevations of the High Bay are essentially mirror images of one another (Photos 4 and 8, respectively). On each of these facades are two sets of doors, one per internal bay. Each door set is a combination of horizontal sliding and vertically lifting sections, all of which are electrically operated.

At ground level, there are four sliding sections; the inner doors, which contain louvered openings and measure 37' x each, and the two outer doors that each measure 38' x for a total width of (Photo The vertical lifting doors are centered over the two inner sliding sections, and have a width of 74' (Photo There are seven individual sections, each of which measures 48' in height. Surrounding the vertical lifting doors is a projecting frame, which houses the moving tracks and lifting mechanisms. Across the remainder of the High Bay's east and west elevations, there are three pairs of metal swing doors for personnel, two to the north and one between the sliding doors; and various louvered vents. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F.

Kennedy Space Center) HAERNo. Page 24 Interior Overall, the High Bay area is comprised of four individual bays, six towers, and the transfer aisle (Photo A-7). Similar to the Low Bay area, the transfer aisle, which extends from the junction of the two areas (at the south end of the High Bay) to the north elevation, divides the High Bay area in half (Photos 21 and As with the Low Bay, this portion of the transfer aisle has a width of and is lit by floodlights and the large areas of translucent panels on the north and south elevations. However, the portion of the aisle through the High Bay has skeletal steel "walls" on the east and west that are high.

The transfer aisle also contains two painted lines on the floor, which are at a 45 degree angle to the north-south axis of the aisle (Photo Extending from northwest to southeast, these lines are used by the crane operators to properly orient the -TO orbiter during stacking procedures. The east and west "walls" of the transfer aisle are formed by six towers, three on either side, that are lettered from south to north, A, B, and C on the west and D, E, and F on the east. These six towers extend for the full height of the building and divide the High Bay into four individual bays, High Bays 1 and 3 on the east and High Bays 2 and 4 on the west. The corner towers, Towers A, C, D, and F, have an "L"-shaped footprint; the center towers, Towers B and E, have a "T"-shaped plan.

For the entire height of the towers, the east- west arms of Towers A, C, D, and F measure approximately in length and 38' in width; while the east-west arms of Towers B and E measure approximately in length and 38' in width. Up to the level, the north-south arms of the corner towers, which measure about 76' in length and 40' in width, and the north-south arms of the center towers, which measure approximately in length and 38' in width, meet, thus forming the "walls" of the transfer aisle. Above the level, the north-south arm of the corner towers measures only 38' in length; that of the center towers measures in length. This creates the diaphragm opening that allows the various vehicle segments to be moved from the transfer aisle to the various cells.

Each individual tower also has two stairwells, one at the east end and one at the west end, and a 38' x 21' dual elevator area at each arm juncture. Throughout the height of the towers, there are various floor levels that contain offices, labs, storage areas, etc. and to the east of the transfer aisle, are identical in form and function.

the south cell, is framed on the south, west, and north by Towers D and E (Photo 45; the north cell, is framed on the south, west, and north by Towers E and F (Photo On each of their respective east walls is the large combination sliding/vertical lift door described above (page Each bay has approximate dimensions of in length (east-west) and in width (north- south), with a clear height of The ground level of each bay features a pair of tracks, with plywood covers, for the crawler transporter. Additionally, there are six MLP support pedestals, one at each corner, one in the middle of the north side, and one in the middle of the south side. These are necessary for the stability of the structure, as described on page 12. See page 18.

CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 25 At the roof level, each bay has a bridge crane with two hooks, one rated at 325 tons, the other rated at 50 tons (Photos 105 and These cranes are shared with the bay's counterpart on the west side of the transfer aisle. To enable and to perform their function of vehicle integration, each cell is equipped with a series of four extendible platforms: Platform D, Platform B, Platform E, and Platform C, from bottom to top. Each of these platforms is divided into a north half (e.g. Platform D-North), which corresponds to the port side of the vehicle, and a south half (e.g. Platform D-South), which corresponds to the starboard side of the vehicle.

Additionally, each platform contains multiple levels. When retracted, the north halves of the platforms sit in the northwest corner of the cell; and the south halves sit in the southwest corner. When required for vehicle integration, the platform halves are mechanically extended along steel tracks, until they meet in the center, completely surrounding the vehicle and forming what architect Max Urbahn described as "small self-contained buildings." The lowest of the four platforms is Platform D, which extends between the level and the level (Photos Each half of the platform has overall dimensions of 38' east to west and 64' north to south.

Platform D contains four levels: the main floor at above grade; the second floor at 78' above grade; the third floor at above grade; and the roof at above grade. The platform has two cut-outs mirrored on each half to form two openings when Platform D is extended. One opening provides access to the tail service masts and the aft end of the orbiter; the other provides access to the ET and Each level also has hinged platforms that allow personnel more immediate access to various areas of the vehicle, such as the underside of the orbiter. In addition, smaller access platforms (APs) are positioned throughout Platform D. Generally, these platforms have matching pairs between the north and south halves.

AP 65, on the second floor, is a rolling platform that extends to the fuselage hatch access panel on the orbiter (Photo Also on the second floor is AP 48, which is also a rolling platform that provides access to the front and back of the AP 93, which sits at the roof level, is a hinged platform with a west and east half that completely surrounds one SRB (Photo Above Platform D sits Platform B (Photos which extends between the level and the level and contains three stories: the main floor above grade), the second floor above grade) and the roof above grade). Each half of Platform B has approximate overall dimensions of 57' north to south, and 64' east to west and, like Platform D, has two cut-outs to form two openings when the platform is extended.

One of the openings surrounds the orbiter, while the other encloses the ET and In addition, there are various smaller access platforms on Platform B. AP 50, which surrounds one SRB per half, is suspended below the second floor (Photo At the roof level, there is AP 90, which also surrounds one SRB per half. Also, there are two access platforms that are specific to the north half of Platform B. On the main floor is AP 66, which provides access to the orbiter's mid-fuselage access hatch "Architectural Challenges." CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 26 (Photo suspended from the roof is AP 99, which extends to the Star Tracker Cavity Access Panel on the orbiter.

In addition, the second floor of the north half of the platform contains the orbiter access clean room in its northwest corner. This contains essentially an extendible tube which stretches from the room to the orbiter (Photos Above Platform B is Platform E (Photos a two level platform that extends between the level (main floor) and the level (roof). Each half of Platform E has approximate overall dimensions of 57' north to south, and 64' east to west. As with the lower two platforms, Platform E has two openings, one for the orbiter and one for the ET and however, the orbiter nose only extends for approximately 3' above the main floor. A removable platform is available for access to the nose (Photo The main floor also contains the AP 46 and the AP 47 platforms.

AP 46 is used solely to surround the whereas AP 47 provides access to both the ET and the (Photos 85 and Only one of these sets can be operational at a given moment. In addition, the north half of the main floor contains the ET Vent Valve Actuation Panel (Photo Platform C, which extends between the level and the level, is the topmost of the four platforms (Photos Each half of the platform has approximate overall dimensions of north to south and 64' east to west. Platform C contains three levels: the main floor at above grade; the second floor at above grade; and the roof at above grade. The first two levels have two openings, one above the nose of the orbiter and one for the ET (the noses of the end just above the roof of Platform E).

The roof level has only one opening, centered above the orbiter. None of the three levels contains any small access platforms. and to the west of the transfer aisle, were historically identical in form and function, but recent modifications have changed this. Like their counterparts to the east of the transfer aisle, each bay has approximate dimensions of in length (east-west), in width (north- south), and in height. the south cell, is framed on the south, east, and north by Towers A and B; the north cell, is framed on the south, east, and north by Towers B and C.

On each of their respective west walls is the large combination sliding/vertical lift door described above (page and each has a pair of ET check-out cells, which are supported by Tower B; those in on the south side of Tower B, those in on the north side. Each pair of check-out cells contains an East Cell and a West Cell. The paired cells measure approximately 74' in length and 43' in width, and contain nine levels that extend between the level and the level.81 See pages 14 and 15. 81 is used as the example in this discussion. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo.

Page 27 Level 1, at above grade, has a solid floor space that provides access to the bottom of the ET (Photos 118 and Level 2 sits at above grade, and has two openings, one per cell, that measure 26' in diameter (Photos At this level, each cell has two ET support stands, located just south of the centerline, which are used to keep the tank in a vertical position (Photo Along the north side of these cells is a Helium Vent Valve (Photo Also at this level, within Tower B, are the Gaseous Nitrogen and Helium Pressurization and Checkout Panels, and the Pneumatic Control Panels for the cells in both and (Photos The East Cell openings on Levels 3 through 7 and above grade, respectively) are essentially identical to one another (Photos At each level, the cell has an octagonal opening that is 35' at its longest and 28' at its widest.

Each face of this octagon has a hinged platform, numbered clockwise 1 through 8, beginning with the north side. Each platform has its own control panel for the winch that moves it into place. On Levels 3 through 6, all of the platforms flip down into their storage position; on Level 7, Platform 1 flips up into its storage position, whereas the remaining platforms flip down. When extended, these eight platforms create a circular opening, 26' in diameter. The West Cell openings on Levels 3 through 7 are similar to the East Cell's, but not every level has an octagonal opening or eight movable platforms. Of these five levels, only Levels 6 and 7 have a full octagonal opening, and only Level 6 has the eight moveable platforms; Level 7 has two, the equivalents of 1 and 8.

Levels 3 and 4 have five sides of the octagon, with the southwest corner of the cell having no perimeter platform. Similar to Level 7, these two levels only have the equivalent of the 1 and 8 movable platforms. Level 5 is the emptiest of the levels, with only four sides of the octagon and no moveable platforms. On Level 8, at above grade, both the East and West Cells have a full octagonal opening, which is the same size as that on the lower levels, but only the East Cell is fitted with the eight movable platforms (Photos 149 and Like the lower levels, these platforms are numbered clockwise 1 through 8, beginning with the north side. However, the circular opening that they create when extended is only 24' in diameter, and all of them flip up into their storage position.

Both cells of Level 9 above grade) are exactly the same, with one T-shaped hinged platform that flips up into its storage position, and contains a small circular opening with a diameter of 8' (Photos Also within the ET cells, there are a few pieces of equipment that are unique to Level 6. On this level, each cell has two ET Support Arms (Photo on which the ET rests. These are directly along the north-south centerline of the circular opening. Also on this level, at the southeast corner, is the liquid hydrogen and liquid oxygen vent valves (Photo and within Tower B, the accompanying ET Vent Valve Actuation Panel (Photo The ET cells in are the exact mirror image of those in with one minor exception.

On Level 7 in movable platforms 3 and 7 are hand-operated, as opposed to winch-operated (Photo CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 28 Aside from the nearly identical ET check-out cells, and have very little in common. At ground level, like and contains a pair of tracks with plywood covers for the crawler transporter, and six MLP support pedestals, one at each corner, one in the middle of the north side, and one in the middle of the south side (Photo In addition, the ground level of has a railroad track through the center of the bay, and various reinforced circular concrete pads, which are used to store fueled SRB segments prior to stacking.

These same concrete pads are in the ground floor of (Photos 158 and also contains original SRB segment processing platforms along the south side of Tower C. These platforms are six levels in height, and contain two processing cells. Above the SRB platforms is a 2-ton jib crane, and there is a 125-ton hoist that can be positioned along the east-west access of the bay (Photo Added when it became a safe haven, see pages 14 and 15. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 29 Bibliography Anonymous. "ET Processing at On file, ET/SRB Operations Office, Archaeological Consultants, Inc. (ACI). Survey and Evaluation of NASA-owned Historic Facilities and Properties in the Context of the U.S.

Space Shuttle Program; John F. Kennedy Space Center Brevard County, Florida. On file, NASA Benson, Charles D. and William Barnaby Faherty. Gateway to the Moon. Building the Kennedy Space Center Launch Complex. Gainesville, University Press of Florida, (first paperback printing). "Building Presents Many Architectural Challenges." Spaceport News (3, 3) 16 January 3. Butowsky, Harry A. Reconnaissance Survey: Man in Space. Washington, National Park Service, Carillion, Ed. Interview with Patricia Slovinac, Vehicle Assembly Building, 15 October Columbia Accident Investigation Board. Report Volume I, August Dethloff, Henry C. "The Space Shuttle's First Flight: From Engineering Science to Big Science: The NASA and NASA Collier Trophy Research Project Winners. NASA SP- Edited by Pamela E.

Mack, Washington, Government Printing Office, Ezell, Linda Neuman. NASA Historical Databook Volume III Programs and Projects The NASA History Series, NASA Washington, NASA History Office, Griek, Larry. Interview with Patricia Slovinac, Vehicle Assembly Building, 13 October Heiney, Anna. "Kennedy readies facilities for shuttle in less than a decade." Spaceport News 8) 14 April . "Lending a Hand, an Arm.. .and a Boom." Spaceport News 5) 4 March 3. Herridge, Linda. "Vehicle Assembly Building doors getting a face-lift." Spaceport News 21) 27 October 1 and 5. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 30 Jarrett, Frank E. "Chronology of KSC and KSC Related Events for 1 November Jarrett, Frank E.

"Chronology of KSC and KSC Related Events for 1 November Jenkins, Dennis R. Space Shuttle, The History of the National Space Transportation System. The First 100 Missions. Cape Canaveral, Florida: Specialty Press, Kanady, Herb. Interview with Patricia Slovinac, Vehicle Assembly Building, 13 October KSC Ground Operations. "USA Processing of Space Shuttle External Tank." On file, ET/SRB Operations Office, 'safe haven' makes room for more." Spaceport News 17) 20 August Launius, Roger D. and Aaron K. Gillette. Toward a History of the Space Shuttle: An Annotated Bibliography. Washington, NASA History Office, Studies in Aerospace History Number 1, Lethbridge, Cliff. "History of the Space Shuttle Program." Lindroos, Marcus.

"President Nixon's Announcement on the Space Shuttle." NASA Office of Policy and Plans, NASA History Office, updated April 14, Lipartito, Kenneth and Orville R. Butler. A History of the Kennedy Space Center. Gainesville: University Press of Florida, Manning, Pat. Interview with Patricia Slovinac, Vehicle Assembly Building, 13 October Nail, Ken, Jr. and Elaine Liston. "Chronology of KSC and KSC Related Events for 5, 1 March National Aeronautics and Space Administration, NASA Shuttle Reference Manual. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 31 . Facts: John F. Kennedy Space Center. . "NASA Centers and Responsibilities." News Reference Manual.

National Aeronautics and Space Administration, History Office, NASA Headquarters. "Report of the Space Task Group, National Aeronautics and Space Administration, Headquarters. "The Vision for Space Exploration." February National Aeronautics and Space Administration, Kennedy Space Center. Countdown! NASA Launch Vehicles and Facilities. Information Summaries PMS 018-A July 16. . "Shuttle Payloads and Related Information." KSC Factoids. Revised November 18, Accessed at Reichhardt, Tony (editor). Space Shuttle, The First 20 Years. Washington, Smithsonian Institution, Reynolds Smith and Hills, Jacksonville. Preliminary Engineering Report, Vehicle Assembly Building Modifications. 31 August On file, KSC Archives. .

"VAB & 4 ET Holding Cells Upgrade to Checkout Cells." February Engineering Documentation Center, Kennedy Space Center. Rumerman, Judy A., with Stephen J. Garber. Chronology of Space Shuttle Flights Washington, NASA History Division, Office of Policy and Plans, October Saltsman, Mike. Interview with Patricia Slovinac, Vehicle Assembly Building, 14 October Seelye Stevenson Value & Knecht, Inc., New York. Data Manual for Design of Vehicle Assembly Building Modifications, Submittal. 31 March On file, KSC Archives. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 32 . "Vehicle Assembly Building Modifications." March Engineering Documentation Center, Kennedy Space Center.

"Shuttle program uses early structures." Spaceport News 21) 27 October 3. Siceloff, Steven. "Changes planned in progress for Kennedy's future in Constellation Program." Spaceport News 21) 5 October 4 and 5. Slovinac, Trish and Joan Deming. National Register of Historic Places Multiple Property Documentation Form, Historic Cultural Resources of the John F. Kennedy Space Center, Florida. October "Steel Beam Tops Out VAB Work." Spaceport News (4, 15) 15 April The White House. "A Renewed Spirit of Discovery - The President's Vision for Space Exploration." January Tucker, Ron. Interview with Patricia Slovinac, Vehicle Assembly Building, 13 May . Interview with Patricia Slovinac, Vehicle Assembly Building, 13 October .

Interview with Patricia Slovinac, Vehicle Assembly Building, 16 October Urbahn Roberts Seelye Moran, New York. "Data Manual for Vertical Assembly Building Associated Facilities and Site Work." 9 June Documents Library, Kennedy Space Center. . "LC 39 Vertical Assembly Building, Volume October Engineering Documentation Center, Kennedy Space Center. . "LC 39 Vertical Assembly Building, Volume October Engineering Documentation Center, Kennedy Space Center. . "LC 39 Vertical Assembly Building, Volume October Engineering Documentation Center, Kennedy Space Center. . "LC 39 Vertical Assembly Building, Volume October Engineering Documentation Center, Kennedy Space Center. "VAB: It Wasn't Always Just There." Spaceport News 8) 10 April, 4.

CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 33 "VAB's Ligthing System Wins Engineering Awards." Spaceport News 3) 5 February 4. Williamson, Ray A. "Developing the Space Shuttle." Exploring the Unknown: Selected Documents in the History of the U.S. Civil Space Program, Volume IV: Accessing Space. Edited by John M. Logsdon. Washington, U.S. Printing Office, "Work on 52-Story VAB Begins." Spaceport News (2, 34) 22 August 1. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 34 Photo A-l. Aerial c _, Space Center, Launch Complex 39, 16 January Vehicle Assembly Building denoted by arrow. Source: John F.

Kennedy Space Center Archives, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 35 Photo A-2. Construction of Vehicle Assembly Building foundation, 14 January Source: John F. Kennedy Space Center, accessed via NASA Image Exchange (NIX) at http://nix.nasa.gov/. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 36 Photo A-3. Early phase of steel construction of Vehicle Assembly Building, 13 October Source: John F. Kennedy Space Center, accessed via NIX at http://nix.nasa.gov/. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 37 Photo A-4.

Construction ol' Vehicle Assembly Building, 9 June Source: John F. Kennedy Space Center, NIX at http://nix.nasa.gov/. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 38 Pholo A-5. Construction ol' Vehicle Assembly Building, 9 August Source: John F. Kennedy Space Center, accessed via NIX at http://nix.nasa.gov/. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 39 Photo A-6. Preparation of Platform D. High Bay #3 for Space Shuttle Program. 21 June Source: John F. Kennedy Space Center Archives, accessed via NIX at http://nix.nasa.gov/. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F.

Kennedy Space Center) HAERNo. Page 40 Photo A-7. General layout of the VAB, 30 March Source: Engineering Development Directorate, Space Shuttle Launch Support Equipment Data Handbook Rev. A), On file, KSC Archives. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 41 Photo A-8. External Tank after it has been rotated to vertical and is ready to be moved into one of the ET check-out cells, 9 February Source: John F. Kennedy Space Center, accessed via CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 42 Photo A-9. A SRB segment being lifted over level for stacking, 30 November Source: John F.

Kennedy Space Center, via CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 43 Photo A-10. Port SRB aft segment and aft center segment being mated, 27 July Source: John F. Kennedy Space Center, accessed via CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 44 : Tj j j!oc-3!j ..-JJUJ. .., jjir -. -.....sass.........^, S^ J: JIJL :. ..* : ? : /iSmo!?.. - y: : , .} .jSjSSii' \ jr v SfIiaiu " ' "( "I! |. $ > Photo A-l 1. External Tank being removed from check-out cell for mating to 28 February Source: John F. Kennedy Space Center Archives, accessed via CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F.

Kennedy Space Center) HAERNo. Page 45 Photo A-12. External Tank being lowered to mate with 28 August Source: John F. Kennedy Space Center Archives, accessed via CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 46 Photo A-13. Orbiter Atlantis in transfer aisle, 7 August Source: John F. Kennedy Space Center, accessed via CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 47 Photo A-14. Orbiter Endeavour being rotated to vertical in transfer aisle, 7 July Source: John F. Kennedy Space Center, accessed via CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 48 Photo A-15.

Orbiter Endeavour being moved from transfer aisle to high bay, note the 45 degree angle of the orbiter to fit through the diaphragm, 7 July Source: John F. Kennedy Space Center, accessed via CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 49 Photo A-16. Orbiter Atlantis being positioned for mating to the ET, 28 August Source: John F. Kennedy Space Center, accessed via NIX at http://nix.nasa.gov/. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 50 T 1 Photo A-17. Birds-eye view of Space Shuttle Discovery in high bay, 6 April Source: John F.

Kennedy Space Center, accessed via CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 51 Photo A-18. Space Shuttle Discovery leaving VAB to go to the launch pad, 6 April Source: John F. Kennedy Space Center, accessed via CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAERNo. Page 52 Sta^. / U E-* """III"" 11X 4^IvIvIvIvIvIv!Jf>X "" ZUffin" . $ ' ' i i. jj* wononr.. \T. Photo A-19. The Orbiter Boom Sensor System in the RMS lab for testing, 1 January Source: John F. Kennedy Space Center, accessed via ADDENDUM TO: HAER CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX HAER 39, VEHICLE ASSEMBLY BUILDING (John F.

Kennedy Space Center) VAB Road, East of Kennedy Parkway North Cape Canaveral Brevard County Florida PHOTOGRAPHS WRITTEN HISTORICAL AND DESCRIPTIVE DATA HISTORIC AMERICAN ENGINEERING RECORD SOUTHEAST REGIONAL OFFICE National Park Service U.S. Department of the Interior 100 Alabama St. NW Atlanta, GA ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 53 HISTORIC AMERICAN ENGINEERING RECORD CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No.

ADDENDUM This report is an addendum to a fifty-two page report previously transmitted to the Library of Congress in July Both the VAB Utility Annex and the Bar ge Terminal Facility a re considered contributing resources to the VAB, which was listed in th e on January 21, becau se of its exceptional importance at the national level in the context of the Apollo program. In addition, the VAB 1 A list of acronyms, which includes those used in the original documentation package, is attached to this addendum as Appendix F. ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No.

Page 54 was found to be exceptionally signifi cant in the context of the Space Shuttle Program (see pages 1-2 of the original documentation package).

Written history

4869 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HAER FL-8-11-B. Not written, edited or summarised by this site.

The documentation of the VAB Utility Annex and Barge Terminal Facility as an addendum to the Cape Canaveral Air Force Station, Launch Complex 39, Vehicle Assembly Building was completed in for KSC by ACI, under contract to InoMed ic Health Applications (IHA), and in accordance with KSC s Programm atic Agreement Regard ing Management of Historic Propertie s, dated May 18, The field team consisted of architectural histor ian, Patricia Slovinac (ACI), and independent photographer, Penny R ogo. Assistance in the field was provided by Barbara Nayl or, KSC Historic Pres ervation Officer, and Nancy English, KSC Cultural Resource Specialist. The written narrative was prepared by Ms. Slovinac. It was edited by Joan Deming, ACI Project Manager; Ms. Naylor and Ms.

Englis h; Elaine Liston, KSC Archivist; and Jane Provancha, Environmental Projects-Manager, IHA. The photographs and negatives were processed by Ze bra Color, Inc., an independent photography/processing studio. The Scope of Services for the project , which was com piled based on the Programmatic Agreement, specifies a documentation effort following HAER Level I I Standards. Information for the written narrative was primarily gathered through informal interviews with cu rrent NASA and contractor personnel and research m aterials housed at the KSC Archives Department. A search f or historic photographs also was conducted at the Kennedy Institutional Imaging Facility.

Selected drawings were prov ided by KSC s Engineering Docum entation Center, which serves as the repository for all facility drawings. The available drawing s for the VAB Utility Annex included the as-built drawings, as well as th ose depicting major modifications to the f acility. Those for the Barge Terminal Facility included the as-built drawings, which were part of the drawings for the overall barge canal system extending through CCAFS and KSC ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 55 does not periodically produce drawings of their facilities to show curren t existing conditions.

For ease of reference, this written narrative is a rranged so that th e basic historical information, physical description, and sources of information for the VAB Utility Annex are presen ted first (beginning on Page No. followed by the sam e data for the Barge Term inal Facility (beginning on Page No. Following the written section is Appendix B: Historic Photos of the VAB Utility An nex (Page No. Appendix C: Architectural Drawings of the VAB Utility Annex (Page No. Appendix D: Historic P hotos of the Barge Terminal Facility (Page No . Appendix E: Architectural Drawi ngs of the Barge Term inal Facility (Page No. and Appendix F: Legend of Acronyms (Page No. ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No.

Page 56

Vab Utility Annex

Part I. Historical Information A. Physical History: 1. Date of construction: The VAB Utility Annex was constructed between and 2. Architect/Engineer: URSAM (Max Urbahn [architectur al]; Roberts and Schaefer [structural]; Seelye, Stevenson, Value and Kn echt [civil, m echanical and electrical]; and Moran, Proctor, Mueser and Rutledg e [foundations]), New York, New York. 3 The addition was designed by Vanderweil, Inc., of Maitland, Florida.4 3. Builder: The original facility was built by th e joint venture of Morrison-Knudsen Company, Inc., Perini Corporation, and Paul Hardeman, Inc., of South Gate, California. RKT Constructors, Inc., of Titusville, Florida, constructed the northwest addition.5 4.

Original plans and construction: The original plans for the VAB Utility Annex date to October construction occurred in a nd The original faci lity was rectangular in plan, and consisted of an open area within the west half of the building, an enclosed personnel support area along the so uth wall, an enclosed electri cal equipment room at the northeast corner, and an enclosed fire suppression equipment room at the southeast corner. Situated around the exteri or of the building were a concrete pad for an electrical substation near the west end of th e north elev ation and a concrete pad for fuel storage tanks to the southwest. A cooling tower was construc ted to the west of the VAB Utility Ann ex, across Utility Road.6 5.

Alterations and additions: In two s mall rooms were created to the east of the personnel support area. 7 Circa a new cooling to wer was constructed to the 2 NASA Real Property Record, Utility Annex, on file, KSC Real Property Office. The Real Property Record provides a date of October 9, for the beginning of construction; however, a photo from the KSC Archives (Figure No. shows that most of the steel skeleton was in place by mid-July 3 Urbahn Roberts Seelye Moran, New York, Launch Complex 39, Vertical Assembly Building, Volume 31, October on file, KSC Engineering Documentation Center. 4 Vanderweil Engineers, Inc., Maitland, Replacement of MCC s and Upgrade Pumping System at the Utility Annex, October on file, KSC Engineering Documentation Center.

5 Ken Nail, Chronology of KSC and KSC Related Events for January 60, on file KSC Archives. 6 Urbahn Roberts Seelye Moran, Volume 31. 7 U.S. Army Corps of Engineers, Canaveral District, Mods to VAB Utility Annex, LC 39, Sound Attenuation Rooms, August on file, KSC Engineering Documentation Center. ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 57 southwest of the VAB Utility Annex. 8 The facility received a small addition between and which consisted of a square foot electrical equipm ent room located at the northwest corner.

At the sam e time, the chil led water system piping, electrical lines, and motor control centers were replaced.9 Additional equipment within the facility has also been upgraded since construction. For ex ample, the electrical switch gear in the northeast corner of the building was replaced circa B. Historical Context: The ACOE, NASA s supervisory design and constr uction agent, hired URSAM to complete the design for the VAB, and ass ociated facilities within the LC 39/VAB Area of On January 16, the ACOE awarded the construction contract for the VAB Utility Annex to the joint venture of Morrison-Knudsen Com pany, Inc., Perini Corporation, and Paul Hardem an, Inc.12 Much of the structural steel skeleton of the VAB Utility Annex was in place by mid-July (Figure No.

as was the concrete pad fo r the f uel oil storage tanks (located to the southwest of the building). The roof structure was in place and the fuel oil storage tanks had been installed by the end of October (Figure No. Less than two months later, the skylights, vents, and boiler stacks were in place, and the exterior walls begun to take shape.13 By January 7, nearly all of the exterior wall panels had been installed (Figure No. The building was completed in June accordin g to the Real Property Records, th e utilities equipm ent was installed in In August the ACOE prepared drawings to add sound attenuation room s to the VAB Utility Annex. These room s were constructe d between and 1 to the east of th e personnel support area.

15 In the two original air compre ssors were replaced with four smaller air compressors.16 In the early a new cooling to wer, designed by Allen & Hoshell 8 Allen & Hoshell, Memphis, Replacement of V.A.B. U.A. [Utility Annex] Cooling Towers, No. November on file, KSC Engineering Documentation Center. 9 Vanderweil Engineers, Inc., Replacement of MCC s; Nail, Events for 60. 10 NASA Utility Annex; Larry Kiel, personal communication (email) with Nancy English, February 25, 11 An overall context of KSC and the VAB are provided in the original report, dated July 12 Construction of the VAB Utility Annex was part of a roughly million contract, which also included construction of the a sewage treatment plant, various roads and parking areas, and various other facilities and utility lines.

NASA, Astronautics & Aeronautics, (Washington, DC: NASA Scientific and Technical Information Division, 15; $66 Million Expenditure to Finance 39 Area Work, Spaceport News, December 19, 8. 13 Photo Number Negative No. on file, KSC Archives Department. 14 NASA Utility Annex. 15 ACOE, Mods to VAB Utility Annex. 16 Ken Nail, Chronology of KSC and KSC Related Events for March 62, on file KSC Archives. ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 58 in November was constructed to the southwes t of the facility ; at this tim e, the old tower was demolished.17 In Va nderweil, Inc.

designed a small addition for the northwest corner of the VAB Utility Annex to hold m otor control centers for the chilled water syste m, which was updated at the same time.18 In the mid-2000s, the roof of the facility was replaced.19 Historic/Current Function of the VAB Utility Annex The VAB Utility Annex has provided the sam e service to the LC 39/VAB Area throughout its entire existence-the only difference has been the quantity of facilities it served. As originally constructed, the VAB Utility An nex was designed to hold the m ain heating, ventilating, air conditioning a nd fire protection prim ary equipment and supervisory control servicing for the VAB, and other auxiliary facilities.

20 The piping f rom the equipment in the VAB Utility Annex to the VAB is loc ated within the bridge between the two buildings; the pipes for the LCC also extend across this br idge and then through the VAB, and across the bridge between the VAB and the In the m id- to late-1970 s, piping was ins talled between the VAB Utility Annex and the OPF, located to the northwest of the Annex, throug h an underground tunnel, so the sam e heating, ventilating, air conditioning, and fire protection serv ices could be provided to that facility.

The same was done in for OPF-3, situated to the north of the Annex, and the Thermal Protection System Facility, located to the north of the OPF.22 At the time of documentation, the VAB Utility Annex was providing chilled and hot water to the VAB, OPF, OPF-3, and th e Thermal Protection System Facility. In addition, it was providing chilled water to itself, and the Processing Control Center, Operations Support Building No. 1, Operations Support Building No. 2, the Repeater Building, the Launch Equipm ent Shop, the Logistics Facility, the Component Refurbishment and Chemical Analysis Facility, the Multi- Function Facility, the Electrical Maintenance Facility, and a utility building. 17 Allen & Hoshell, V.A.B. U.A.

Cooling Towers; Ken Nail, Chronology of KSC and KSC Related Events for March on file KSC Archives. 18 Vanderweil Engineers, Inc., Replacement of MCC s; Nail, Events for 60. 19 NASA Utility Annex. 20 Urbahn Roberts Seelye Moran, New York, Data Manual for Vertical Assembly Building Associated Facilities and Site Work, June 9, II.F.1, on file, KSC Documents Library. 21 Urbahn Roberts Seelye Moran, Volume 31; Urbahn Roberts Seelye Moran, New York, Launch Complex 39, Vertical Assembly Building, Volume 14, October on file, KSC Engineering Documentation Center; Urbahn Roberts Seelye Moran, New York, Launch Complex 39, Vertical Assembly Building, Volume 29, October on file, KSC Engineering Documentation Center.

22 Ken Nail, Chronology of KSC and KSC Related Events for March 99, on file KSC Archives. ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 59 Part II. Structural/Design/Equipment Information A. General Statement: 1. Character: The VAB Utility A nnex (Photo Nos. is an In dustrial Vernacular style building located di rectly west of the VAB Low B ay. It is one-story in height and contains roughly square feet of interior space. The building features an irregular floor plan due to the circa addition at the northwest corner. 2. Condition of fabric: Due to periodic maintenance and continual use of the fa cility, the VAB Utility Annex is in good condition. B. Description of Exterior: 1.

Overall dimensions: The original portion of the VAB Utility Annex (see Photo No. 227 for a depiction of the original and new portio ns of the facility) has approxim ate overall dimensions of 253 in length (east-west), 103 in width (north-south), and 30 in height. The northwest addition roughly m easures 61 in len gth (east-west), 41 in width (north-south), and 12 in height. At the north e nd of the east elevation is an elevated bridge that leads to the VAB. 2. Foundations: The foundation for the o riginal portion of the VAB Utility A nnex is comprised of a reinforced poured concrete slab that ranges in thickness from 4 to 14 and is supported by reinforced concrete footers.

Addi tionally, the chillers, air com pressors, boilers, and fire suppression system pumps sit on concrete housekeeping pads on top of the base floor slab. The foundation for the northwest addition consists of a 4 -thick, reinforced poured concrete slab supported by reinforced concrete footers.23 3. Walls: The walls of the origin al portion of the VAB Utility Annex are comprised of painted galvanized insulated metal wall pan els. The walls for the no rthwest addition are painted galvanized uninsulated metal panels. 4. Structural system, framing: The structural system for the entire VAB Utility Annex is composed of steel columns, beams, and purlins. 5. Stoops: Each entrance into the VAB Utility Annex has a poured concrete stoop.

23 Urbahn Roberts Seelye Moran, Volume 31; Vanderweil Engineers, Inc., Replacement of MCC s; Johnson, Levinson, Ragan, Davila, Inc., Study to Upgrade Systems at the VAB Utility Annex at the Kennedy Space Center, Florida, (report, NASA 20. ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 60 6. Stacks: There are three boiler stacks near the west end of the roof, roughly 9 from the south edge of the building. Towards the east end of the roof are three fire suppression system exhaust pipes, about 11 from the south edge of the building. In addition, there are eight ventilator hoods spaced across the longitudinal centerline of the roof. 7. Openings: a.

Doorways and doors: The main entrance to the VAB Utility Annex is located on the south elevation of the original portion and c onsists of one set of double alum inum swing doors with one-light fixed windows in the upper half. The original s ection of the facility also contains one single one-light alum inum swing door and one alum inum overhead rolling door on the west elevation; and one set of double one-light alum inum swing doors, one single alum inum swing door fitted with a louv er, and one solid alum inum swing door on the east elevation. The addi tion features one se t of double louvered aluminum swing doors on the south elevati on, one alum inum overhead rolling door on the west elevation, and one set of double solid aluminum swing doors on the east elevation.

There are no doors on the north elevation. b. Windows: None of the elevations for the a nnex or its addition contains window openings; however, the north elevation of th e original section features two 10 x 4 translucent plastic panels. In addition, the roof of the original section features eight, 12 x 4 translucent plastic skylights. 8. Roof: a. Shape, truss type, covering: All sections of the VAB Utility Annex feature a flat roof comprised of a 4 -thick, cast in place rein forced concrete deck su pported by steel framing, which is topped with built-up roofing.24 C. Description of Interior: 1. Floor plans: The main entrance of the VAB Utili ty Annex opens in to a 72 x 38 personnel support area that is roughly cente red along the south wall (P hoto Nos.

This area is divided into two halves by a 38 -long corridor; a door on the north wall opens into the main equipment area. Within the support area, on the east side of the corridor, are a break room, restrooms, and a circa laboratory and repair shop. On the west side of the corridor, there are two offices along the south wall and a control room to the north. At the time of documentation, the control room , which measures approximately 25 x 16 , retained 24 Urbahn Roberts Seelye Moran, Volume 31; Vanderweil Engineers, Inc., Replacement of MCC s. ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 61 the original m aster control console (Photo N o.

for all of the m echanical equipment within the VAB Utility Annex; the console was situated along the north wall. Windows in the west and north wall of the control room provide visual access to the main equipm ent area of the building. The main equipment area of the VAB Utilit y Annex (P hoto Nos. is m ostly comprised of one open space, which is v isibly divided in h alf by a lon gitudinal aisle, and functionally divided by equipm ent type. To the north of the ai sle, at the west en d of the building, is the 126 x 50 chiller area (Photo No. This area contains five chillers , numbered 1 through 5 f rom east to west; a sixt h chiller is com prised of a m odification to Chiller No. 4. 25 To the south of each chiller is its individual control panel (Photo No.

Directly to the east of Chiller No. 1, within a 9 -wide space, are four secondary chilled water pumps, numbered 1 through 4 from north to so uth (Photo No. the five primary chilled water pumps are along the north wall of the Annex. To the east of these pum ps, is the roughly 28 -wide air com pressor area. Here, there are four air com pressors, numbered 1 through 4 from west to east (Phot o No. To the northeast of Air Compressor No. 4 is a gallon compressed air tank. At the east end of the building, to the north of the aisle, is an enclosed electrical e quipment room, roughly 75 x 50 (Photo N o.

This room contains two motor control centers on the we st wall, one row of electrical switchgear equipment parallel to the south wall and one pa rallel to the west wa ll, and two load break switches on the south wall. Above this room is a mezzanine that holds additional electrical equipment and storage racks (Photo No. At the south edge of the mezzanine, suspended from a steel column, is a one-quarter ton crane (Photo No. To the south of the aisle, west of the pers onnel support area, is th e roughly 75 x 38 hot water area (Photo No. Here, there are three boilers, numbered 1 through 3 from east to west; to the north of each is its respective control panel (Photo No. The four prim ary hot water pumps, numbered 1 through 4 from north to south, are situated to the east of Boiler No.

1 (Photo No. and the f our circulating pumps are along the south wall. To the west of Boiler No. 3, there is a 1,000-gallon hot water ta nk; a fuel oil heater and pum p sit to the west of this tank (Photo No. Directly to the east of the personnel support area is an L- shaped tool crib/work area comprised of roughly 976 square feet of space. At the south east corner of the VAB Utility Annex is another enclosed room with approximate dimensions of 55 x 37 (Photo No. This room contains fire suppression equipm ent, in the form of three pumps (Photo No. along the south wall and are num bered 2 through 4; along the north wall of this room are 25 Johnson, Levinson, Ragan, Davila, Inc., VAB Utility Annex, 39.

ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 62 three domestic water pumps (Photo No. At the southeast corner is a 10 x 8 chlorinator room with a small mezzanine above that holds additional fire suppression equipment. The northwest addition to the VAB Utility A nnex is also rectangular in plan. Th is area is mostly comprised of one open space that has a 480-volt substation to the north and two motor control centers to the south (Photo Nos. . A small, 17 x 8 secondary pump control room is located in the northeast corner. 3. Stairways: There is one set of metal and concrete steps leading from the main floor level to the m ezzanine level within the northeast co rner of the bu ilding.

A set of m etal steps provides access to the small mezzanine located within the southeast corner room. 4. Flooring: The VAB Utility Annex f eatures different flooring materials depending on the use of the space. The equipm ent areas, mezzanine, and restrooms have bare conc rete floors; the control room has carpeting; and the office area has vinyl asbestos tile. 5. Wall and ceiling finish: The few interior walls within the VAB Utility Annex are comprised of concrete block. For the m ost part, the ceiling within the structure is exposed structural framing and the underside of the roof concrete slab. The control room and offices have acoustical tile ceilings; the restroom and shower have Keene s cement plaster ceilings.26 6. Openings: a.

Doorways and doors: There are nine interior doorwa ys in the VAB Utility Annex. Eight of the doors are within the personne l support area and are single, hollow metal doors with pressed steel frames. The ninth door, which leads to the southeast corner room where the fire suppression equipm ent is locat ed, is a 10 -4 x 8 -4 sliding fire door (Photo No. b. Windows: The control room has two pairs of fixed glass windows on its north wall and one pair of fixed glass windows on its west wall (Photo No. These windows provide visual access to the equipment within the facility. 26 Keene s cement is a gypsum plaster finish that contains alum in the mixture. It has a high-strength ratio and sets quickly. 27 Urbahn Roberts Seelye Moran, Data Manual, II.F.4-1.

ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 63 7. Mechanical equipment: a. Heating, air conditioning, ventilation: The VAB Utility Annex contains a heating, and air conditioning system for the personnel support area only; v entilation is provided for the entire facility. b. Lighting: The lighting system for the VAB U tility Annex includes surface-mounted and pendant fluorescent fixtures throughout the equipment areas and recessed fluorescent fixtures in the personnel support area. c. Plumbing: The VAB Utility Annex contains its own plumbing system, one for chilled water and one for heated water. d.

Fire Protection: The VAB Ut ility Annex contains its own fire protection system, which is comprised of sprinklers, standpipe hose racks, and fire extinguishers. D. Equipment: 1. Chillers: At the time of documentation, there were six chillers in the VAB Utility Annex. Four of the chillers, Nos. are original to the building (Photo No. Chiller No. 5 was installed in Each of thes e is a field erected, York, Model Turbom aster . Chiller Nos. 1-5 are 2,5 00-ton chillers rated at gallons-per-minute for the ch ill water and gallons-per-minute for th e condenser water. Chiller No s. 1-4 have a kilowatt per ton net chiller efficiency rating, and Chiller No. 5 has a kilowatt per ton efficien cy rating. The sixth chiller is a m odification to Chiller No.

4 in the form of an additional ton compressor.28 2. Chilled water pumps: As originally constructed, the VAB Utility Annex had f our chilled water pum ps, arranged in a direct -pump, parallel configur ation. Between and the pum ping system within the VAB U tility Annex was changed to a prim ary- secondary configuration, and tertiary pum ps were installed in the buildings supported by the Annex. At the tim e of docum entation, there w ere five prim ary pumps and four secondary pumps. The prim ary pumps were Paco Pum ps, Model No. with a capacity of gallons per minute and a total dynam ic head of 45 . The secondary pumps (Photo No. 28 Johnson, Levinson, Ragan, Davila, Inc., Study to Upgrade Systems, 39; NASA Utility Annex; Chiller No.

4 System Performance Data Sheet, provided to author June by Larry Kiel, VAB Utility Annex Subject Matter Expert. ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 64 were Goulds Pumps, Inc., Model No. with a capacity of gallons-per-minute and a total dynamic head of 80 .29 3. Air compressors: There were four air compressors in the VAB Utility Annex at the time of documentation (Photo No. . These were Model No. m anufactured by Kellogg. Each compressor had a speed of 750 revol utions per minute and a pressure of bars.30 4. Boilers: At the tim e of docum entation, the VAB Utility Annex contained three b oilers (Photo No. All were International Boil er Works, Model No.

TJW Each boiler could produce up to 20 m illion British thermal units per hour at a m aximum release rate of British thermal units per hour-feet squared. Each unit operated on a dual-fuel system of natural gas and No. 2 fuel oil.31 5. Hot water pumps: At the tim e of docum entation, the VAB Anne x contained four primary pumps and four circulating pumps associated with the hot water system. The primary pumps were Model Horizontal P rocess Pumps, manufactured by the Dean Pum p Division of Met-Pro Corporat ion (Photo No. The circ ulating pumps also were manufactured by the Dean Pum p Division of Met-Pro Corporation, and were Model No. R- Both pump models have a capacity of up to gallons per m inute and a maxim um total dynamic head of 800 .32 6.

Fuel oil heater/pump: The VAB Annex had one oil pum p at the time of documentation that provided fuel oil to the boilers when natural gas was not being used (Photo No. The pump was a Imo Pump Division Series 3D, with a maximum capacity of 400 gallons per minute at 500 pounds per square inch. It ope rated at a speed of revolutions per minute.33 29 Johnson, Levinson, Ragan, Davila, Inc., Study to Upgrade Systems, 51; NASA Utility Annex; Primary Chilled Water Pump Data Sheet, provided to author June by Larry Kiel, VAB Utility Annex Subject Matter Expert; Secondary Chilled Water Pump Data Sheet, provided to author June by Larry Kiel, VAB Utility Annex Subject Matter Expert.

30 NASA Utility Annex; Air Compressor April 15, Field Test Sheet, provided to author June by Larry Kiel, VAB Utility Annex Subject Matter Expert. 31 Johnson, Levinson, Ragan, Davila, Inc., Study to Upgrade Systems, NASA Utility Annex; Boiler Data Sheet, provided to author June by Larry Kiel, VAB Utility Annex Subject Matter Expert. 32 NASA Utility Annex; Boiler Primary Pump Data Sheet, provided to author July by Larry Kiel, VAB Utility Annex Subject Matter Expert; Boiler Circulating Pump Data Sheet, provided to author July by Larry Kiel, VAB Utility Annex Subject Matter Expert. 33 NASA Utility Annex; Oil Pump Data Sheet, provided to author July by Larry Kiel, VAB Utility Annex Subject Matter Expert.

ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 65 7. Fire suppression pumps: At the time of documentation, the VAB Annex contained three fire suppression pumps (Photo No. All th ree were manufactured by Fairbanks Morse Pump Corporation and were of the Model No. series. The pumps had a m aximum capacity of gallons per minute and a maximum total dynamic head of 710 .34 8. Domestic water pumps: The VAB Utility Annex contained three domestic water pumps at the tim e of documentation (P hoto No. 2 These pum ps were m anufactured by Fairbanks-Morse Pump Corporation and we re Model No. UA-S01. These pumps had a capacity of 325 gallons per minute, with a total dynamic head of 510 .35 E.

Site Layout: The VAB Utility Annex is situated to the west of the VAB; the two are connected by a second-story bridge structure at the north end of the Annex s east wall. To the south of the Annex, there is a concrete pad for three boiler oil tanks to the west (Photo No. and a parking lot to the east. A dr iveway extends westward from the parking lot to Utility Road. South of the driveway is the circa cooling tower (Photo No. 34 NASA Utility Annex; Fire Pump Data Sheet, provided to author June by Larry Kiel, VAB Utility Annex Subject Matter Expert. 35 NASA Utility Annex; Mike Denyer, personal communication (email) with Nancy English, (forwarded to author), July 9, ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F.

Kennedy Space Center) HAER No. Page 66 Part IV. Sources of Information A. Primary

Sources

4328 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HAER FL-8-11-B. Not written, edited or summarised by this site.

Allen & Hoshall, Memphis, Tennessee. Replacement of V.A.B. U.A. Cooling Towers, No. Architectural drawings, NASA November On file, KSC Engineering Documentation Center, Florida. Vanderweil Engineers, Inc., Maitland, Florida. Replacement of MCC s and Upgrade Pumping System at the Utility Annex. Architectural drawings, NASA October On file, KSC Engineering Documentation Center, Florida. John F. Kennedy Space Center Archives Department, Florida. NASA Real Property Record, Utility Annex. On file, KSC Real Property Office. Urbahn Roberts Seelye Moran, New York, New York. Data Manual for Vertical Assembly Building Associated Facilities and Site Work. June 9, On file, KSC Documents Library. Launch Complex 39, Vertical Assembly Building, Volume 14.

Architectural drawings, NASA October On file, KSC Engineering Documentation Center. Launch Complex 39, Vertical Assembly Building, Volume 29. Architectural drawings, NASA October On file, KSC Engineering Documentation Center. LC 39 Vertical Assembly Building, Volume 31. Architectural drawings, NASA October On file, KSC Engineering Documentation Center, Florida. U.S. Army Corps of Engineers, Jacksonville, Florida. Modifications to VAB Utility Annex, LC- 39: (Sound Attenuation Rooms). Architectural drawings, NASA August On file, KSC Engineering Documentation Center, Florida. ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 67 B. Secondary Johnson, Levinson, Ragan, Davila, Inc.

Study to U pgrade Systems at the VAB Utility Annex at the Kennedy Space Center, F lorida. Analysis report, NASA On file, VAB Utility Annex. Nail, Ken. Chronology of KSC and KSC Rela ted Events for March On file KSC Archives. Chronology of KSC and KSC Related Ev ents for March On file KSC Archives. Chronology of KSC and KSC Related Even ts for January O n file KSC Archives. NASA. Astronautics & Aeronautics, Washington, DC: NASA Scientific and Technical Information Division, ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 68

Barge Terminal Facility

Part I. Historical Information A. Physical History: 1. Date of construction: The Barge Term inal Facility was dredged and constructed between June 6, and August 30, 2. Architect/Engineer: The drawings for the dredging of the Barge Term inal Facility were completed by the ACOE.37 3. Builder: The Barge Terminal Facility was constructed by Gahagan Dredging Corporation of Tampa, Florida, and R. E. Clarson, Inc., of St. Petersburg, Florida.38 4.

Original plans and construction: The earliest located drawings for the Barge Te rminal Facility area date to Novem ber and detail areas of land to be dredged and used as fill for the VAB and Launch Pad 39 Drawings from November July and February provide inform ation regarding the shape of the Barge Terminal Facility as well as the turning basin, wharf, pile dolphins, and bollards.40 5. Alterations and additions: According to the Real Pro perty Record, the Barge Term inal Facility channel was widened and deepened in No other alterations or additions are indicated.41 36 NASA Real Property Record, Barge Terminal Facility, on file, KSC Real Property Office.

37 US Army Corps of Engineers, Canaveral District, Access Channel & Hydraulic Fill for VAB and Pad November on file, KSC Engineering Documentation Center; US Army Corps of Engineers, Canaveral District, Vehicle Unloading Dock and Area, November on file, KSC Engineering Documentation Center; US Army Corps of Engineers, Canaveral District, Dredging Saturn Barge Channel, July on file, KSC Engineering Documentation Center; US Army Corps of Engineers, Canaveral District, Dredging Saturn Barge Channel, February on file, KSC Engineering Documentation Center. 38 NASA Barge Terminal Facility. 39 ACOE, Access Channel & Hydraulic Fill. The original master plans for KSC included three launch pads, labeled A, B, and C from north to south.

By March the locations of Pads A and C were switched, so Pad A was then the southernmost pad for LC 39. In the end, NASA only constructed two of the pads, A and B. NASA, Merritt Island Launch Area Master Plan, December on file, KSC Archives Department; NASA, Merritt Island Launch Area Master Plan, March on file, KSC Archives Department. 40 ACOE, Unloading Dock and Area; ACOE, Dredging Saturn Barge Channel; ACOE, Dredging Saturn Barge Channel. 41 NASA Barge Terminal Facility. ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 69 B. Historical Context: The construction of the Barge Terminal Facility (Figure No.

was co mpleted in conjunction 42 with the site preparation (land clearing a nd dredging) for the construction of the VAB. Dredging operations (Figure No s. for a barge cana l began early in Novem ber The approximately 10 -deep, 124 -wide, ile long c hannel extended from the original barge channel in the B anana River to a turnin g basin at the southeast of the VAB. At the northwest corner of the basin was the Barge Term inal Facility.43 Construction of the Barge Terminal Facility, including the headwall, wharf, and pad area, began on June 6, (Figure Nos. C-4 through The headwall was the firs t portion to be built, followed by the wharf and the pad area.

Work was completed on August 30, The first Apollo Program com ponent to arrive at the Barge Term inal Facility, on Nove mber 2, was the inner stage component for the second stage of the Saturn V rocket for the AS-500F test vehicle onboard the barge KSC 1 (Figure No. Although it ne ver flew in space, AS- provided technicians the opport unity to test the procedures for vehicle assembly, transport from the VAB to the launch pad, mobile launcher and launch pad connections, and propellant loading operations.

On S eptember 12, the first co mponent of an actual flight vehicle, the first stage for Apollo 4, arrived at the Barge Terminal Facility.45 For the remainder of the Apollo Program, the Barge Term inal Facility served as the arrival point for all first, second, and third stages of the Saturn V rockets (for the lunar m issions and Skylab 1) and the Saturn IB rockets (for Skylab 2-4 and the ASTP) (Figure No. The final com ponent, the first stage for the ASTP rocket, arrived on April 24, The Barge Term inal Facility provided its fi rst support of the SSP on April 3, when the Orbiter Weight Simulator arrived at KSC from Sim ilar to AS-500F, this sim ulator allowed KSC technicians to fit-check platform s in the OPF and VAB and f it-check the Mate - Demate Device at the S LF.

It also provided ground crew traini ng for post-landing procedures. 47 On March 28, the barge Poseidon delivered the first S pace Shuttle external tan k, ET-1 to be used for to th e Barge Terminal Facility. Over the next thirty- one years, 136 external tanks were delivered to the f acility (Figure Nos. the last (ET-122) arrived on 42 See pages of the original submission. 43 Benson and Flaherty, Gateway, 44 NASA Barge Terminal Facility. 45 Benson and Flaherty, Gateway, Alan Lawrie, Saturn (Burlington, ON: Apogee Space Books, 46 Saturn 1B Due Here, Spaceport News, April 18, 7; Edward Clinton Ezell and Linda Neuman Ezell, The Partnership: A NASA History of the Apollo-Soyuz Test Project (Mineola, NY: Dover Publications, Inc., Appendix F.

47 Jenkins, Space Shuttle, ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 70 September 27, onboard the barge Pegasus. This tank was used during the final mission of the Space Shuttle Endeavour.48 Aside from direct support for the Apollo and Sp ace Shuttle Programs, NASA has used the Barge Terminal Facility for other tasks.

On April 5, 197 8, Apollo hardware that had been on display at the KSC Visitor Information Cent er, including the first and sec ond stages of a Saturn IB, af t interface, and spacecraft capsule, were loaded onto a barge at the fac ility to be transported to Savannah, Georgia, where the artifacts would then continue to Tokyo, Japan, for a Space Science Exhibition.49 Similarly, following the the Barge Te rminal Facility wa s the send-off point for various Shuttle-era artifacts. On May 2 4, a high-fidelity replica orbiter nam ed Explorer that had been on displa y at the KSC Visitor Complex for eighteen years, was placed on a barge for delivery to JSC to be exhibited atop an SCA.

50 Less than a year later, on April 24, the external tank from a SSP structural test article, a SRB nose cone, a SRB aft skirt, and a crew transportation vehicle, set sail from the Ba rge Terminal Facility; their destination was the Wings of Dreams Aviation Museum at the Keystone Heights Airport in Starke, Florida.51 48 ET-122 was fabricated and signed over to NASA on November 21, but was never delivered to KSC for use; instead, it remained in storage at the Michoud Assembly Facility in New Orleans.

The tank received post-Columbia accident modifications in and was eventually delivered to KSC on September 27, for use as the launch-on-need tank for The first tank slated for the mission, ET-138, arrived at KSC on July 13, but it was later decided to use this tank for Space Shuttle Atlantis last flight, Research did not indicate why the switch was made. Shuttle External Tank for Mission Arrives at NASA s Kennedy Space Center, audio release, July 15, Photo Caption, KSC Photo No. Lockheed Martin, Space Shuttle Flight Info, accessed August 49 Saturn 1B Goes to Japanese Expo, Spaceport News, April 14, 1 and 4. 50 Robert Z.

Pearlman, Space Shuttle Replica Docks in Houston Lake, Launches Shuttlebration , Space.com, June 1, 51 Space Shuttle External Tank, Astronaut Mover on Barge for Museum, Collectspace.com, April 24, ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 71 Part II. Structural/Design/Equipment Information A. General Statement: 1. Character: The Barge Terminal Facility (Photo Nos. is located to the southeast of the VAB. The resource is defined as the co ncrete headwall along much of the northern edge of the turn basin, the concrete wharf at the west end of the turn basin, and the concrete pad to the west of the wharf. 2.

Condition of fabric: Due to periodic maintenance, the Barge Terminal Facility is in good condition. B. Description: The Barge Term inal Facility is com prised of three components: a wharf, a headwall, and a pad area. The wharf (Photo Nos. is located at th e northwest corner of the Barge Term inal Facility. It has approximate overall dimensions of 75 in length (north-south) and 37 -6 in width (west-east). Its su rface, a 3 -th ick bituminous pavement cladding, is ab out 8 abov e mean sea level.

The structure is comprised of precast c oncrete deck units, precas t concrete girders, prestressed concrete piling, timber bumpers and piles, and is enclosed with a chain fence.52 There are thirty deck units, each of which measures roughly 13 in le and 5 -6 in width, arranged so that there are five units end-to-end along the length of the wharf and six units side-to-side within the width. The deck units are supported by six girders or iented along a west-east axis. Each girder is 33 in length, 3 in width, and 2 in height, and s its on five evenly-spaced pilings, which are roughly 1 -2 squa re and range in height from 38 to 50 . Six additi onal batter piles are situated along the east edge of the wharf where the boats dock.

Likewise, the 8 x 8 tim ber bumpers and 12 -diameter timber piles are only on the east edge of the wharf. There are also two 35-ton bollards anchored into the w harf (Photo No. One is located roughly 7 north and 13 -6 west of the southeast corn er of the wharf and the other is about 7 south and 13 -6 west of the northeast corner of the wharf. The -wide concrete headwall (Photo Nos. extends along most of the north edge of the turning basin. The wall beg ins at the wes t end of the wharf and extends eastward for approximately 311 . It then extends for 480 along a northeasterly axis befo re it turns eastward again and extends another 510 . The pad area is located to the west of the wharf (Photo No. It has approximate overall dimensions of 350 in length and 39 in width.

It is comprised of, from surface to base, two 1.5 52 NASA Barge Terminal Facility. ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 72 bituminous concrete layers separated by a tack co at, a 6 -thick lim erock base course, a 6 -thick layer of loose measure limerock, and a 15 -thick layer of compacted earth. D. Site Information: The Barge Terminal Facility is situated at the northeast corner of a turning basin, located to the southeast of the VAB. The f acility is reached by a curving roadway off of Saturn Causeway that also provides access to the parking area for the Press Site, which sits to the southwest of the turning basin.

The turning ba sin is roughly 10 deep and ranges between 130 and in width (or if the borrow pit ar ea to the south is included). Along its west shore, approximately 185 from the south edge of the wharf, is one of two tim ber mooring dolphins (Photo No. A second tim ber dolphin is located roughly 185 south and 293 east of the southeast corner of the wharf. ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 73 Part IV. Sources of Information A. Primary NASA. Merritt Island Launch Area Master Plan. December On file, KSC Archives Department. Merritt Island Launch Area Master Plan. March On file, KSC Archives Department. NASA Real Pro perty Record, Barge Term inal Facility. On file, KSC Rea l Property Office.

US Army Corps of Engineers, Canaveral District. Access Channel & Hydraulic F ill for VAB and Pad November On file, KSC Engineering Documentation Center. Vehicle Unloading Dock and Area. November On file, KSC Engineering Documentation Center. Dredging Saturn Barge Cha nnel. July On file, KSC Engineering Documentation Center. Dredging Saturn Barge Channel. Fe bruary On file, KSC Engineering Documentation Center. B. Secondary Benson, Charles D. and William Barnaby Faherty. Gateway to the Moon. Building the Kennedy Space Center Launch Complex. Gainesville, University Pr ess of Florida, (first paperback printing). Ezell, Edward Clinton, and Linda Neum an Ezell. The Partnership: A NASA History of the Apollo-Soyuz Test Project. Mineola, NY: Dover Publications, Inc., Lawrie, Alan. Saturn.

Burlington, ON: Apogee Space Books, ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 74 APPENDIX B: Historic Photos of the VAB Utility Annex ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 75 Figure Construction of the VAB Utility Annex, facing northeast, July 14, Source: John F. Kennedy Space Center Archives, ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 76 Figure Construction of the VAB and VAB Utility Annex (denoted by arrow), facing east, October 13, Source: John F.

Kennedy Space Center Archives, ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 77 Figure Construction of the VAB and VAB Utility Annex (denoted by arrow), facing northeast, January 7, Source: John F. Kennedy Space Center Archives, ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 78 Figure View of VAB and VAB Utility Annex (denoted by arrow), facing northeast, January 7, Source: John F. Kennedy Space Center Archives, ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No.

Page 79 Figure View of VAB Utility Annex showing northwest addition (denoted by arrow), facing northeast, January 29, Source: John F. Kennedy Space Center Archives, ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 80 APPENDIX C: Architectural Drawings of the VAB Utility Annex Scans of each Drawing at the original size are located within the Field Notes) ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No.

Page 81 Figure Urbahn-Roberts-Seelye-Moran, Launch Complex 39, Vertical Assembly Building, Volume 31, Utility Annex, Floor 1, Level 0 -0 , October Sheet ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 82 Figure Urbahn-Roberts-Seelye-Moran, Launch Complex 39, Vertical Assembly Building, Volume 31, Utility Annex, Equipment Layout, October Sheet ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No.

Page 83 Figure Urbahn-Roberts-Seelye-Moran, Launch Complex 39, Vertical Assembly Building, Volume 31, Utility Annex, Elevations, October Sheet ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 84 Figure Urbahn-Roberts-Seelye-Moran, Launch Complex 39, Vertical Assembly Building, Volume 31, Utility Annex, Sections, October Sheet ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 85 Figure U.S. ACOE, Modifications to VAB Utility Annex, (Sound Attenuation Rooms), Architectural Plan and Details, August Sheet 2. ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F.

Kennedy Space Center) HAER No. Page 86 Figure Allen & Hoshall, Replacement of V.A.B. U.A. Cooling Towers, No. K6- Utilities & Grading Site Plan-East, November Sheet 4. ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 87 Figure Allen & Hoshall, Replacement of V.A.B. U.A. Cooling Towers, No. K6- Exterior Elevations, November Sheet 10. ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 88 Figure Vanderweil Engineers, Replacement of MCC s and Upgrade Pumping System at the Utility Annex, VAB Utility Annex Site Plan, October Sheet 3.

ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 89 Figure Vanderweil Engineers, Replacement of MCC s and Upgrade Pumping System at the Utility Annex, Architectural Floor and [Ceiling] Plans-Demolition and New Construction, October Sheet 5. ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 90 Figure Vanderweil Engineers, Replacement of MCC s and Upgrade Pumping System at the Utility Annex, Building Elevations, October Sheet 6. ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No.

Page 91 APPENDIX D: Historic Photos of the Barge Terminal Facility ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 92 Figure Artist s concept of VAB Area and launch pads (Barge Terminal Facility to right of VAB, denoted by arrow), facing northeast, May 15, Source: John F. Kennedy Institutional Imaging Facility, LOC-63C-1793. ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 93 Figure Dredging of the Barge Terminal Facility, direction unknown, May 16, Source: John F. Kennedy Space Center Archives, LOC-63-5287. ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F.

Kennedy Space Center) HAER No. Page 94 Figure Dredging of the Barge Terminal Facility, direction unknown, May 28, Source: John F. Kennedy Space Center Archives, LOC-63-5462. ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 95 Figure Construction of the headwall, direction unknown, July 17, Source: John F. Kennedy Space Center Archives, LOC-63-7283. ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 96 Figure Construction of the Barge Terminal Facility headwall and dock, facing northeast, August 26, Source: John F. Kennedy Space Center Archives, LOC-63-8501.

ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 97 Figure Construction of the Barge Terminal Facility headwall and dock, facing southwest, September 5, Source: John F. Kennedy Space Center Archives, LOC-63-8916. ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 98 Figure View of the Barge Terminal Facility (early construction work on the VAB in the background), facing northwest, September 10, Source: John F. Kennedy Institutional Imaging Facility, LOC-63-9121. ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No.

Page 99 Figure Construction of the wharf, direction unknown, May 14, Source: John F. Kennedy Space Center Archives, ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 100 Figure A S-IV-B inner stage for a Saturn V launch vehicle on a barge docked at the Barge Terminal Facility, facing northwest, November 2, Source: John F. Kennedy Space Center Archives, ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 101 Figure Unloading of a at the Barge Terminal Facility, facing northwest, February 7, Source: John F.

Kennedy Institutional Imaging Facility, ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 102 Figure The external tank for arriving at the Barge Terminal Facility, facing northeast, April 22, Source: John F. Kennedy Space Center Archives, ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 103 Figure The external tank for being unloaded at the Barge Terminal Facility, facing northwest, July 14, Source: John F. Kennedy Space Center Media Gallery, accessed at ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No.

Page 104 APPENDIX E: Architectural Drawings of the Barge Terminal Facility Scans of each Drawing at the original size are located within the Field Notes) ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 105 Figure E-1. U.S. ACOE, Dredging Saturn Barge Channel, Cover Sheet & Control Data, February Sheet 1. ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 106 Figure E-2. U.S. ACOE, Vehicle Unloading Dock and Area, Turning Basin Layout, January Sheet 2. ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 107 Figure E-3. U.S.

ACOE, Dredging Saturn Barge Channel, Cut 20, Sta. V.A.B. Turning Basin, February Sheet 13. ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 108 Figure E-4. U.S. ACOE, Vehicle Unloading Dock & Area, Wharf Plan, January Sheet 8. ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 109 Figure E-5. U.S. ACOE, Vehicle Unloading Dock & Area, Vicinity Map, Location Plan & Sheet Index, January Sheet 1. ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 110 Figure E-6. U.S. ACOE, Vehicle Unloading Dock & Area, Site Plan, January Sheet 3.

ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 111 APPENDIX F: Legend of Acronyms ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F. Kennedy Space Center) HAER No. Page 112 ABMA Army Ballistic Missile Agency ACI Archaeological Consultants, Inc.

ACOE Army Corps of Engineers AFB Air Force Base AFP Air Force Plant ALT Approach and Landing Tests AP Access Platform ARF Assembly and Refurbishment Facility ASTP Apollo-Soyuz Test Project CAIB Columbia Accident Investigation Board CCAFS Cape Canaveral Air Force Station CEV Crew Exploration Vehicle CSM Command/Service Module DoD Department of Defense ET External Tank FSS Fixed Service Structure GUCA Ground Umbilical Carrier Assembly HB High Bay HST Hubble Space Telescope IHA InoMedic Health Applications ISS International Space Station JSC Johnson Space Center KATS Kennedy Avionics Test Set KSC Kennedy Space Center LaRC Langley Research Center LC Launch Complex LCC Launch Control Center LOC Launch Operations Center LOD Launch Operations Directorate LPS Launch Processing System LUT Launch Umbilical Tower MILA Merritt Island Launch Area MLP Mobile Launcher Platform MSC Manned Spacecraft Center Marshall Space Flight Center NASA National Aeronautics and Space Administration National Register of Historic Places National Space Technology Laboratories O&C Operations and Checkout OPF Orbiter Processing Facility ADDENDUM TO: CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, VEHICLE ASSEMBLY BUILDING (John F.

Kennedy Space Center) HAER No. Page 113 OV Orbiter Vehicle PCR Payload Changeout Room Payload Ground Handling Mechanism RMS Remote Manipulator System Rotation, Processing and Surge Facility Reynolds, Smith & Hills RSS Rotating Service Structure SCA Shuttle Carrier Aircraft SLF Shuttle Landing Facility SRB Solid Rocket Booster SSC Stennis Space Center Santa Susana Field Laboratory SSME Space Shuttle Main Engine SSP Space Shuttle Program STG Space Task Group STS Space Transportation System Shuttle Wheel and Tire Shop TPS Thermal Protection System TSM Tail Service Mast U.S. United States VAB Vehicle Assembly Building

In context

Cape Canaveral, Florida The place record: every map, photograph and survey of this town.
Brevard County, Florida 134 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Cape Canaveral

24 of 118 records shown

The federal surveyors worked through Cape Canaveral building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Cape Canaveral Air StationHAER FLA,5-CACAN,1-32,823 words
Cape Canaveral Air Force StationHAER FL-8-1232,234 words
Cape Canaveral Air Force StationHAER FL-8-AO27,461 words
Cape Canaveral Air Force StationHAER FL-8-11-F22,264 words
Cape Canaveral Air Force StationHAER FL-8-11-O19,777 words
Cape Canaveral Air Force StationHAER FL-8-AV18,663 words
Cape Canaveral Air Force StationHAER FL-8-618,475 words
Cape Canaveral Air Force StationHAER FL-8-11-M17,593 words
Cape Canaveral Air Force StationHABS FL-581-A17,410 words
Cape Canaveral Air Force StationHAER FL-8-11-G17,133 words
Cape Canaveral Air Force StationHAER FL-8-11-J16,548 words
Cape Canaveral Air Force StationHABS FL-581-B14,684 words
Cape Canaveral Air Force StationHAER FL-8-11-L13,962 words
Cape Canaveral Air Force StationHABS FL-583-A13,824 words
Cape Canaveral Air Force StationHAER FL-8-11-R13,738 words
Cape Canaveral Air Force StationHABS FL-581-C13,646 words
Cape Canaveral Air Force StationHAER FL-8-713,389 words
Cape Canaveral Air Force StationHAER FL-8-A12,671 words
Cape Canaveral Air Force StationHAER FL-8-11-D12,041 words
Cape Canaveral Air Force StationHAER FL-8-11-K12,011 words
Cape Canaveral Air Force StationHAER FL-8-11-A11,934 words
Cape Canaveral Air Force StationHAER FL-8-11-P11,823 words
Cape Canaveral Air Force StationHAER FL-8-11-S11,622 words
Cape Canaveral Air Force StationHAER FL-8-11-C11,607 words

Provenance

  • Written history. Quoted verbatim from HAER FL-8-11-B. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.