From the record

“The Crawlerway was listed in the National Re gister of Historic Places on January 21, Originally nominated in the context of the Apollo Program, ca. through the Crawlerway has since gained importance in the context of the Spac e Shuttle Program ca. to It is significant under Criterion A in the areas of Transportation and Space Exploration, and under Criterion C in the area of Engineering.”

Written record, HAER FL-8-11-P survey. Machine-read text.

Surveyed by the federal HAER program as HAER FL-8-11-P · the record runs 11823 words · one of 123 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

98 words

Source document Quoted word for word from HAER FL-8-11-P. Not written, edited or summarised by this site.

Vehicle Assembly Building/Launch Complex 39 Area John F. Kennedy Space Center Cape Canaveral Brevard County Florida The Crawlerway exten ds from the Vehicle A ssembly Building (VAB), located at latitude: longitude: to Launch Com plex 39A, located at latitude: longitude: A second branch of the Crawlerway extends from latitude: longitude: - to Launch Com plex located at latitud e: longitude: The original Mobile Service Structure Park Site is located at latitud e: longitude: These coordin ates were obtained on January 17, through Google Earth . Present Owner/ Occupant: National Aeronautics and Space Administration (NASA) Kennedy Space Center, FL

Significance

260 words

Source document Quoted word for word from HAER FL-8-11-P. Not written, edited or summarised by this site.

The Crawlerway was listed in the National Re gister of Historic Places on January 21, Originally nominated in the context of the Apollo Program, ca. through the Crawlerway has since gained importance in the context of the Spac e Shuttle Program ca. to It is significant under Criterion A in the areas of Transportation and Space Exploration, and under Criterion C in the area of Engineering. Because the Crawlerway has achieved s ignificance within the past 50 years, as it was of exceptional im portance to the as well as the Apollo Program , Criteria Consideration G applies. Within the context of the the period of signi ficance for the Craw lerway is from when the first flig ht-ready Space Shuttle vehicle was transpo rted to the launch pad, through the end of the program .

In total, the Crawlerway supported the transport of 135 Space Shuttle missions, as well as sixteen Apollo era flights. Under Criterion C, the Crawlerway is significant as a uniqu e dual-lane su rface, specifically designed as a roadway for the transportation of assembled space flight vehicles from the VAB to the launch pad. It was o riginally engineered to w ithstand the CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 2 pressure from the massive weight of the combination of the Saturn rocket, the Mobile Launcher, and the Craw ler, at approxim ately m illion pounds (the com bined weight of th e Space Shuttle, Mobile Launcher Platform and Crawler Transporter was 17 million pounds).

Written history

9931 words

Source document Quoted word for word from HAER FL-8-11-P. Not written, edited or summarised by this site.

The documentation of the Cape Canaveral Air Force Station (CCAFS), Launch Complex 39, Crawlerway wa s conducted in for the John F. Kennedy Space Center by Archaeological Consultants, Inc. (ACI), under contract to InoMedic Health Applications (IHA), and in accordance with KSC s Programmatic Agreem ent (PA) Regarding Management of Historic Propertie s, dated May 18, The field team consisted of architectural histor ian, Patricia Slovinac (ACI), and independent photographer, Penny Rogo Bailes. Assistance in the field was provided by Barbara Nayl or, KSC Historic Pres ervation Officer, and Nancy English, KSC Cultural Resource Specialist. The written narrative was prepared by Ms. Slovinac; it was edited by Joan Deming, ACI Project Manager; Elaine Liston, KSC Archivis t; Ms. Naylor and Ms.

English of and J ane Provancha, Environm ental Projects-Manager, IHA. The photographs and negatives were processed by Zebra Color, Inc., an independent photography/processing studio. The Scope of Services for the project, which was written based on the PA, specifies a docum entation effort fo llowing HAER Level II Standards. Information for the written narrative was primarily gathered through informal interviews with current N ASA and contractor personnel and research materials housed at the KS C Archives Departm ent. Selected drawings were provided by KSC s E ngineering Documentation Center, which serves as the repository fo r all f acility drawings. For the Crawlerway, this included the original as-built drawings.

It should also be noted that KSC does not periodically produce drawings of their facilities to show current existing conditions. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 3 LIST OF ACRONYMS ACI Archaeological Consultants, Inc. ACOE U.S.

Army Corps of Engineers CCAFS Cape Canaveral Air Force Station ET External Tank IHA InoMedic Health Applications ISS International Space Station JSC Johnson Space Center KSC Kennedy Space Center LC Launch Complex MLP Mobile Launcher Platform Marshall Space Flight Center MSS Mobile Service Structure NASA National Aeronautics and Space Administration National Register of Historic Places OV Orbiter Vehicle PA Programmatic Agreement SRB Solid Rocket Booster SSME Space Shuttle Main Engine SSP Space Shuttle Program STS Space Transportation System URSAM Urbahn, Roberts, Seelye, and Moran U.S. United States VAB Vehicle Assembly Building CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 4 Part I. Historical Information A.

Physical History: 1. Date of construction: November through February 2. Architect/Engineer: Giffels and Rossetti, Inc. of Detroit, Michigan; U.S. Army Corps of Engineers (ACOE), Merritt Island, Florida.2 3. Builder: Blount Brothers Construction Company of Montgomery, Alabama, and M. M. Sundt Construction Company of Tucson, Arizona m ile segment between VAB and Launch Complex 39 Pad A); George A. Fu ller Company of Los Angeles, California mile segment from main branch of Crawlerway to LC 39 Pad B); Morrison- Knudsen Co., Inc., Perini Corp., and Paul Ha rdeman, Inc., all of South Gate, California (segment around north side of VAB).3 4. Original plans and construction: For the most part, the Crawlerway present at the tim e of documentation resembles the original.

The alignment of the Crawlerway has not changed. The only difference is when origin ally constructed, between Nove mber and August the m ain portion of the Crawle rway (from the east elevation of the VAB to LC 39A), had a m acadam surface, as did that po rtion around the north of the VAB (constructed between March and January 5. Alterations and additions: Between and the m acadam surface of the m ain portion of the Crawlerway and the portion ar ound the north of the VAB were removed and replaced with rounded river gravel. 5 From through the entire grave surface was replaced, and the lim erock base was repaired and resto red.

In 20 00, the gravel surface on the portion of the Crawlerway between the VAB and LC 39, Pad A was replaced.6 1 ACOE, Apollo Launch Complex 39 (Cape Canaveral: ACOE South Atlantic Division, no date), 40. 2 Giffels & Rossetti, Inc., Detroit, Complex 39, Volume I, Crawlerway and Adjacent Facilities (architectural drawings, NASA February on file, KSC Engineering Documentation Center, Florida. 3 ACOE, Complex 39, 40. 4 First Crawlerway Portion Accepted by Space Center, Spaceport News, January 21, 1; ACOE, Complex 39, 40. 5 Charles D. Benson and William B. Faherty, Moon Launch!

A History of the Saturn-Apollo Launch Operations (Gainesville: University Press of Florida, 6 Crawlerway Undergoes First Full-Scale Refurbishment, Spaceport News, May 7, 3; Justin Junod, personal communication (email) with Nancy English, May 30, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 5 B. Historical Context: The VAB/LC 39 Area of the John F. Kennedy Space Center was originally designed to accommodate the powerful Saturn V rocket, which was set to launch man to the Moon during the Apollo Program. The trem endously large and com plex rocket prompted research into new methods of preparing a vehicle for its voyage in to space.

Up to this poin t, all rockets and space modules had been assembled and tested solely at the launch pad from whic h they would lift off; however, these early vehicles were much si mpler in configuration, relying on a single booster to reach orbit as opposed to the planned two or th ree booster stages for the Apollo vehicles. Additionally, the multi-booster configuration of the Saturn ro ckets required a longer process ing time, which presented a greater potential for dela ys in processing and checkout due to inclem ent weather, especially if these activities were completed at the launch pad.

Therefore, the decision was made to construct an enclosed facility fo r vehicle processing, asse and checkout (the VAB); and then transport the vehicle atop its launch platform to the launch pad.7 The first studies for LC 39 by Martin Ma rietta Corporation focused on using either a barge and canal sy stem or a rail line to transp ort the Apollo vehicles to the launch pads. The initial cost estimates favored the barge system, but further inquiries (late 1961/early raised substantial questions as to the barge s propulsion and steering capabilities, as well as its ability to keep the vehicle stable.

Concurrent with these studies was a comprehensive survey by American Machine and Foundry Company that examined various methods of hauling the vehicle, including a barge and canal system, railway wheels, pneumatic tires, and crawler treads; this study resulted in the suggestion of a com bined barge and rail system .8 In the m idst of these studies, Barry Schlenk, a representative of Bu cyrus-Erie Company of Milwa ukee, Wisconsin, contacted the National Aeronautics an d Space Adm inistration (NASA). Schlenk had heard about the vehicle transport conundrum, and with him, brought pict ures of a steam -shovel crawler designed and built by his com pany for use in the coalfield s of Kentucky.

After a site visit to the coalm ine in February NASA hired Bucyru s-Erie Company to study the us e of a crawler-style vehicle to transport the Saturn rocket . The results were successful, a nd at a conference in June NASA formally decided to proceed with the use of the Crawler Transporter (Crawler).9 On September 8, NASA issued an updated pr oject document for LC 39, which introduced the requirements for the roadway o n which the Crawler would travel; this roadwa y eventually 7 Charles D. Benson and William B. Faherty, Gateway to the Moon. Building the Kennedy Space Center Launch Complex (Gainesville, University Press of Florida, Patricia Slovinac, Cape Canaveral Air Force Station, Launch Complex 39, Crawler Transporters (John F. Kennedy Space Center), HAER No.

Historic American Engineering Record (HAER), National Park Service, U.S. Department of the Interior, September 11. 8 Benson and Faherty, Gateway, Slovinac, Crawler Transporters, 12. 9 Benson and Faherty, Gateway, Slovinac, Crawler Transporters, 12. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 6 became known as the Crawlerway. 10 As part of the Fiscal Y ear construction budget, KSC requested funds for construction of the main branch of the Crawlerway, which extended from the VAB to LC 39A.

The funds for the rem ainder of the Crawlerway were in cluded in the Fiscal Year budget.11 In preparation for construction of the faciliti es within the VAB/LC 39 Area, ACOE awarded a contract to Gahagan Dredging Corp oration of Tampa, Florida, to clear the land, and dredge an access channel (the barge canal).12 On October 31, Ga hagan began to clear the land in the VAB and Areas; one week later, the firm started to dredge the barge canal. Approximately million cubic feet of the dredged sand were de posited along the site of the Crawlerway, at a width of 187 and depth of 6.5 .

13 Vibratory rollers were us ed to compact the fill loca ted below the trackways, and a 100-ton vehicle then proof-rolled the fill.14 As Gahagan continued to clear and dredge land, on February 1, NASA signed an contract with Giffels & Rossetti, Inc. of Detroit, Michigan, an architecture/engineering firm, for the design of the Crawlerw ay and the launch pads.

15 On February 21, the first conference regarding the design of the Crawlerway was held at attendees included four representatives from NASA, four from ACOE s Jacksonville, Flor ida, office, five from Giffels & Rossetti, and four from URSAM (Urbahn, Roberts, Seelye, and Moran).16 At this meeting, URSAM suggested that the Crawlerway be com prised of various layers, with a tota l thickness of roughly 4.5 , and topped by a layer of crushed stone and a soft grade of asphalt for economics in maintenance. In addition, it was proposed that the Crawlerway have a 1 percent tr ansverse slope from the center to each outer edge to assist with drainage.17 10 Benson and Faherty, Gateway, The project document provided the basis for KSC s construction budget over the next few fiscal years.

11 Benson and Faherty, Gateway, 12 The barge canal would be used to transport the first and second stages of the Saturn V vehicle by boat to the VAB area. 13 Big Dredges Help Build Cape s Vital Roadways, Spaceport News, February 7, 4. Other portions of the dredged sand were placed at the site of the VAB and Pad A. Benson and Faherty, Gateway, 14 E. R.

Bramlitt, History of Canaveral District (Cape Canaveral: ACOE South Atlantic Division, Benson and Faherty, Gateway, 15 Million Set for Merritt Island, Spaceport News, March 12, 2; Benson and Faherty, Gateway, 16 URSAM was a combination of four New York architecture and engineering firms, organized in The acronym was created using the first letter in each company s name: Max Urbahn [architectural]; Roberts and Schaefer [structural]; Seelye, Stevenson, Value and Knecht [civil, mechanical and electrical]; and Moran, Proctor, Mueser and Rutledge [foundations]. Patricia Slovinac, Cape Canaveral Air Force Station, Launch Complex 39, Vehicle Assembly Building (John F. Kennedy Space Center), HAER No. Historic American Engineering Record (HAER), National Park Service, U.S.

Department of the Interior, July 11. 17 URSAM, Minutes of Meeting: Crawlerway Design Conference held at NASA LOC, Cape Canaveral, February 21, Sweetsir Collection, File No. ARCH00000113, Kennedy Space Center Archives Department, Florida; Benson and Faherty, Gateway, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 7 At a second m eeting, held on March 27, Gi ffels & Rossetti presented their proposed Crawlerway design, which was based on the outcome of the February 21 st meeting, to personnel from URSAM, ACOE, and others. The co mpany s design included a 6 top layer of cutback SA-3 asphalt, and a 1 percent downward slope from the m edian.

Donald Buchanan of and representatives of the Marion Powe r Shovel Com pany (builders of the Crawler) objected to the use of an asphalt surface on the Crawlerway and the sloping surface. They feared that the asphalt would adhere to the vehicle s treads and cause increas ed friction between the treads and the su rface; the su rface slope, they argued, would require additional steering correction. The m eeting concluded with two defin ite agreements among the pa rties. First, two criteria were set for the selection of the surface material: the material was not to adhere to the Crawler s treads and would have a coefficient of friction no greater than 0.3 under expected operating temperature ranges.

Seco nd, it was decided that the track ways would be flat, but the median would remain sloped.18 After additional meetings and further load capacity studies, NASA issued a request for proposal for the construction of the roughly segment of the Crawlerway between the VAB and LC 39A. The roughly 5 million contract was issued to the com bination of Blo unt Brothers Construction Company of Montgomery, Alabama, and the Sundt Construction Com pany of Tucson, Arizona. 19 Work comm enced on Novem ber 19, with preparation of the base sand fill. As the base sand fill was prepared, rollers leveled the fill, a nd successive layers of consolidated sand and graded crush ed aggregate were added. The surface was then sealed with macadam.20 The work on this segm ent was completed in August (Figure Nos.

A-3 through A-8).21 The portion of the Crawlerway around the VAB was constructed by the joint venture of Morrison-Knudsen Co., Inc., Perini Corp., and Paul Hardeman, Inc., all of South Gate, California, as part of the million contract for construction of the VAB. 22 This segment was completed between March and January The Crawlerway was used for the first tim e on January 28, when the first Crawler was driven for roughly , and five months later, on June 22, the Crawler carried its first load, a Mobile Launcher, along the Crawlerway. During this test, the Crawler s treads chewed 18 Morgan F. Jones, Memorandum for Record: Crawler-Transporter Crawlerway Meeting; LOC E&L Building, March 27, April 5, Sweetsir Collection, File No.

ARCH00000113, Kennedy Space Center Archives Department, Florida; Benson and Faherty, Gateway, 19 The contract also included construction of LC 39A. Million Set, 2; Benson and Faherty, Gateway, 20 URSAM, Crawlerway Design Conference; The Ralph M. Parsons Company, Los Angeles, Preliminary Engineering Report, Space Shuttle Launch and Landing Facilities, Volume V, August Sweetsir Collection, File No. ARCH00022137, Kennedy Space Center Archives Department, Florida, 7; Benson and Faherty, Moon Launch!, 21 Bramlitt, Canaveral District, 57. 22 ACOE, Complex 39, 41; Million Set, 2. 23 ACOE, Complex 39, 41; First Crawlerway Portion Accepted by Space Center, Spaceport News, January 21, 1. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No.

Page 8 up large portions of the [Crawlerway s] macadam surface. 24 As a result, on July 24, 1965NASA tested two stretches of road, approxim ately one-half of a m ile long: one was covered with rounded river gravel, also known as Alabam a River rock, and the other was covered with crushed granite.25 Based on the resu lts of this test, the decision was made to use rounded river gravel for the Crawlerway surface, 4 -deep on the straight portions and 8 -deep on curves.26 On November 30, NASA signed a contract fo r approximately $24 million with the George A.

Fuller Company of Los Angeles, California, for the construction of Launch Pad 39B and the section of the Crawlerway between the main branch and the top of the launch pad.27 Work on the Crawlerway began in December the segm ent was com pleted in February .28 This was the only segment of the Crawlerway to be originally constructed with an rounded river gravel surface. On May 25, the Crawlerway was used by th e Crawler to carry the Apollo test vehicle to LC 39A for fit checks (Figure No.

A-9); the first transfer of a Mobile Service Structure to LC 39A along the Crawlerway occurred on July 20, Subsequently, the Apollo 4 vehicle, which would be the first launch of th e Saturn V rocket, was carried to LC 39A on August 26, During the Apollo era, the Craw lerway supported sixt een flights, which included twelve Apollo flights, four Skylab launches, and the A pollo-Soyuz Test Project (Figure Nos. A-10, A-11). Twelve of the m issions launched from LC 39A, and four lifted off from LC For the first eleven years of its ex istence, the only modifications to th e Crawlerway were th e periodic raking of the rounded riv er gravel su rface using a springtoo th harrow (Fig ure No.

A- The first substantial refurbishment of the C rawlerway occurred in when rock from unused areas of the Cra wlerway was gathered and spread over active sections of the facility. On December 29, the Crawlerway supported the SSP for the first time, when the Space Shuttle Columbia was carried to LC 39A for (Figure No. A-14). 24 Benson and Faherty, Moon Launch!, 25 Donald D. Buchanan, Memorandum for Record: Surface Coat of Gravel on Crawlerway, Complex 39, June 7, Sweetsir Collection, File No. ARCH00000113, Kennedy Space Center Archives Department, Florida; Benson and Faherty, Gateway, 26 J. F. Burke, Crawlerway Surfacing, letter dated August 27, Sweetsir Collection, File No. ARCH00000113, Kennedy Space Center Archives Department, Florida.

27 Past 12 Months Busiest Ever for Facilities, Spaceport News, December 31, 4; Benson and Faherty, Gateway, 28 ACOE, Complex 39, 41. 29 Benson and Faherty, Moon Launch!, 30 A springtooth harrow is a farming machine with curved teeth, typically used for loosening soil. It was commonly used by American farmers to cultivate corn. Crawlerway Smoothed by Farming Machine, Spaceport News, August 17, 8. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 9 Between and addition al rounded river gravel was purchased and applied to the m ain branch of the Crawlerway, between the VAB and LC 39A.

Around the portion of the Crawlerway located west of the VAB was altere d with the addition of modular office buildings, trailers, and a parking lo t; all were placed on top of the Crawlerway s s urface.31 The same year, the rock over a 600 segment of the Crawlerw ay near LC 39A was rem oved and replaced. In additional rounded river gravel was added to the sloped porti on of the Crawlerway within LC Beginning in the Crawlerway underwent its first complete refurbishment. Over a period of two and one-half years, Starba se Development, of Mim s, Florida, rem oved the rounded river gravel surface as well as the 3.5 -thick crushe d aggregate base in to sections. The 3.5 base w as repaired and restored using cr ushed limerock purchased from Goodson Paving, Inc.

of Sharpes, Florida; the rounded river grav el was then replaced with m aterials provided by Conrad Yelvington Distributors, Inc., of Daytona Beach, Florida.33 In as part of the safe haven project, the portion of the Crawlerway on the west side of the VAB, between the Crawler Park Site and the southwest High Bay, was restored (Figure No. A- Since then, the Crawlerway ha s not undergone any substantial changes.

By the end of the SSP in July the Crawlerway had supported 135 Space Shut tle missions, eighty-two of which launched from LC 39A and fifty-three of which lifted off from LC In addition, on October 20, the Ares I-X vehicle traversed the Crawlerway on its trip to LC 39B for its test flight, and on Nove mber 16, the Crawlerway supported the test of the new Mobile Launcher for the Space Launch System Program (Figure No. A-16).35 NASA s John F. Kennedy Space Center NASA KSC is responsible for launch and landi ng operations, vehicle processing and assem and related space explo ration programs in sup port of m anned and unm anned missions.

It is located on the east coas t of Florida, about 150 m iles south of Jacksonville and to th e north and 31 ACI, Survey and Evaluation of NASA-owned Historic Facilities and Properties in the Context of the U.S. Space Shuttle Program, John F. Kennedy Space Center Brevard County, Florida, (Survey report, NASA 32 Lockheed Space Operations Company, Project Plan for Crawlerway Refurbishment, May Railroad Archives, Box 1, Folder Kennedy Space Center Archives Department, Florida, 33 Crawlerway Undergoes First Full-Scale Refurbishment, Spaceport News, May 7, 3; Lockheed Space Operations Company, Project Plan, 3-1 through 34 The safe haven project modifications, completed by Rush Construction Corporation of Titusville, Florida, allowed KSC to use the southwest High Bay during hurricane season.

If sustained winds were 69 miles per hour or greater, a stacked vehicle at the launch pad could be returned to the southwest High Bay in the VAB, leaving the northeast and southeast High Bays open for vehicle stacking operations. See Slovinac, Vehicle Assembly Building, 14. 35 Anne Heiney, Ares I-X: Putting the Pieces Together, Spaceport News, October 30, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 10 west of Cape Canaveral, in Brevard and Vo lusia Counties, and encom passes almost acres. The Atlantic Ocean and CCAFS are located to the east, and the Indian River is to the west.

Following the launch of Sputnik I and Sputnik II, which placed Soviet satellites into Earth s orbit in the attention of the Am erican public turned to space e xploration. President Dwight D. Eisenhower initially assigned res ponsibility for the U.S. Space Program to the Departm ent of Defense. The Development Operatio ns Division of the Army Ballis tic Missile Age led by Dr. Wernher von Braun, began to focus on the use of missiles to propel payloads, or even a man, into space.

The United States successfully entere d the space race with the launch of the Arm y s scientific satellite Explorer I on January 31, using a m odified Jupiter missile named Juno I.36 With the realization that the m ilitary s involvement in the space prog ram could jeopardize the use of space for peaceful purposes, Presiden t Eisenhower formed NASA on October 1, as a civilian agency with the mission of carrying out scientific aeronautical and space explora tion, both manned and unmanned. Initially working with NASA as part of a cooperative agreem ent, President Eisenhower officially transferred to NASA a large portion of the Army s Development Operations Division, including th e group of scientists led by Dr.

von Braun, and the Saturn rocket program.37 NASA became a resident of Cape Canaveral in when the Army Missile Firing Laboratory, then working on the Saturn rocket project under th e direction of Dr. Kurt Debus, was transferred to the agency. Several Army facilities at CCAFS were given to NASA, including various offices and hangars, as well as LCs 5, 6, and 26; LC 34 at CCAFS was constructed by NASA.

The Missile Firing Laboratory was renam ed Launch Op erations Directorate and becam e a branch office of Marshall Space Fligh t Center As the A merican space program evolved, the responsibilities of the L aunch Operations Directorate grew, and NASA Headquarters separated the Directorate from officially designating it an independent field installation called the Launch Operations Center.38 In May President John F. Kennedy charged NASA and the associated industries to develop a space program that would surpass the Sovi et program by landing a man on the Moon by the end of the decade.

W ith the new, more powerful Saturn V rocket an d the accelerated launch schedule, it was apparent that a new launch complex was required, and CCAFS, with twenty-two launch complexes, did not have the space to acco mmodate new rocket fac ilities. Merritt Island, an undeveloped area west and no rth of the Cape , was selected for acquisition, and in the Merritt Island Launch Area (which , with the L aunch Operations Center, would becom e 36 Benson and Faherty, Gateway, 37 Benson and Faherty, Gateway, 15. 38 Benson and Faherty, Gateway, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 11 was developed. In that year, NASA requested fr om Congress authority to purchase acres of property, which was formally granted in The U.S.

Army Corps of Engineers acted as the agent for purchasing the land, which took pl ace between and NASA began gaining title to the land in late taking over appr oximately acres by outright purchase, which included several small towns, such as Orsi no, Wilson, Heath and Audubon, m any farms, citrus groves, and several fish camps. Negotiations with the State of Florida provided submerged lands, resulting in the acquisition of property identified on the original Deed of Dedication. Much of the State-provided land was located south of the Old Haulover Canal and north of the Barge Canal. The American program to put a m an in space and land on the Moon proceeded rapidly with widespread support. In Nove mber the La unch Operations Center and Merritt Island Launch Area were renam ed John F.

Kennedy Space Center to honor the late President. 39 The space program was organized in to three phases: Projects Mercury, Gemini, and Apollo. Project Mercury, initiated in was executed in less than five years. Begun in Project Gem ini was the interm ediate step toward achieving a manned lunar landing, bridging the gap between the short-duration Mercury fli and the long-duration m issions proposed for the Apollo Program.40 Apollo, the largest and most ambitious of the manned space programs, had as its goal the landing of astronauts on the Moon and thei r safe return to Earth. Provi ding the m uscle to launch the spacecraft was the Saturn fam ily of heavy vehicl es.

Saturn IB rockets were used to launch the early unmanned Apollo test fl ights and the first manned flight, Apollo 7, which c arried astronauts on a ten-day Earth orbital mission.41 Three different launch vehicles we re used for Apollo: Sa turn I, Sa turn IB and Sa turn V; and three different launch complexes were involv ed: LC 34 and LC 37 on CCAFS, and LC 39 on KSC (LC 37B and LC 39 Pads A and B are still active). 42 Altogether, thirty-two Saturn flights occurred (seven from LC 34, eight from LC 37, and seventeen from LC 39 Pad A [twelve] and Pad B [five], including Skylab and the Apollo-S oyuz Test Project) during the Apollo era. Of the total thirty-two, fifteen were manned, and of the seven attemp ted lunar landing m issions, six were successful.

No m ajor launch vehicle failures of eith er Saturn IB or Saturn V occurred . There were two major command/service module failures, one on the gro und (Apollo 1) and one on the way to the Moon (Apollo 39 Harry A Butowsky, Reconnaissance Survey: Man in Space (Washington, DC: National Park Service, 5; Benson and Faherty, Gateway, 40 Butowsky, Man in Space, 5. 41 Butowsky, Man in Space, 5. 42 LC 39 is comprised of two launch pads, Pad A and Pad B. Unless otherwise noted, the term LC 39 refers to both launch pads. 43 NASA, Facts: John F. Kennedy Space Center 82. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No.

Page 12 The unmanned Apollo 4 m ission, which lifted off on November 9, was the first Saturn V launch and the first launch from LC 39 (Pad A) at The next launc h from LC 39 (Pad A) was Apollo 6, on July 14, Be ginning with the launch of Apollo 8 on August 14, all manned missions have launched from LC 39. 44 On July 20, the goal of landing a m an on the Moon was achieved when Apollo 11 astronauts Neil Armstrong, Buzz Aldrin, and Michael Collins successfully executed history s first lunar landing. Armstrong and Aldrin walked on the surface of the Moon for two hours and thirty-one minutes, and collected 21 kilogram s of lunar material.

Apollo 17 served as the first n ight launch in Decem ber An estim ated people viewed the liftoff from LC 39 Pad A, which was the final launch of the Apollo Program.45 Skylab, an Earth-orbiting mission that was a follow-on to the Apollo Program, served as an early type of space station. W ith cubic feet of work and living space, it was the largest habitable structure ever placed in orbit, at th e time. The station achieved several o bjectives: scientific investigations in Earth orbit (astronomical, space physics, and biological experiments); applications in Earth orbit (Ear th resources surveys); and long- duration spaceflight. Skylab 1 orbital workshop was inhabited in succession by three crews launch ed in m odified Apollo command/service modules (Skylab 2, 3 and 4).

Actively used until February , Skylab 1 remained in orbit until July 11, when it re-entered Earth s atmosphere over the Indian Ocean and Western Australia after completing orbits.46 The Apollo-Soyuz Test Project of July the final application of the Apollo Program, marked the first international rendezvous and docking in space, and was the first m ajor cooperation between the only two nations engag ed in manned space flight, the U.S. and Russia. As the first meeting of two m anned spacecraft of different nations in sp ace, and the first dockin g and visits by astronauts and cosm onauts into the oth ers spacecraft, the event was highly significant.

The Apollo-Soyuz Test Project established workable joint docking mechanisms, taking the first steps toward mutual rescue capability of both Russian and American manned missions in space.47 On January 5, President Richard M. Nixon delivered a speech in which he outlined the end of the Apollo era and the future of a reus able space fligh t vehicle, th e Space Sh uttle, which would provide routine access to sp ace. By commencing work at this tim e, Nixon added, w e can have the Shuttle in m anned flight by , and operational a short tim e after that. 48 The Space Task Group, prev iously established by President Nixon in February recomm ended three choices of long-range space p lans.

All in cluded an Earth orb iting space station, a space 44 Apollo 5 launched from CCAFS s LC Apollo 7 launched from LC 34 at Benson and Faherty, Moon Launch!, 45 NASA, Facts, 46 NASA, Facts, 91. 47 NASA, Facts, 96. 48 Marcus Lindroos, ed., President Nixon s Announcement on the Space Shuttle, updated April 14, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 13 shuttle, and a manned Mars expedition.

49 Although none of the original program s presented was eventually selected, NASA i mplemented a program , shaped by the politics and econom ic realities of its time that served as a f irst step toward any future plans for implementing a space station.50 During this speech, President Nixon instructed NASA to proceed with the design and building of a partially reusable Space Transportation System commonly referred to as the Spac e Shuttle) consisting of a reusable orb iter, three reusable main engines, two reusab le solid rocket boosters and one non-reusable external liquid fuel tank (ET). NASA s administrators vowed that the Space Shuttle would fly at least fifty tim es a year, m aking space trav el economical and safe.

NASA gave responsib ility for developing the S pace Shuttle s o rbiter vehicle and overall management of the SSP to the Manned Spacecraft Center (now known as the Johnson Space Center in Houston, Texas, based on the Center s experience. i n Huntsville, Alabama, was respon sible for de velopment of the Space Shuttle Main Engin e (SSME), the the ET, and for all propulsi on-related tasks. Engineering design support continued at and NASA s Langley Research Center, in Ha mpton, Virginia, and engine tests were to b e performed at NASA s National Space Techno logy Laboratories (later named Stennis Space C enter) in south Mississi ppi, and at the Air Force s Rocket Propulsion Laboratory in California, which later be came the Santa Susana Field Laboratory.

51 NASA selected KSC as the primary launch and landing site for the responsible for designing the launch and recovery facilities, was to develop methods for shuttle assem checkout, and launch operations.52 On September 17, the full-scale Orbiter Vehicle (OV) prototype Enterprise (OV- was completed. Designed for test purposes only and never intended for space flight, structural assembly of OV-101 ha d started more than two y ears earlier in June at Air Force Plant 42 in Palmdale, California. Although the Enterprise was an alum inum shell prototype incapable of space flight, it reflected the overall design of the orbiter.

As such, it serv ed successfully in as the test article during the Approach and La nding Tests aimed at checking out both the m ating with the Boeing 747 Shuttle Carrier Aircraft fo r ferry operations, as we ll as the orb iter s unpowered landing capabilities. 49 NASA, Report of the Space Task Group, (Washington, DC: NASA Headquarters, 50 Dennis R. Jenkins, Space Shuttle, The History of the National Space Transportation System. The First 100 Missions (Cape Canaveral, Florida: Specialty Press, 99. 51 Jenkins, Space Shuttle, 52 Linda Neuman Ezell, NASA Historical Databook Volume III Programs and Projects The NASA History Series (Washington, DC: NASA History Office, table Ray A. Williamson, Developing the Space Shuttle, in Exploring the Unknown: Selected Documents in the History of the U.S.

Civil Space Program, Volume IV: Accessing Space, ed. John M. Logsdon (Washington, DC: U.S. Printing Office, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 14 The first orbiter intended for spaceflight, Columbia (OV-102), arrived at KSC from Air Force Plant 42 in March Originally scheduled for liftoff in late the launch date was delayed by problems with both the SSME com ponents as well as the thermal protection system . Columbia spent 610 days in the Orbiter Processing Faci lity, another thirty-five days in the VAB and 105 days on LC 39A before lifting off on Apri l 12, the first orbital test flight and first SSP m ission, ended with a landing on Ap ril 14, at Edwards Air Force Base in California.

This launch dem onstrated Columbia s ability to fly into orbit, condu ct on-orbit operations, and return safely. 53 Columbia flew three additional test flights in and all with a crew of two. The Orbita l Test Flight Program ended in July with 95 percent of its objectives accomplished. After the end of the fourth m ission, President Reagan declared that with the next flight the Shuttle would be fully operational. During the a total of 135 m issions were launched from From April until th e Challenger accident in January between two and nine missions were flown yearly, with an average of four to five per year. The m ilestone year was when nine flights were successfully completed. The years between and were the most productive, with seven or eight yearly missions.

Since in addition to its unique responsibility as the Shuttle launch site, KSC also became the preferred landing site. Over the past three decades, the SSP has la unched a nu mber of planetary and astronomy missions including the Hubble Space Telescope, the Galileo probe to Jupiter, Magellan to Venus, and the Upper Atmospheric Research Satellite. In addition to astronomy and military satellites, a series of Spacelab res earch missions were flown, which carried d ozens of international experiments in disciplines ranging from materials science to plan t biology. Sp acelab was a manned, reusable, m icrogravity laboratory flown into space in the Spac e Shuttle cargo bay.

It was developed on a modular basis allowing assembly in a dozen arrangements depending on the specific mission requirements.54 The first Spacelab m ission, carried aboard Columbia began on Novem ber 28, Four Spacelab missions were flown between and Following a stand-down in the afterm ath of the Challenger disaster, the next Spacelab mission was not launched until In total, twenty -four Space Shuttle m issions carried Spacelab hardware before the program was decommissioned in In a joint U.S./Russian Shuttle- Mir Program was initiated as a precursor to construction of the International Space Station (ISS ).

Mir was launched in February and remained in orbit 53 Jenkins, Space Shuttle, 54 NASA, News Reference Manual (Florida: Kennedy Space Center, 55 which landed on May 3, was the final Spacelab mission. NASA Shuttle Payloads and Related Information, KSC Factoids (Florida: Kennedy Space Center, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 15 until March The first approach and fly around of Mir took place on February 3, and the first Mir docking was in June During the three-year Shuttle- Mir Program (June 27, to June 2, the Space Shuttle docked with Mir nine times. The Orbiter Atlantis flew all but the last two of t hese docking m issions. In Dr. Nor man Thagard was the first Am erican to live aboard the Russian space station.

Over the next three years, six more U.S. astronauts served tours on Mir. The Shuttle served as a means of transporting supplies, equipm ent, and water to the space station in addition to perform ing a variety of other m ission tasks, m any of which involved Earth science experim ents. It returned experiment results and unneeded equipment to Earth. T he Shuttle-Mir Program served to acclimate the astronauts to living and working in space. Many of the activities carried out were types they would perform on the ISS.57 On December 4, Endeavour launched the first U. S. component of the ISS into orbit. This event m arked, at long last the start of the Shuttle s use for which it was prim arily designed transpo rt to and from a perm anently inhabited orbital sp ace station.

58 Discovery, launched on May 27, m arked the first mission to dock with the ISS. Since that time, most Space Shuttle m issions supported the assembly of the space station. Th e last major component of the ISS was delivered in May during the final flight of Endeavour The SSP suffered two major setbacks with the tragic losses of the Challenger and Columbia on January 28, and February 1, respectivel y. Following the Challenger accident, the program was suspended, and President Ronald Reagan formed a thirteen-member commission to identify the cause of the disaster. The Rogers Commission report, issued on June 6, which also included a review of the concluded t hat the drive to declar e the Shuttle operational had put enormous pressures on the system and stretched its resources to the limit.

59 In addition to mechanical failure, the Comm ission noted a number of NASA managem ent failures that contributed to the catastrophe. As a result, am ong the tangible actions taken were extensive redesign of the upgrading o f the Space S huttle tires, brakes, and nose wheel s teering mechanisms; the addition of a drag chute to help reduce speed upon landing; the addition of a crew escape system ; and the requirem ent for astrona uts to wear press urized flight safety suits during launch and landing operations. Ot her changes involved reorganization and decentralization of the NASA moved the m anagement of the program from JSC to NASA Headquarters (Washington, with the ai m of preventing communication deficiencies.

60 56 Tony Reichhardt, ed., Space Shuttle, The First 20 Years (Washington, DC: Smithsonian Institution, 85. 57 Judy A. Rumerman, with Stephen J. Garber, Chronology of Space Shuttle Flights (Washington, DC: NASA History Division, 3. 58 Williamson, Developing, 59 Columbia Accident Investigation Board (CAIB), Report, Volume I, (Washington, DC: U.S. Government Printing Office, 25, 60 CAIB, Report, Volume I, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No.

Page 16 Experienced astronauts were pla ced in ke y NASA m anagement positions, all docum ented waivers to existing flight sa fety criteria were revoked and forbidden, and a policy of open reviews was implemented.61 In addition, NASA adopted a Spa ce Shuttle flight schedule with a reduced average num ber of launches and disc ontinued the long-term practice of launching commercial and m ilitary payloads.62 The launch of Discovery from LC 39B on September 29, m arked a Return-to-Flight af ter a thirty-two-month stand-down in m anned spaceflight following the Challenger accident.

In the aftermath of the Columbia accident, a seven-month investigation ensued, concluding with the f indings of the Columbia Accident In vestigation Board, whic h determined that bo th technical and management conditions accounted for the loss of the orbiter and crew . According to the Board s Report, the physical cause of th e accident was a b reach in the therm al protection system on the leading edge of the left wing, caused by a piece of insulating foam, which separated from the ET after launch and struck the wing. 63 NASA spent more than two years researching and implementing safety improvements for the orbiters, and ET. Following a two-year stand-down, the launch of on July 26, m arked the first Return-to-Flight since the loss of Columbia. On January 14, President George W .

Bush outlined a new space explor ation initiative in a speech given at NASA Headquarters. Today I announce a new plan to explore space and extend a human presence across our solar system . . . Our first goal is to complete the International Space Station by . . . The Shuttle s chief purpose over the next several years will be to help finish assembly of the International Space Station. In the Space Shuttle after nearly 30 years of duty will be retired from service. . .64 Following the Presiden t s speech, NASA released The Vision for Space Exploration, which outlined the Agency s approach to the new direction in s pace exploration.65 As part of this initiative, NASA decided that th e Space Shuttle would not be upgrad ed to serve beyond and, after completing the ISS, the SSP will be retired.

61 Cliff Lethbridge, History of the Space Shuttle Program, program.html. 62 Lethbridge, History. 63 CAIB, Report, Volume I, 9. 64 Weekly Comp. Pres. Docs., Remarks at the National Aeronautics and Space Administration, Vol. 40, Issue 3 (January 19, 65 NASA, The Vision for Space Exploration (Washington, DC: NASA Headquarters, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 17 Development of KSC s LC 39 and Vehicle Assembly Building Areas Today, KSC maintains operational control over acres, all located in Brevard County. The major facilities are lo cated within the Industrial Area, the L C 39 Area, the VAB Area, and th e Shuttle Landing Facility Area.

The LC 39 and VAB Areas were develo ped primarily to support launch vehicle operations and related launch pro cessing activities. They contain th e VAB, the Launch Control Center, the Orbite r Processing Facility (High Ba y Nos. 1 and 2), the Orbiter Processing Facility, High Bay No. 3, the two Launch Pads, 39A and and other support facilities. Following completion of the Apollo-Soyuz Test Project in the facilities at KSC were modified to support the KSC was originally one of three possible launch sites evaluated, along with Vandenberg Air Force Base in Califor nia and the White Sands Missile Range in New Mexico. Compared with the other two location s, KSC had the advantage of approxim ately $1 billion in e xisting launch facilities.

Thus, le ss time and money would be needed to m odify existing facilities at KSC rather than to build new ones at another location. The estimate of to m illion to m odify the existing KSC f acilities was roughly half the cost of new construction. In addition, only KSC had abort op tions for a f irst revolution return of the low cross-range orbiter.66 To help keep costs down, beginning ca. KSC engineers adapted and modified many of the Apollo launch faciliti es to serve the needs of the Among the key facilities undergoing change were the VAB, the Launch Control Center, and LC 39 Pads A and B. New facilities were constructed only when a unique requirem ent existed. The m ajor new st ructures included the Shuttle Landing Facility and the Orbiter Proce ssing facilities.

Multi-million dollar contracts for design and construction were aw arded to both national and loca l firms, including Reynolds, Smith and Hills of Jacksonville, Florida; the Fr ank Briscoe Company, Inc. of East Orange, New Jersey; Algernon Blair Industrial Contractors, Inc. of Norcross, Georgia; the Holloway Corporation of Titusville, Florida; and W&J Construction Corporation of Cocoa, Florida. Alterations to the VAB included m odification of two of the four high bays for assembly of the Space Shuttle vehicle, and changes to the othe r two high bays to acco mmodate the process ing and stacking of the and ET.

The north door s were widened by almost 40 to perm it entry 66 Jenkins, Space Shuttle, A first revolution return was type of mission abort that entailed placing the orbiter into a suborbital trajectory, which led to a landing following a single revolution around the Earth. The low cross- range orbiter was an initial design concept where the orbiter had straight wings, as opposed to the delta wing style that was adopted following NASA s evaluation of launch sites. For a first revolution return, the low cross-range orbiter would have a higher angle of approach, a shorter entry-to-touchdown distance, a shorter time-to-touchdown, and a higher landing speed.

Bellcomm, Inc., OSS Study-Space Shuttle Recovery in Southwestern U.S.-Case (memorandum for file, NASA, 2, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 18 of the towed orbiter. W ork platforms shaped to fit the Shuttle configura tion were added to High Bays 1 and 3 where Shuttle assembly occurred, and internal structural changes were also made to High Bays 2 and 4, where the ETs were processed. Major changes were m ade to LC 39, Pads A a nd B. Modifications were com pleted in mid-1978 at Pad A and in at Pad B. With the excepti on of the six fixed pedestals, which support the all of the structu res on the hardstand s of each pad were rem oved or relo cated.

Fuel, oxidizer, high-pressure gas, electrical, and other service lines were rerouted. New hypergolic fuel and oxidizer support areas were constructed at the southwest and southeast corners, respectively, of the pads. The Saturn fuel support area was rem oved, a ne w Fixed Service Structure was erected using an original Apollo-era Launch Umbilical Tower, a Rotating Service Structure was added, the Saturn flame deflectors were replaced, and a Payload Changeout Room and a Payload Ground Handling Mechanism were added. A sound s uppression water system was installed on the pads to reduce the acoustical levels within the orbiter s payload bay and thus, to protect it and its payloads from damage.

A related system, the Overpressure Suppression System, was installed to reduce the pressure pulse at SRB ignition.67 Additional changes were m ade to Pads A and B in the afterm ath of the Challenger accident; other modifications followed the Return-to -Flight in Am ong the modificatio ns were the installation of new w eather protection structures to supplement the Rotating Service Structure; improvements in temperature and humidity controls for the Payload Changeout Room; upgrades to the em ergency exit s ystem, including the addition of two slidewire baskets ; installation of new elevators on the Rotating Se rvice Structure; and improvem ents to the pad communications system. Changes were first made at Pad B, followed by identical changes at Pad A.68 67 Wallace H. Boggs and Samuel T.

Beddingfield, Moonport to Spaceport. The Changing Face at Astronautics & Aeronautics 20, (July/August 68 ACI, Survey and Evaluation of CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 19 Part II. Structural/Design Information A. General Statement: 1. Character: The Crawlerway (Figure Nos. A-1, A-2; Photo Nos. 1, 2) has an approxim ate total length of 5 miles. Its main expanse extends from the east side of the VAB towards th e two launch pads. Roughly 2 m iles from the VAB, th e Crawlerway splits into two branches, one of which continues east to LC 39A (Photo No. 3); the ot her extends north to LC 39B (Photo No. 4). The Crawlerway has a total width of 130 and consists of two trackways separated by a grassed m edian (Photo No. 5) .

Originally, the Crawle rway was specia lly designed to carry the combined load of the Crawler Transporter, the Mobile Launcher, and the Saturn/Apollo Spacecraft; the estim ated weight of this com bination was 18. 5 million pounds.69 Based on this weight and potential wind loads, ACOE engineers calculated an approximate load of pounds per square f oot for the Crawlerway. This load rate was sufficient to carry the S pace Shuttle, Crawler T ransporter, and MLP com bination, with an estimated weight of 17 million pounds. 2. Condition of fabric: The Crawlerway is in good condition due to periodic maintenance. B. Description: The Crawlerway is a 130 -wide roadway, comprised of two 40 -wide trackways separated by a 50 -wide grass m edian (Photo No. 5) .

Each trackway consists of five layers of differing materials, with a com bined depth of approximately 8 . The t op layer consists of rounded river gravel; it is 4 deep on the straight sections and 8 deep on the curves. The second layer contains approximately 3.5 of graded crushed limerock, and the third layer is comprised of 1 of consolidated hydraulic fill sand with a California Beari ng Ratio of 25. The fourth layer consists of 2 of sand, compressed to a Californi a Bearing Ratio of 15. Below the sand is a sub- base of hydraulic fill, which ranges in thickness between 1 and 3.5 . 70 Wooden ties form a curb along the length of the outer edge of each trackway; the ties are connected to one another with 1/8 -thick, perforated galvanized steel plates to allow drainage (Photo No.

69 Kay Grinter, Crawlerway Provides Firm Foundation for Saturn V, Spaceport News, October 16, 7. During the Apollo Program, the Crawler was also used to carry the Mobile Service Structure to the launch pad; the combination had an approximate weight of million pounds. ACOE, Complex 39, 39. 70 Ralph M. Parsons, 7. The California Bearing Ratio rating was developed by the California Department of Transportation as a means of measuring the load-bearing capacity of soils used for building roads or airstrips; the harder the surface, the higher the rating.

The standard material for this test is crushed California limestone, which was given a value of California bearing ratio, Wikipedia, 71 Lockheed Space Operations Company, Crawlerway Refurbishment, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 20 In general, the Crawlerway extends from the VA B to both LC 39A (total of 3.4 m iles) and LC 39B (total of 4.2 miles); various short branches provide access to the MSS Park Site (Photo Nos. 18, the MLP Refurbishm ent Area (Photo No. 8), and the Crawler Park Site (Photo No. Within the VAB Area, the layou t of the Crawlerway is roughly rectangular. On the west side of the VAB (Photo No. 7), there is one set of trac kways, which leads from the southwest High Bay.

The trackways extend at an angle of 12 degrees to the south of due west for roughly 126 before curving to the northwest, at a radius of 500 , for a length of around 785 , and then traveling at an angle of 15 degrees west of due north for a pproximately 388 . At this point, the Crawlerway curves again toward the northeast for an appr oximate length of 785 (radius of about 500 ), where it then extends straight for roughly 800 at an angle of 12 degrees north of due east (Photo No. 8). The Crawlerway then cu rves through 80 degrees toward the southeast for a rough length of 672 (radius of around 481 ) and continues straight for an approximate distance of 350 before it curves towards the southeast over a radius of 481 for a length of 755 , where it meets the main branch (Photo No.

The main branch of the Crawlerway begins on the east side of the VAB, where there are two sets of trackways, one from the northeast High Bay and one from the southeast High Bay (Photo Nos. 10, About 550 to the east, the two sets of trackways converge; and about 950 from the VAB, the set of trackways meets with the por tion of the Crawlerway that trave ls north of the VAB. From this junctio n, the Crawlerway conti nues to extend towards the launch pads at a n angle of 12 degrees north of due east, for about . It then curves over a radius of 898 for a length of 163 , before it continues straight at an angle of 23 degrees north of due east. 73 After approximately m iles), the Crawlerway divides into two branches, one to LC 39A and the other to LC 39B (Photo No.

The branch to LC 39A continues at an angle of 23 degrees north of due east for approximately miles). At this point, the Crawlerway curves over a radius of 900 for a length of , where it then continues du e north for about m iles) to the top of the launch pad (Photo No. 74 The second branch, which leads to LC curves to the northwest over a radius of 500 and a length of , before extending for roughly m iles) at an angle of around 27 degrees west of due north. This branch then curves through an angle of 27 degrees, with a radius of , for a length of around 480 .

The Crawlerw ay then travels for approximately miles) due north to the top of the launch pad.75 72 ACOE, Merritt Island, VAB Crawlerway Surfacing (architectural drawings, NASA May Sheet 2, on file, KSC Engineering Documentation Center, Florida; Space Gateway Support, CCAFS/KSC Basic Information Guide (facilities map, NASA January map 7, on file, KSC Master Planning Office, Florida. 73 Giffels & Rossetti, Crawlerway and Adjacent Facilities, Sheet 74 Giffels & Rossetti, Crawlerway and Adjacent Facilities, Sheet 75 ACOE, Merritt Island, Pad B, Crawlerway Surfacing; Audio/Video Cables and Miscellaneous Work, Volume 1 (architectural drawings, NASA December Sheet CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 21 D.

Site Information: The Crawlerway s spatial arrangement reflects the overall m aster plan of the LC 39/VAB area. Explosive h azards, the da ngers of launching o ver other com plexes or inhabited areas, and maintaining a line of site between the launch vehicle and the Launch Control Center determined the choice of sites for Pads A and B, as well as the distan ce between them.76 The need to protect people and facilities from the four com mon types of launch hazards, blast, acoustic, toxic, and nu clear, determined the choice of location for the VAB, within what was referred to in the m aster plan as the launch support zone.

77 The Crawlerway, which connected the VAB to the launch pads, had two key design re strictions: a minimum radius of 500 at the curves and a m aximum 5 percen t grade at the pad approaches. 78 These design restrictions, as well as the idea of keeping the distance between the VAB and launch pads as sm all as allowed by safety restrictions, determined the final layout of the Crawlerway. The Crawlerway extends from the VAB area, at its west end, to the two launch pads, 39A at its east end and 39B at its norther nmost point. Within the VAB ar ea, the Crawlerway passes the Orbiter Processing Facility (High Bay Nos. 1 and 2), the T hermal Protection System Facility, and the Orbiter Processing Faci lity, High Bay No. 3.

To the nor th of the Therm al Protection System Facility, on the west side of the Crawle rway, is the Crawler pa rk site. The park site measures approximately 610 x 360 , and contai ns a m aintenance/office building and enough space to park both Crawlers. To the north of the Orbiter Processing Facility, High Bay No. 3, on the north side of the Crawlerw ay is the ML P Refurbishment Area. This site contain s two extensions angled 45 degrees from the Crawle rway, each of which m easures roughly 430 x 130 ; each extension can hold one From the VAB, the Crawlerway extends through th e flat, marshy terrain of Florida s east coast, parallel to the barge canal. At 7.5 above m ean sea level, it crosses dry land, swamps, sloughs, and bogs.

All of these soft m aterials required excavation and replacem ent with com pacted hydraulic sandfill to form a strong foundation. 79 Approximately east of the VAB, the Crawlerway passes through the Fl uid Servicing Area. Roughly further east, just prior to where the Crawlerway splits to head to the different launch pads, is the MSS Park Site. This s ite consists of an approxim ate length of Craw lerway, which is angled toward the southwest from the main branch.

The area contains si x support buildings used by technicians who maintained the MSS during the Apollo Program , or if e mergency repair work was required on 76 The mobile launch concept provided for an enclosed building where the launch vehicle could be prepared, protecting the vehicle from corrosion by salt in the air, and protecting the vehicle and technicians from variable Florida weather, such as high winds, rain, and lightning. In addition, the mobile launch concept promised faster launch operations, the vehicle would only require one week at the launch pad, and for cost savings, as the work force would be concentrated in a single facility as opposed to multiple launch pads.

Benson and Faherty, Gateway, 77 Pan American World Airways, Guided Missiles Range Division, Analytical Report for NASA Merritt Island Launch Area Master Plan, Volume III (Cape Canaveral, FL: Pan American World Airways, Sweetsir Collection, File No. ARCH00017252, Kennedy Space Center Archives Department, Florida. 78 Pan American World Airways, Analytical Report, 28. 79 Bramlitt, Canaveral District, 58. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 22 the Crawler during the Apollo and Space Shuttle Programs. To the south of the MSS Park Site is a KSC Visitor Center tour stop. After passing the MSS Park Site, the Crawlerway again proceeds through marshy terrain to both LC 39 Pad A to th e east, and LC 39 Pad B to the north.

At the fenced edge of each lau nch pad, the Crawlerway continues to the top of each pad, at a 5-deg ree slope. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 23 Part III. Sources of Information A. Primary

Sources

1429 words

Source document Quoted word for word from HAER FL-8-11-P. Not written, edited or summarised by this site.

Bellcomm, Inc. OSS Study-Space Shuttle Recovery in Southwestern U.S.-Case Memorandum for file, NASA, Columbia Accident Investigation Board. Report, Volume I. Washington, DC: U.S. Government Printing Office, Giffels & Rossetti, Inc., Detroit. C omplex 39, Volume I, Crawlerway a nd Adjacent Facilities. Architectural Drawings, NASA February Lindroos, Marcus, ed. President Nixon s Announcement on the Space Shuttle. Updated April 14, National Aeronautics an d Space Adm inistration. News Reference Manual. Florida: Kennedy Space Center, Report of the Space Task Group, Washington, DC: NASA He adquarters, The Vision for Space Exploration. Washington, DC: NASA Headquarters, National Aeronautics an d Space Adm inistration, Kennedy Space Center. Countdown! NASA Launch Vehicles and Facilities.

Florida: Kennedy Space Center, 199 1. Shuttle Payloads and Related Information. KSC Factoids. Florida: Kennedy Space Center, Pan American World Airways, Guided Misisles Range Division. Analytical Report for NASA Merritt Island Launch Area Master Plan, Volume III. Cape Canaveral, FL: Pan American World Airways, Sweetsir Collec tion, File No. ARCH00017252, Kennedy Space Center Archives Department, Florida. Railroad Archives, Kennedy Space Center Archives Department, Florida. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 24 Space Gateway Support. CCAFS/KSC Basic Information Guide. Florida: Kennedy Space Center, Master Planning Office, Sweetsir Collection, Kennedy Space Center Archives Department, Florida. U.S.

Army Corps of Engineers, Merritt Is land. Pad B, Cr awlerway Surfacing; Audio/Video Cables and Misc ellaneous Work, Volume 1. Architectural drawings, NASA December On file, Kennedy Space Center Eng ineering Documentation Center. VAB Crawlerway Surfacing. Ar chitectural drawings, NASA May On file, Kennedy Space Center Engineering Documentation Center. Weekly Compilation of Presidential Documents (Weekly Comp. Pres. Docs.), Remarks at the National Aeronautics and Space Administration, Vol. 40, Issue 3 (January 19, B. Secondary Archaeological Consultants, Inc. (ACI). Sur vey and Evaluation of NASA-owned Historic Facilities and Properties in th e Context of the U.S. Space Shuttle Program , John F. Kennedy Space Center Brevard Count y, Florida. Survey rep ort, NASA Benson, Charles D.

and W illiam B. Faherty. Gateway to the Moon. Building the Kennedy Space Center Launch Complex. Gainesville: University Press of Florida, (f irst paperback printing). Moon Launch! A History of the Saturn-Apollo Launch Operations. Gainesville: University Press of Florida, (first paperback printing). Boggs, Wallace H. and Samuel T. Beddingfield. Moonport to Spaceport: The Changing Face at Astronautics & Aeronautics 20, July/August Bramlitt, E. R. History of Canaveral District. Cape Canaveral: ACOE South Atlantic Division, Butowsky, Harry A. Reconnaissance Survey: Man in Space. Washington, DC: National Park Service, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 25 Dethloff, Henry C.

The Space Shuttle s First F light: In From Engineering Science to Big Science: The NASA and NASA Collier Trophy Research Project Winners, NASA SP- edited by Pamela E. Mack, Washington, DC: Government Printing Office, Ezell, Linda Neuman. NASA Historical Databook Volume III Programs and Projects The NASA History Series. Washington, DC: NASA History Office, Jenkins, Dennis R. Space Shuttle, The History of the National Space Transportation System. The First 100 Missions. Cape Canaveral, Florida: Specialty Press, Launius, Roger D. and Aaron K. Gillette. Toward a History of the Space Shuttle: An Annotated Bibliography. Washington, DC: NASA History Office, Studies in Aerospace History Number 1, Lethbridge, Cliff. History of the Space Shuttle Program. Lipartito, Kenneth and Orville R. Butler.

A History of the Kennedy Space Center. Gainesville: University Press of Florida, NASA. Facts: John F. Kennedy Space Center. Reichhardt, Tony, ed. Space Shuttle, The First 20 Years. Washington, DC: Smithsonian Institution, Rumerman, Judy A., with Stephen J. Garber. Chronology of Space Shuttle Flights Washington, DC: NASA History Division, Slovinac, Patricia. Cape Canaveral Air Fo rce Station, Launch Com plex 39, Crawler Transporters (John F. Kennedy Space Cent er), HAER No. Historic American Engineering Record (HAER), Nationa l Park Service, U.S. De partment of the Interior, September Slovinac, Patricia. Cape Canaveral Air Force Station, Launch Complex 39, Vehicle Assem bly Building (John F. Kennedy Space Center), HAER No.

Historic American Engineering Record (HAER), National Park Se rvice, U.S. Departm ent of the Interior, July CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 26 Slovinac, Patricia and Joan De ming. National Register of Historic Places Multiple Property Documentation Form, Historic Cultural Resources of the John F. Kennedy Space Center, Florida. October U.S. Army Corps of Engineers. Apollo Launch Complex 39. Cape Canaveral: A COE South Atlantic Division, no date. Williamson, Ray A. Developing the Space Shuttle. In Exploring the Unknown: Selected Documents in the History of the U.S. Civil Space Program, Volume IV: Accessing Space, edited by John M. Logsdon, Washington, U.S.

Printing Office, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 27 Figure A-1. Aerial view of Launch Complex 39 showing the Crawlerway, camera facing northeast, April 16, Source: John F. Kennedy Space Center Archives, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 28 Figure A-2. Aerial view of Launch Complex 39 showing the Crawlerway, camera facing southwest, November 24, Source: John F. Kennedy Space Center Archives, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 29 Figure A-3. View of Crawlerway construction, showing hydraulic fill, April 30, Source: John F. Kennedy Space Center Archives, LOC-63-4457.

CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 30 Figure A-4. View of Crawlerway construction, December 26, Source: John F. Kennedy Space Center Archives, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 31 Figure A-5. View of Crawlerway construction, near VAB, March 30, Source: John F. Kennedy Space Center Archives, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 32 Figure A-6. View of Crawlerway construction, April 7, Source: John F. Kennedy Space Center Archives, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 33 Figure A-7.

View of Crawlerway construction, April 7, Source: John F. Kennedy Space Center, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 34 Figure A-8. Aerial view of LC 39 construction, showing VAB in foreground and Crawlerway in background and at right, January 28, Source: John F. Kennedy Space Center Archives, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 35 Figure A-9. Crawlerway in use as crawler transporter carries the Apollo test vehicle to LC 39A, May 25, Source: John F. Kennedy Space Center Archives, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 36 Figure A-10.

Crawlerway in use as crawler transporter carries Apollo 4 to LC 39A, August 26, Note the mobile service structure within its park site at left. Source: John F. Kennedy Space Center Archives, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 37 Figure A-11. Rollout of Apollo 11 from the VAB to LC 39A, May 20, Source: John F. Kennedy Space Center, accessed via CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 38 Figure A-12. View of a springtooth harrow being used to smooth the Crawlerway surface. Source: Spaceport News, August 17, page 8. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 39 Figure A-13.

View of a crawler transporter at the base of a launch pad, January 1, Note the track imprints within the Crawlerway in the foreground. Source: John F. Kennedy Space Center Archives, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 40 Figure A-14. Rollout of Space Shuttle program mission December 29, Source: John F. Kennedy Space Center Archives, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 41 Figure A-15. Aerial view of Crawlerway showing the restored portion leading into VAB High Bay No. 2, June 2, Source: John F. Kennedy Space Center Archives, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, CRAWLERWAY (John F. Kennedy Space Center) HAER No. Page 42 Figure A-16.

Test rollout of the newly constructed mobile launcher that will be used in the future Space Launch System program, November 16, Source: John F. Kennedy Space Center, accessed via

In context

Cape Canaveral, Florida The place record: every map, photograph and survey of this town.
Brevard County, Florida 134 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Cape Canaveral

24 of 118 records shown

The federal surveyors worked through Cape Canaveral building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Cape Canaveral Air StationHAER FLA,5-CACAN,1-32,823 words
Cape Canaveral Air Force StationHAER FL-8-1232,234 words
Cape Canaveral Air Force StationHAER FL-8-AO27,461 words
Cape Canaveral Air Force StationHAER FL-8-11-B25,294 words
Cape Canaveral Air Force StationHAER FL-8-11-F22,264 words
Cape Canaveral Air Force StationHAER FL-8-11-O19,777 words
Cape Canaveral Air Force StationHAER FL-8-AV18,663 words
Cape Canaveral Air Force StationHAER FL-8-618,475 words
Cape Canaveral Air Force StationHAER FL-8-11-M17,593 words
Cape Canaveral Air Force StationHABS FL-581-A17,410 words
Cape Canaveral Air Force StationHAER FL-8-11-G17,133 words
Cape Canaveral Air Force StationHAER FL-8-11-J16,548 words
Cape Canaveral Air Force StationHABS FL-581-B14,684 words
Cape Canaveral Air Force StationHAER FL-8-11-L13,962 words
Cape Canaveral Air Force StationHABS FL-583-A13,824 words
Cape Canaveral Air Force StationHAER FL-8-11-R13,738 words
Cape Canaveral Air Force StationHABS FL-581-C13,646 words
Cape Canaveral Air Force StationHAER FL-8-713,389 words
Cape Canaveral Air Force StationHAER FL-8-A12,671 words
Cape Canaveral Air Force StationHAER FL-8-11-D12,041 words
Cape Canaveral Air Force StationHAER FL-8-11-K12,011 words
Cape Canaveral Air Force StationHAER FL-8-11-A11,934 words
Cape Canaveral Air Force StationHAER FL-8-11-S11,622 words
Cape Canaveral Air Force StationHAER FL-8-11-C11,607 words

Provenance

  • Written history. Quoted verbatim from HAER FL-8-11-P. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.