Ellis Island, Contagious Disease Hospital Powerhouse and Laundry Building, New York Harbor
Ellis Island, Contagious Disease Hospital Powerhouse and Laundry Building, New York Harbor, New York County, NY. Surveyed as HABS NY-6086-X, with a 22,530-word written history.
From the record
“The Powerhouse and Laundry Building was constructed during as part of the Contagious Disease Hospital complex on Island 3 of the Ellis Island U.S.”
Written record, HABS NY-6086-X survey. Machine-read text.
Surveyed by the federal HABS program as HABS NY-6086-X · the record runs 22530 words · one of 297 surveyed structures published for this county.
Source document
Quoted word for word from HABS NY-6086-X.
Not written, edited or summarised by this site.
New York Harbor, Jersey City, Hudson County, New Jersey and New York City, New York County, New York The Island 3 Powerhouse and Laundry Building on Ellis Island is located at latitude: longitude: The coordinate was taken at the stack and was obtained in using Google Earth There is no restriction on its release to the public.
Significance
19844 words
The headings the report itself prints. Each one jumps to where it begins.
Source document
Quoted word for word from HABS NY-6086-X.
Not written, edited or summarised by this site.
The Powerhouse and Laundry Building was constructed during as part of the Contagious Disease Hospital complex on Island 3 of the Ellis Island U.S. Immigration Station. Construction of the hospital significantly expanded the facilities run by the United States Public Health and Marine Hospital Service (after U.S. Public Health Service or USPHS) in conjunction with the Bureau of Immigration at Ellis Island. Ellis Island officials lobbied for the Island 3 Hospital following the New York Public Health Department s announcement that it no longer intended to provide care for immigrants suffering from contagious diseases.
With support among local health officials dwindling and concerns about the spread of contagious diseases like favus, measles, scarlet fever, and trachoma enduring, officials sought to expand the medical capabilities available on the island. This expansion, Ellis Island authorities believed, required the additional power, sanitizing, and staff facilities provided by the Island 3 Powerhouse and Laundry Building. The Office of the Supervising Architect of the Treasury, James Knox Taylor, designed and oversaw construction of the Powerhouse and Laundry Building, working closely with Chief Engineer and Superintendent of the U.S.
Public Buildings of New York City, Alfred Brooks In addition to its power and heat production, laundry, and sanitizing facilities, the Island 3 Powerhouse housed water tanks and heavy pumps for a high pressure firefighting system. It provided dining ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 2) and kitchen facilities for medical and non-medical employees, and the second floor was divided into separate men s and women s staff quarters. Located at the southwest corner of Ellis Island, the uneven U-shaped building follows the Georgian Revival exterior design of other Island 3 hospital buildings. It has a red tile roof, pebble and dash stucco wall treatment, and red brick and limestone quoins and details.
The Powerhouse and Laundry Building is distinguished by the presence of circular, metal sash windows on the upper level of the powerhouse wing and an 87-foot yellow brick chimney stack that rises from an octagonal base on the east side. The Island 3 Powerhouse helped provide heat and electricity to Ellis Island during periods of high-demand in the winters of and It may have continued to provide power during peak periods in ensuing years, though this remains unclear in source material. During this time the building continued to house hospital staff and served as a laundry and sanitizing space.
Due to changing energy requirements, improvements at the powerhouse on Island 1, and the conversion of the Island 3 Mortuary into a space to house laboratory animals, the engine room of the Powerhouse and Laundry Building was converted into a mortuary and autopsy theater c. In March of the USPHS vacated the hospital facilities and the U.S. Coast Guard Port Security Unit adopted some of the space on Island 3 for file storage. The Ellis Island U.S. Immigration Station closed on November 12, The hospital complex has remained largely unoccupied even following its inclusion in the Statue of Liberty National Monument in under the administration of the U.S. Department of the Interior, National Park Service. PART I. HISTORICAL INFORMATION A. Physical History: 1. Date of erection: 2.
Architect: Office of the Supervising Architect, U.S. Department of the Treasury (James Knox Taylor, Supervising Architect) 3. Original owner: U.S. Department of Commerce and Labor, Subsequent owners: U.S. Department of Labor, U.S. Department of Justice, Immigration and Naturalization Service, U.S. General Services Administration, U.S. Department of the Interior, National Park Service, 1965-present 4. Builder: North-Eastern Construction Co., New York ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 3) 5. Original plans and construction: Historic plans and field observations indicate that the Powerhouse and Laundry Building largely retains its historic exterior appearance. In addition, much of the early, if not original, mechanical equipment remains.
In the Office of the Supervising Architect prepared plans for the Powerhouse and Laundry Building (Figures This drawing set includes elevations, floor plans, roof, foundation, and framing plans, sections, and details. 1 Drawings show an uneven U-shaped, 2 -story, Georgian Revival style building with brick detailing, a hipped tile roof, and yellow-brick stack. The interior has been modified somewhat, particularly on the first floor level. Second-floor staff quarters remained largely unchanged apart from the conversion of one bedroom into a bathroom sometime before The uneven U-shaped plan, however, is intact and many early windows and doors remain. The exterior largely reflects its original massing, materials, and detailing. However, some stairs and platforms have been removed.
In May during construction, a number of proposals were made for alterations to the original Powerhouse and Laundry Building plans. To accommodate heavy pumps for a high pressure fire system, freshwater storage tanks, and three water-tube boiler units and engines, some of the foundations required additional support. An engine room replaced rooms laid out for sterilizing and cleaning, and the partition between the two rooms was omitted. A concrete beam replaced the partition, and in the wall between the engine room and a laundry room a pilaster was built to support the concrete beam. A pilaster was also added inside the exterior wall. The doors into the laundry and tank room were infilled, the partition between the tank rooms was omitted, and the door next to the coal room was sealed up.
Additionally, a door was cut into the boiler room and an iron stair was built in the engine room, as the floor had been lowered. The walls of the coal room were also altered in order to support the exterior, second-level steel door. 2 6. Alterations and additions: The building was altered fairly soon after its completion in as heating, lighting, and fire-prevention demands changed. In the two covered ways connected to the Powerhouse and Laundry Building were enclosed to make travel between buildings easier in periods of extreme weather. The laundry wing of the building was altered around to install a mattress sanitizer and the window along the exterior wall of the sanitizing room was converted into a door for installation and access purposes.
This decade also saw updates to plumbing, including the reinstallation of supply lines and salt water lines used to flush toilets. A bedroom in the women s staff quarters was converted to a bathroom by The exact date of this conversion remains unclear, however, as does the date the first floor pantry was altered into a toilet. The engines, generator, and switchboard in the engine room were 1 Original drawings for Ellis Island buildings are digitized and available from the Technical Information Center (TIC), Denver Service Center, National Park Service, U.S. Department of the Interior at http://etic.nps.gov. 2 Beyer Blinder Belle and Anderson Notter Finegold, Ellis Island Statue of Liberty National Monument: Historic Structures Report Units 2, 3, and 4, Volume 4, Part 2 (U.S.
Department of the Interior, National Park Service, ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 4) removed in and in the space was converted to an autopsy theater with refrigerated cadaver drawers and a separate wash room. Changes may also have been made to the building between and by the U.S. Coast Guard. However, specifics have not been found. B. Historical Context: For further information about other historic buildings and the landscape at Ellis Island, including the pavilions and other support facilities of the Contagious Disease Hospital, see: HABS No. ELLIS ISLAND [overview] HABS No. NY-6086-E - ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. - ELLIS ISLAND, MAIN HOSPITAL HABS No. - ELLIS ISLAND, HOSPITAL OUTBUILDING HABS No.
- ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL MEASLES WARD G HABS No. - ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL OFFICE BUILDING HABS No. - ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL MORTUARY HABS No. NY-6086-O - ELLIS ISLAND, NEW IMMIGRATION BUILDING HABS No. - ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL STAFF HOUSE HABS No. - ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL KITCHEN HABS No. - ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL MEASLES WARD A HABS No. NY-6086-U - ELLIS ISLAND, PSYCHOPATHIC WARD HABS No. - RECREATION BUILDING HABS No. - RECREATION SHELTER HABS No. - ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL ISOLATION WARD I HABS No. - ELLIS ISLAND,
Contagious Disease Hospital Administration Building Hals
No. - ELLIS ISLAND [landscape overview] Early Construction on Ellis Island In Congress established the United States Immigration Station at Ellis Island, New York. Its creation effectively moved the management of immigration away from individual states and under the purview of the Federal government. The facility on Ellis Island in the New York Harbor came to represent one of the most well-known examples of Federal immigration facilities. 3 The station opened on January 1, and 3 Tracy J. Stakely, Cultural Landscape Report for Ellis Island Statue of Liberty National Monument Site History, Existing Conditions, Analysis (Brookline, MA: National Park Service, Olmstead Center for Landscape Preservation, 27. ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No.
(Page 5) processed over immigrants before the wood station caught fire and was destroyed five years later. 4 The Department of Treasury, the department responsible for immigration at that time, quickly began planning construction of a new immigration facility on the island. The New York firm of Boring & Tilton s bid won the competition to design and build the new fireproof immigration station. 5 The firm s plan consisted of three main buildings a French Renaissance style immigration building, a kitchen and laundry building, and a powerhouse aligned on a southwest-northeast axis.
Although the first powerhouse escaped the fire of the Treasury Department decided that all buildings should be made fire-proof, which meant the wood-frame powerhouse sheathed in slate and metalwork would require rebuilding. The new powerhouse was larger than the first, and it incorporated portions of the old building and equipment. 6 As the immigration station expanded and electricity demands rose in later years, some of the steam and power production equipment installed in the new Island 1 Powerhouse would be transferred to the Powerhouse and Laundry Building on Island 3. This effectively made room for newer, more efficient and productive equipment in the main powerhouse on Island 1.
7 The new Island 1 Powerhouse with its boilers and high voltage direct current system provided heat and electricity for the new Immigration Station as well as the new Island 2 Georgian Revival hospital complex and outbuildings, the first section of which opened in March The federalization of immigration control included provisions for the medical examination of arriving aliens, which led to construction of the Main Hospital on Island 2 and later to the construction of Island 3 and the Contagious Disease Hospital. People with dangerous or contagious diseases, criminal backgrounds, or real or perceived mental deficiencies could be turned away by the Marine Hospital Service surgeons who staffed Ellis Island. 8 They were meant to base their decisions on the 4 Harlan D.
Unrau, Historic Resource Study (Historical Component) Volume I of III: Ellis Island Statue of Liberty National Monument, New York-New Jersey (U.S. Department of Interior, National Park Service, xix. 5 The new immigration station at Ellis Island was only the second project created under the Tarsney Act an act which authorized private sector architectural competitions for the design of federal buildings. 6 Beyer Blinder Belle and Anderson Notter Finegold, Ellis Island Statue of Liberty National Monument, Historic Structure Report, Powerhouse, Volume 3, 10. 7 James Knox Taylor letter to F. P.
Sargent, 29 July File 8C, Entry 8, Record Group 85 - Records of the Immigration and Naturalization Service, National Archives and Records Administration, Washington, DC [hereafter Entry 8, RG 85, NARA I]. 8 For additional context on U.S. immigration practices and their change over time see Mae M. Ngai, Impossible Subjects: Illegal Aliens and the Making of Modern America (Princeton, NJ: Princeton University Press, and John Higham, Strangers in the Land: Patterns of American Nativism, (New Brunswick, NJ: Rutgers University Press, ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 6) liability of an immigrant becoming a public charge.
9 Passengers whom Federal medical officers identified as having physical or mental defects or requiring further examination were held in medical detention rooms. The Island 2 Main Hospital served passengers requiring immediate surgical or medical treatment, and those with communicable diseases trachoma, favus, tuberculosis, measles, diphtheria, scarlet fever, or chicken pox were transferred directly from the ship to New York City Health Department hospitals before construction of the Contagious Disease Hospital on Ellis Island. Quarantine cases, including cholera, smallpox, yellow fever, typhus, and plague, were immediately removed from arriving ships and transported to a Quarantine Station near Staten Island.
10 Expanding Medical Facilities at Ellis Island Upon its opening in the Island 2 Main Hospital was immediately deemed utterly inadequate. 11 In addition, that year, the New York Public Health Department announced its intention to break ties with Ellis Island, stating it no longer intended to accept immigrants suffering from contagious diseases. Ellis Island faced the loss of the Health Department s support and growing public fear of and prejudice against infected immigrants. Commissioner-General of Immigration T. V. Powderly s words embodied this fear and prejudice: If we remain indifferent simply because these diseases do not prove fatal to life, we evade our duty; for the health of the nation is imperiled while one man is diseased.
The old America is the asylum of the oppressed of the world, is too threadbare to withstand the assaults of disease. There is a danger that the oppressed may, through the burdens they fasten on others, become oppressors every advance of loathsome, dangerous or contagious disease should be challenged at sea coast and border line, and denied admission to the United States. 12 With the loss of the New York Public Health Department s assistance and rising pressure to keep contagious immigrants away from U.S. cities, officials at Ellis Island worked quickly to address their inability to handle contagious disease cases on the island.
Ellis Island Commissioner of Immigration William Williams soon began lobbying for the construction of a new island, which would house a pavilion-plan Contagious Disease 9 An act in amendment to the various acts relative to immigration and the importation of aliens under contract or agreement to perform labor Congress, 2nd Session, Congressional Record (3 March Chap. 26 Stat. Harlan D. Unrau, Historic Resource Study, 10 Lorie Conway, Forgotten Ellis Island: The Extraordinary Story of America s Immigrant Hospital (New York: HarperCollins, 35; Unrau, Historic Resource Study, Appendix D, Organization of the U.S. Immigrant Station at Ellis Island, New York, Together with a Brief Description of the Work Done in Each of Its Divisions (23 October 11 Unrau, Historic Resource Study, Volume II, 12 T.
V. Powderly, Commissioner General of Immigration, Immigration s Menace to the National Health, The North American Review (July 53. ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 7) Hospital. 13 Pressured by the growing number of immigrants and the imperative to keep aliens with contagious diseases out of America, Congress soon appropriated funds for a new island, Island 3, which would house a hospital for the treatment of contagious diseases. 14 In spite of Commissioner Williams urgent pleas to begin work on the construction of the island immediately, the process faced two major bureaucratic hurdles.
First, the island was planned within 500 feet of Island 2, and it was unclear whether the Surgeon General and Sanitary Board would rule this distance wide enough to guarantee safety from infection. However, in November the Chairman of the Sanitary Board, Dr. J. H. White, conveyed the board s opinion that a hospital within 400 feet of the hospital on Island 2 and separated by 200 feet of water was compatible with safety from the fear of extension of contagion. 15 Shortly thereafter Surgeon General Walter Wyman wrote to Williams with his approval of the site by enclosing the Sanitary Board s ruling. 16 Following this, the State of New Jersey filed a lawsuit claiming ownership of Ellis Island. The state called for the expulsion of the Immigration Station.
All construction and improvement expenditures stopped. The Federal government did not receive clear title to Ellis Island and the submerged land around it until November 30, At this point construction of Island 3, where the Powerhouse and Laundry Building would eventually be built, began. The island consisted of log cribbing infilled with clean soil, according to the specifications of Alfred Brooks Chief Engineer and Superintendent of Repair of U.S. Public Buildings at New York. 17 Completed in early the 4 -acre island increased the total size for Ellis Island to 21 acres. Island 3 was connected to other sections of the Immigration Station via wood gangway at its northwest end.
The Pavilion Plan Hospital With construction of Island 3 completed and the allocation of a appropriation in the Sundry Civil Appropriation Act approved on March 3, planning for the Island 3 Contagious Disease Hospital began. Immigration officials, public health surgeons, and Federal engineers and architects collaborated to design a pavilion plan hospital complex.
The design emphasized cross ventilation and salubrious airflow and was based around the general acceptance of the aerial conduction of disease, 13 William Williams letter to Secretary of Treasury, 30 October File (Part 1A) Estimates of Construction Hospital Island, Entry 9 Subject and Policy Files, Record Group 85 - Records of the Immigration and Naturalization Service, National Archives and Records Administration, Washington, DC [hereafter Entry 9, RG 85, NARA I]. 14 Unrau, Historic Resource Study, Volume II, 15 Sanitary Board of the USPHMHS (J. H. White, Chairman) letter to Surgeon General, 6 November File (Part 1A), Entry 9, RG 85, NARA I. 16 Surgeon General letter to William Williams, 26 November File (Part 1A), Entry 9, RG 85, NARA I.
17 Part 3 Construction, New Island, File Box 36, Entry 9, RG 85, NARA I. ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 8) or, as it was known to contemporaries, the miasmic or pythogenic theory. 18 The plan originated in Europe and Great Britain and is attributed in large part to Florence Nightingale, who expounded on the implications of hospital architecture in patient care during her time working as a nurse in the Crimean War. 19 Signs that germ theory was well accepted may also be seen in the design of the hospital. Coved floors and ceilings and painted plaster walls, for example, provided an easier way to clean and sanitize hospital spaces, ridding them of disease-causing germs.
Though scientific understanding of germ theory was well established in this period, the belief that stagnant air caused poor health seemed so logical that it continued to hold sway in hospital design. 20 The Office of Supervising Architect James Knox Taylor produced the final design and layout for the Contagious Disease Hospital. The Administration Building, with kitchen at its rear, was located at the center. Eight identical two-story Measles Wards were staggered, alternating on either side of an open, central corridor.
The Staff House and three free-standing Isolation Wards stood at the southeast end of the island, and the Powerhouse and Laundry Building, Mortuary, and Laboratory were located at the northwest end (Figure Additional staff quarters could be found on the second floor of the Powerhouse and Laundry Building. Consistent with mature pavilion plan designs, the architects emphasized the importance of air flow. Small ventilation openings were cut beneath limestone windowsills in the Measles Wards, and Taylor and Alfred Brooks Fry were careful to include a ventilation system in the hospital that stopped air from traveling between floors. Such care, however, did not extend to the Powerhouse and Laundry Building.
As no patients resided there and the staff quarters located on the second-story were intended for non-medical employees, careful ventilation proved less important. 21 There are no vents under the sills of the windows in this building and ventilation is not divided by floor, as evidenced by the lack of registers. Many of the rooms, however, do feature coved ceilings and floors and painted plaster walls architectural features associated with germ theory and its emphasis on cleanliness. In the male staff quarters, however, a picture rail stands in contrast to the coved design, creating difficult to clean corners. With designs in hand, Ellis Island authorities were eager to seek bids and begin construction of the Contagious Disease Hospital.
18 Anthony King, Hospital Planning: Revised Thoughts on the Origin of the Pavilion Principle in England, Medical History 10, no. 4 (October In addition to Nightingale, King traces the contribution of other researchers and architects to the spread of the pavilion hospital in England. 19 Florence Nightingale, Notes on Hospitals (London: Longman, Green, Longman, Roberts, and Green, 3rd revised edition, preface. 20 Nancy Tomes, The Gospel of Germs: Men, Women, and the Microbe in American Life (Cambridge: Harvard University Press, 21 Harlan D.
Unrau, Historic Structure Report: Ellis Island, Historical Data Historical Data, Statue of Liberty National Monument (Denver, Co: United States Department of the Interior, National Park Service, Denver Service Center, Unrau notes the Laundry Building contained sleeping rooms, dining room and kitchen for attendants employed in the Laundry Building and others who do not have direct contact with sick patients. ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 9) Funding, Phased Construction, and Alterations in Progress The Federal government advertised the construction bid offering for the Contagious Disease Hospital on September 17, a month after James Knox Taylor completed the final architectural drawings.
Realizing that the construction of the new hospital would require at least double the already appropriated, the Commissioner-General of the Bureau of Immigration wrote to the Secretary of Commerce and Labor, requesting an additional 22 In spite of wide support for construction of the new hospital, securing funding proved a difficult task. The lowest construction bid came to and did not include heating and ventilating equipment, the elevator in the Administration Building, screens for the buildings, the concrete pipe trench under the covered way, or electric light equipment and wiring. These items would require a separate contract and additional funding.
23 The Office of the Supervising Architect estimated that the complete project would cost approximately 24 Not wishing to request more than the amount, which already represented a larger amount than originally planned, or to redraw the plans, the Office of the Supervising Architect devised a plan to secure funding based around phased construction of the hospital. Work would begin on certain sections of the hospital with the hope that Congress would approve additional appropriations at a later date. Phase 1 of the construction project included the Administration Building, Kitchen, Measles Wards A, B, and E, and the Powerhouse and Laundry Building as well as connecting corridors for the buildings.
The phased approach, with its exclusion of steam and electrical equipment and wiring, proved troublesome with regards to the Powerhouse and Laundry Building. A letter from the North-Eastern Construction Co., which had won the bid to build the hospital, outlines some of the difficulties and frustrations related to such a construction approach: We feel that you should call your attention to the omission of the heating, electric wiring and elevators, and request that these items be contracted for at the very earliest possible moment.
The heating pipes and electric conduits should be placed in the building as the building progresses, and if not will require a great amount of cutting of finished work, and we would respectfully notify you that after work has been put in place by us, we will not permit any cutting or destroying of finished work, when said cutting is occasioned by the neglect of the Government in placing heating pipes and 22 Commissioner-General, Bureau of Immigration to the Secretary of Commerce and Labor, memo, 12 November File Entry 9, RG 85, NARA I. 23 Acting Commissioner-General, Bureau of Immigration and Naturalization, memo, 15 December, File 51,436/1/8A, Entry 8, NARA I. 24 Secretary of the Treasury letter to Secretary of the Department of Commerce and Labor, 3 December Entry 9, RG 85, NARA I.
ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 10) electric conduits in the buildings at the proper time, unless extra compensation is allowed us for same. 25 North-Eastern Construction Co. was attempting to secure the contract for installation of electrical equipment. However, Chief Engineer and Superintendent Alfred Brooks Fry noted, it is not the practice of the office of the Supervising Architect or, as a rule, of large corporations, to include the installation of electric, boiler and hydraulic plants in building contracts Such an approach he argued would mean that the building contractors added their own profit on the plant to the constructor s profit.
26 While it may have been common practice to offer two separate contracts to two separate companies for construction and the installation of electrical equipment respectively, it was exceptional that the electrical installation contract was not let at the same time as the construction contract. Although the Powerhouse and Laundry Building was deemed necessary and therefore included under Phase I construction of the Contagious Disease Hospital, the Ellis Island administration had not yet made a clear decision on how they intended to run the heating and electric system on Ellis Island as a whole. Though labeled, Power House on drawings, some correspondence suggests that the building was not originally meant to provide electricity only steam for heating and laundry purposes.
The Acting Secretary wrote, for example, The question of having two separate plants for the purpose of generating electric current for lighting power was given due consideration in preparing the drawings and specifications, but as it is contrary to good engineering practice to arrange the layout in that way without special conditions demanding it, and as no such conditions exist so far as the knowledge of this Department goes, no engine room was contemplated or provided in the new power house erected in connection with the Contagious Disease Building. 27 This was in response to letters between Civil Engineer J. D.
Howell and Commissioner Robert Watchorn who had been discussing the architectural alterations required to install engines, generators, and heavy fire-system tanks in the building. 28 Watchorn insisted that the Island 1 Powerhouse was overloaded even before accounting for the amperes the new Contagious Disease Hospital would require. The Immigration Station required electricity not only for lighting but also for pumping water for cooking, domestic and sanitary 25 North-Eastern Construction Co. letter to Secretary of the Department of Commerce and Labor, 26 February File 8B, Entry 9, RG 85, NARA I. 26 Chief Engineer & Superintendent, memo, 27 May File 8C, Entry 8, RG 85, NARA I. 27 Acting Secretary letter to The Secretary of Commerce & Labor, 22 June File 8C, Entry 8, RG 85, NARA I. 28 J. D.
Howell letter to Chief Engineer and Superintendent, 13 May File 8C, Entry 8, RG 85, NARA I; Memo for Chief Engineer, 21 May File 8C, Entry 9, RG 85, NARA I; J. D. Howell letter to Robert Watchorn, 25 May File 8C, Entry 8, RG 85, NARA I; Chief Engineer & Superintendent letter to The Commissioner of Immigration, 27 May File 8C, Entry 8, RG 85, NARA I. ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 11) purposes, for heating and ventilation, and for electric laundry machines, which were chosen for their efficiency and compactness. 29 He argued that the engine room on Island 1 did not have the space to expand the plant sufficient to carry the load of the new buildings.
He thus suggested that three 75-kilowatt engines along with their generators be moved from the Island 1 Powerhouse to the Powerhouse and Laundry Building on Island 3. Island authorities planned also to cross connect the two powerhouses, making either available in an emergency. Watchorn s suggestion was accepted. In addition to the engines, three of the boilers from Island 1 were slated for transfer to Island 3. In spite of further debate related to the additional cost of labor the two Powerhouses would require, this transfer of equipment occurred in 30 The decision to install engines and related equipment in the Powerhouse and Laundry Building required several structural alterations during construction.
To make space for the three engines, generators, and switchboard the rooms labeled sterilization room and clean room in the southwest corner of the building on the original plans were combined. Instead of the partition between the two rooms, two 12 x I- beams with a pilaster built at each end would provide structural support. One pilaster may currently be seen emerging from the wall in the linen room next to the mortuary. The floor of the room was lowered to grade level and pilasters and a concrete slab foundation were added in the engine room as well as the room that would house the fire-system tanks.
A construction photo from shows the room that would become the engine room before it was lowered to grade level (Figure The photo also shows spacing between the concrete foundation and walls in the boiler room a design choice meant to stop mechanical vibrations from transferring to walls and upper floors (Figure Original plans show two rooms labeled tank room (Figure 1). However, the division between the two was removed to allow room for the large water tank. In addition, due to errors in the original plans, the framing for the coal bunker walls had to be modified. The framing as it was originally drawn did not allow enough support for the second floor door as shown on the northwest elevation (Figure 6). 31 In March the Northeastern Construction Co.
proposed yet another alteration to the Powerhouse and Laundry Building. They suggested that a perforated radial brick chimney replace the specified and partially built common brick chimney visible in a construction photo from July (Figure The octagonal base of the radial brick stack may be seen in progress just one month after the Powerhouse was photographed with the beginnings of a common brick chimney (Figures 18 and The radial brick design had recently gained popularity due to the lighter weight of materials and more attractive appearance. Chief Engineer Alfred Brooks Fry approved of the modified plan with some alterations.
Supervising Architect James Knox Taylor agreed with Fry s propositions, which included increasing the thickness of the stack by 2 to within 12 of 29 Commissioner General letter to the Secretary of Commerce and Labor, 8 June File Entry 9, RG 85, NARA I. The heating was not electric, but some of the pumps required electricity. Most ventilation was not electric, but there were some electric fans operating in laundry spaces in particular. 30 Robert Watchorn letter to F. P. Sargent, File 8D, Entry 8, RG 85, NARA I. Alfred Brooks Fry letter to the Commissioner of Immigration, 2 July File 8D, Entry 8, RG 85, NARA I. 31 J. D. Howell letter to Robert Watchorn, 25 May File 8C, Entry 8, RG 85, NARA I. ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No.
(Page 12) the top; including an octagonal base; and bonding the chimney into the wall of the building. 32 The completed Powerhouse and Laundry Building, excepting the second floor staff quarters, varied significantly from Taylor s original drawings. The footprint remained the same, but several alterations in design and purpose occurred in first-floor spaces in both the laundry and powerhouse wings. Department of Commerce and Labor Accepts the Powerhouse and Laundry Building In the autumn of the Northeastern Construction Co. announced that, according to the wishes of Ellis Island officials, they had completed Phase 1 construction ahead of their November 1, deadline.
The company requested final inspection and to hand the buildings over to the Department of Commerce and Labor, which controlled Ellis Island at the time. Chief Engineer Alfred Brooks however, was reluctant to make final inspection and take over the buildings. He believed it was unfair for the Department of Commerce and Labor to have to maintain the buildings during the winter of He argued it would not be possible for Ellis Island to heat the buildings until permanent heating equipment was provided. If Northeastern Construction Co. retained control of the buildings, the company would be required to heat and maintain the buildings through the winter.
Fry questioned the legality of forcing the government to accept the buildings before November 1, In spite of protests from Ellis Island officials the Department of Commerce and Labor s solicitor passed down the legal opinion that the firm was entitled to inspection and final payment. 33 The final inspection of the completed Phase 1 buildings, including the Powerhouse and Laundry Building, took place on December 12, Commissioner Robert Watchorn found the work in compliance with specifications, but added that he and Fry noticed that owing to the marked changes in the temperature which had occurred within the preceding 48 hours, there was a very sensible accumulation of moisture on electric fixtures and in electric terminals; also that in some cases the walls were sweating very badly.
34 In order to prevent damage to walls, electric equipment, and freeze-ups in plumbing, Fry decided it was necessary to provide temporary steam heat to the buildings. This was arranged by taking steam from the Main Powerhouse on Island 1. The Island 3 Powerhouse was not yet equipped to provide steam to the buildings.
35 The buildings were turned over to the government in late December or early January and the administration quickly made arrangements to install permanent main supply and return pipes in the existing pipe chase and to make temporary supply connections on Island 2 and temporary return connections to the Powerhouse on Island 32 Beyer Blinder Belle and Anderson Notter Finegold, Ellis Island Statue of Liberty National Monument, Historic Structure Report, Powerhouse, Volume 4, 33 Unrau, Historic Structure Report, Garber letter to Commissioner of Immigration, 25 September RG 85, NARA I; Sargent to Commissioner of Immigration, Ellis Island, 26 September RG 85, NARA I; and Contract and Bond for Construction of Additional Buildings in Completing New Hospital at Ellis Island, 14 October RG 85, NARA I.
34 Alfred Brooks Fry to Commissioner of Immigration, Port of New York, 12 December RG 85, NARA I. 35 Ibid. ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 13) 1. 36 While these connections were temporary, it appears they later became a permanent part of the infrastructure, though detailed documents regarding this have not been found. Fry s testimony before the House Appropriations Committee for the fiscal year implies that steam connections between Island 1 and 3 had been maintained.
With regards to running boilers on Island 3, he stated we would have to run there at least six firemen and three coal heavers, and of course, that addition in pay would very much more than offset the loss of heat radiation in carrying steam over [from the Island 1 Powerhouse]. He argued that installing better boilers on Island 1 would be more economical than utilizing the boilers in the Powerhouse and Laundry Building. In his testimony he usually focuses on the generation of electricity, but in this case he notes that heating the Contagious Disease Hospital could also be completed more cost-effectively through drawing steam from the Powerhouse on Island 1.
37 Alterations Shortly After Construction of the Contagious Disease Hospital Construction of the entire Contagious Disease Hospital was completed in the spring of Shortly thereafter, Island administrators and hospital staff began to consider several improvements. The largest of these improvements was the enclosure of the covered ways connecting the various buildings of the Contagious Disease Hospital. Although open corridors fit more within the air flow parameters of pavilion plan hospitals, they proved troublesome for the movement of staff, particularly in inclement or cold weather.
38 Construction images reveal the open covered ways with their ornate, open concrete designs attached to the Powerhouse and Laundry Building before they were filled in and windows were added in (Figures 19 and Several calls for improvements to the Powerhouse and Laundry Building specifically arose around this time.
Commissioner William Williams outlined several in a letter to the Commissioner-General of Immigration in July In the letter he requested the following appropriations: 36 Watchorn letter to Sargent, 14 December RG 85, NARA I; Larned letter to Commissioner General, 17 December RG 85, NARAI; Garber letter to Commissioner General, 19 December RG 85, NARA I; Sargent letter to Commissioner of Immigration, Ellis Island, 24 December RG 85, NARA I; and Sargent letter to Northeastern Construction Company, 30 December RG 85, NARA I. 37 Ellis Island Immigration Station: Hearings before the Subcommittee of House Committee on Appropriations, House of Representatives, Cong., 3rd Sess. (statements of Mr. William Williams, Immigration Commissioner, New York; Mr. Alfred B.
Chief Engineer, Treasury Department, New York; and Mr. Roger O Donnel, Special Inspector, Immigration Service), 38 Annual Report, Commissioner-General of Immigration Fiscal Year William Williams letter to Commissioner-General of Immigration, 7 July RG 85, NARA I; William Williams letter to Commissioner- General of Immigration, 22 July RG 85, NARA I; An Act Making Appropriations for Sundry Civil Expenses of the Government for the Fiscal Year Ending June Thirtieth, Nineteen Hundred and Fourteen, Cong., 3rd Sess., RG 85, NARA I. ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 14) 1.
For alterations to power-house and laundry building of said hospital, including the re-arrangement and re-installation of laundry machinery, disinfecting apparatus, plumbing, and remainder of plant therein 2. For enlarging with incidental alterations central kitchen building of said hospital, including additions to cooking, lighting and heating plant, plumbing, etc. 3. For a disinfecting plant on said No. 3 island, including necessary structure and concrete dock appertaining thereto 4. For a garbage crematory and concrete dock appertaining thereto on said No. 3 island Williams indicated the garbage crematory, or incinerator, on Island 3 was the most urgent need, writing that they had no other means of disposing waste except by disinfecting it and throwing it into the water.
Hauling garbage to the Island 1 Crematory, he continued, would create a most unsanitary nuisance especially taking under consideration the infectious, contagious diseases treated on the island. 39 Williams letter emphasizes the importance of sanitation at the Contagious Disease Hospital and highlights a more germ- theory-centered approach to hospital management. Although few records indicating decisions on these requests have been found, later drawings, aerial images, and remaining equipment reveal that some were addressed.
A disinfecting plant, or mattress sanitizer the American Kinyoun-Francis steam and formaldehyde disinfector, rectangular type, with a radial arm door at each end was installed along with a concrete dock providing access to the sanitizing room in (Figures 21 and 40 The sanitizer replaced a sterilizing machine, which was badly corroded from continuous use since The new machine cost and was similar to those installed in the Baggage & Dormitory Building on Island 1.
41 An entrance and platform providing access to the sanitizer was also added as evidenced by close examination of aerial photos showing the southwest elevation of the building (Figures 23 and In addition, an incinerator may currently be found beside the two remaining boilers in the building s Boiler Room (Figures 25 and The exact date of the addition of the incinerator, however, remains uncertain. In October the Contagious Disease Hospital was ready to accept patients excepting its inability to light its buildings. Although electricity-producing equipment had been moved to the Island 3 Powerhouse in the plant could not operate without labor. Engineers, dynamo tenders, and firemen were required to run the plant on Island 3. Together their salaries would cost per month.
In addition, the monthly cost of coal required to fuel the power plant amounted to The installation of tie lines, 39 William Williams letter to Commissioner-General of Immigration, 29 July File Entry 9, RG 85, NARA I. 40 See Hull letter to Commissioner of Immigration, Ellis Island, 17 September RG 85, NARA I; Guppy to Commissioner of Immigration, Ellis Island, 10 November RG 85, NARA I; and Curran to Commissioner- General of Immigration, 12 November RG 85, NARA I. 41 Ibid. ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No.
(Page 15) connecting the Powerhouse on Island 1 to the Island 3 Powerhouse, on the other hand, would cost 42 As early as Williams and the Commissioner-General of Immigration requested funding for the installation of electric tie lines between the Powerhouses. The administration weighed the two options additional labor or the installation of tie lines and chose to connect the two powerhouses. The tie lines had the added benefit of guaranteeing backup service should one plant break down. 43 The Contagious Disease Hospital was opened for occupancy on June 20, following the connection of the two Powerhouses, which provided electricity to Island 3.
Continuing Debates over Heating and Electric Supply The early saw plans for more additions to Ellis Island, including the expansion of the Baggage & Dormitory Building on Island 1, as well as the completion of additional buildings associated with the Main Hospital on Island 2 and the Contagious Disease Hospital. With these additions the question of providing adequate electricity for Ellis Island again became an issue of debate. It featured heavily in Chief Engineer Alfred Brooks Fry s testimony before the House Appropriations Committee in and Fry hoped Congress would appropriate for enlargement of the boiler plant on Island 1.
He requested funds for the installation of three marine type cross-drum water tube boilers of 500 horsepower to replace four of the remaining 125-horsepower boilers installed in These 125-horsepower boilers were the same type as the three moved to the Powerhouse and Laundry Building in The Chairman of the Subcommittee on Appropriations, however, was reluctant to grant such funding given that Ellis Island already had reserve heating and electrical capacity provided by the Island 3 Powerhouse, which according to Fry s testimony had rarely, if ever, been employed.
44 Fry countered the Chairman s opinion, arguing You must remember that at Ellis Island we are practically like people on board ship at sea, and in winter, particularly, we have to depend largely on our own water supply, and we have to depend on our own plants for light, heat, and power. Fry hoped to continue holding the boiler and power plant on Island 3 in reserve and make up for the additional electrical demands that would accompany the expansions on Island 1 with improvements to the Main Powerhouse. In addition to arguing that such an isolated system should have reserves for the safety of those inhabiting the island, Fry noted that utilizing the reserve Powerhouse on Island 3 would be uneconomical.
Coal consumption would increase and firing the boilers 42 Beyer Blinder Belle and Anderson Notter Finegold, Ellis Island Statue of Liberty National Monument, Historic Structure Report, Powerhouse, Volume 4, 43 Commissioner-General letter to Secretary of Commerce and Labor, 8 June and William Williams letter to Commissioner-General of Immigration, 1 July RG 85, NARA I. See also, Unrau, Historic Structure Report, Ellis Island, 44 Immigrant Station, Ellis Island, Hearings before the Subcommittee of House Committee on Appropriations, House of Representatives, Cong., 2nd Sess. (statement of Alfred Brooks chief engineer and superintendent of the U.S. Public Buildings of New York City), At first Fry claims they never had occasion to operate the reserve plant on Island 3.
However, later in his testimony he states that they used the reserve plant once during the winter of ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 16) on Island 3 would require more firemen. Firemen, Commissioner William Williams informed the Chairman, could not be hired on short notice with civil service rules in effect, so it would be difficult to hire them for temporary, emergency labor. Still, the Chairman of the Appropriation Committee was reluctant to concede that the extra labor would outweigh the requested for plant improvements, and Congress did not approve the appropriation for the fiscal year.
45 Fry and Williams returned the following year and made largely the same arguments, asking again for worth of improvements to the Island 1 Powerhouse. Again they hoped to replace four boilers, which were growing old and replace them with larger and more economical units. The Chairman of the Committee, however, questioned how the age of the boilers was pertinent, given that they were installed in and should last about 20 years. 46 At this, Fry insisted that the issue was truly one of economy.
47 In spite of Fry s arguments, the Powerhouse on Island 1 would not receive new equipment until In this year, Webster Furnaces replaced the boilers located on the south side of the chimney and the requested three 500-horsepower units replaced the four 125-horsepower units installed in that remained in the Island 1 Powerhouse. 48 Based on this, it may be surmised that the boilers and engines of Island 3 were utilized in the interim in winter months when demands for steam heat and electric lighting would have been at their highest. The Powerhouse on Island 3 received its steam and electricity-producing equipment in when it was moved from the Main Powerhouse on Island 1.
The three coal-fired Oil City Boiler Works boilers produced an average working steam pressure of 125 pounds per square inch, at times providing steam heat for the station s buildings and energy for the three 75-kilowatt engines also installed in Ellis Island ran on a direct current electrical system that provided an original capacity of 425 kilowatts at 240 volts. 49 By when the Main Powerhouse was upgraded, alternating current systems (AC) with a 110 volt capacity had gained prominence in electric distribution systems in the U.S. 50 Why did Ellis Island authorities choose to install the higher voltage DC system? 45 Ibid. 46 These were the same model of boilers which had been moved to the Island 3 Powerhouse, two of which remain in the building s boiler room.
Given this information, it is conceivable that the boilers in the Island 3 Powerhouse would have been out of commission by the 47 Ellis Island Immigration Station: Hearings before the Subcommittee of House Committee on Appropriations, House of Representatives, Cong., 3rd Sess. (statement of Alfred Brooks chief engineer and superintendent of the U.S. Public Buildings of New York City), 48 Beyer Blinder Belle and Anderson Notter Finegold, Ellis Island Statue of Liberty National Monument, Historic Structure Report, Powerhouse, Volume 3, 29. 49 Beyer Blinder Belle and Anderson Notter Finegold, Ellis Island Statue of Liberty National Monument, Historic Structure Report, Powerhouse, Volume 3, 32.
50 Though the immigration station was not classified as a domestic space and the Federal government rather than private industry owned the powerhouse, it may be useful to consider the influential current wars of the decades preceding the construction of the Main Powerhouse on Island 1. Maury Klein, The Power Makers: Steam, Electricity, and the Men Who Invented Modern America (New York: Bloomsbury Press, suggests that the late and early saw two sides embattled for control of the electric light and power business. This competition revolved primarily around two technologies direct current and alternating current (AC) electric systems. ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No.
(Page 17) The Island and its Powerhouses differed from mainland distribution systems. The Immigration Station was not beholden to the market outside of fuel costs and operated on a much smaller scale. AC systems had, in part, gained popularity due to their superior ability to transfer electricity over significant distances. The electricity transfer distance on Ellis Island, however, was quite short. It is possible that the installed DC system proved more cost effective for the Immigration Station. No transformer, for example, was required to step voltage up and back down, as was necessary in an AC system. While the electrical system differed from that of the mainland, it held much in common with an onboard or ship electrical system.
Ships with electric capabilities similarly operated on high voltage DC systems. On ships today, DC technology provides lower transmission losses, takes up less space, reduces fuel costs, and allows for faster and simpler parallel connection of generators and easier energy storage. 51 These benefits of a shipboard DC system likely also applied to the small, closed system on Ellis Island. The administration even pressed to replace four of the original boilers at the main powerhouse with three marine type cross-drum water tube boilers in 52 According to some Ellis Island oral histories the island authorities installed shipboard electric appliances on the island.
One doctor recalled, We had a black kitchen stove, electric, that was very workable, but it was a shipboard stove, and it worked on the two-thirty-two wire direct current, as did the lights and everything else. 53 Installing shipboard appliances was likely a necessity as those made for the mainland ran on a lower voltage system. The DC system installed at the turn of the century would later prove a poor decision. The supervising engineer of Ellis Island in outlined difficulties with the system: The present electric service of the plant [on Island 1] is volt direct current which is now almost obsolete and in a few years will be entirely out of use in this area. Even now it is extremely difficult to obtain modern Thomas Edison, whose company patented the direct current system, and Harold P.
Brown, an electrical engineer from New York, argued against the use of alternating current the electric system employed by the competing Westinghouse Electric Company. Edison and Brown, identified as the New York State Expert on Electrical Execution, argued that alternating current was dangerous and a hazard to public health. Alternating current, however, proved more economical and better for transmitting electricity across long distances. It became the standard for domestic distribution in the U.S. Fears of electrocution aroused in relation to the DC/AC debate did not lead to a disavowal of alternating current systems. However, they may have influenced the standard 110 volt domestic distribution in the U.S., which differs from the 220 volt distribution in much of Europe.
51 Rene Prenc, et. al. Advantages of Using a DC Power System On Board Ship, Annals of Maritime Studies / Pomorski Zbronick, 52, no. 1, 83. 52 Immigration and Naturalization Immigrant Station, Ellis Island, Hearings before the Subcommittee of House Committee on Appropriations, House of Representatives, Cong., 3rd Sess. (statement of William Williams and Alfred Brooks chief engineer and superintendent of the U.S. Public Buildings of New York City), 53 James Louis Baker, interview by Janet Levine, 16 April National Park Service interview EI-280, transcript prepared by Nancy Vega, 40. ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 18) appliances and replacement parts for such current.
It is our opinion that no change should be made in the present electric generating machines, as the present equipment is adequate for several years of service, and we believe that when the present generating equipment is discontinued that suitable cables should be installed and electric energy purchased from the Public Utility companies such as is now the case at Hoffman Island and various other islands in this area. 54 While the high voltage DC system may have proved cost-effective and sensible at the time of its installation, it became a liability in later years. World War I With the outbreak of World War I in Europe in immigration tapered off significantly. Numbers decreased even more drastically after the United States declared war on Germany. In immigrants passed through Ellis Island.
In only arrived. With lower numbers of immigrants arriving at Ellis Island and the world at war, the purpose and practices of the Island s hospitals changed. Spurred by contemporary interest in intelligence testing, eugenics, and other quasi-scientific methods of racial categorization, surgeons and United States Public Health Service (USPHS) officers at Ellis Island developed standardized testing for feeble-mindedness as well as a manual outlining mental diseases in aliens. 55 During this period the hospitals also provided care to the crews of German and Austrian ships who were detained at Ellis Island in the Baggage & Dormitory Building in addition to immigrants and servicemen. The Immigration Act of changed the duties of Ellis Island s USPHS staff.
It required that the USPHS staff conduct medical examinations of the crew of every merchant ship. Then, in the Army designated the Contagious Disease Hospital and Main Hospital together as Debarkation Hospital No. 1, where staff processed and treated servicemen returning from WWI. During this temporary Army occupation, immigrant patients were treated in New York and New Jersey hospitals. 56 Few architectural changes occurred during this period at the Contagious Disease Hospital. As noted, the Island 1 Powerhouse received new equipment in which may suggest some changes in the power and heating practices employed on Island 3 since the two were connected via tie lines. The summer and fall of did see the replacement of 54 John J.
McNeely, District Engineer, letter to Supervising Engineer, Public Buildings Administration, 20 October Box Entry 31C - General Correspondence and Related Records, Record Group 121 Records of the Public Buildings Service, National Archives and Records Administration II, College Park, MD [hereafter Entry RG NARA II]. 55 United States Surgeon-General s Office, Annual Report of the Surgeon General of the Public Health Service (Washington, DC: Government Printing Office, 56 See Samuel R. Palfreyman, Ellis Island, Contagious Disease Hospital Administration Building, HABS No. NY- Historic American Buildings Survey, Prints and Photographs Division, Library of Congress, Washington, DC. ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No.
(Page 19) several windows on the north side of Ellis Island. On July the munitions warehouses at Black Tom Wharf on the New Jersey coast exploded. The explosion was linked to German saboteurs, and the resulting concussions and debris damaged buildings across the island. The Powerhouse and Laundry Building, located at the north end of Island 3 and closest to the explosion likely suffered more significant damage than other buildings on Ellis Island. Hospital floors were covered with glass from broken windows, which required the temporary evacuation of both hospitals on Ellis Island as well as their dormitories. Former Commissioner William Williams stated practically all the windows on the north side of the new hospital buildings were blown in.
He estimated the damages amounted to somewhere between and 57 U.S. Public Health Service, Sanitizing Equipment, and Improved Quarters On July 1, the military returned Ellis Island s hospitals to the Bureau of Immigration. In September of the same year, the Bureau of Immigration transferred the administration of the Hospitals on Islands 2 and 3 back to the United States Public Health Service (USPHS). The two Hospitals were renamed United States Public Health Service Hospital No. 43. They continued to serve immigrants, but 150 beds were set aside for USPHS patients who included seaman and discharged military personnel. 58 The saw changes in both the administration of and buildings at Ellis Island.
The Immigration Quota Act of for example, limited the numbers of incoming immigrants based on nationality and percentages drawn from the Census. An even more stringent policy was enacted in Harlan D. Unrau notes that the Immigration Act of which tightened immigration quotas by basing the percentage limitations on the census, marked a change in the administrative function of Ellis Island. Preceding the law, Ellis Island processed immigrants. Following the implementation of the act, assembly, detention, and deportation became the primary objectives of the island s staff and facilities. 59 New restrictions meant fewer immigrant patients, allowing more space for the treatment of merchant seamen, the Coast Guard, and the U.S. Employees Compensation Commission.
The Powerhouse and Laundry Building underwent some alterations during this period. A mattress sanitizer was fitted in the laundry wing of the building circa (Figures 21 and Commissioner William Williams requested this specific equipment in but its purchase and installation was denied by Congress and later likely pushed off with the onset of World War I. 60 The mattress sanitizer replaced a sterilizing machine, which was in poor repair as it had seen constant use since At some point an incinerator replaced one of the boilers, which by the had reached the end of 57 Ellis Island Hard Hit, (2 February Box 4, Volume II, 45, William Williams Papers, Archives and Manuscripts Section, New York Public Library.
58 Unrau, Historic Resource Study, Volume II, 59 Unrau, Historic Resource Study, Volume III, 60 William Williams letter to Commissioner-General of Immigration, 29 July File Entry 8, RG 85, NARA I. ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 20) their purported lifetime. 61 Perhaps this coincided with the installation of the mattress sanitizer.
The incinerator and sanitizer were previously requested in the same letter, and their installation suggests a move towards more advanced germ theory practices, a move that continued into the with the installation of knee- and foot-operated sinks associated with the mortuary that replaced the old engine room around Germ theory proved that germs (bacillus) that invaded the human body caused diseases, and moreover that a specific bacillus caused a particular disease. Trichophyton schoenleinii for example caused favus. The medical community had largely accepted the theory by the end of the nineteenth century.
In Charles Chamberland, a French physician and bacteriologist working at the Pasteur laboratory, demonstrated that disease- causing microorganisms, germs, could be efficiently and effectively killed through the use of a steam chamber, or autoclave. The idea was adopted by others who engineered large steam chambers to quickly and effectively disinfect the baggage of entire shiploads of passengers. 62 The mattress sanitizer, which was installed in the Powerhouse and Laundry Building at the Contagious Disease Hospital on Ellis Island, represents a variation of this apparatus. A two-leaf door was opened along the southwest elevation of the building to allow space for installation and utilization of the mattress sanitizer. A ghost of a platform may currently be seen leading to this door.
Perhaps the concrete platform Commissioner Williams called for in his request for appropriations to the Commissioner-General of Immigration in was realized at some point and later removed. 63 The mattress sanitizer was fitted in a wall such that one side of the machine was accessed from one room and one from the adjacent room (Figures 21 and There was no dividing wall on the original plan, which labeled the room in which the mattress sanitizer would later be situated, Storage Room for Disinfected Clothing, (Figure 1). It is likely that dirty mattresses were taken outside and delivered to the first, or exterior, sanitizing room via a concrete ramp and double-leaf doors on the southwest elevation.
The mattresses would have been inserted on this side of the sanitizer, sanitized with steam, and then removed, clean, from the other side in the second room. Once clean, mattresses may have been hung or stacked on the metal apparatus that remains in the second room, and which leads out into the covered way. Clean mattresses could then be delivered back to their wards via connecting corridors. The rooms next to the mattress 61 The Chairman of the House Committee on Appropriations notes during Alfred Brooks Fry s statement that boilers ought to last 20 year. See Ellis Island Immigration Station: Hearings before the Subcommittee of House Committee on Appropriations, House of Representatives, Cong., 3rd Sess. (statement of Alfred Brooks chief engineer and superintendent of the U.S.
Public Buildings of New York City), 62 Michael C. LeMay, Doctors at the Borders: Immigration and the Rise of Public Health (Santa Barbara, CA: Praeger, 73. 63 Commissioner-General, Bureau of Immigration to the Secretary of Commerce and Labor, memo, 12 November File Entry 8, RG 85, NARA I. Drawings as late as show a platform along the southwest elevation, providing access to the exterior room of the mattress sanitizer. See Drawing Electrical Installation, Island No. 3 (U.S. Department of Labor, Immigration Service, Ellis Island, ID Technical Information Center (TIC), Denver Service Center, National Park Service, U.S. Department of the Interior at http://etic.nps.gov. ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No.
(Page 21) sanitizing rooms provided space for laundering, drying, ironing, and storing hospital linens. A door to one of the rooms was altered at some point into a Dutch door. This likely allowed an attendant to pass clean linens to maids who would make up beds for the hospital s patients. Staff who worked in the laundry resided in one of the two double-loaded corridors of living quarters located above the laundry wing in the Powerhouse and Laundry Building. T. Bruce H. Anderson, who detailed as U.S. Public Health Service Officer of the Day on Island 3 in recalled male laundry workers mostly Irish and one Italian quartered on the second floor of the building. 64 Original plans label the corridors Women s Quarters, and Men s Quarters, and a report entitled, Employees Quarters, U.S.
Marine Hospital Ellis Island, New York, January notes that the Powerhouse and Laundry Building had second floor quarters for housing male attendants. 65 This suggests that in later periods both hallways of rooms housed male employees. This is probable given that many staff rooms in the hospital spaces were set aside for women. Chief Nurses inspected the quarters of all employees on the Islands on which they were stationed. They reported to their superiors that the quarters were generally adequate and sufficient. However, furnishings were at times considered insufficient. Rooms were relatively unadorned. However, a picture-rail does run along the corridor and rooms in the original men s staff corridor in the Powerhouse and Laundry Building.
Employees housed in the Powerhouse and Laundry Building, it seems, frequently complained about being located above the laundry, which operated 24 hours a day. 66 Care had been taken to stop vibrations from engines and machines related to heating and power production from transferring along walls to staff quarters. Foundations below the powerhouse wing of the building stopped 6 from the walls in order to avoid this. 67 Similar care in design was taken with regards to the laundry wing. 68 The noise of the machines, however, likely transferred between floors.
New Deal Improvements Economic opportunities in the United States dwindled with the onset of the Great Depression following the stock market crash of With few job opportunities and welfare programs stretched to the limit, Americans feared immigration would worsen an already desperate situation. President Herbert C. Hoover urged American consuls to 64 Anderson also recalls a fight between the Irish men and the lonely Italian man ending with the Italian worker on climbing on the building s roof to escape. See T. Bruce H. Anderson, interview by Elizabeth Yew, 22 September National Park Service interview transcript prepared by Charlene Keylor, 2.
65 Billings letter to Surgeon General, 30 July Entry 10 General Subject File, Record Group 90 Records of the Public Health Service, National Archives and Research Administration, College Park, MD [hereafter Entry 10, RG 90, NARA II]. 66 Unrau, Historic Resource Study, Volume II, 67 Infrequent use of this machinery would also have made it less of an annoyance. 68 Beyer Blinder Belle and Anderson Notter Finegold, Ellis Island Statue of Liberty National Monument: Historic Structures Report Units 2, 3, and 4, Volume 4, Part 2, The piling was designed to separate the floors and foundations of the building in order to prevent vibration from transmitting between them. ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No.
(Page 22) execute their duty to prevent people likely to become public charges from entering the country. In addition, radical efforts were made to rid the nation of recent arrivals. For example, Secretary of Labor William N. Doak led a national roundup of illegal aliens for prospective deportation and transferred many of them to Ellis Island. 69 Such actions reinforced the idea that Ellis Island s main objective had in fact switched from processing immigrants to overseeing their detainment and deportation. In spite of difficult financial times, Congress appropriated funds for the maintenance and repair of Ellis Island s Contagious Disease Hospital. The Powerhouse and Laundry Building was included under several of these repairs.
The Quintine Realty Company of New York City and Bloomfield, New Jersey was contracted to repair and replace roofs on Island 3, paint the exterior wood and metal surfaces, and install an island-wide fire alarm system. 70 In January H. Z. Altberg of New York City overhauled the electrical system of the island, rerunning electric circuits in external conduits and installing new power plug outlets, steel switchboards, ceiling and sidewall light fixtures, mains in the tunnel, and re-wiring 30 circuits of which 21 were to be installed in new exposed conduits (Figure 71 Morris Friedlander, Inc.
of Brooklyn won the contract to paint the interior of all Island 3 buildings in May and in June Orange Screen Company of New York City installed and replaced insect screens on all buildings on Ellis Island, inclusive of doors along the Island 3 covered ways. 72 Although it is unclear whether the Powerhouse and Laundry Building received any specific repairs or alterations in the early changes in the Powerhouse on Island 1 provide some clues as to the utilization of the steam and electricity-producing equipment on Island 3. In the Powerhouse on Island 1 was converted from coal- burning to oil-burning. The Babcock and Wilcox tubular boilers of 410 installed in and each having three Bethlehem Dahl oil burners, were to be altered and reused with the new oil system.
It was hoped that this conversion would reduce fuel and labor costs, lowering the overall operating costs of Ellis Island. 73 Given the updates at the Island 1 Powerhouse, the existence of tie-lines and steam connections between it and the other islands, the supposed lifetime of the boilers installed at Island 3, and the labeling of the Powerhouse and Laundry building as Old Powerhouse, one may assume with a fair amount of certainty that the boilers at the Powerhouse and Laundry Building were no longer running by (Figure 74 According to a notation on a drawing the 69 Unrau, Historic Resource Study, Volume I, 9. 70 Specification for Repairs and Replacements, Roofs and Leaders, All Buildings with Connecting Corridors, Island #3, 3 September1931, Specifications for Painting, Island No.
3, 20 August and Specifications for Fire Alarm System at Ellis Island, 21 October Record Group 79 Records of the National Park Service, National Archives and Records Administration Northeast Region, New York, NY [hereafter RG 79, NARA NE 71 Specifications for Electric Installation, Island No. 3, 20 January RG 79, NARA NE 72 Specifications for Painting (Interior), Hospital Buildings, Islands Nos. 2 and 3, 5 May RG 79, NARA NE Specifications for Screens on Islands Nos. 1, 2, 3, 6 June RG 79, NARA NE 73 Beyer Blinder Belle and Anderson Notter Finegold, Ellis Island Statue of Liberty National Monument, Historic Structure Report, Powerhouse, Volume 3, 74 Replacements to High Pressure Steam Lines Islands #2 & #3, Drawing No. File 32-A (U.S.
Department of Labor, Immigration Service, Ellis Island, ID Technical Information Center (TIC), Denver Service Center, National Park Service, U.S. Department of the Interior at http://etic.nps.gov. ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 23) engines were removed in so the Powerhouse had certainly stopped producing electricity by that time (Figure Steam and electrical operations had likely ceased around when the Island 1 powerhouse received additional boilers. Before this, it seems that the plant on Island 3 in the Powerhouse and Laundry Building was only employed intermittently during extreme winter conditions or perhaps as a backup while boilers on Island 1 underwent repairs.
75 In Edward Corsi, an immigrant who came through Ellis Island in became the island s new Commissioner of Immigration. Despite harsh anti-immigration measures and the general xenophobic treatment of immigrants following the stock market crash, Corsi aimed to humanize and improve the Ellis Island experience. He hoped to turn it into an inspiration to immigrants and citizens through improving infrastructure and social service programs. 76 Following the election of President Franklin D. Roosevelt in and the implementation of his New Deal public works programs, Secretary of Labor Frances Perkins put together a fifty-two-member nonpartisan citizen committee to analyze the existing conditions and operations of Ellis Island.
The goal of the committee was to improve the physical plant, the immigrant experience, and ensure compliance with immigration law. Working with Corsi, the Committee submitted its report in which called for more effective, fairer immigration regulations as well as physical improvements to the Island s landscape and numerous buildings. 77 None of the suggested improvements were aimed directly at the Powerhouse and Laundry Building. However, they did suggest the improvement or replacement of an incinerator. As there was an incinerator on both Islands 1 and 3, it is unclear which the committee meant to improve.
Although little documentation has been found regarding it, one major architectural change occurred in the Powerhouse and Laundry Building around 78 The room that had previously housed engines for electrical generation was converted into a mortuary and autopsy theater. The engines were removed in (Figure In Chief Surgeon C. H. Lavinder wrote a letter to the Surgeon General discussing the need for a new autopsy room, to be placed in the former dynamo room on Island 3. He wrote: The Immigration Service is quite willing that we should make use of that room for this purpose, and is also quite willing to try to secure the 75 Immigration Station, Ellis Island, Hearings before the Subcommittee of House Committee on Appropriations, House of Representatives, Cong., 3rd Sess.
(statement of Alfred Brooks chief engineer and superintendent of the U.S. Public Buildings of New York City), 76 Diane Elizabeth Williams, Ellis Island, New Immigration Building, HABS No. Historic American Buildings Survey, Prints and Photographs Division, Library of Congress, Washington, DC. 77 Carleton H. Palmer, Ellis Island Committee, Report of the Ellis Island Committee, March (New York: 78 The only related sources are a drawing of the room, a letter, and notes on an invitation to bidders. The drawing differs significantly from the layout of the room as built. See Neill P. Thompson, Associate Architect, letter to W. E.
Reynolds, Assistant Directory of Procurement, 17 September Box Entry RG NARA II; and Specifications for Miscellaneous Alterations, Etc., to the United States Immigration Station, Marine Hospital at Ellis Island, New York Harbor, 11 August File RG 79, NARA NE The specifications for bidders related not to construction of the mortuary but to the mortuary racks for cadavers. ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 24) necessary funds to put it in shape for this purpose, including the necessary icebox for 8 or 10 bodies. Our present autopsy room is totally inadequate in size and its arrangements are very poor.
This hospital does a large volume of autopsy work which I consider of the highest importance and we should be able to do it under better conditions. It is a common complaint from the staff that they are unable to perform autopsies in a satisfactory manner so that the staff may see what is going on by reason of the lack of space. 79 With the move towards treating more chronic conditions of seaman and others qualified to receive treatment from the U.S. Public Health Service, clinical research studies the gonorrhea treatment study of for example began to play a larger role in the Ellis Island hospital program. The U.S. Marine Hospital No. 43, was becoming a marine hospital in fact as well as in name.
80 With this transition in mind, the construction of an autopsy room, set up as a theater, or teaching space, makes sense. There is a drawing of a mortuary room to be fitted in the old engine room (Figure However, the execution of the conversion varied markedly from this drawing (Figure The mortuary drawers are stacked two wide and eight high. The drawing, on the other hand, has the drawers running eight wide and two high, on a wall other than where the drawers are currently located. The drawing also placed the seating area against the opposite wall and depicts one large room rather than a larger mortuary and autopsy theater and separate wash room.
The room which had previously served as the engine room became two rooms, a smaller sanitizing or wash room, and an autopsy theater with access to refrigerated cadaver drawers. The wash room provided space for doctors to wash their hands before and after autopsies. It held two sinks, both of which had foot- or knee-operated mechanisms. The engine for the refrigerated cadaver drawers is also in this room. Behind the wall along which the engine is located are the cadaver drawers. One window on the southwest elevation of the building was filled in to accommodate the refrigerated storage unit. Also of note, Albin Makelony, an employee of the U.S. Immigration Service on Ellis Island from suggested that mortuary bins were once located in the boiler room.
National Park Service reports posit that this could suggest the location of an improvised mortuary during the years following the conversion of the Mortuary Building into housing for small laboratory animals and preceding the conversion of the engine room into a mortuary and autopsy theater. 81 If his recollection is correct, it implies the boilers were not running in 79 Lavinder letter to Surgeon General, 11 May Box Entry 10, RG 90, NARA II. 80 Sprague letter to Surgeon General, 27 July Entry 10, RG 90, NARA II.
81 Interview with Albin Maskelony in Beyer Blinder Belle and Anderson Notter Finegold, Historic Structure Report, Volume 4, Part 2, 262 and Beyer Blinder Belle and Anderson Notter Finegold, Historic Structure Report, Volume 4, Part 2, ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 25) World War II, the U.S. Coast Guard Era, and the Closure of Ellis Island The outbreak of World War II saw yet another shift in immigration practices. This is perhaps most clearly expressed through the move of the Immigration and Naturalization Service (INS) from the Department of Labor to the Department of Justice, which occurred on June 14, Following U.S. entry in World War II, the INS became responsible for detaining suspected enemy aliens.
82 The Main Immigration Building was even used to imprison them. During the war, the U.S. Coast Guard Port Security Unit used buildings on Ellis Island as a training facility, and the hospitals served wounded soldiers as well as detainees. With the end of World War II, Ellis Island resumed processing and treating immigrants and deportees as well as those eligible to receive treatment through the U.S. Public Health Service. The hospitals continued to adapt with changing health needs. From for example, Wards 13, 14, 17, 18, and 23 of the Contagious Disease Hospital housed mentally ill patients. 83 By this time it seems the Powerhouse and Laundry Building had lost much of its usefulness.
By the the building is labeled as Old Powerhouse, and a plan labeled the building Powerhouse & Storage, (Figures 28 and Cold War enmity between the United States and the Soviet Union led to yet more changes to U.S. immigration policy. In Congress passed the Internal Security Act, which barred aliens who had been members of Communist or Fascist organizations from entering the United States. Following implementation of this act, Ellis Island came to house nearly detainees. The Federal government, however, realized that several immigrants seeking entry from Eastern Europe, Italy, and Germany had been forced to join Communist and Fascist groups, and the law was modified and former detainees were allowed to enter the United States. 85 On March 1, due to declining numbers of patients, the U.S.
Public Health Service determined the hospitals were obsolete and closed them. 86 For the detainees that 82 Unrau, Historic Resource Study, Volume III, 83 Unrau, Historic Resource Study, Volume III, Electroshock therapy was practiced in Ellis Island hospitals, which required a rotary adapter to convert the Island s direct current electricity. In oral histories a psychiatrist and his son, who lived on Ellis Island in the recalled the ways they coped with the high voltage system on the island. The appliances they brought with them a sewing machine, for example ran on so the doctor would set up a parallel circuit with a light bulb to keep the appliances from burning out. He even used the rotary adapter purchased for the hospital s electroshock therapy program to run his television set.
See James Louis Baker, interview and William Hale Baker, interview by Paul E. Sigrist, 21 August interview EI-35, transcript prepared by Paul E. Sigrist and reconceived by John Muriello. 84 Replacements to High Pressure Steam Lines Islands #2 & #3, and Planting Plan, 1 October Drawing No. ID Technical Information Center (TIC), Denver Service Center, National Park Service, U.S. Department of the Interior at http://etic.nps.gov. 85 Unrau, Historic Resource Study, Volume I, 11; Williams, Ellis Island, New Immigration Building, 20. 86 New York Times, December 28, in Unrau, Historic Structure Report, ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 26) remained, the USPHS maintained a small infirmary in the Main Immigration Building.
87 The USPHS vacated the hospitals on March 1, at which point the Coast Guard occupied them, reportedly using some of the Measles Wards for file storage. On November 12, immigration processing, detainee concentration, and Coast Guard operations ceased at Ellis Island. The Island sat empty under the control of the General Services Administration (GSA), which intended to sell or lease the property to private businesses. 88 In the meantime the GSA removed furniture, medical equipment, and plumbing fixtures from Ellis Island and repurposed them in other Federal facilities including border patrol offices, Federal prisons, the Public Health Service, the military, and the General Services Administration.
89 After several failed attempts to sell the island, the National Park Service took over jurisdiction, and on May 11, President Lyndon B. Johnson issued Proclamation which added the island to the Statue of Liberty National Monument. 90 PART II. ARCHITECTURAL INFORMATION A. General Statement 1. Architectural character: The Powerhouse and Laundry Building is 2 -stories high, with laundry facilities and staff quarters in one wing, and heating and electric rooms in the other wing. The building sets itself apart through its roughly U-shaped footprint and yellow-brick stack. Although a distinctive structure within the Island 3 Contagious Disease Hospital complex, the building s exterior and detailing are consistent with the surrounding institutional architecture.
Exterior walls are finished with original pebble and dash (medium aggregate) stucco, red brick and limestone detailing, and the building is topped with a red-tile, hipped roof. It retains its original exterior form, materials, and detailing and much of its early interior materials and finishes including wall and ceiling plaster; ceramic, glass, and metal light fixtures; metal door and window hardware; and wood door and window units. Additionally, much of the early if not original mechanical equipment remains including two boilers, an incinerator, an engine for the refrigerated mortuary drawers, pumps, and several tanks of various sizes. The original 87 4 powerhouse stack, however, has been shortened and currently stands 76 10, and some exterior platforms and stairs have been removed. 2.
Condition of fabric: Fair. In several rooms plaster, wood flooring, and wood window elements as well as wiring and plumbing systems are deteriorated. The autopsy theater, in the southwest corner of the building, is in the best condition. B. Description of Exterior: 87 Stakely, Cultural Landscape Report for Ellis Island Statue of Liberty National Monument, 92. 88 U.S. Senate, Congress, 1st Session, Report No. Disposal of Ellis Island (Washington, DC: Government Printing Office, 89 Unrau, Historic Resource Study, Volume III, 90 Unrau, Historic Resource Study, 11; Williams, Ellis Island, New Immigration Building, 20. ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 27) 1.
Overall dimensions: The Powerhouse and Laundry building has an uneven U-shaped footprint measuring 102 on its southwest axis (laundry wing) and 95 3 on its northwest axis (boiler room wing). 2. Foundations: The Powerhouse and Laundry Building has brick foundation walls with smoothly dressed granite sheathing approximately eighteen inches high and four inches thick. The visible brick portion of the foundation is 13 courses high and laid in a roughly five to one common bond with an extra, sloped header course that acts as a water table. An additional two to three brick courses laid in a stretcher pattern are located below the granite sheathing. Three roughly square, perforated metal doors with pintle hinges provide access to the crawl space and pipe chase under the building.
The exterior frames of the doors are applied directly to the foundation with the true bottom aligning with the top of the 18-inch granite sheathing. 3. Walls: The exterior walls are load-bearing red brick with a pebble dash stucco veneer. Decorative red brick quoins accent the corners of the building and a red brick cornice consisting of a bottom course of header bricks topped by five stretcher courses adorns the tops of the walls. Additionally, there are horizontally oriented rectangular spandrels between the window openings of the first and second floors of the Powerhouse and Laundry Building. These decorative spandrels are recessed and have the same pebble dash stucco finish as the rest of the wall. 4.
Structural system, framing: The boiler room is built on a concrete slab foundation, while the laundry portion of the building is built on a concrete pile foundation with reinforced concrete joists and steel beams. The piling was designed to separate the floors and foundations of the building in order to prevent vibration from transmitting between them. 91 Additionally, structural clay tiles can be found throughout the building s interior walls. Steel I-beams may be found, particularly in areas that house and support heavy equipment. The framing in the coal room, for example, which supports a second floor iron door, includes 8 I-beams weighing 18 pounds to the foot.
92 Two pilasters one completely in an exterior wall and one emerging slightly into a laundry room replaced a load-bearing wall, which was removed during construction when it was decided the room would house engines. The attic reveals robust, riveted, longitudinal iron trusses with V-shaped trusses at intervals. A heavy, tiled roof, running the span of the Powerhouse and Laundry Building requires strong support. However, as the Powerhouse and Laundry Building is the only structure on Island 3 with metal trusses, it can be surmised that this structural choice was related to the mechanical functions of the building. 5.
Stoops, Fire Escapes, and Covered Ways: 91 Beyer Blinder Belle and Anderson Notter Finegold, Ellis Island Statue of Liberty National Monument: Historic Structures Report Units 2, 3, and 4, Volume 4, Part 2, 92 Ibid. ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 28) a. Stoops: The Powerhouse and Laundry Building has one remaining concrete stoop. The single remaining stoop is located on the southeast wall. It consists of seven concrete stairs with curved cheek walls. The spring-loaded door at the top of the stoop leads to the detached covered way. The exterior walls and early plans, however, show evidence of additional stairs, stoops, and loading docks, which have been removed.
On the northwest wall, for example, several metal spikes in the pebble dash stucco suggest there may have been metal stairs, or a loading apparatus leading to the second floor door of the coal room. Plans show there was a stoop on this wall to the left of the coal room, which was removed to make space for the connecting brick corridor leading to Island 1, constructed in the On the exterior wall of the laundry wing, holes in the brick foundation, running for five bays (from the third bay from the west corner to the first door) suggest earlier existence of a loading dock. There is ghost evidence of a stair on roughly the east end of the wall, which ran parallel with it.
Additionally on this wall, on the farthest east bay, there is physical evidence of a metal stair and rail running parallel to the wall and traveling down to the east which also appears on the original drawings. b. Fire Escapes: The Powerhouse and Laundry Building has two metal fire escapes. A metal platform with a wall-mounted metal ladder extends down from the window of the original men s quarters hallway. A second metal platform with metal ladder, also to be used as a fire escape, extends from the center bay, to the right of the chimney at the end of the hallway of the original women s quarters. Each has an emergency light, caged in metal, mounted above the platform. These may have been added in the early as part of the installation of the Fire Alarm System. 93 c.
Covered Ways: The Powerhouse and Laundry Building is connected to other buildings in the Contagious Disease Hospital through two covered ways. These connections are typical of pavilion plan hospitals a typology originating in mid- nineteenth century British architecture and popularized in the United States following the Civil War. The two covered ways of the Powerhouse and Laundry Building were originally open but were enclosed fairly soon after the completion of the building in The one-story, T-shaped covered way running along the southeast side of the boiler room, and providing access to the laundry wing and staff quarters, stands separate from the Powerhouse and Laundry Building to afford space for the stack.
Its foundation is similar to that of the rest of the building, consisting of red brick on granite. It has a simple, flat concrete roof and consists of seven bays with 93 Specifications for Fire Alarm System at Ellis Island, 21 October RG 79, NARA NE ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 29) concrete piers separating each. The wall surface, added when corridor was enclosed in is granite crystal stucco, scored or stamped, with a decorative faux jack arch design above each window. Two spandrel panels run below each window and there is a concrete box cornice along the top of the wall. Industrial, steel sash windows run along both sides of the detached covered way. Each window has 20 rectangular lights arranged five by four.
The middle six lights pivot open along a horizontal axis. The covered way, additionally, has a concrete ceiling and floor and houses a pipe chase under its foundation, which may be accessed via a perforated metal door like those located along the foundation of the Powerhouse and Laundry Building. The flat roof drained via metal pipes that travel through the floor and out of the foundation. Floor drains from when the covered way was open also remain. The second covered way shares a wall with the boiler room and continues as the main connecting corridor for the Contagious Disease Hospital (Passageway It is nine bays across and mimics the design of the outer wall, windows, roof, and foundation of the southeast corridor.
The fifth bay from the southeast is a door modified from a window which connects via short, uncovered walkway to the old Mortuary (later the small animal housing building). The third bay from the northwest connects to a corridor, which leads to the Office/Laboratory Building. 6. Chimneys: a. Chimney: A roughly square, red brick, external chimney is found on the southeast elevation of the Powerhouse and Laundry Building s laundry wing. The chimney continues the five to one common bond pattern of the brick section of the foundation. Two brick courses project before a corbeled brick top with limestone capping. b. Stack: A yellow brick chimney stack originally rose approximately 87 from an octagonal, red brick base on the southeast side of the Powerhouse and Laundry Building.
It is situated between the boiler room and the detached covered way. The yellow brick portion of the stack was constructed using radial bricks, a technique that became popular in the early twentieth century due to the relative lightness of required materials and improved appearance. The stack narrows as it rises and metal flashing may currently be found around the top. It has been altered to a lower height, 76 , and the corbelled top has been removed. The removed bricks are stacked nearby inside the covered way. The octagonal red brick base shares one side with the boiler room and gaps at the corners alternate on each course. There is a square, metal door set into the octagonal base of the stack, which reads, H. R. Heinicke, Incorporated, New York, H. R. Heinicke, Inc.
designed and built radial brick chimneys during the early century. 7. Openings: ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 30) a. Doorways and doors: There are five doorways, which lead effectively outside. These consist of the southeast entrance to the detached covered way, two doors on the laundry wing leading from the kitchen and mattress sanitizing room and two metal doors leading from the coal room on the northwest elevation.
Plans and aerial photographs show an exterior door was added at grade level, replacing a window along the northwest elevation by (Figures 23 and The door led to the old engine room (currently the mortuary), and possibly served as a way to remove engines and generators in order to convert the room to a mortuary in With the completion of the mortuary, the door was altered back to a window. A ghost of the door is visible on the exterior. The two courses of granite covering this section of the foundation further hint at the door s earlier existence. Nine additional exterior doors six on the laundry wing and three on the boiler wing lead from the enclosed covered ways directly into the stair halls for the staff quarters, various laundry rooms, and the boiler room.
One two-leaf door leading into the boiler room was added later, along with a platform. This addition likely coincided with the installation of an incinerator. Typical exterior doorways consist of a veneered rectangular wood door with five recessed panels. Doors are topped with a two-light moveable transom. Doors leading from an enclosed covered way are largely representative of typical exterior doors. However, screen doors and screen transoms have been added. Door frames were built out to make room for the screen doors and screen transoms. Some of these doors have signage. For example, on one there is a wood sign reading Linen & Cloth Room. Doors are trimmed with what looks effectively to be a full-round bead.
Some doors and frames leading to the hall on the laundry wing and into the boiler room next to the stairs to the men s staff quarters have been completely removed. The door on the southwest side of the building, which leads to the mattress sanitizing room, was created from an original window opening, perhaps to afford room to install and access the sanitizer. It is a two leaf wood door that begins at the top of the foundation. The doors have two wooden recessed panels with a three part trim and glazing in the top half. As with other exterior doors, there is a two-light transom above each leaf. The doorway leading to the remaining concrete stoop has a rectangular wood opening set directly into concrete.
A large transom and three side lights run from the transom down the sides of the two-leaf door. Decorative metal panel sheaving covers the bottom one-third of the door. The door operates on a spring mechanism. Two metal doors lead to the coal room on the northwest side of the building. One enters the room on the first level; the other enters at the second. The first floor door is set directly into the wall on a deep reveal with no trim. There is a sagging metal lintel above a two-leaf door of riveted steel, which is situated on metal tracks due to the considerable weight of the door. It is opened with a fixed handle ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 31) and may be locked with a slide bar.
The upper entrance to the coal room is a squat, riveted steel two-leaf door with segmental arch opening. It has a deep reveal and rests on a granite sill. A decorative hood with red brick keystone and stucco pattern, projects slightly from the wall above the door. b. Windows: The Powerhouse and Laundry Building has regularly spaced fenestration on the first and second floors. Five windows look into the covered way. A ghost of a window may be seen on the northwest elevation. It was filled in with later with work on the covered way connecting Island 3 to Island 1. A first- floor window on the southwest elevation, which looked into the old engine room has also been filled.
This was required as the refrigerated cadaver drawers in the current mortuary run flush with the exterior wall at this bay. The typical window is set directly into the masonry wall and has a limestone lug sill, with a roughly six inch reveal and a two over two double hung wood sash window. Inset frames on the exterior of the windows are trimmed with approximately 2 wide full-round molding. Windows on the first floor are rectangular and second floor windows on the laundry wing have a curved upper rail that fits under a decorative hood formed by a brick keystone, brick corner blocks, and a slightly raised pebble dash stucco portion connecting them in the form of a segmental arch. This decorative arch is similar to but smaller than the arch above the second floor door of the coal room.
Straight wood panels were added to the exterior of second floor windows to receive wood frame storm windows or screens, blocking the arched portion. Some exterior windows along the laundry wing have painted chain-link grating mounted outside the frames. The boiler room distinguishes itself with regular circular fenestration on the second floor. These windows are also set directly into the masonry wall and have a decorative surround consisting of four raised stucco sections connecting four sets of brick blocks. Original circular windows are five-light wood sash with a circular center light with four equally divided lights surrounding it. Replacement wood sashes are divided into four equal lights.
These windows open on a horizontal center pivot and have a finger pull bolt located at the bottom. On either side of the stack on the southeast wall of the boiler room, two first-floor windows have been filled in. This alteration may have coincided with later installation of or modifications to mechanical equipment in the boiler room. 8. Roof: a. Shape, covering: The Powerhouse and Laundry Building has an uneven U-shaped hipped roof (opening on the southeast side) connecting its multiple wings. The roof is sheathed with red clay tiles with curved ridges. Hip tiles outline the roof ridges. ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 32) b.
Cornice, eaves: The Powerhouse and Laundry Building has wide, open eaves with exposed, decoratively notched false rafter ends. Copper gutters are intact with replacement PVC downspouts in some places that run parallel to remaining cast iron downspout bases. c. Vents: There is a large copper ventilator at the center of the boiler wing ridge. There are two additional, smaller ventilation pipes exposed on the roof. One serves the mattress sanitizer and the other likely provided sewage gas ventilation for the building s toilets. C. Description of Interior: 1. Floor plans: The Powerhouse and Laundry Building is organized in an uneven U- shaped plan, with covered ways running along the southeast and northeast walls.
On the first floor, a kitchen, dining room, laundry and sanitizing rooms, two toilets, and the mortuary are located in the wing running parallel to the southwest seawall. The old tank room, coal room, and pump room connect the southwest laundry wing to the shorter portion of the U where the boiler room is located. Two straight-run stairways connect the first and second floors. The second floor consists of two wings housing staff quarters originally, one for men and one for women. These double loaded corridors of small rooms do not connect. 2. Stairways: The Powerhouse and Laundry Building has two staircases connecting the first and second floors.
One runs parallel to the kitchen and dining rooms and leads to the double-loaded east-west corridor of staff quarters, originally designated for women. The second parallels the boiler room and provides access to the double- loaded north-south corridor of staff quarters originally designated for men. The straight run, open well stairs to the original women s quarters are made of painted concrete. There are 17 closed-riser stairs connecting the two floors. The first stair is curtailed to make space for a square column newel post with classical top, featuring recessed panels. A metal hand railing runs along the open side of the stairs and is supported by plain metal posts. The stairs to the original men s quarters are also concrete and straight-run.
However, they are closed with a round, wood wall-mounted rail supported by metal brackets running along one side. Again, 17 closed-riser stairs connect the two floors. In the boiler room, located at grade level instead of on a raised foundation like the laundry wing, there is a set of six wood, open-riser stairs on a metal carriage that lead to a metal plate landing at the door into the connected covered way. There is evidence that the stairs were moved from the side of the platform leading parallel to the covered way to lead instead straight down from the doorway. There is a makeshift wood ramp mounted on top of the deteriorating stairs. Additionally, a metal ladder leads from this landing to the mezzanine level of the boiler room, which houses various tanks.
ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 33) A platform raised to the covered way level on six brick piers runs along the left side of the incinerator at the other doorway into the attached covered way. The platform is constructed of wood and concrete beams running between piers and covered in concrete and red quarry tiles. A wall-mounted wood ladder provides access to the platform from the boiler room floor. Two sets of eight, straight run, closed-riser stairs run along either side of the raised seating area in the mortuary. They are concrete over clay tile subflooring and there is no railing along either set of stairs.
A ramp runs down one wall next to one of the sets of stairs and was used to wheel gurneys into the room to access the cadaver drawers and autopsy floor. 3. Flooring: Most rooms retain early flooring. The staff quarter bedrooms have three- inch tongue and groove hardwood floors with coved wood bases. As in other spaces excepting the boiler room wing the subfloor is concrete with metal hangers and structural clay tiles below the concrete layer. All bathrooms, excepting the bathroom that was converted from a pantry, have concrete floors. This includes the women s staff bathroom on the second floor, which was converted from a bedroom.
Several rooms, including the bathroom converted from a pantry, the men s and women s staff quarters hallways, the kitchen, dining room, linen and cloth room, and tank room have linoleum flooring, either in sheet or rolled form. The linoleum is heavily deteriorated and barely visible in some spaces. It was either applied directly to the concrete subfloor or to a hardwood subfloor in second floor instances. The mortuary is set apart by a six-inch glazed off-white square tile floor in the autopsy area at the bottom of the stepped seating platforms. The seating area consists of concrete platforms with structural clay tile underneath.
The remaining rooms, including the remaining bathrooms and hallways, the sanitizing room, laundry room, coal room, boiler room, pump room, and the mezzanine have utilitarian concrete floors. These provide a finished look over the concrete slab below. 4. Wall and ceiling finish: Grooved structural masonry tiles as well as brick serve as the lathe for the plaster and cement finishes on many of the building s interior walls and ceilings. Spaces around doors sometimes reveal a metal lathe under the plaster, but in most cases the plaster was applied directly to the walls.
In most rooms the plaster finish has a three-inch cove at the ceiling and rounded corners in keeping with contemporary best practices for hospital design to maximize room cleanliness by minimizing the number of edges and crevices where dirt and dust could collect. Walls in some bathrooms, the mortuary, and scrub room have painted, slightly raised cement wainscoting. In the mortuary this may have served to protect more fragile plaster walls from rolling gurneys. Some walls in the boiler room, pump room, tank room, and the portion of the coal room above the mezzanine are exposed painted ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 34) brick. The bottom portion of the coal room and all walls shared with it, however, are coated in concrete.
The ceiling of the pump room is an unfinished, utilitarian concrete, and the coal room, mezzanine, and boiler room are open to the roof, which has metal sheeting covering the wood roof decking. The connection to the chimney in the kitchen has been patched with bricks. A portion of a pilaster, added for support when it was decided the building would house engines, may be seen projecting from the room adjacent to the mortuary. Again, the mortuary sets itself apart through the design of its ceiling, where acoustic tiles have been glued and nailed. 5. Openings: a. Doorways and Doors: The Powerhouse and Laundry Building has numerous interior single-leaf doors leading to various housing, laundry, and utility rooms.
The typical door found throughout is wood with five shallow recessed horizontal panels. The original finish was a brown varnish. Some doors though including the interiors of some bedroom doors were later painted. The typical door hardware appears in most cases to be original: an oval metal knob located on the lower half of a metal escutcheon. Keyed mortise locks appear in the upper section of the escutcheon. Bedroom doors and several first floor doors leading to hallways have deadbolts, which were added at a later date. The second floor has many of its interior screen doors intact.
New screen doors and the built-out molding to accommodate them were added sometime during the and screens were replaced in the Notable exceptions to this typical door include the two-leaf steel door on metal runners that connects the coal and boiler rooms. It is the twin of the first-floor metal door of the coal room, which leads outside. Additionally, a typical door that leads to a laundry room has been altered to act as a Dutch door. The door was cut in half and a sill added. The doorway to the mortuary is also exceptional. A widened, flat trim with miters joints and a quarter-round on the outer edge frames the two-leaf door. It is painted tan on the exterior side and green on the interior to match the room s wainscoting.
Privacy wire glass windows are situated near the top of each door and three recessed panels run below. There is a keyed deadbolt on the exterior and top and bottom slide bolts on the right leaf. b. Windows: On the laundry wing the second floor interior of the windows has a 6 , flat frame trimmed with a quarter-round outer edge on all sides. Most are finished with a dark varnish, though some particularly those in the bedrooms have been painted. The top sash is curved. Typical first floor windows have a similarly wide, flat frame but the top sash is not curved. Windows in the dining room and kitchen have a two-part trim, consisting of a quarter-round connected to an ogee curve.
However, windows in spaces more directly related to heating and power production and laundry do not have the quarter-round, representing a plainer, utilitarian version of the typical first floor window. ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 35) The coal room, boiler room, and mezzanine house the other typical window of the Powerhouse and Laundry Building. These are round four or five light windows that open on a horizontal axis. The four light windows seem to be later replacement sash. Some of the windows, including those in the bathrooms and some of the circular ones are fitted with privacy glass. Of these, some have wire running through them.
Though the mortuary windows are representative of the typical plain, first floor window underneath, they set themselves apart through a built-out casing with mitered corners. These casings house blackout roll shades to close for slideshows. The casings are painted green to match the room s painted cement wainscoting. In addition, there is a two-by-two, four-light skylight in the original men s quarters bathroom. Each light measures roughly 2 by 3 and only the south lights open on a center pivot mechanism. The skylight opens to the attic where another skylight opens through the roof. This skylight consists of multiple, long, fixed lights. 6. Decorative features and trim: There is a picture rail in the original men s staff quarters, including the hallway, bedrooms, and bathroom.
This choice appears to stand in opposition to the design of the coved ceilings, a practice typical of early twentieth century to reduce dirt and dust collection. It also seems odd that the original women s quarters have no picture rail. Other decorative features or trim, such as baseboards and wainscoting, are simply painted on. In some cases a thin layer of cement is added before the paint. Additionally, there is a bulletin board located in the kitchen consisting of a framed board. 7. Hardware: The windows excluding the circular ones have metal fingerplates and sash locks. Above many of the windows, there are clips used to hold and dispense roller shades or venetian blinds, many of which have deteriorated or been removed.
Transoms are hinged on the bottom and may be opened through a pull bar mechanism. Typical door hardware appears to be original: an oval metal knob located on the lower half of a metal escutcheon. Keyed locks appear in the upper section of the escutcheon in most cases. Deadbolts were later added to doors leading to covered ways and bedrooms. The doors have tip pin hinges. Screen doors have stationary handles, springs, and hook-and-eye locking mechanisms. However, it appears that some residents replaced the plain stationary handles of their screen doors with more decorative alternatives. Various metal hooks, pegs, towel bars, shelves, and mirrors hang from walls in the bedrooms, bathrooms, and closets. 8. Mechanical equipment: a.
Heating, ventilation: The Powerhouse and Laundry Building was heated with cast iron radiators linked to the building s boiler as well as the boilers on Island 1. Radiators appear under windows in virtually every room. The typical radiator has ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 36) wide rounded fins, averaging around 12 in number. Some, however, have more squared fins. An effective ventilation system was central to pavilion plan hospital design. However, the primary ventilation concern of the Powerhouse and Laundry Building was the function of power, heating, and laundry equipment, not cross contamination.
In the Powerhouse and Laundry Building, ducts, fans, and flues helped remove heat and toxins related to steam production and laundry from the building. Unlike other buildings of the Island 3 Hospital, windows in the Powerhouse and Laundry Building do not have air intakes beneath them. There are fewer vents as well. Single round openings with metal framing, which once housed exhaust fans, may be found in the Linen & Cloth Room and a laundry room. There are three copper roof ventilators. One connects to the mezzanine, which houses several tanks, above the pump room. The incinerator and boiler both connect to large ducts, which feed exhaust and smoke into the circular stack. b. Lighting: White porcelain wall sconces are found throughout the Powerhouse and Laundry Building.
They appear in two typical designs: one oval and one round. The oval sconces are likely replacements added in the (Figure These fixtures include an electrical socket and pull chain. Few signs of the chains remain, however. Ceiling fixtures include flush mounted porcelain or porcelain- coated metal bases with opaque glass closed shades, as well as metal pole and pendant ceiling fixtures with either metal or glass shades. Utilitarian, green metal shades that seem to date later appear in the mortuary and boiler room. The most decorative ceiling fixture is found in the wash room. It is a chain pendant fixture with a decorative milk glass closed, drum-shaped shade. The shade itself is painted with geometric designs. The mortuary houses several unique light fixtures.
There are theater-inspired recessed lights under the first two windows, which serve to illuminate the stairs along the seating area. They have sheet metal shades, which are painted green to match the windows and wainscoting. A light serving a similar purpose may be found on a pole emerging from the concrete floor along the other set of stairs. It also has a sheet metal shade. However, it remains unpainted. The most unique light in the building appears above the autopsy area in the mortuary. The large, cantilevered, swinging light is clamped on to one of the metal pipe columns with threaded ends installed when the mortuary was constructed. It has pipe supports and a handle, so that it can easily be swung to one side during slideshows.
A hook on the pipe suggests the apparatus used to move more freely, and it was necessary to hook the light apparatus to the far wall. The light itself houses several bulbs and is large, rectangular, and enclosed with opaque glass on the bottom. Additionally, the mortuary is the only room with an early plastic, or Bakelite, set of toggle switches and switch plate. ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 37) Each wing, hall, and the boiler room house large junction boxes with double metal doors, both with keyed entry. Above each is a socket for a bulb, perhaps to act as an emergency light. c. Plumbing: The Powerhouse and Laundry Building was constructed with a variety of plumbing fixtures, some of which have been changed or removed.
There are exposed pipes in several areas. This is likely due mostly to the purpose of the building, but it also suggests that plumbing has been changed or upgraded over the years. This is certainly the case in the upstairs bathroom in the original women s quarters, which was converted from a bedroom, as well as in the downstairs bathroom adjoining the kitchen, which used to serve as a pantry. All the toilets are tankless, and a variety of sinks often porcelain-coated metal may be found throughout. Depending on the location and purpose, sinks have either mixer or non-mixer faucets. Sinks in the mortuary and scrub room stand out. In order to prevent the spread of germs and maintain sanitary hands, sinks in these rooms are either knee or foot- operated, and in some cases both are options.
Additionally, there is a relatively, recently added galvanized steel sink with motorized garbage disposal on the platform to the left of the incinerator in the boiler room. d. Miscellaneous: a. Cadaver Drawers: The mortuary houses a set of refrigerated cadaver drawers powered by a compressor and motor on concrete blocks in the scrub room. There are eight compartments arranged in pairs, four high. The bottom six openings measure slightly larger than 2 by 3 and the top pair is slightly taller, with squarer openings. The drawers are framed on three sides (excepting the bottom) by wood molding measuring 5 wide and consisting of two flat pieces that taper inward. The drawers are painted green up to the level of the wainscoting in the room, and light blue above.
A wider rail separates the top pair of doors from the rest. Doors to the drawers are thick insulated wood with a sheet metal panel inside. There are two vertical recessed panels on the exterior of the drawer doors and two strap hinges per door. Handle latch mechanisms are used to secure the doors. The interior of the drawers is sheathed in sheet metal and likely insulated with cork. The bottom six drawers have open wood racks. Each rack holds a wood tray (with either horizontal or vertical wood slats) with two fixed handles and recessed wheels, which sit on metal sheathed tracks below. There are metal stops at the back of the drawer slides to keep racks from running into the back of the drawer. The top two drawers house pipes for coolant.
There is a metal sheet running under these drawers, perhaps to catch liquid or to separate the mechanical or electrical space from the drawers below. This is typical of other refrigerators from the which ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 38) housed mechanical equipment/fans in at top compartment. Also of note, there are Roman numerals carved into the wood trays and the bottom border of the drawers. b. Incinerator: There is an incinerator located to the left of the boilers in the boiler room. Made of cast iron, it is enclosed by glazed white brick on the front and sides and unglazed, red brick along the back. The top is metal with a manhole hatch cover.
There are several heavy metal doors on pulley mechanisms as well as hinged doors lower down to access ash. It is connected to heavy metal I-beams to support large pipes. Two flues lead to a large vent, which is also attached to the boilers. The Report of the Ellis Island Committee suggests that the incinerator be rebuilt, changed to oil burning instead of wood burning, or, preferably, be replaced by one of modern construction. 94 However it is unclear whether they were referring to an incinerator on Island 1 or 3. c. Boiler: There is a double, cast iron boiler in the boiler room. It was made by Oil City Boiler Works in and it has a twin quality to it. It is connected, but there are separate boiling chambers.
The front is exposed, heavy cast iron with several cast iron doors to access coal chambers. The brick inside these chambers is fairly clean, however. The left and right sides of the boiler are surrounded by glazed white tiles, though there are doors and cast iron indentations on both sides. There is space between the boiler and the back wall. d. Tanks, pumps, motors: In the pump room there are three pumps and two tanks one large and one small, likely serving different purposes. Additionally there are two Dayton-Dowd pumps with motors mounted on a two-level concrete platform with glazed brick on the bottom and metal rails to support the top engine. 95 As Dayton-Dowd did not exist until these motors are a later addition.
Additionally the bottoms of two tanks located on the mezzanine poke through the pump room s ceiling. This portion is not insulated. However the upper portions of the tanks (in the mezzanine) are insulated in asbestos and canvas. These tanks are supported on an I-beam structure at the center and all attached pipes are insulated. There is another, smaller tank also on an I-beam located in the mezzanine. It is not insulated and is labeled as a water heater. The water heater may be original as it states that its patent was renewed in It is possible that it was moved to the mezzanine from the tank room around the time the mortuary was constructed. 94 Carleton H. Palmer, Ellis Island Committee, Report of the Ellis Island Committee, 17.
95 Dayton-Dowd emerged in as a version of Wolverine Motor Works, previously Sintz Gas Engine Co. They stopped making tractors in but pump manufacturing continued until ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 39) e. Mattress sanitizer: There is a large, cast iron mattress sanitizer between two sanitizing rooms. It is likely that dirty mattresses would be delivered via the two leaf door on the exterior wall to the first room and then travel through to the second room, sanitized. There is metal railing inside the sanitizer to support four mattresses, and it seems that it used steam to sanitize. It is made by the American Sterilizer Co. in Erie, Pennsylvania. 96 D. Site: 1.
Historic landscape design: The Contagious Disease Hospital is situated on a roughly northwest-southeast axis, and the Powerhouse and Laundry Building is situated at the northwest end of the axis. It sits on the corner of Island 3 between the rest of the Contagious Disease Hospital and Liberty State Park which was the former location the industrial wharfs in Jersey City, New Jersey. Passageway C9 (which connects the Powerhouse to the rest of the Contagious Disease Hospital), the Laboratory and Mortuary partially block the view of the Powerhouse from Islands 2 and 3. PART III. SOURCES OF INFORMATION A.
Architectural drawings: A computerized Drawings Index System for all types of Ellis Island architectural and engineering drawings is located at the Technical Information Center (eTIC), Denver Service Center, National Park Service. Original drawings are digitized and available at http://etic.nps.gov. The drawings most useful in preparing this report were: Office of the Supervising Architect, James Knox Taylor, Contagious Disease Hospital, (15 April NPS Drawing No. Sheet [site plan and elevation; General View birds-eye rendering]. Office of the Supervising Architect, James Knox Taylor, Contagious Disease Hospital Power House and Laundry Building, (1 August NPS Drawing No. 356/43,902E/Z4, Sheets [approach plan, plans, elevations, sections, and details].
Office of the Supervising Architect, Contagious Disease Hospital Powerhouse and Laundry Building Disinfector, Immigration Station, Ellis Island, NY, (24 November NPS Drawing No. [plan and elevation]. Office of the Supervising Architect, Contagious Disease Hospital Powerhouse and Laundry Building Engine Room Plan, Immigration Station, Ellis Island, NY, (1 June NPS Drawing No. 356/127,120A, [plan]. The American Sterilizer Co. was founded in Their equipment built on the work of Louis Pasteur and 96 Charles Chamberland who worked on an autoclave that sanitized medical tools. ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 40) B.
Early Views: Several construction photographs of the Powerhouse and Laundry Building are located in the collections of the Still Picture Branch, National Archives and Records Administration (NARA II), College Park, MD. They are found in Record Group Records of the Public Building Service, Prints: Photographs of the Construction of Federal Buildings, General views of the Contagious Disease Hospital are found in Record Group Records of the Public Health Service. Selected specific views are reproduced and identified below. C. Selected
Bibliography
2488 words
Source document
Quoted word for word from HABS NY-6086-X.
Not written, edited or summarised by this site.
Record Group 79 Records of the National Park Service, National Archives and Records Administration Northeast Region, New York, NY. Record Group 85 Records of the Immigration and Naturalization Service, National Archives and Records Administration, Washington, Record Group 90 Records of the Public Health Service, National Archives and Records Administration II, College Park, MD. Record Group 121 Records of the Public Buildings Service, National Archives and Records Administration II, College Park, MD. 1. Primary and period sources: Evans, William H. It Pays to Build Beautiful Power Plants, Power Plant Engineering 33, no. 11 (June 1, Martin, T. Commerford and Stephen Leidy Coles, eds.
The Story of Electricity: A Popular and Practical Historical Account of the Establishment and Wonderful Development of the Electrical Industry. New York: Story of Electricity Co., Power-Station Buildings, Power 43, no. 14 (April 4, Reed, Alfred C. The Medical Side of Immigration, Popular Science Monthly 80 (April U.S. Department of Labor. Report of the Ellis Island Committee. New York: Ellis Island Committee, March U.S. Department of Commerce and Labor. Report of the Commission appointed by the President on September 16, to Investigate the Condition of the Immigrant Station at Ellis Island. Washington, U.S. Government Printing Office, U.S. House of Representatives, Congress, 1st Session. Hearings on House Resolution May 29, Washington, Government Printing Office, U.S.
Senate, Congress, 3rd Session. Ellis Island Affairs: Annual Report of William Williams, U.S. Commissioner of Immigration for the Port of New York, In Reference to ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 41) Ellis Island Affairs for the Year Ended June 30, Washington: U.S. Government Printing Office, William Williams Papers. Archives and Manuscripts Section, New York Public Library. Wyman, Walter. The U.S. Marine Hospital Service, Science 18, no. 453 (4 September 2. Secondary sources: Adams, Annmarie. Medicine by Design: The Architect and the Modern Hospital, Minneapolis: University of Minnesota Press, Adams, Annmarie. Architecture that Breathes. Harvard Design Magazine, no. 40 Beyer Blinder Belle and Anderson Notter Finegold.
Ellis Island Statue of Liberty National Monument: Historic Structure Report Units 2, 3 and 4, Volume 4, Part 2. U.S. Department of the Interior, National Park Service, Cannato, Vincent J. American Passage: The History of Ellis Island. New York: HarperCollins, Conway, Lorie. Forgotten Ellis Island: The Extraordinary Story of America s Immigrant Hospital. New York: HarperCollins, Fair, Alistair. A Laboratory of Heating and Ventilation : the John Hopkins Hospital as Experimental Architecture, Journal of Architecture 19, no. 3 Hughes, Thomas P. Networks of Power: Electrification in Western Society, Baltimore, MD: Johns Hopkins University Press, Jones, Christopher F. Routes of Power: Energy and Modern America. Cambridge, MA: Harvard University Press, King, Anthony.
Hospital Planning: Revised Thoughts on the Origin of the Pavilion Principle in England, Medical History 10, no. 4 (October Kisacky, Jeanne. Germs are in the Details: Aseptic Design and General Contractors at the Lying-in Hospital of the City of New York, Construction History: International Journal of the Construction History Society 28, no. 1 Leach, William. Land of Desire: Merchants, Power, and the Rise of a New American Culture. New York: Random House, ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 42) Lee, Antoinette J. Architects to the Nation: The Rise and Decline of the Supervising Architect s Office. New York and Oxford: Oxford University Press, Littmann, William.
Designing Obedience: The Architecture and Landscape of Welfare Capitalism, International Labor and Working-Class History 53 (Spring Ngai, Mae M. Impossible Subjects: Illegal Aliens and the Making of Modern America. Princeton, NJ: Princeton University Press, Nye, David E. American Technological Sublime. Cambridge, MA: MIT Press, Nye, David E. Consuming Power: A Social History of American Energies. Cambridge, MA: MIT Press, Nye, David E. Electrifying America: Social Meanings of a New Technology, Cambridge, MA: MIT Press, Pitkin, Thomas M. Keepers of the Gate: A History of Ellis Island. New York: New York University Press, Rose, Mark H. Cities of Light and Heat: Domesticating Gas and Electricity in Urban America. University Park: Pennsylvania State University Press, Rosenberg, Charles E.
The Care of Strangers: The Rise of America s Hospital System. New York: Basic Books, Stakely, J. Tracy. Cultural Landscape Report for Ellis Island Statue of Liberty National Monument Site History, Existing Conditions, Analysis. Brookline, MA: National Park Service, Olmstead Center for Landscape Preservation, Taylor, Jeremy. The Architect and the Pavilion Hospital: Dialogue and Design Creativity in England London and New York: Leicester University Press, Thompson, John and Grace Goldin. The Hospital: A Social and Architectural History. New Haven and London: Yale University Press, U.S. Department of Health and Human Services. Doctors at the Gate: U.S. Public Health Service at Ellis Island, Exhibit brochure. U.S. Senate, Congress, 1st Session. Disposal of Ellis Island: Report No.
Washington, U.S. Government Printing Office, Tomes, Nancy. The Gospel of Germs: Men, Women, and the Microbe in American Life. Cambridge, MA: Harvard University Press, ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 43) Unrau, Harlan D. Historic Resource Study (Historical Component) Volume I, II, and III: Ellis Island Statue of Liberty National Monument, New York-New Jersey. U.S. Department of the Interior, National Park Service, Unrau, Harlan D. Historic Structure Report, Ellis Island Historical Data Statue of Liberty National Monument, New York/New Jersey. U.S. Department of the Interior, National Park Service, Denver Service Center Ward, David and Olivier Zunz, eds.
The Landscape of Modernity: New York City, Baltimore, MD: Johns Hopkins University Press, Williams, Diane Elizabeth. Historic American Buildings Survey (HABS) No. Ellis Island, Prints and Photographs Division, Library of Congress, PART IV. PROJECT INFORMATION Documentation of the Island 3 Powerhouse and Laundry was undertaken in summer by the Historic American Buildings Survey (HABS), Heritage Documentation Programs National Park Service (Catherine C. Lavoie, Chief, HABS; Richard O Connor, Chief, The project (part of Phase VI of Ellis Island HDP documentation) was sponsored by Statue of Liberty National Monument (STLI) John Piltzecker, Superintendent.
Field recording and measured drawings were completed by Paul Davidson (Project Supervisor and HABS Architect) and Dan De Sousa (HABS Architect), as well as student architects Ruben Melendez (Polytechnic University of Puerto Rico), Angelivette Nieves-Viruet (Polytechnic University of Puerto Rico), and Kelly Haley (University of Maryland). Rachel Lanier Taylor Candidate, University of Washington) served as project historian, with guidance from Lisa Pfueller Davidson (HABS Historian). HABS Photographer Jarob J. Ortiz completed large format photographs during summer Assistance was provided by Diana Pardue (Chief, Museum Services, STLI) and the staff of Statue of Liberty National Monument. ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 44) PART V.
ILLUSTRATIONS Figure 1: Office of the Supervising Architect, Contagious Disease Hospital Power House and Laundry Building First Floor Plan, Immigration Station, Ellis Island, NY (1 August Source: NPS Drawing No. 356/43,902E/Z4, Sheet 1 of 15, eTIC, Denver Service Center, NPS ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 45) Figure 2: Office of the Supervising Architect, Contagious Disease Hospital Power House and Laundry Building Second Floor Plan Over Laundry, Immigration Station, Ellis Island, NY (1 August Source: NPS Drawing No. 356/43,902E/Z4, Sheet 2 of 15, eTIC, Denver Service Center, NPS ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No.
(Page 46) Figure 3: Office of the Supervising Architect, Contagious Disease Hospital Power House and Laundry Building Roof Plan, Immigration Station, Ellis Island, NY (1 August Source: NPS Drawing No. 356/43,902E/Z4, Sheet 3 of 15, eTIC, Denver Service Center, NPS Figure 4: Office of the Supervising Architect, Contagious Disease Hospital Power House and Laundry Building Southwest Elevation, Immigration Station, Ellis Island, NY (1 August Source: NPS Drawing No. 356/43,902E/Z4, Sheet 4 of 15, eTIC, Denver Service Center, NPS ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No.
(Page 47) Figure 5: Office of the Supervising Architect, Contagious Disease Hospital Power House and Laundry Building Southeast Elevation, Immigration Station, Ellis Island, NY (1 August Source: NPS Drawing No. 356/43,902E/Z4, Sheet 5 of 15, eTIC, Denver Service Center, NPS Figure 6: Office of the Supervising Architect, Contagious Disease Hospital Power House and Laundry Building Northwest Elevation, Immigration Station, Ellis Island, NY (1 August Source: NPS Drawing No. 356/43,902E/Z4, Sheet 6 of 15, eTIC, Denver Service Center, NPS ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No.
(Page 48) Figure 7: Office of the Supervising Architect, Contagious Disease Hospital Power House and Laundry Building Northeast Elevation and Chimney Details, Immigration Station, Ellis Island, NY (1 August Source: NPS Drawing No. 356/43,902E/Z4, Sheet 7 of 15, eTIC, Denver Service Center, NPS ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 49) Figure 8: Office of the Supervising Architect, Contagious Disease Hospital Power House and Laundry Building Elevation and Section A.A., Immigration Station, Ellis Island, NY (1 August Source: NPS Drawing No.
356/43,902E/Z4, Sheet 8 of 15, eTIC, Denver Service Center, NPS Figure 9: Office of the Supervising Architect, Contagious Disease Hospital Power House and Laundry Building Section Immigration Station, Ellis Island, NY (1 August Source: NPS Drawing No. 356/43,902E/Z4, Sheet 9 of 15, eTIC, Denver Service Center, NPS ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 50) Figure 10: Office of the Supervising Architect, Contagious Disease Hospital Power House and Laundry Building Foundations, Immigration Station, Ellis Island, NY (1 August Source: NPS Drawing No. 356/43,902E/Z4, Sheet 10 of 15, eTIC, Denver Service Center, NPS ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No.
(Page 51) Figure 11: Office of the Supervising Architect, Contagious Disease Hospital Power House and Laundry Building First Floor Framing, Immigration Station, Ellis Island, NY (1 August Source: NPS Drawing No. 356/43,902E/Z4, Sheet 11 of 15, eTIC, Denver Service Center, NPS ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 52) Figure 12: Office of the Supervising Architect, Contagious Disease Hospital Power House and Laundry Building First Floor Framing, Immigration Station, Ellis Island, NY (1 August Source: NPS Drawing No. 356/43,902E/Z4, Sheet 12 of 15, eTIC, Denver Service Center, NPS ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No.
(Page 53) Figure 13: Office of the Supervising Architect, Contagious Disease Hospital Power House and Laundry Building Second Floor Framing, Immigration Station, Ellis Island, NY (1 August Source: NPS Drawing No. 356/43,902E/Z4, Sheet 13 of 15, eTIC, Denver Service Center, NPS ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 54) Figure 14: Office of the Supervising Architect, Contagious Disease Hospital Power House and Laundry Building Ceiling Framing, Immigration Station, Ellis Island, NY (1 August Source: NPS Drawing No.
356/43,902E/Z4, Sheet 14 of 15, eTIC, Denver Service Center, NPS Figure 15: Office of the Supervising Architect, Contagious Disease Hospital Power House and Laundry Building Roof Framing, Immigration Station, Ellis Island, NY (1 August Source: NPS Drawing No. 356/43,902E/Z4, Sheet 15 of 15, eTIC, Denver Service Center, NPS ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 55) Figure 16: Office of the Supervising Architect, Contagious Disease Hospital Approach Plan, Immigration Station, Ellis Island, NY (18 August Source: NPS Drawing No. 462/43,902A, Sheet 1 of 24, eTIC, Denver Service Center, NPS ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 56) Figure 17: Power House from Corridor (2 July (Photograph No.
121-BCP-38A-18) Source: Record Group Still Picture Branch, NARA, College Park, MD Figure 18: Power House Looking W. (14 August (Photograph No. 121-BCP-38A-19) Source: Record Group Still Picture Branch, NARA, College Park, MD ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 57) Figure 19: Powerhouse showing octagonal base of stack and ornate covered way before enclosure (Photograph No. 121-BCP-38A-21C) Source: Record Group Still Picture Branch, NARA, College Park, MD Figure 20: Typical Elevation of One Story Corridor, Contagious Disease Hospital Approach Plan, Immigration Station, Ellis Island, NY Source: Detail of NPS Drawing No.
Sheet 2 of 7, eTIC, Denver Service Center, NPS ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 58) Figure 21: Mattress Sanitizer, Powerhouse and Laundry Building, Contagious Disease Hospital, Ellis Island, New York (June 30, Source: Field Photo by Rachel Lanier Taylor, Summer Historian Historic American Buildings Survey Figure 22: Office of the Supervising Architect, Contagious Disease Hospital Power House and Laundry Building Disinfector, Immigration Station, Ellis Island, NY (24 November Source: NPS Drawing No. eTIC, Denver Service Center, NPS ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 59) Figure 23: Ellis Island, New York Harbor, Rec d from Mitchel Field, (14 October (Photograph No.
18-AA-91-5) Source: Record Group 18-AA, Still Picture Branch, NARA, College Park, MD Figure 24: Ellis Island, New York Harbor, Rec d from Mitchel Field, (4 February (Photograph No. 18-AA-93-59) Source: Record Group 18-AA, Still Picture Branch, NARA, College Park, MD ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 60) Figure 25: Incinerator, Boiler Room, Powerhouse and Laundry Building, Contagious Disease Hospital, Ellis Island, New York (June 30, Source: Field Photo by Lisa P. Davidson, Historian Historic American Buildings Survey Figure 26: Boilers, Boiler Room, Powerhouse and Laundry Building, Contagious Disease Hospital, Ellis Island, New York (June 30, Source: Field Photo by Lisa P.
Davidson, Historian Historic American Buildings Survey ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 61) Figure 27: U.S. Department of Labor, Electrical Installation Island No. 3 Light Fixture Details, Immigration Service, Ellis Island, NY (12 December Source: NPS Drawing No. Sheet 6 of 7, eTIC, Denver Service Center, NPS Figure 28: U.S. Department of Labor, Immigration Service, Ellis Island, New York Harbor, New York, Replacements to High Pressure Steam Lines Islands #2 & #3 (24 November Source: NPS Drawing No. eTIC, Denver Service Center, NPS ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No.
(Page 62) Figure 29: Office of the Supervising Architect, Contagious Disease Hospital Power House and Laundry Building Engine Room Plan, Immigration Station, Ellis Island, NY (1 June Source: NPS Drawing No. 356/127,120A, eTIC, Denver Service Center, NPS ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 63) Figure 30: Mortuary and Autopsy Room Tentative Changes (never built), Marine Hospital, Immigration Station, Ellis Island, Source: NPS Drawing No.
sheet 7 of 15, eTIC, Denver Service Center, NPS Figure 31: Mortuary and Autopsy Theater, Powerhouse and Laundry Building, Contagious Disease Hospital, Ellis Island, New York (June 30, Source: Field Photo by Rachel Lanier Taylor, Summer Historian Historic American Buildings Survey ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL POWERHOUSE AND LAUNDRY BUILDING HABS No. (Page 64) Figure 32: Office of the Supervising Architect, Public Buildings Administration, Ellis Island Botanical Plan (12 October Source: NPS Drawing No. 356/43,968A, eTIC, Denver Service Center, NPS ADDENDUM TO: HABS ELLIS ISLAND, CONTAGIOUS DISEASE HOSPITAL HABS POWERHOUSE AND LAUNDRY BUILDING (U.S.
Immigration Station) Statue of Liberty National Monument New York Harbor New York New York County New York BLACK AND WHITE FILM PHOTOGRAPHS COLOR FILM PHOTOGRAPHS HISTORIC AMERICAN BUILDINGS SURVEY National Park Service U.S. Department of the Interior C Street NW Washington, DC
The federal surveyors worked through New York building by building. These are the other structures
they measured and filed a report on, longest report first.
Written history. Quoted verbatim from HABS NY-6086-X. United States federal work, no copyright under 17 U.S.C. 105.
Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.