Prepared in April and May for the New York Ci- ty Department of Ports, International Commerce and Trade, this documentation mitigated anticipated ad- verse effects on the two piers by their demoli- tion for a concrete batching plant. Principal researcher and author: Michael S. Raber Raber Associates 41 Great Hill Road, Cobalt, CT Photography and historic Gerald Weinstein view research: Photo Recording Associates 458 Greenwich Street New York, NY Additional research: Norman Berger and Douglas Criscitello Department of Ports, International Trade and Commerce Battery Maritime Building New York, NY Thomas R. Flagg Photo Recording Associates 366 Orchard Terrace Bogota, NJ WEST STREET AND WEST STREET PIERS {Piers 95 and 96, North River) HAER No.
(Page 3) Part I: Historical Information Port of New York Transatlantic Passenger Liners and Municipal Infrastructure The Port of New York's premier position in American trade with Europe, first established after the War of soon made it a center of transatlantic passenger ship traffic. With the beginnings of regular steamship service in the late liner companies with larger ships shifted the center of transatlantic commerce at New York from the East River to the Hudson (North River). The number of companies increased dramatically after as Bri- tish and other European lines became the dominant carriers, creating more demand for facilities on Manhattan's Lower West Side.
By this time, how- ever, the waterfront favored by the liners was a morass of congested, inade- quate facilities which threatened to diminish New York City's trade in favor of neighboring Brooklyn and Jersey City. Much of Manhattan's waterfront had passed into private hands through sales of water lots before The growth of railroad terminals on both sides of the Hudson, with increased wa- terfront devoted to lighterage and car transfer, and the dispersed, ineffec- tive city administration and policing of public or private waterfront faci- lities, discouraged development of better liner piers.
Following a thorough reassessment of city waterfront management and conditions in the Department of Docks emerged in as the central municipal agency for wa- terfront planning, financial administration, and construction. A compre- hensive plan prepared under former General George McClellan called for foot-wide, bulkheaded marginal streets, wooden pile piers feet long and feet wide, and slips between piers feet wide. The city under this plan slowly re-acquired most of the Manhattan waterfront, and built new bulkheads, built or rebuilt pier substructures, with leasing of the new facilities to private parties who were responsible for making any superstructural improvements.
New private pier construction had to meet De- partment of Docks standards as well (state of New.York City of New York van Buren Hoag Albion Moehring Financial limitations following the. Panic, as well as time spent devel- oping standard pier and bulkhead designs, delayed virtually all new munici- pal waterfront improvements until the late .with little if any work done on the North River above Street until the Most sustained municipal North River activity concentrated on the more commercially impor- tant waterfront south of West Street, where the passenger ship traffic predominated to about Canal Street. During the first decades of centralized municipal waterfront planning, the pier lengths prescribed in and suit- ed to the largest ships remained adequate for liner traffic.
By the however, maximum liner lengths were approaching 700 feet, as steel ship- building advances and the pursuit of company or national prestige led to longer and longer vessels which reached feet by the mid Between and the Department of Docks (by then the Department of Docks and Ferries) engaged in a sustained race against this trend, working to accom- modate both ship lengths and the limits of the federally mandated pierhead lines in the North River. WEST STREET AND WEST STREET-PIERS (Piers 95 and 96, North River) HAER No.
(Page 4) The Department of Docks completed four passenger ship terminals during this period: five piers at least 700 feet long and feet wide in the Gansevoort Section nine piers at least 825 feet long and feet wide in the adjacent Chelsea Section to the north three piers from West to West streets, 700 feet long and feet wide and five piers feet long and about 135 feet wide between West and West streets All but the third ter- minal involved excavation into the upland to achieve greater pier length, and the construction of completely new substructures.
The terminal includ- ing the surviving piers at West and West streets was somewhat anomolous in this sequence, in that the city here rebuilt three older piers without upland excavation, to accommodate not the longest or potentially longest passenger ships but somewhat smaller transatlantic vessels such as those serving the Mediterranean. Although the Department of Docks studied the possibility of building an array of piers, to feet long, be- tween West and West streets as early as the contraction in liner traffic during World War I may have tempered these plans.
Only one of the longer piers envisioned at this time soon emerged, at West Street with the other four eventually built for the new Transatlantic Steamship Terminal not begun before (City of New York Department of Docks engineers designed all of the municipal liner piers, following evolving substructure and superstructure. plans which they developed All twenty-two piers had heavily-braced wooden pile substructures, standardized by the department before The Gansevoort piers had the traditional wooden decks (probably on the second stories of the sheds as well), but during Chelsea pier construction the department began replacing part of the wooden decks with concrete.
After successfully introducing a composite design with wood piles and all-concrete deck in South Brooklyn in department engineers used this pattern (described in Part II) for all subsequent liner piers. All superstructures were steel framed and generally covered with galvanized metal, with other materials used on street facades beginning with the Chelsea piers. Most superstruc- tures had two stories, including all piersheds except the one at West Street. Such superstructures were unusual in the Port of Mew York, where timber framing had prevailed, at the time of Gansevoort pier construction. The plate girder supports for the second stories added weight and cost, but also provided some fire protection.
The steel framed form quickly became common in the port after the turn of the century (Staniford Raber, Flagg, Wiegand and Antici The municipal liner piers had several distinctive plan and engineering fea- tures, some of which also proved important influences on other private or public waterfront projects. The first three terminals completed had bulk- head sheds joining the inshore pier ends and forming continuous street fa- cades, with each pier associated with a bulkhead shed running half the width of each adjacent slip. Although perhaps derived from earlier ferry terminal designs in the port, the bulkhead sheds allowed for some separation of the passenger service and general cargo handling which characterized most trans- atlantic passenger traffic.
The bulkhead sheds often had elevators, stairs, and conveyors or escalators for passengers and baggage, leaving the pier- sheds open for storage and handling of general cargo, such sheds were not common at general cargo or lighterage piers. Cargo doors in continuous WEST STREET AND WEST STREET PIERS (Piers 95 and 96, North River) HAER No. (Page 5) piershed bays allowed for easier movements between piers and ships too long to be moved within a slip after mooring. Unlike the bulkhead sheds, the continuous cargo doors, and the rigid cargo mast systems of steel columns and beams which first appeared at the Chelsea piers and contemporary North German Lloyd terminal in Hoboken, became common at two-story general cargo piers in the port by World War I.
Most earlier piersheds, apparently in- cluding the Gansevoort piers, relied for ship-pier transfers on ship wiches and booms, or included timber or steel masts joined only with cable stays to support hoisting blocks for winch-powered transfers. Unlike perhaps any other waterfront projects ever built in the port, the liner terminals built by the Department of Docks included both heavily orna- mented, primarily sheet metal outshore pier facades, and monumental pierhead and bulkhead shed facades sharply defining street edges. Although the de- partment's conscious or formal involvement in the City Beautiful movement of with an emphasis on large-scale, uniformly-designed public com- plexes remains undocumented, the terminal facades clearly emerge from that trend.
Classicized details, with pediments masking structural gable roof trusses, characterized most outshore facades. The Gansevoort and Chelsea terminal street facades were extremely powerful endings to adjacent cross streets, with continuous two-story sheds and higher facades at the pier- heads. The earlier project, perhaps built at least in part by the pros- pective liner company tenants who added varied details, had corrugated iron facades with continuous pilastered bays. In the Chelsea section, where the department contracted directly for all work, the facades are more monumen- tal, eclectically classicized structures of stucco, scored to resemble cut stone and laid over frameworks of steel, concrete, and metal lath on granite bases.
Semi-circular arches under pediments mark the main entrances. Visually, the terminal facade between West and West streets bridges the styles of the Chelsea piers and the last terminal south of Street. The central arches persisted through the two later projects, but in brick facade walls topped with terracotta tile entablatures, and the bulk- head sheds became less important, lowered to one story at streets and disappearing entirely at the last terminal, where the piers stood indi- vidually with four-bay headhouses. Department of Docks planning criteria for the size or use of bulkhead sheds vs. headhouses remains undocumented, though as noted below the inter-terminal facade similarities were planned.
Following completion of the last terminal in the department made few improvements or additions to the liner facilities during the remaining years of traditional passenger liner traffic, except for sprinkler systems in- stalled in the early By the mid airline and container ship competition had eliminated nearly all of the transatlantic traffic and most other traditional shipping in Manhattan, leaving a few passenger lines serv- ing the remnants of the Caribbean cruise trade. The city renovated three of the later liner piers at and streets in the early to serve cruise traffic, under Port of New York Authority management.
Earlier attempts to renovate some Chelsea piers for traditional purposes failed, and the city gradually demolished all or parts of most other liner pier in at- tempts to lease the properties for other purposes, or turned them over to other city agencies for storage or office space. Only three of the twenty- two completed liner piers now retain anything like original integrity: Chel- sea Pier 54, and the piers at West and West streets. WEST STREET AND WEST STREET PIERS {Piers 95 and 96, North River) HAER NO. (Page 6) Development and operation of the West 55th-West Street Terminal Figure 2 shows the principal stages in the development of this site.
The Department of Docks gained control of the waterfront encompassing the later terminal between before which time the shoreline was well east of its present limit. A stream entered the North River around Street,' near a small timber crib pier built at Street. Lumber and building materials yards marked the undeveloped, partly refuse-laden shoreline, as the Upper West Side north of about Street entered a sustained period of residential development lasting until World War I. Most local department activity during the pre-war period involved construction of pier facilities serving the burgeoning neighborhood, and of permanent river wall which could serve future commercial shipping interests as part of a marginal street.
The department built timber pile piers at and streets and respectively, and a slightly wider pier at Street with the present river wall also built in the early The Street Pier became part of a Department of Docks repair yard, for the department's large construction and maintenance force, while the two piers to the south served for public wharfage, receipt of building materials, ice, or coal, and for dumping of refuse by contracting companies. Coal companies leased most of the bulkhead space between the piers.
None of these uses yielded large rents, and the department made no further improvements to the area until World War I, except to lengthen all three piers to the federal pierhead line, between and (City of New York Raber, Flagg, Weinstein, Antici, and Wiegand Although department plans of evidently called for building piers of feet or more in this area, as part of the development of passenger liner terminals from about to streets, final plans completed called instead for rebuilding of the three 700-foot-long piers with concrete decks, piersheds, and bulkhead sheds as a ".,terminal for Mediterranean Service..[with] uniform ornamental architectural sheds which will add greatly to the attractiveness of this section of the waterfront and will harmonize with the pier sheds..between and street" (City of New York Department construction forces rebuilt part of the West Street Pier in and and moved the repair yard at Street to St.
George, Staten Island, in anticipation of leasing the planned new fa- cilities to shipping companies.
After completing lease arrangements with Furness, Withy & Company, and Navigazione Generale italiana (NGI) late in set to commence upon completion of the new sheds, the department contracted for remaining fabrication and construction tasks at the three piers between January and June of Contractors completed at least some of the substructure rebuilding, a process described in Part II below, and ap- parently had the three terminal sections ready for occupancy by the end of Perhaps because the leases required the tenants to pay for installa- tion of boiler plant, winches, generators, and power machinery, and divided the terminal between Furness Withy at Street and NGI at and streets, most of the construction contracts were based on this spatial divi- sion.
The department evidently achieved uniformity in structural work as well as design by contracting with the Pennsylvania Steel Company for fabri- cation of all three sets of superstructures, and construction of the two nor- thern ones, with construction at West Street performed by Snare & Tri- este Co. (City of New York 8, and 10, [unpub- lished sources]; Pennsylvania Steel Company [plans]). WEST STREET AND WEST STREET PIERS (Piers 95 and 96, North River) HAER NO. (Page 7) Both leases, for ten-year terms with two possible renewals of similar length, called for the city to pay for all improvements except as noted above, in keeping with development procedures used at least from the time of Chelsea Section construction.
Tenants were to pay for any future inshore pier exten- sion requiring excavation, while the department would pay for any outshore pier extension, with additional rents charged on the improvements in either case and all such improvements to revert to the city upon lease expiration or termination. As noted below, NGI elected to make an inshore extension in The original leases reveal much less revealing tenants rights to fur- nish accommodations to other lines, noting only priviledge in this re- gard for its own subsidiaries, although later renewal leases not yet reviewed may be more explicit.
Furnishing wharfage and terminal use rights to other lines, at least temporarily, was evidently extremely common practice in the port, as suggested by the incomplete data currently available on the tenants in question (City of New York 8, and 10, [unpublished sources]). Navigazione Generale Italiana, which began passenger and cargo service to New York in was the largest of some seven North Atlantic lines operating from Italy by at which time NGI made subsidiaries of three competitors: La Veloce, Italia, and Lloyd Italiano. In NGI absorbed Lloyd Italiano to acquire more ships. Before taking over the West and West Street piers, NGI operated from West Street.
Through much or all of its tenan- cy at the new terminal, NGI shared one or both of its piers with the Swedish- American Line under an undocumented arrangement. Although the terminal was not intended for the largest liners planned or in service NGI success during the early led to its construction of two liners launched in which both exceeded the 700-foot-length of its New York piers:. ROMA and AUGUSTUS, the latter being the largest passenger motor liner ever built. To accommodate these ships, NGI demolished part of the West Street bulkhead street and excavated 26 feet of additional inshore bow slip space, lined with a concrete wall, just prior to the first arrival of the ROMA. By the early anticipated new ships made NGI use of the terminal for transatlantic liners increasingly dubious.
Although it was clear after about that Mussolini wished to consolidate all remaining Italian lines to eliminate com- petition, NGI and one of its remaining two rivals, Lloyd Sabaudo, both began 800-foot ships under government prodding in These two ships, REX and CONTE Di SAVOIA, were seen as Italian prestige projects, and during the first few years after their completion in were among the five largest ships in the North Atlantic traffic.
With Depression effects hurting the competitive Italian lines, and anticipated exacerbation of this problem with the launch- ing of the two new ships, the Italian government oversaw the merger of NGI, Lloyd Sabaudo, and Cosulich into a new Italia line in Italia remained a tenant at and streets until although the extent of its ac- tual continued use is unclear, and then moved to one of the larger new piers at West Street (Photographs U.S. Army Corps of Engineers City of New York Manhattan Maxtone-Graham Emmons Bonsor III, and IV, WEST STREET AND WEST STREET PIERS (Piers 95 and 96, North River) HAER No. (Page 8) Furness, Withy & Co., grew from its beginnings in the to owner- ship under various form of numerous shipping lines.
The West Street Pier quickly became the center of Furness traffic to Bermuda, a cruise trade the company entered in and engaged in until when it closed opera- tions at this terminal. The most prominent vessels serving this terminal were the QUEEN OF BERMUDA and the MONARCH OF BERMUDA, from the early until a few years after World War II, which interrupted all transatlantic traffic. During at least part of its first lease, Furness shared the Street facility with Lloyd Sabaudo. Furness lines serving other areas, such as Halifax, Nova Scotia, and St. Johns, were evidently active enough to war- rant Furness tenancy of the entire terminal after the Italia lease expiration.
Although formal or informal arrangements with other non-Furness lines are unclear, Grace Lines shared the pier at Street during the late and ships from at least Anchor Lines, Holland-America, Swedish- America, Home Lines, the Greek Line, and the Chandris Line appeared at the terminal during the last thirty years of Furness tenancy (Photographs World's Maritime News Corporation U.S. Army Corps of Engineers Kludas III, Bonsor III, Cummmerford Aside from the bow slip built by NGI, and relatively minor interior altera- tions and exterior repairs, the two principal tenants made no alterations to the terminal during its five decades of active life.
Each line supplied and operated its own portable operating equipment, outlined in Part II below, in conjunction with permanent facilities such as cargo masts, elevators, and fixed escalators. For most of its tenancy, Furness, Withy & Co., con- tracted with the Bay Ridge Operating Company for stevedoring services (U.S. Army Corps of Engineers Twilight Life Following Liner Operations Unable to find any other tenants or alternative uses for the terminal after the city ceased maintenance of any kind, shut off most utilities, and used the complex for impounded car storage and refuse transfer/equipment storage by the Department of Sanitation. The piers may also have served as informal living spaces for local homeless people, and as sources of stolen copper.
A Note on Pier Numbers Most Manhattan piers have had one or more numbers assigned by the Department of Docks. The system currently in use dates from the period of Chelsea pier construction, after which time piers extended from Battery Place to West Street, and pier numbers above on the North River derived from adding 40 to the street numbers. Thus, although almost always referred to in original material as piers at West and streets, the terminal piers were also known as Piers 95, 96, and 97. WEST STREET AND WEST STREET PIERS (Piers 95 and 96, North River) HAER No.
(Page 9) Part II: Descriptive Information General Character and Condition When completed Piers 95, 96, and 97 formed a small steamship termi- nal, with piers of equal length, visually integrated outshore facades, and continuous bulkhead sheds with uniform architectural treatment. . The long inshore facade defined the west side of Twelfth Avenue and the marginal way for the length of three city blocks, fronting an open paved area about 190 feet wide. Construction of additional slip space south of Pier 97 removed the bulkhead shed south of that pier for some 90 feet in leaving the street facade intact and replacing part of the firewall to the south with cargo doors.
By completion of both the elevated West Side Highway and the Transatlantic Steamship Terminal to streets) changed the di- rection, width, and character of Twelfth Avenue at Piers Furness, Withy & Co., added or altered small storage, office, and shop spaces in the piershed and bulkhead shed interiors during its lease of all three piers after and added electric signs to all three pier entrances in The city's Department of Marine and Aviation added sprinkler systems and fire curtains in After the end of liner traffic at this terminal municipal use for storage of impounded cars, street cleaning vehi- cles, and" road salt included additional minor alterations of interior bulk- head shed spaces, and removal of most steamship line signage from the street facades.
The Department of Sanitation demolished the piershed and northern half of the bulkhead shed at West Street in and rebuilt the Pier 97 substructure* Removal of Pier 97 truncated the original terminal form. There were espe- cially adverse visual effects on the long inshore facade, already obscured by sanitation trucks and road salt, and burdened since by contorted spatial and traffic relationships to Twelfth Avenue and streets to the east.
Except for some removal or covering of bulkhead shed facade doors and win- dows, however, surviving exteriors remain largely intact, reflecting origi- nal uses, terminal design, and architectural detailing (Photographs Piershed and bulkhead shed interiors retain all original and later sheds, offices, and other enclosures, plus some original heating equipment.
The interiors retain spaces devoted to passenger movement, longshoremen gath- ering and timekeeping, cargo or baggage storage and movement, customs pro- cedures, office work, and utility systems, despite some accumulation of de- bris, removal of most electrical and plumbing fixtures, and deterioration of decorative elements in passenger areas (Photographs ; Superstructures at Piers 95 and 96 remain in generally good structural con- dition, except for the neglected roofs (Photograph A recent fire at Pier 96 exacerbated roof deterioration. All cargo doors appear to be inop- erable.
Substantial deterioration of pier substructures, in some places distorting superstructure framing slightly, led the Department of Ports and Terminals to condemn both piers in (Photographs 1, 4, 6, 9, and 10; personal communications, Norman Berger and Thaddeus Logan, New York City Department of Ports and Terminals). WEST STREET AND WEST STREET PIERS (Piers 95 and 96, North River) HAER No. (page 10) Exteriors Beyond and perpendicular to the masonry bulkhead wall, the substructures of Piers 95 and 96 are each 60 feet wide, and extend west and feet, respectively. A slip 200 feet wide separates the two piers. Each piershed is some by 55 feet in area, with 2.5-foot-wide aprons to the north and south.
The two-story Pier 95 piershed has a roof peak 48 feet above the pier deck for 662 feet beyond the bulkhead line, defining a shorter second story fronting an outshore promenade deck, while the one-storied Pier 96 shed is 28 feet high throughout. The piershed roofs and framing continue inland some feet as part of the bulkhead sheds, defining the central entrances from the street. Along the bulkhead wall, each of the two foot-long bulkhead sheds includes two 48-foot-wide wings with shed roofs sloping outshore from 20-foot-high summits, running perpendicular to the higher central section about 100 feet in each direction. The bulkhead sheds join at a common firewall, with the Pier 96 shed similarly meeting the re- mains of the Pier 97 shed.
The latter structure, built around its 110-foot- wide pier, originally extended a total of about 310 feet along the street, so that the original inshore terminal facade extended some 830 feet (Figure 3). Substructures and Foundations From its inception in until the Department of Docks made many technical advances in the design of pier substructures and bulkhead or river walls adapted to Port of New York conditions. Municipal waterfront con- struction reproduced successful pier and bulkhead designs at hundreds of sites in the port. Thus while surviving original information on the speci- fic substructures at and streets appears limited, contemporary de- signs used elsewhere by the department probably mirror conditions at this terminal.
The wooden pile piers first built by the department at these sites were ty- pical examples of this form as it emerged after the Civil War, by which time the port's pollution was eliminating the marine borers whose ravages had previously limited the use of foundations resting entirely on piles. A tim- ber pile pier consists essentially of wooden piles driven into yielding har- bor bottoms in rows about 10 feet apart, transverse to the long axis of the pier, with each row capped by heavy timbers, and with the entire array of piles and caps supporting a plank deck on longitudinal timbers.
Municipal and many private builders preferred this form to earlier cribwork or crib- work-and-pile substructures because it was easier to construct in soft bot- toms, was more elastic in ship-pier collisions, was easier to rebuild, and allowed for better passage of strong tides, harbor sediments, and wastes. Surviving plans of the pier built at West Street show the dia- gonal and horizontal bracing within each pile row already favored by the De- partment of Docks (Figure 4). This pier, originally 650 by 60 feet in area, extended 500 feet past the bulkhead line along which the department did not actually build until shortening the pier approach.
The department built a pier of the same size and, probably, design, at West Street, about the same time the river wall appeared, with both piers thus extending 500 feet into the river (City of New York [plans], Snow Hoag Raber, Flagg, Wiegand, and Antici WEST STREET AND WEST STREET PIERS (Piers 95 and 96, North River) HAER No. (Page 11) Pile structures below mean low water, in borer-free conditions, could last indefinitely; intertidal foundations lasted about twenty-five years, while wood decks subject to horse urine and other moisture deteriorated after a few years. The potential immortality of the lower foundations contributed to much retention of these elements in rebuilding projects.
Piers 95 and 96 retained their original widths and presumably their lower piles and braces through several reconstruction programs. The Department of Docks extended the West Street Pier 200 feet with all-timber construction reaching the federal pierhead line of the West Street Pier re- ceived similar attention in By this time, department engineers had gradually developed a reinforced concrete deck design for timber pile piers to increase deck life. As applied after at new municipally-built ter- minals, this design included concrete slabs inches thick and about 10 feet long laid directly on pile rows, with timber clamps at the top of each row replacing the usual caps and the concrete replacing all rangers, string- ers and deck planking (Figure 4).
Most municipal piers built this way after about had asphalt wearing surfaces on the concrete. The department or its contractors rebuilt the piers at and streets with such decks between and during planning or early construction of the terminal proposed between and streets, apparently adding the clamp timbers to the existing pilings. Both the original timber and later concrete decks at the Street Pier were about 10 feet above mean low water. The pier deck at Street was huilt for live loads of 500 pounds/square inch, and includes inches of asphalt surface.
Additional piles in alternate rows supported one-story piershed columns, as at Street, while for two-story sheds as at Street the columns usually rested on pile-supported con- crete pedestals extending below the deck to mean low water (City of New York 6, 8 [plans], Staniford and Guise Staniford Masonry river walls, built by the Department of Docks along the bulkhead line between and streets, define the upland terminal area covered by the bulkhead sheds. As developed by the department after from George McClennan's initial recommendations, the river walls derived strength and durability from large pre-cast concrete blocks laid on foun- dations of piles or concrete-covered rip-rap. The blocks extended between about 16 and 2 feet below mean low water.
Concrete laid in place rested on the large blocks, with ashlar granite blocks completing the outer wall faces to elevations about 10 feet above mean low water. Figure 5 shows thetype of wall probably built around streets,, where the bulkhead remains today in excellent condition {Photograph The department probably placed earth and ash fill behind the wall sections at or slightly after ini- tial wall construction, with an asphalt surface. During bulkhead shed con- struction in contractors removed this surface for placement of u- tility lines and 4-foot-high concrete shed column foundation pedestals 4-9 feet square, rebuilding the surface in concrete and asphalt similar to the pier decks (Hoag City of New York 5 [plans]).
^The Department of Docks wood pile-concrete deck designs are generally well documented, and the substructures at Piers 95 and 96 are not of themselves significant. Field documentation did not include work under the piers to confirm substructure details. WEST STREET AND WEST STREET PIERS (Piers 95 and 96, North River) HAER No. (Page 12) Superstructures Built-up steel I-beam columns, supporting built-up steel girders and/or steel roof trusses, frame all superstructures at both surviving piers in a single continuous set of connected piersheds and bulkhead sheds.
Although divided historically by construction contracts, function, and tenant ar- rangements, the only physical separation of the three original pier complex- es occurred at the two firewalls between the three bulkhead sheds, and each wall evidently had connecting doors. In this sense, the original terminal was one very large structure which included three piers. Piersheds Each of the two surviving piersheds has a single transverse bay on each floor.
At Pier 95, the composite, bolted I-beam columns with 16-by-10-inch cross sections rise 42 feet above the pier deck, defining 33 longitudinal 2- story bays beyond the bulkhead line and 2 such bays inshore in the bulkhead shed, to support the horizontal framing for the second floor, the roof trusses, and the cargo mast system described below {see Mechanical and Hand- ling Equipment). All longitudinal bays in the 2-story piershed proper are 20 feet wide, with bays feet wide in the central bulkhead shed sec- tions. The outshore end of the lower story extends feet beyond the rest of the shed framing under the promenade deck, including four transverse 10-by-9-inch built-up I-beam columns.
Principal transverse framing elements in the piershed, joining the shed columns, include 54-i-foot-long built-up girders with 5-by~l-foot I-sections under the second floor,, and through trusses with 8-foot-high peaks and 1:5 slopes. Longitudinal framing mem- bers between bays include 9-, and 20-inch I-beams under the second floor deck, doorhead and lattice girders at deck and roof truss edges, and 10-inch channel beam purlins under the roof boards. Prominade deck fram- ing includes and 20-inch I-beams.
Inshore end framing slopes up slightly to accommodate a difference in pier and bulkhead shed deck eleva- tions, apparently made during construction (Photographs 4, 6, 15, and 16; City of New York 2, 8 [plans, reproduced in Photographs 32 and With some exceptions, piershed framing at West Street is similar. The single story shed has 32 20-foot-wide, and 3 12.5-foot-wide, longitudinal bays defined by built-up 12-by-10.5-inch I-beam columns 22 feet high. Most other transverse and longitudinal framing members mirror arrangements seen in the Pier 95 upper story.
Other than height and the placement of cargo masts, the principal exterior difference between the two sheds is the presence in Pier 96 of three 30-foot-high shed roof sections inserted into the northeasternmost bay adjacent to the river wall, and into both sides of the seventh bay from the outshore pier end. Additional truss sections added to the typical roof trusses provide the added height for each such insert (Photographs 9, 10, and 20; City of New York 9 [plans, reproduced in Photograph Steel-framed, galvanized-steel-covered cargo doors, each built for manual chain-lifting in two sections with the highest lift position parallel and just beneath trusses or girders, fill most bays on the north and south-sides of both piersheds.
Pier 95 cargo doors are each 20 feet high, with multi- paned fixed windows in the upper sections; except for two 30-foot-high doors WEST STREET AND WEST STREET PIERS (Piers 95 and 96, North River) HAER No. (Page 13) under the higher roof sections in the seventh bay from its outshore end, all cargo doors at Pier 96 are 22 feet high and lack windows.
Corrugated gal- vanized steel siding covers only bays originally used for interior enclo- sures and utilities described below: at the most inshore and outshore bays of the Street piershed; and,, at Pier 95, both stories of the inshore bay, the eighteenth bay from the river wall on the north side, the upper story of the outermost bay, and the narrower bay under the promenade deck (Photographs 6, 9, 10, 15, 16, 18, and 20; City of New York 10 [plans, reproduced in Photograph Department of Docks engineers added classicized facades to the outshore ends of both piers, using crimped or galvanized iron sheets riveted to steel frameworks of 5-, 6-, and 12-inch channel beams and smaller bars.
These materials, with some wrought iron details, mask the one-bay gable- ends with pedimented triple bays set off by Doric pilasters. Both piers have very similar pilaster, entablature, and pediment designs, with the principal facade differences resting in definition of the stories. The 14-foot-wide concrete promenade deck at Pier 95, surrounded by a railing of steel pipe, splits the facade vertically into two stepped sections, the uppermost of which had all three bays filled with plate glass around single and central double oak doors, while the lower level had a central ll-by-13-foot rolling steel shutter door flanked by nearly closed bays with 2.5-foot-square win- dows.
The Pier 96 facade is essentially the lower facade section at Pier 95, with entablature and pediment added: the central bay had a rolling steel shutter door below tw.o 7-by-4-foot windows," flanked by and bays with two 4-by-5-foot windows apiece over steel siding. All of the doors and windows on both pier facades are now removed, destroyed, or frag- mentary, and most other three-dimensional details are also gone, but the original flagpoles survive (Photographs 4, 7, and 11; City of New York 2 and 12 [plans, partly reproduced as Photograph When last painted at an unknown date, the piers both had what are now nearly vanished coats of medium or light green, a color still seen at New York City municipal waterfront structures.
Light colored lettering across the frieze at Pier 96 still defines most of the words NAVIGAZIONE GENERALE ITALIANA, dating to the original tenant here, while raised metal characters on the acroterion locate the pier at 56 ST. 55 ST appears at a comparable location at Pier 95, but it is not clear from original plans, historic views, or surviving fabric if Furness, Withy & Co., ever had similar frieze de- coration (Photographs 4, 7, 11; City of New York 2 [plans, reproduced as Photograph 32 ]). A few damaged windows at the inshore pier ends mark interior spaces. Pier 96 has one 4-by-3-foot window for a toilet in the southeasternmost bay above the river wall.
Larger Pier 95, with more interior spaces, has two 6-over- 6, 6-by-3-foot windows for two toilets in the northeasternmost lower bay, and three similar windows for office and toilet space in the southeastern- most lower bay, all of which follow original plans in location but have sloped framing to accommodate the pier/bulkhead deck elevation differences noted above. Both sides of the upper inshore bay at Pier 95 have a total of five 6-over-6, 4-by-3-foot windows, probably added for interior sheds some- time after original construction; two similar, probably added windows pene- trate the innermost upper story cargo door (Photographs 2, 6, WEST STREET AND WEST STREET PIERS (Piers 95 and 96, North River) HAER NO.
(Page 14) Both piers have similar roof construction of 1.5-by-8-inch, tongue-in-groove spruce roof boards over the purlins, under layers of tar paper and asphalt/ tar combinations with copper flashing. Eight 24-inch-diameter galvanized ventilators punctuate both ridge lines, at the middle of every fifth bay be- ginning in the fifth bay from the bulkhead. With the exception of scuttles on the three Pier 96 shed roof sections, roof bays have pairs of foot, 6-pane skylights with .25-inch wire glass, alternating near ridge lines and roof edges. Gutter pipes encased in raised roof edges drain into galvanized 4-inch leaders running down every fourth shed column.
Although not yet penetrated by many actual holes, both roofs have suffered greatly from lack of maintenance and, at Pier 96, recent fire damage, but they re- tain substantial remains of cargo handling systems discussed below under Me- chanical and Handling Equipment {Photographs 9, 10, 12; city of New York 6, 8, [plans, reproduced in Photographs 34 and Bulkhead Sheds Framing for the gable-roofed central section of each bulkhead shed carries through from the piersheds, as noted above, with the exception of the se- cond floor supports. The central 44-foot-long transverse girder and its northern supporting column provide room for elevator, stair, and baggage conveyor facilities, while the 32-foot-long inshore girder over the street entrance rests on a central column and brick facade walls.
The three most inland roof trusses at Pier 95 carry suspended steel frame, 32-foot-wide arches for the second story plaster ceiling, joined by 8-inch channel beams. In each of the 100-foot-long shed-roofed sections north and south of the central bay at each pier, built-up 10-inch I-beams define five bays and support through trusses with 14-foot clearances above the deck. A row of 6- inch I-beam columns at 9.25-foot-intervals under the southernmost truss at Pier 95 frames the southern end wall of the shed; the more poorly documented Pier 96 bulkhead shed may have similar framing at its northern end. Lattice or doorhead girders 2 feet high link the waterside ends of the trusses, with 10-inch channel beam purlins and provide all other longitudinal framing.
There is an additional low shed-roofed section rising above part of the passenger stair described below at Pier 95, 20 by 28 feet in area with the roof sloping along the long axis of the shed, adjacent to the northeast cor- ner of the central section (City of New. York 7, 9, 10, 11, and 13 [plans, partly reproduced in Photographs 36. and The Street bulkhead shed has four exterior sides: one at the extreme south end of the terminal, one on either side of the piershed along the bulkhead line, and the 260-foot-long street facade. Pier 96 has somewhat similar street and waterside exteriors, but originally had no north exterior since it abutted the Pier 97 bulkhead shed.
The original north end of the present complex was an 8-inch-thick hollow terracotta block firewall sepa- rating the two sheds. After the removal of the southern Pier 97 shed sec^ tion in an 18-foot-wide steel cargo door similar to those seen else- where on Pier 96 replaced the westernmost section of this wall. The south wall of Pier 95 consists of comparable terracotta block construction, with a stepped upper section between the columns under the roof truss and concrete block caps. Steel framed cargo doors, feet high but otherwise identi- cal to those along Pier 96, define the central three bays of each waterside exterior section at Pier 95, while galvanized steel closes the other four WEST STREET AND WEST STREET PIERS (Piers 95 and 96, North River) HAER No. (Page 15) bays.
Two six-over-six windows in the waterside bay immediately south of the pier mark interior office space which encompasses the south pier/bulk- head shed junction. At Pier 96, identical cargo doors fill the southernmost three and the northernmost four waterside bays, with windowless galvanized siding in the remaining bays (Photograph 10; City of New York 7, 9). The long street facade reflects bulkhead shed structural divisions, while masking the different roof ends with strong horizontal lines of Ionic entab- latures featuring pronounced dentils. Buff-colored brick walls, 16 inches thick along the lower shed sections and 20 inches thick along the projecting 60-foot-wide central facade sections, rise above 8-inch-thick, 34-inch-high granite false pedestals.
Except in the central sections, the brickwork is not loadbearing. At the central sections of the surviving pier facades, the brick rises feet at Pier 95 and about 25 feet at Pier 96, encom- passing 32-foot-wide arches with cast concrete keystones beneath the foot-high entablatures, made of white glazed terracotta tiles on red brick backing. Built-up steel girders, 4 feet high and embedded in the brick- work, divide each central arch and support steel, cast iron, and glass in- fill above. Dark green paint covers all metal facade elements. Pairs of oak lifting doors, divided by 12-by-10-inch built-up I-beam columns, closed entrances below the girders; all are now inoperable and deteriorated, with some destruction of glass and wood panels.
Door counterweight structures stand inside the corners of each 4-foot brick return at central section ends. The exterior returns are fully detailed (Photographs 3, 5, 8, City of New York 1-3 [plans, reproduced in Photographs The varying widths and heights of the original pier ends created very dif- ferent proportions among the three original central facades, as identical pedestal and entablature dimensions contrasted with arch radii treatments. The greater uniformity and more controlled proportions of the lower bulk- head shed sections are more visually successful, and gave integrity to the entire terminal street facade.
The granite pedestals, brick color, 5-foot- high terracotta tile entablatures with small dentils, and cast concrete keystones relate the 27-foot-high facades directly with the larger central sections. Each structural bay of the lower sections emerges as a brick arch feet high, and 10 or 12 feet wide with semi-circular upper steel and glass infill above plate glass windows, single or double oak hinged doors, or oak lifting doors framed in steel with cast iron and sheet metal details. Except where the sheds for Pier 96 and Pier 97 meet at adjacent lifting door arches, the narrower arches mark the north and south bays of each shed sec- tion.
Concrete curbing fronts all window and pedestrian door arches, while the paved surface east of the terminal continues through all lifting door arches between cast iron pedestal guards. The placement of doors and win- dows within this treatment sometimes served functional ends, as where doors entered offices or passenger vestibule areas, but was sometimes as unrelated to interior shed spaces as the facade was generally structurally unrelated to the sheds and piers. Except for sheet metal covering placed over the se- cond arch from the southern end of Pier 96 during sprinkler valve shed construction the facade apparently retained its original integrity throughout the period of steamship company use.
The facade today extends north to the fourth bay of the southern shed section at the Pier 97 site, with highly varied survival of interior arch treatments (Photographs 3, 5, 8, 13, 19; City of New York [reproduced in Photographs WEST STREET AND WEST STREET PIERS (Piers 95 and 96, North River) HAER No. {Page 16) Facade decoration, other than the architectural detailing described above, appeared only on the central bulkhead sections. Surviving original plans for the Street Pier called for raised copper lettering to spell FURNESS WITHY & CO.
in the frieze and the names of possible sub-tenants LLOYD SABAUDO and SWEDISH-AMERICAN on either side of the arch, a pair of concrete medallions below the frieze with the anticipated date of construction, and a raised italic 55 ST on the infill below the keystone. As built, the date of shed completion was incised into the right medallion, matched on the left by the incised vertical initials F W; both these details sur- vive, along with the infill characters. There is no record of raised let- tering beside the arch. Original and later frieze lettering went through several underdocumented changes (see Photographs 27 and 30) prior to the installation of an electric sign, now partially removed, for Furness BERMUDA Lines above the entablature.
Other undocumented facade details in- clude PIER 95, painted below the infill sometime after Photograph 30) and three cast iron flagpole bases riveted onto the facade girder and central column. The flagpoles, one of which remains, may be original con- struction features not originally planned for the terminal (Photographs 27- 30; City of New York 1, 2 [plans, reproduced in Photographs Manhattan 4639A). The Street Pier had similar but fewer decorative details: concrete me- dallions, italic 56 ST in the arch infill with a later PIER 96 painted on the girder below, and a single flagpole in a cast iron base at the facade center. The medallion initials are raised rather than incised, suggesting that the I. on the left and the L.I.
on the right were added over original characters sometime after the formation of the new amalgamated Italia line; Lloyd Italiano, the only North Atlantic line with appropriate ini- tials, may have retained some corporate identity after its takeover by NGI. NAVIGAZIONE GENERALE ITALIANA appeared on the terracotta frieze, pro- bably as part of original decoration with subsequent removal under Furness, which may have erected an electric Furness Lines electric sign in (Pho- tographs 8, 28; Bonsor III, City of New York Manhattan The terminal street facade rises above adjacent bulkhead shed roofing, form- ing 5-foot-high parapets along the lower shed sections. The common brick firewall between the two piersheds, with a stepped meets the parapet.
Wooden backing for the two central upper facades, built of nominal inch framing and l-by-6-inch tongue-in-groove sheathing, may be undocumented attempts to prevent moisture from eroding the facade masonry. A small flagpole attached to the backing at Pier 96 rises above, the roof peak and the facade. Copper flashing marked all facade-shed roof junctures, which to- day include a variety of cement and roofing materials marking previous minor repairs. Bulkhead shed roofs were identical in original construction to those seen on the piersheds. Two skylights similar to those on the pier- sheds appear over the second and fourth bays of both surviving south shed sections, while each north shed section has three skylights.
Pier 95 has one additional skylight on the raised roof over the passenger stair. A second additional skylight planned et Pier 95, atop the elevator shaft ris- ing to just below the central facade top, was evidently not built (Photo- graphs 6, City of New York 2, 7 [plans, partly reproduced as Photograph WEST STREET AND WEST STREET PIERS (Piers 95 and 96, North River) HAER No. (Page 17) interiors Piersheds Both piersheds are essentially open interior spaces for cargo and passenger movement, with small enclosed storage areas in corners of outshore pier halves, and toilets and additional storage areas at inshore ends adjacent to the bulkhead sheds.
A hollow terracotta block firewall, penetrated by a sliding tin-covered wood door 16 feet long and 14 feet high, divides the lower level of Pier 95 transversely at the pier center to form the only large and original interior division inside the two piersheds. Other fire- resistant interior structural elements include two corrugated steel cur- tains added to roofs trusses in each pier in trusses located 262 and 462 feet from the upper outshore end of the Street piershed, and and feet from the outshore end of the Street piershed.
Original plans suggest Pier 95 had no interior enclosures beyond the first inshore bay, except perhaps a 10.75-foot-high, 20-by-16.5-foot concrete room in the north side of the first lower level bay outshore of the firewall, on top of which room sat heating equipment discussed below. This room, cur- rently fitted with a wood floor, coat hooks, and an inoperable radiator, appears to have last been a longshoremen's staging area/coat room, although it may have once served as a paint storage room.
The only other permanent features on the lower level beyond the first inshore bay were two 3-foot- diameter metal spiral stairs, located as shown in Photograph 31, which rose some feet to the top of the 4.5-inch-thick, reinforced concrete upper deck, rated for 250 pounds/square inch and covered with a .5-inch asphalt layer.
Two 12-by-5-foot holes in the upper deck led to baggage chutes which have not survived on site (see Photograph At undocumented times after terminal construction, Furness Withy & Co., built eight steel-frame, metal-sided sheds for storage and baggage handling, as shown in Photograph xx: two at the lower outshore end; one at the northern upper outshore end; one at the second southern lower inshore bay, with open steel mesh double doors, possibly used to store hoist or other machine oils; and four at the first two upper inshore bays (Photographs City of New York 1, 4 [plans, reproduced as Photographs 31 and The inshore ends of both piers originally had steel-framed, metal-walled toilet and washroom areas for longshoremen, decorated with floral or geome- tric pressed tin panels on walls and ceilings.
In Pier 95, two such 12-to- 13-foot high spaces encompass an area 4.6 by 16 feet in the northeasternmost bay, with a third toilet 6.5 by 14 feet on the opposite wall, adjacent to what was originally a similarly constructed office built around the corner of the piershed and bulkhead shed (Photographs 17, Furness Withy subdivided this latter space along the bulkhead line in creating a 20- by-6.6-foot lunch stand later apparently a union office with the construc- tion of a second interior wall in the bulkhead shed section of the office {Photograph Pier 96 originally had two toilets in the southeastern piershed corner, similar to those at Pier 95, in adjacent 9.75-foot-high rooms totalling 10 by feet in area.
The only other original interior features in this piershed were a 15.3-foot-long sliding, metal-covered door for the 14.5-foot-high opening in the hollow terracotta block firewall at WEST STREET AND WEST STREET PIERS {Piers 95 and 96, North River) HAER No. (Page 18) the inshore pier end, and a steel-framed, wood-decked platform in the north- eastern corner of the piershed. The latter structure, 20 by 30 feet and feet above the deck, supports heating equipment discussed below.
Fur- ness Withy built a 10-foot-high cargo locker for valuables under the plat- form in by feet with a wire-mesh, 7-foot-high double door through the firewall; a later undocumented wire-mesh enclosure fills the rest of the southeasternmost inshore bay adjacent to the toilets (City of New York 1, 4, 9 [plans, reproduced as. Photographs 31, 40, and and Manhattan and Bulkhead Sheds The most visually distinctive interior spaces in passenger ship terminals were those built for passenger waiting and movement, in contrast to more utilitarian office and storage spaces which appeared at a variety of large cargo-handling piers in the Port of New York. Passengers and their baggage moved between ship decks and upper piersheds decks, and between upper piershed decks and marginal street areas.
The lower decks of two-story pas- senger ship piers served largely to handle and store general cargo, requir- ing truck access through piershed central street entrances. In wider piers such as at Street, stairways, elevator, and baggage escalators could link upper deck and street levels in a flow parallel to a pier's long axis, with lower ends of. such links located to one side of the street entrance. At Pier 95, the 55-foot-wide piershed precluded this arrangement and requir- ed an L-shaped traffic flow.
A waiting room on the upper deck, adjacent to the street facade, connects to a vestibule with lowerer ceilings in the first two bays of the lowe,r bulkhead shed section to the north, via an ele- vator, a 10-foot-wide double stairway with steel and wood bannisters, and a 5-foot-wide electric baggage escalator with toothed wooden slats. Terracot- ta block walls rising the full height of the lower bulkhead shed define an area about 54 by feet between the lower passenger areas and the rest of the shed, with utilities and mechanical equipment installed under the stairs and escalator. Decorated pressed tin panels cover or once covered most vestibule and stairwell surfaces, as well as the ceilings and upper wall surfaces of the bathrooms and offices lining -the waiting room above.
A curved plaster ceiling with meander-pattern fillets, originally painted an unknown color, dominates the 45-by-33-foot waiting room which connects with the upper piershed deck via seven doors. Fragments of the pink Tennessee marble wainscotting and door trim survive where this material once finished north, south, and west waiting room surfaces, and the womenjg bathroom off the southeastern waiting room corner. Photographs 31 and 40 show the ar- rangment of the bathrooms and offices around the waiting room (Photographs City of New York 3, 13, 4 [plans, reproduced as Photo- graphs 33, 37, and Photographs 4o, and 41 show some original and current arrangments of other interior bulkhead shed spaces at and streets.
Original offices, with some later subdivisions, were wood-framed structures 21 feet wide and feet high, with decorated pressed tin on all ceilings and walls, including exterior walls inside the shed. Furness Withy added a number of paint, plumbing, carpenter, and machine shop spaces at Street between and There additions include a metal-walled, enclosed mezzanine built in the southern two bays of the bulkhead shed with WEST 55thSTREET AND WEST STREET PIERS (Piers 95 and 96, North River) HAER No. (Page 19) inch I-beam columns 8.3 feet high, inch girder joists, and a yellow pine floor; and an adjacent two-story metal-walled enclosure along the next waterside bay.
Immediately south of the boiler room at the Street shed's northern end, discussed below, Furness Withy also added a two-story frame structure, the upper level of which appears to have served recently as a lounge for city personnel. A similar two-story structure was added to the southeastern corner of the Pier 96 bulkhead shed, next to the dry pipe sprinkler valve room. The northern section of this shed, including a 12.75-foot-long battery, motor and generating room, and the 38.2-foot long boiler room adjacent to the offices (Photographs 17, 19; City of New York 1, 4, 9 [plans, reproduced as Photographs 31, 40, and Utilities Original terminal facilities included direct current electrical and water connections with municipal systems extending to the adjacent paved areas.
These connections provided for overhead lights suspended from trusses, ceil- i.ng, and inshore facade walls, for several ornamental lights on outshore facades, for motors driving the elevator and baggage escalator in Pier 95, and for plumbing. Most motors and lights, and some plumbing fixtures, sur- vive in deteriorated form, although there has been extensive stripping of all electrical outlets and other fixtures with copper components. Each pier/bulkhead shed had its own heating plant, much of which remains in place. Pairs of coal-fired, horizontal return, fire tube boilers, manufac- tured by the Titusville Iron Company of Titusville, PA, provided steam for heating systems from terracotta-block-enclosed boiler rooms with plaster ceilings at or near the north end of each bulkhead shed.
Stacks extend about 43 feet above shed- roof. Coal supply facilities remain unclear: Pier 96 has no apparent coal room; the 9-foot-wide coal room at Pier 95, built smaller than shown in original plans, retains no evidence of supply intakes. Fur- ness Withy converted the Pier 96 boilers to oil-fired units at an unknown date, with burners made by Todd Shipyards Corporation. The boilers fed two types of heating sytems. Networks of low-pressure, two-pipe, overfeed radiators heated bulkhead shed offices and passenger areas; a small number of the radiators survive.
Hot blast systems provided heat to piershed areas encompassing the full length of Pier 96 and the outer half of the lower deck at Pier 95, through steam-heated, condensate-return air heaters and forced air blowers which fed insulated sheet metal ducts supported by roof trusses or floor girders. Virtually all the ducts survive. The entire air heater and blower plant survives at Pier 96 on the platform at the inshore pier end, including a Niagara Conoidal Air Heater and a blower from the Buffalo Forge Company operated by a variable direct current motor. Copper resistors and a control panel for the motor are partly intact on the bulkhead shed deck, behind a metal wall in the first bay to the north.
The air heater at Pier 95, located beyond the mid-pier firewall on top of the concrete enclos- ure noted above, has disappeared (Photographs 15, 18, 19, 23, 24; American Society of Mechanical Engineers Theodore Audel & Co. City of New York 16 and Wm. J. Olvaney [plans, partly reproduced in Photographs 38 and 39 ]). 1 The sprinkler valve room is mislocated one bay to the north in City Of New York 9 [plan, reproduced in Photograph WEST 55thSTREET AND WEST STREET PIERS (Piers 95 and 96, North River) HAER No. (Page 20 ) Furness Withy apparently installed charging equipment supplied by the Conlan Electric Company north of the Pier 96 boiler room, for a plant in- cluding two 40 motors, two generators, and batteries with plug-in boxes.
The charging plant probably dated to original terminal construction. The charging panel from this installation survives adjacent to the boilers. While undocumented, it is likely this plant serviced the portable electric winches, baggage escalators, and belt conveyors used at the terminal, and may have been the only such power source among the three original piers (U.S. Army Corps of Engineers City of New York Manhattan The dry pipe sprinkler systems installed on both piers by the Raisler Corporation, with valves supplied by the Belable Automatic Sprinkler Company' of Mount Vernon, NY, survive intact. At Pier 95, the valve room is a wood- framed, wallboard-sided enclosure under the passenger stairs and baggage es- calator.
The Pier 96 valve room is a 10.5-foot high, 15-by-21-foot metal structure in the second bay from the south end of the shed (Photographs 18, 19, 25; Raisler Corporation [plans]; City of New York 4, 9[plans, reproduced as Photographs 40 and Mechanical and Handling Equipment Passenger liner piers such as Pier 95 handled two principal types of cargo: baggage and breakbulk freight. If ships using such piers carried bulk com- modities such as grain, which remains undocumented, special purpose vessels would have worked the moored ships on offshore sides, with no use of a-pier. Baggage handling involved use of portable escalators or conveyors between pier and ship, especially to upper decks, with hand-powered or mechanized trucks or tractors for movement along the decks.
Baggage reached street le- vel via chutes through upper decks, as at Pier 95, and fixed baggage escala- tors. General cargo movement between ship and pier usually involved use of cargo masts, ships' winches, and fixed or portable winches on the piers. Cargo movement on the pier could involve the same trucks or tractors used for baggage, forklifts after and trucks for cargo transport off the pier into the streets. Most of the equipment used on the piers was thus portable, allowing deployment to both varied stowage points on a ship and to different piers used by the same tenants or stevedore companies. Pier 97 shared a variety of equipment after under Furness, Withy & Co., and the Bay Ridge Operating Company.
Prior to Navigazione Generale Italiana and its successor, Italia, used a common array of portable equip- ment at West and streets. The location of the battery charging plant on Pier 96 suggests that all terminal tenants had access to this point. The principal apparent difference between NGI and Furness, Withy was the Italian line's reliance on more hand and machine trucks (U.S. Army Corps of Engineers Only some of the permanent equipment survives at the West and street piers. The only trace of baggage handling equipment is the electric escalator at Pier 95, which appears to retain all parts including the mo- tor suspended under the upper end. Pier 97 evidently had a similar feature, as did other undocumented passenger ship piers.
WEST 55thSTREET AND WEST STREET PIERS (Piers 95 and 96, North River) HAER No. (J?age 21) The surviving piers at this terminal have substantial remains of two types of cargo mast systems, reflecting their different heights. One-story Pier 96 has 35-foot columns extended above every fourth piershed column beginning at the third bay from the bulkhead, providing a height of about 57 feet above the pier deck. Each column is a built-up, inch I-beam. Steel star struts, each made of two angle bars bolted together, brace the columns to steel plates bolted to the roof trusse upper chords. Taut wire stay cables 1.5 inches thick join the columns, and also secure the last co- lumn in each row to the piershed roof, from plates riveted to each column top.
Cargo cables inches thick suspended below the stay cables could support, on stirrups which do not survive here, mobile hoisting blocks for use with winches and lines. This arrangement was common at one-story cargo piers in the Port of New York, which generally served ships of moderate height. Although Pier 96 served passengers as well as general cargo, its limited baggage and passenger facilities and single story evidently pre- cluded handling of larger transatlantic or Bermuda ships.
The two higher shed doors allowed for some service of taller passenger vessels (Photo- graphs Figure 6; Staniford Pier 95 has the more rigid system, with steel beams between cargo masts, used for two-story piersheds built in the port after The 28-foot- high columns, extending for 32 bays beginning at the second bay from the bulkhead, have I-beams and star-strut braces identical to those at Pier 96. Like the earlier Chelsea Piers, and the North German Lloyd terminal at Ho- boken, stirrups suspended from the beams supported hoisting blocks.
The earlier system of rigid beams in line with the cargo masts had some recog- nized problems which city engineers addressed at piers built after running cables through blocks directly above the shed side wore excessively on the yellow pine door head girder fenders, and movement of hoisting blocks on rigid beams during lifting operations put stress on the stirrups. De- signs for the municipal pier at West Street, erected addressed the first problem by extending the cargo beams 2 feet outshore on a curved steel member and replacing the pine fenders with curved steel plates riveted to door head girders and filled with cement mortar.
Designs for the West and West street piers incorporated the new door head girder fend- ers, and addressed the second problem for the first time by hinging the cargo beams to the columns, allowing them to revolve so that the beam was always normal to the pull of the hoisting lines. The hinged design involved framing extension supports from the cargo masts, and hanging the cargo beams from the supports with steel pins. Most 6-by-l.25-inch, cargo I-beams at Pier 95 support three stirrups at 5-foot intervals.
The cargo mast columns also support 2,3-foot-wide wooden catwalk decks, equipped with lights, lad- ders, and pipe rails (Photographs 4, 6, 12; City of New York 8 [plans, reproduced as Photograph Staniford Use of electric winches with cargo masts began in the Port of New York at the large passenqer ship piers, with deployment at other piers or cargo handling facilities in the port only after World War I. Electric winches were eventually favored over earlier steam winches by their greater speed, safer operation in greater power and more uniform speed, elimination of po- tentially frozen pipes or cylinders, and greater maneuverability.
As indi- cated in Figure 7, they were usually deployed only on lower decks, requiring ships' winches for upper deck-ship transfers (Taylor WEST STREET AND WEST STREET PIERS (Piers 95 and 96/ North River) HAER No. -(-Page 22) Figure 1. LOCATION OF WEST AND WEST STREET PIERS ON MANHATTAN ISLAND WEST STREET AND WEST STREET PIERS {Piers 95 and 96, North River) HAER No. (Page 23) SHORELINE CHANGED BY SHORELINE DEVELOPMENT AT AND AROUND WEST AND WEST STREET PIERS, ITO3 SHORELINE CHANGED 8V ' 8 13 w I! $ ft 5J -0 -0 * rr= ! J L. mS Figure 2 WEST STREET AND WEST STREET PIERS (Piers 95 and 96, North River) HAER No. {Page 24) 1=1 w >A fc * I; r AVtNUC CALX O* PHT Figure 3. NEW YORK CITY LINER PIER DEVELOPMENT ON NORTH RIVER, TO STREETS, Source: U.S.
Army Corps of Engineers WEST STREET AND WEST STREET PIERS {Piers 95 and 96, North River) HAER No. (Page 25) Section of Original West Street Pier ;.; ..; # *T. .>! * m CencrrteDeck ^ I Half Cross Section' o+ Foundation Row TJ & Harf Cross Section a+ Intermediate Row Typical Department of Docks Concrete Deck-Wood Pile Pier, after Figure 4. DEPARTMENT OF DOCKS ALL-TIMBER AND CONCRETE DECK-WOOD PILE PIER SECTIONS