Michael J. Emmons, PART I. HISTORICAL INFORMATION A. Physical History: 1. Date of erection: March 3, to February 6, 1 2. Architect: James Knox Taylor, Supervising Architect, Treasury Department 3. Original owners: U.S. Department of Commerce and Labor, Subsequent owners: U.S. Department of Labor, U.S. Department of Justice, Immigration and Naturalization Service, U.S. General Services Administration, U.S. Department of the Interior, National Park Service, 1965-present 4. Contractor: New York State Construction Co. 1 Harlan D. Unrau, Historic Structure Report (Historical Data) Statue of Liberty National Monument, New York/New Jersey, (U.S.
Department of the Interior, National Park Service, For finish date, see the notation on letter from the surety company for New York State Construction Company, dated November 29, requesting date of completion and acceptance of contract. File Entry 9 Subject and Policy Files, Record Group 85 Records of the Immigration and Naturalization Service, National Archives and Records Administration, Washington [hereafter referred to as Entry 9, NARA I]. However, this finish date only represents the conclusion of the New York State Construction Company s work. Problems with the electrical contractor extended that work through May. See Unrau ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 3) 5.
Original plans and construction: A site plan shows the first proposed configuration of the Baggage & Dormitory Building. A set of architectural drawings, totaling 28 sheets, includes a full set of elevations, floor plans, sections, and details, as drawn about one month before construction began. Based on these plans, drawings from addition, renovation plans, and recent field inspection, it is clear that a significant amount of the Baggage & Dormitory Building reflects its early condition, in both plan and materials. 6. Alterations and additions: The largest and most significant addition occurred in with construction of the third floor and the two-story Steel & Masonry Projection ( Porch Addition ) on the north side of the building.
In a large disinfecting room was constructed on the third floor, atop the porch at the north corner of the building. The second and third floors largely retain their original layouts and early materials, with alterations most frequently having occurred with restroom facilities. The first floor experienced frequent changes in floor plans, including the removal of walls, partitioning of rooms, adding and removing restrooms, and alterations to window and door configurations. Though a significant amount of historic fabric remains even on the first floor, several existing partition walls and other facilities reflect World War II era changes, especially by the U.S. Coast Guard. B.
Historical Context: The Rise of Federal Immigration Administration & The Construction of Ellis Island Before the the policy and administration of immigration was primarily left to individual states. During the organized labor fought to exclude foreign-born competition as industrial expansion in the United States attracted large numbers of immigrants from Europe and Asia. Unions felt immigrant workers took jobs, depressed wages, and tolerated more dangerous working conditions. Several states passed legislation to restrict immigration, but many of their efforts were declared unconstitutional due to interstate commerce laws. Congressional intervention began in with restrictions on Oriental immigration.
In the Federal government passed the Chinese Exclusion Act, as well as a more general immigration law which established a fifty-cent immigration tax and prohibiting entry to any convict, lunatic, idiot, or any person unable to take care of himself or herself without becoming a public charge. 2 This new federal intervention, coupled with inconsistencies, administrative problems, and even corruption at state immigration stations, led to the landmark Immigration Act of which federalized immigration administration in the United States. Besides adding new rules and restrictions for immigration, the act established the Office of the Superintendent of Immigration within the Treasury Department, which oversaw a new force of federal immigration inspectors at stations in several major U.S. cities.
3 2 Barbara Benton, Ellis Island: A Pictorial History (New York: Facts on File Publications, 3 service ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 4) The new immigration station at Ellis Island opened in January replacing the facilities at Castle Garden on the southern tip of Manhattan. For about a century, Ellis Island had been the site of small Army defensive structures at first a simple earthworks, but by the War of a casemented battery with twenty guns, a magazine, and a small garrison. Only a gunpowder magazine remained in when work began on the new immigration station. After a year and a half, Ellis Island had a newly dredged channel, crib works for landfill to expand the island, and twelve buildings.
The centerpiece of the now fourteen-acre island was an impressive, two-story main processing building, constructed of pine and galvanized iron, and featuring dramatic, four-story towers with pyramidal roofs. After just five years of operation, however, the entire main building burned to the ground in a dramatic conflagration that lasted less than three hours. The memory of this fire had a direct impact on future buildings at Ellis Island including the Baggage & Dormitory which were almost all built in new materials that were fireproof. 4 As the government rebuilt, the design of the new main building was critical, since it established the architectural tone for the island and set in motion a series of space and design problems that officials would struggle to overcome for decades to come.
The building was constructed of brick, stone, and steel, based on a design from the New York firm of Boring and Tilton. The Tarnsey Act of allowed the Treasury Department to solicit architectural designs and competitive bidding from private firms. A five-architect panel chose the Boring and Tilton proposal unanimously because its French Renaissance design was both attractive and economical. 5 Boring and Tilton also designed the other Phase I buildings, including the Main Hospital Building, the Kitchen & Laundry, and the Powerhouse Building.
These supporting structures, and future buildings that were influenced by them, lacked the dramatic towers and other architectural flourishes of the Main Building, but they consistently featured similar heavy quoining, arched openings, wall banding, and symmetry that generally echoed the central structure, even if lending a more Georgian Revival or Beaux Arts appearance. This design idiom was later adopted for the Baggage & Dormitory Building. By most accounts, the Boring and Tilton design for the Main Building was a successful one. In the Architectural Record observed that the design challenges of a large immigration station like the new one at Ellis Island were quite without precedent.
The critic observed that the next closest analogue to an immigration station must be a railway station, since it required landing and circulation. Yet immigration processing on the immense scale of New York s, and the significant time it required, made circulation an even more urgent design consideration. 6 Boring and Tilton had provided for an uninterrupted circulation for a continuous human flow by effectively minimizing the congestive effects of corners. As a result, the critic gushed, the layout was so successful that, in the new examination hall, the astonishing record has been 4 Benton, 5 Benton, 40. 6 Architectural Appreciations No. III, Architectural Record, 12, no. 7 (December ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No.
NY-6086-E (Page 5) made of immigrants processed in just nine hours. The article concluded that the architects and the U.S. government, alike, were to be congratulated. 7 The Flood of Immigration & The Persistent Need for Expansion As promising as the design may have been, the timing of the new Main Building was unfortunate. It was planned during the late as immigration numbers declined significantly due to federal restrictions, economic depression, and a cholera scare. By New York processed just immigrants only 40% of the total of This lull was highly deceiving, as the United States was about to experience the most dramatic wave of immigration it had yet experienced.
During the fifteen years between when the Main Building was completed, and the year after the Baggage & Dormitory was expanded, 15 million immigrants would pour into the United States and Ellis Island bore the brunt of the influx.8 No design for the Main Building is likely to have met these new demands, and soon, Boring and Tilton s structure appeared insufficient and problematic as thousands descended onto the island daily. The rising flood of immigration strained all the facilities at Ellis Island a persistent condition that plagued the station for almost two decades. As one historian put it, no difficulties at Ellis Island were more hampering or more persistent, and none gave rise to more criticism, than the lack of adequate space.
The buildings bulged at the seams at the station as American industrial expansion created an unprecedented era of immigration. Despite the best efforts of a succession of commissioners, the island s facilities were never quite equal to the demands placed on them. 9 The letters and reports of the commissioners at Ellis Island reveal a long, frustrating struggle to convey to Congress the reality of the extreme conditions there, and more importantly, the urgent need for improved facilities to handle them. At the same time, records reveal that the commissioners faced regular accusations especially from the New York press that Ellis Island was a crowded, dangerous, unsanitary place where immigrants were subjected to institutionalized abuse and neglect from station employees.
These allegations, when investigated, were almost always proven untrue, and the commissioners and staff on the island were generally credited with running an orderly, clean, and safe operation, despite a consistent need to make the best of limited space and resources. The commissioners often expressed a remarkable desire to ensure that immigrants were treated well, made as comfortable as possible, provided decent food, and overall, make their first impression of the United States a good one. 10 7 Architectural Appreciations No. III, 8 Thomas M.
Pitkin, Keepers of the Gate: A History of Ellis Island (New York: New York University Press, 9 Pitkin, 10 For example, William Williams first memo as Commissioner of Immigration at New York on June 12, insisted that, Immigrants must be treated with kindness and consideration. Any government official violating the terms of this notice will be recommended for dismissal from the Service. Williams had been brought in to correct staff corruption. Reproduced in Lorie Conway, Forgotten Ellis Island: The Extraordinary Story of America s Immigrant Hospital (New York: HarperCollins, 27. ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No.
NY-6086-E (Page 6) The Long Campaign for New Baggage & Dormitory Space These themes were persistent during the long campaign waged by two different commissioners to secure additional space for operations at the Main Building. As early as the new Commissioner of Immigration at New York, William Williams, had already concluded that the Main Building was inadequate in size, its layout was poor in design, and it was built of substandard materials that already required significant maintenance.
As immigration numbers continued to increase steadily, Williams felt a sense of duty to report to Congress with deep regret that: The Ellis Island structure has in many respects failed to justify the reasonable expectations based upon the liberal expenditure made and the evident purpose of Congress to furnish an ideally perfect building . . . It is injudiciously designed in respect to the subdivision of the interior space for the various uses intended, resulting in the crowding of immigrants together in a manner detrimental both to their health and comfort, and in other respects imposing unnecessary hardship and discomfort upon them. Large as the cost already has been, this fault can be corrected in a measure by additions to the present buildings.
What seems far more serious is the faulty material and construction, involving outlays for repair and reconstruction almost from the moment the building was accepted on behalf of the Government. Where the fault rests for these serious defects the Bureau can not say; it can only direct attention to them for your information and the enlightenment of Congress. 11 The following year, in the report to Congress, Commissioner Williams continued his campaign for additional funding for improved facilities. He repeated his complaints about the building, and added the further barb that there might be a popular impression that the erection of Government buildings is distinguished by the use of poor material and inferior workmanship.
He seemed to increase the seriousness of his claim by advancing that no amount of repairing, unless the building is remodeled, will ever render it suitable for an immigrant station. For the first time, the movement of baggage was cited as a real problem, one that would require significant changes to the island landscape. Williams pointed out that every alien, be it a man or woman, encumbered with heavy and unwieldy baggage and often surrounded with clinging children, has first to mount stairways and then to descend, in undergoing the process of inspection. This impractical and unreasonable procedure caused unnecessary distress at a time when few of them are in a condition to undergo fatigue. 12 Williams report was full of examples of spaces that 11 U.S.
Treasury Department, Annual Report of the Commissioner General of Immigration for the Fiscal Year Ended June 30, Document no. (Washington: GPO, 12 U.S. Treasury Department, Annual Report of the Commissioner General of Immigration for the Fiscal Year Ended June 30, Treasury Department Document no. (Washington: GPO, 65. ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 7) were cramped, uncomfortable, very bad, crowded, and shockingly inadequate. In short, there was an urgent need for major expansion at the New York station.
13 Williams recommended a large appropriation be made to remodel and enlarge the Main Building, by expanding the two wings of the Main Building to the north about 70 feet, and also the main block of the building 30 feet, which he estimated would cost about 14 Due to a lack of funding by Congress, and a conflict between New Jersey and the United States over ownership rights to Ellis Island, it would be another five years before a major expansion was possible. In the meantime, as a temporary measure to deal with the overcrowding, a large, single- story wooden barracks was erected on the future site of the Baggage & Dormitory Building.
These impermanent quarters contained 700 beds, and served for many years as an important stopgap for overflow housing until the new Baggage & Dormitory Building was constructed. The temporary barracks were a welcome relief to Williams. The new frame structure increased the island s sleeping capacity to Besides increasing the number of beds, Williams pointed out that the barracks was serving a useful and humanitarian purpose in that it is on a level with the ground floor and relieves hundreds of aliens of the necessity of carrying their baggage up and down long flights of stairs morning and evening. 15 Still, these expanded accommodations were not enough, and Williams insisted that the island should have at least beds available.
Two years later, in planning for large-scale expansion could finally move forward after ejectment proceedings were settled and the United States secured clear and unencumbered title to Ellis Island. The Commissioner-General of Immigration, Frank P. Sargent, reported that this removed the only obstacle to utilizing the appropriations already made by Congress to enlarge the area of the island . . . and in other ways to increase the facilities for prompt and effective inspection of the heavy immigration to the port of New York.
16 These improvements could not come soon enough for Robert Watchorn, now Commissioner at Ellis Island, who stressed to Congress: To receive, examine, and dispose of aliens in one fiscal year is a work so stupendous that none but painstaking students of the immigration service could possibly have any intelligent conception of what arduous duties and unusual considerations it involves. Large numbers of each day s arrivals are for various causes detained at Ellis Island for many days, and all of those deported are usually detained from one to two weeks, pending the next sailing of a vessel of the line bringing them.
During periods of detention they must be fed, sheltered, furnished beds, baths, etc., and their friends must be communicated with some telegrams being sent to relatives and friends, and as many received in 13 Ibid., 69. 14 Ibid. 15 Ibid. 16 Department of Commerce and Labor, Bureau of Immigration Document No. 42, Annual Report of the Commissioner-General of Immigration to the Secretary of Commerce and Labor for the Fiscal Year Ended June 30, (Washington: GPO, 71. ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 8) reply, during the past fiscal year. In addition some letters addressed to detained aliens were received at this office and delivered to the addressees.
17 Watchorn soon advanced his own proposal for the expansion and rearrangement of operations on the island, and some tentative plans were finally drawn up in February based on his ideas. These drawings proposed not an extension of the Main Building, but instead, a new building that was nominally attached to it. This revealed Watchorn s concept for what would soon become the new Baggage & Dormitory a separate structure adjoined to the north corner of the Main Building. 18 Still without formal approval of his plans or the necessary appropriation from Congress, Watchorn began a strong campaign for his proposed expansion. In a lengthy, seven-page letter to Commissioner General of Immigration Frank P.
Sargent, in April Watchorn advocated for his proposal mostly by reviewing the serious problems continuing to face Ellis Island. He stated in frank terms that not a single feature connected with the reception, examination and detention of aliens that is not susceptible of very great improvement. 19 Watchorn summarized many problems at the station, but one was particularly chilling. Perhaps recalling the fate of the original main building at Ellis Island, which had burned to the ground less than ten years before, Watchorn shared a deep concern about the safety of the immigrants housed in the temporary wooden barracks. This was a dangerous fire hazard, he suggested, since up to 720 adults were often quartered there with the windows and doors barred shut for security.
I need only to leave it to the imagination of the Bureau, Watchorn warned, as to what would occur if the place should ever unfortunately take fire. Watchorn felt that Ellis Island simply could not stand to wait any longer for the long-needed changes, arguing that the proposed expansion was as absolutely necessary as the original building had been. He ended his letter by urging the immediate approval and funding of his proposal for the new Baggage & Dormitory Building, and related changes. In Watchorn s letter to Sargent, the first and most problematic issue he reviewed was actually baggage handling. As early as a New York Times piece highlighted the unique and monumental task of processing baggage at Ellis Island.
Since the article was written during a year when immigration numbers were only half the totals during Watchorn s expansion campaign, one can better appreciate the nature of the problem he must have faced. The article proclaimed the Ellis Island station as the greatest baggage station on the face of the earth, and noted playfully that the task there was a heavy one. Yet the work was serious. According to the article, half a million pieces of luggage passed through the island per year and this was not hand luggage, which 17 Ibid., 71. 18 Chief Engineer and Superintendent, U.S. Public Buildings, NY City, Tentative Plan Showing Proposed New Building, Alterations, Etc., U.S. Immigration Station Ellis Island, New York Harbor (13 February NPS Drawing No.
eTechnical Information Center [hereafter eTIC], Denver Service Center. 19 Letter, Commissioner Robert Watchorn to Hon. F. P. Sargent, Commissioner-General of Immigration, (25 April File Box Entry 9, NARA I. ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 9) Ellis Island handlers fortunately were not required to handle. Instead, the thousands of pieces come in the nature of great, unwieldy bags made of matting, ticking, or canvas, some being so dirty and the figures on them so imperfect that it requires an expert to find out to whom they belong. Baggage also arrived in the form of baskets ( some big enough to hold furniture ), boxes, cages, tin cans, and other combinations of wood, tin, or iron.
Baggage commonly included unwieldy items such as bedsteads (both iron and wood), chairs, small tables, and cooking utensils. 20 While the article may have exaggerated the typical contents of the immigrants baggage, the processing of the luggage at Ellis Island clearly posed as big of a challenge if not more as processing the people. In fact, Commissioner Watchorn made that exact suggestion in his letter pitching his proposal to Commissioner General Sargent in which two pages out of seven enumerated problems with the current baggage system and facilities. Watchorn reported that baggage constitutes three-fourths of the difficulty when processing the immigrants, and moving the baggage was now more cumbersome and unnecessarily laborious than that of handling the passengers themselves.
21 Watchorn s description of the baggage problem sheds light on the former landscape of baggage movement at Ellis Island, before the Baggage & Dormitory was constructed: The proposed changes I have the honor to suggest will shorten the distance which baggage has to be handled more than two-thirds, and will relieve the stress on the front of the building in relation to baggage entirely. All baggage removed from the main building destined to New York and vicinity is now trucked from the main entrance almost the entire length of the Island over the planked portion of the Island adjacent to the ferry slip. . . .
There are times when this plank road is so completely packed with people, many of them immigrants burdened with their hand-baggage and packages, that there is great risk, and the marvel is that many people have not already been seriously or fatally injured. As the trucks are brought down the grade from the main building some of them containing as many as 25 or 30 trunks they acquire so great a momentum before the plank road is actually reached as to be absolutely beyond control of the baggage handler. 22 Besides the danger and difficulties of the baggage system on the island, the inability to process more baggage had caused thousands of people to be kept on board of ships for several days, causing frustration and embarrassment.
Finally, in Congress approved an appropriation of for a new Baggage & Dormitory Building. Yet Watchorn s frustrations were not over. In his Annual Report in 20 Baggage of Immigrants, The New York Times, 19 January 21 Letter, Commissioner Robert Watchorn to Hon. F. P. Sargent, Commissioner-General of Immigration, (25 April File Box Entry 9, NARA I. 22 Ibid. ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 10) the summer of that year, he lamented that owing to the unprecedented pressure on the time of the Supervising Architect s office, final steps have not yet been taken toward consummating the plans, which he regretted very much.
Watchorn feared that unless action was quickly taken to finish the plans and break ground, it would soon be too late to complete the building in time for the spring rush the following year. 23 In an attempt to keep on some pressure, he pointed out that the Main Building was constructed at a time when immigration numbers had never reached but that now the volume was almost thrice As a result, aliens were sleeping under conditions that we certainly can not defend. 24 Planning and Constructing the Baggage & Dormitory Despite Watchorn s plea for expedience, another six months would pass before plans for the Baggage & Dormitory Building were finalized.
Besides the backlog at the Supervising Architect s office, the delay was further lengthened by Watchorn s request for alterations to the proposed drawings in October. His suggestions were not insubstantial. They included a flat tile roof over the entire building rather than an inclined roof, three stairways to the roof, three toilets on the roof, changes to the second floor wall lines to allow room for beds (including 10 family rooms, later to be used for detention rooms), additional toilet rooms and lavatories, two doorways on the northeast side of the building, and additional details for finishing interior spaces. 25 Watchorn s description of suggested alterations provides useful context for several features of the Baggage & Dormitory, many of which are still extant.
His request for a flat tile roof over the entire building reflected his belief that it was most essential that ample space be provided for detained aliens, since roof terraces provided ample space and easy control over the population. He requested that the northeast elevation, which is now covered by the porch addition, be constructed with two doorways, one to receive, and the other to discharge baggage. The entrance to the covered way leading to New York ferry was to include a gradual incline . . . in lieu of steps to facilitate the handling of baggage trucks.
Perhaps the most universal change he suggested, which affected the character and appearance inside much of the building, was the substitution of Glazed tile dado [and] two-inch hex white vitrified tile floors instead of the proposed concrete and Terrazo floors. He argued that the glazed tile dado and two-inch vitrified hex floors were the only materials that were sanitary, durable, and attractive. For these reasons, Watchorn continued, I strongly urge tile finish in corridors, detention rooms, dormitories and toilets.
26 As these proposed alterations were considered and implemented, there was a discovery that the project, as currently designed, would require an additional appropriation of 23 Department of Commerce and Labor, Bureau of Immigration and Naturalization, Report of the Commissioner-General of Immigration for Fiscal Year (Washington, DC: GPO, 24 Ibid. 25 Letter, Commissioner Robert Watchorn to Hon. F. P. Sargent, Commissioner-General of Immigration, (14 October File - Part 1, Entry 9, NARA I. 26 Ibid. ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 11) According to Watchorn, it was the judgment of Mr. J. K. Taylor, Supervising Architect, and Mr.
Alfred Brooks Chief Engineer and Superintendent of Repairs, that the plans as already drawn could not possibly be followed in the construction and alteration of buildings at this station, within the appropriation of Rather than waiting for further funds from Congress, a decision was made to curtail the design to bring the project within the budget. This would cause even more delay.
Still, the Supervising Architect assured Watchorn that the amended plans would be ready by December 1, 27 When the new plans had not been received by that date, Watchorn again dashed off letters to express his frustration, despite knowing that the files are replete with official communications from this office extending over a period of nearly five years urging the necessity for the construction of the building in question. 28 Thankfully, Watchorn finally received the final plans minus heating and lighting designs on Christmas Eve. Construction Process On December 30, the Department of Commerce and Labor granted authority to Watchorn to officially solicit proposals for the construction of the Baggage & Dormitory Building.
Of the four submitted, the New York State Construction Company s bid of was the best, and after a brief vetting process, they were selected to perform the work. By January 15, a contract was already finalized. The contract required all labor and materials for a Baggage & Dormitory Building, including a complete system of plumbing and the driving of necessary piles, and perhaps reflecting last minute alterations to plans, family rooms were required instead of one of the dormitories (as was shown on drawing number and all windows to be equipped with sheet metal weather strips. 29 The work was to be completed by December 31, allowing less than a year for the entire project.
30 It is unclear exactly when the temporary barracks were removed from the future site of the Baggage & Dormitory Building. A tentative site plan from February 13, shows the outlines of present barracks to be removed . 31 Another drawing, in August 27 Letter, Commissioner Robert Watchorn to Hon. F. P. Sargent, Commissioner-General of Immigration, Washington, DC, (7 November File - Part 1, Entry 9, NARA I. 28 Letter, Commissioner Robert Watchorn to Hon. F. P. Sargent, Commissioner-General of Immigration, Washington, DC, (3 December File - Part 1, Entry 9, NARA I. 29 Watchorn wrote: The equipment of all windows with sheet metal weather strips, provided for in Alternative C, is desirable, and would, I am reliably informed, reduce the cost of heating the building in winter at least 20% . . .
The Civil Engineer at this Station estimates that about six hundred (more or less) piles will be required. See Letter, Commissioner Robert Watchorn to Hon. F. P. Sargent, Commissioner- General of Immigration, Washington, DC, (11 January File - Part 1, Entry 9, NARA I. 30 Contract dated January 15, between the New York State Construction Company and The United States Government, File Part 2, Item #1, Lines and Item #3, Line 29, Entry 9, NARA I. 31 Chief Engineer and Superintendent, U.S. Public Buildings, NY City, Tentative Plan Showing Proposed New Building, Alterations, Etc., U.S. Immigration Station Ellis Island, New York Harbor (13 February NPS Drawing No. eTIC, Denver Service Center. ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No.
NY-6086-E (Page 12) shows an even better footprint of the Old Barrack to be Removed, and describes it as a building of wood, with cement floor about 15 above grade, and a cement sidewalk in place on the east end of the barracks (Figure 1). 32 There is a nine-month gap in the evidence for the barrack removal, but a photo dating to May 12, shows the site after two months of construction. A line of immigrants, mostly children, stands in front of a new temporary barracks behind the Main Building, with foundation work apparently occurring at the Baggage & Dormitory site. 33 One of the first tasks facing the New York State Construction Company, due to the site being on an island with a high water table, was driving approximately 600 concrete piles to prepare the foundation.
This significant step would cause complications and delays in construction. First, there was disagreement on whether the company should have known that it had to wait 28 days for the concrete piles to cure before they could be driven. 34 Further, while officials and contractors had been aware of the remains of previous structures beneath the building site, they were more extensive than initially understood. The contract had acknowledged that a belief that in places the site of the proposed building is underlaid by such debris as old brick walls and footings, timber cribbing with loose rock fill, concrete tunnels, logs, etc., at a depth from five to seven feet below surface.
35 Yet in November, when the builder requested an extension to the contract, he explained that in carrying out the excavation of the site we encountered several old foundations and pipe chambers, which were not covered by our contract, causing a delay of twenty-one days. 36 With the memory of the fire still fresh in the mind of administrators, the Baggage & Dormitory was built of steel, concrete, brick, and to a remarkable degree, in structural terra cotta or hollow tile. Terra cotta, as a building material, was entering its golden age in the early twentieth century, when it was widely marketed as a cutting-edge, adaptive, modern construction material that was almost completely fireproof.
At the Baggage & Dormitory, terra cotta, or structural clay tile, was used for structural walls, partition walls, floor arches, furring for plaster on walls and ceiling, and column housings. The contract stipulated that all structural terra cotta shall be porous containing not less than 40% voids, be moulded fair and true and evenly burned, unwarped, free from limestone or magnesia pebbles, cracks, or other defects, and of a texture that will receive a nail without cracking and firmly hold it, and surfaces that were to receive plaster must be rough. 37 Due to the deterioration and subsequent removal of old plaster 32 Supervising Architect, Treasury Department, James Knox Taylor, U.S.
Immigration Station, Ellis Island, (Baggage and Dormitory), Approximate Location of Test Pits and Barrack Building, (12 December NPS Drawing No. 462/41,902A, Sheet 28, eTIC, Denver Service Center. 33 Johanna Dykhoff, 40 Holland with 11 Children, May 12, Photograph Ellis Island collections. 34 Letter, Shelbourne to Chief Engineer & Superintendent, (24 November quoted in Unrau 35 Quoted in Unrau 36 Letter, Shelbourne to Chief Engineer & Superintendent, (24 November quoted in Unrau 37 General Conditions in original Contract with New York State Construction Company, File part 2, Entry 9, NARA I. ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 13) in the Baggage & Dormitory, a significant amount of the terra cotta elements are now exposed.
Structural alterations that deviated from the original plans included a new method for covering the single girders of the structural frame, a more fireproof solution that was recommended not just by the New York State Construction Company, but also by the National Fire Proofing Company and the Chief Engineer Albert Brooks The builder also received permission to alter column construction by riveting the plates directly to the columns rather than setting them loose on the masonry. In the cellar, concrete walls were further waterproofed and strengthened with felt and asphalt rather than burlap, and the floors were reinforced with Clinton wire cloth.
38 The contract with the New York State Construction Company required a complete plumbing system, but separate contracts were issued for the heating and electrical systems. In June, the contract to install the heating was awarded to Evans, Almirall & Company for a bid of while the Lee and Bellmer Company secured the work for the electrical system for An additional contract was entered into with the New York State Construction Company for the installation of the beds on the second floor a total of iron beds that could be tilted upward with a lifting mechanism including 480 in the southeast dormitory, 432 in the southwest dormitory, and 204 in the family rooms.
39 Interesting to note is that just as construction was proceeding on the Baggage & Dormitory Building, immigration to the United States and to Ellis Island dropped off precipitously. A Boston Journal article in January reported an alarming decrease in immigration to Boston, and noted that Ellis Island also looks like a deserted city. For example, the White Star liner Oceanic, which usually arrived with 500 to 600 passengers, had recently floated into port with only 43 passengers. The article reported that the reduction to just one-tenth of the regular capacity of a day left 500 employees with very little to do.
The flow of immigrants had so significantly ebbed that a big reduction in the working force at Ellis Island was possible unless a rush of travel legitimized retaining a full staff, and Watchorn was quoted in the article acknowledging the likely need for layoffs. 40 By the end of when the work on the Baggage & Dormitory Building was nearing completion, the total immigration at Ellis Island for the year reached just 58% of the year before, when a record had passed through. 41 The reason for such a drop was reportedly due to a rash of tales borne home of hard times in the United States. 42 Whatever the reason, the numbers would quickly rebound so much so, that the new Baggage & Dormitory would need to be expanded.
38 Unrau 39 Unrau 40 Alarming Decrease in Immigration to Boston Worries Steamship Agents, The Boston Journal 9 January 3. 41 U.S. Immigration Statistics: Immigration Station at Ellis Island, NY, National Park Service. Compiled based on Annual Reports of the Commissioner-General of Immigration, 42 Alarming Decrease in Immigration to Boston Worries Steamship Agents, The Boston Journal,9 January 3. ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 14) Midway through the project, the administration was generally encouraged by the promise of the new building.
By June the Baggage & Dormitory was partially roofed and Commissioner-General Sargent expressed confidence that the new building would place the station in a condition leaving little or nothing to be desired for the housing immigrants. 43 Yet Commissioner Watchorn occasionally expressed frustration or anxiety about the pace of the work. Unfortunately, his fears were realized in November, when the New York Construction Company requested an extension of almost two months on the contract. Many unforeseen problems were cited, including the discovery of several old foundations and pipe chambers before driving the concrete piles, the delay in allowing the concrete piles to cure properly, and a bricklayer and stonecutter union s strike that delayed work for a week.
All but seven days of the requested extension were denied, but it was clear to all that the project would not likely be finished on time. Still, by February 6, the New York Construction Company s work on the impressive new Baggage & Dormitory Building measuring 230 feet by 150 feet was complete. 44 Original B&D Layout Tracing the Movement of Baggage & People The final plans sent to Watchorn just before construction started reveal the original layout of the new Baggage & Dormitory Building. 45 It was situated to the north of the Main Building, connected to it by a short, one-story corridor from the railroad ticket office at the rear of the Main Building (Figure 2).
Those entering the Baggage & Dormitory from this corridor would have passed through swinging double doors into a large Public Lobby that spanned nearly the entire front of the building (Figure 3). Restrooms and a stairway to the second floor were near this entrance. Though at least two photographs show the Baggage & Dormitory lobby empty or with only a few people present, this area would likely have been quite crowded during its early years. During the peak times of immigration at Ellis Island, the adjacent ticket offices issued as many as twenty-five tickets per minute.
46 At the other end of the Baggage & Dormitory s main lobby, toward the western corner of the building, another stairway led to the dormitory spaces on the second floor, while the Public Lobby turned ninety-degrees and narrowed, running toward the back of the building between two baggage areas the New York Baggage Room on the northwest end of the building, and the Scale Room connected to the large, central Baggage Room. The perimeter of the building included several offices and restrooms, another stairway, and a fan room. At the front of the Baggage & Dormitory, on the southwest side, a two-story corridor provided access to the Kitchen & Laundry Building from both the first floor lobby and the second floor stair hall.
43 Unrau 44 Electrical work by Lee and Bellmer Company was incomplete due to several problems, and that contract was not satisfied until late May. See Unrau 45 Supervising Architect, Treasury Department, James Knox Taylor, U.S. Immigration Station, Ellis Island, (Baggage and Dormitory), (12 December NPS Drawing No. 462/41,902A, Sheets 1- 28, eTIC, Denver Service Center. 46 Catherine Boland Erkkila, American Railways and the Cultural Landscape of Immigration, Buildings & Landscapes 22, no. 1 (Spring 39. ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 15) Much of the central Baggage Room was located under skylights, made possible by a large rectangular light court in the middle of the second floor.
These skylights would have provided important illumination to the work inside the Baggage Room, where men would have been busy sorting various types of baggage and containers that were often poorly marked. The article about the baggage operation at Ellis Island provides a glimpse of the nature of this important work. At that time, workers often needed to check, identify, and transfer to railroad or city thousands of piece of baggage per day, based on a numbering system. Baggage did not generally contain a name, but instead, were marked with only a big painted number or combination of numbers which corresponded to a number kept by the immigrants. Some of these markings were so dirty and the figures on them so imperfect that it required an expert to figure out who it belonged to.
47 As Watchorn had requested during the planning process, two sets of swinging doors were located in the back northeast wall presumably one each for incoming and outgoing baggage carts. More swinging double doors were located on each wall of the spacious Baggage Room three to the Scale Room, three to the front Public Lobby, and two to a Custom House Storage room on the east end of the building. Drawings and written references indicate that a wharf and dock originally was located quite close to the back of the Baggage & Dormitory, within the current porch addition. During construction, Commissioner-General F. P.
Sargent suggested in his annual report that, To facilitate the proper handling of the baggage of arriving aliens, by making available the new baggage room now in course of construction on the east end of the island, the harbor in the vicinity of said baggage room should be dredged, permitting the docking of vessels immediately alongside thereof. 48 Here, ferries would be moored for the unloading of baggage not carried by the immigrants as they were processed in the Main Building. Once sorted, they were presumably taken back out to a ferry carrying it to the appropriate location probably the train station across the harbor in New Jersey.
Baggage destined to New York seems to have been processed through the New York Baggage room on the northwest end of the building, which contained swinging double doors to a Covered Way that curved to the northwest end of the island, toward the New York ferry dock. The second floor was dedicated to dormitories and detention rooms for immigrants who did not pass initial inspection or had to wait at Ellis Island overnight before departing (Figure 4). A large dormitory was located on the front southwest side of the building and another even larger one spanned from front to back on the southeast end of the building.
At the rear of the building, a large space that was initially drawn to be a single large dormitory was subdivided into ten, much smaller family rooms that flanked a double- loaded hallway. Two detention rooms were located on the northwest end of the building. Surrounding the central light court, hallways wrapped around three sides to provide 47 Baggage of Immigrants, The New York Times, 19 January 48 Annual Report of the Commissioner-General of Immigration. 78. Commissioner William Williams also references a new baggage and dormitory dock in a letter on March 15, ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 16) access to the dormitories and detention rooms, while family rooms abutted the light court on the northeast side.
Every dormitory or detention room had access to one restroom, except the largest dormitory, which had two restrooms and a locker room. The building also featured a rooftop terrace that covered most of the roof. A pergola circled the entire perimeter of the building, with corner pavilions that complimented the corner projections of the building (Figure 5). An article published a few years after the completion of the Baggage & Dormitory Building allows a glimpse of the atmosphere in the detention rooms. They were among the most interesting points on the island. The immigrants who are to be deported, or who for any reason must be kept on the island some time, are placed in the detention quarters.
As a result of the motley crowd, women and children of all races and tongues are in one large room, and men in the other. Visitors were not allowed in the quarters, which featured tiers of beds that accommodated people, but often this number is exceeded by Though crowded, the article pointed out that in mild weather they all are sent on the fine broad roof of the building, referencing the rooftop with pergola. 49 Major Expansion A Third Story and Three-Level Porch It was clear to administrators almost immediately that the new Baggage & Dormitory Building was still not sufficient to handle the continuing high volume of immigration at New York.
In the Annual Report in June William Williams, who had just returned to the Ellis Island commissioner position less than two months before, noted that the fine new dormitory building was already taxed to its utmost. He continued that no provision has been made either for baths, forced ventilation, or freight-elevator service, all of which are important and must be added. 50 No freight elevator seems to have been installed in the building, though a small one may have been later accessible in the Kitchen & Laundry corridor. Some of these issues raised by Williams were quickly attended to, adding features to the Baggage & Dormitory to make it more practical and complete.
In new ventilation fans were installed on the second floor dormitories at a cost of about To make useful the courtyard created between the Baggage & Dormitory and the Main Building, a concrete floor was laid and restrooms were installed. Two toilets were constructed on the new dock. Already, the first floor layout was being altered, as enclosures were built inside the waiting room for the Western Union Telegraph Company and steamship company agents, and a wood floor was laid for a witness waiting room that was replacing a space originally dedicated to eastern passenger business (Figure 6). A space no longer used by Western Union was added to the enlarged enclosure for the commissary contractors, Hudgens & Dumas.
In a contractor was hired to tile and waterproof three toilet rooms on the second story. 51 49 Dr. Alfred C. Reed, Going Through Ellis Island, The Popular Science Monthly 82 (January 15. 50 Annual Report of the Commissioner-General for the Fiscal Year Ended June 30, (Washington, DC: GPO, 51 Unrau ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 17) Despite these improvements, less than two years after the completion of the Baggage & Dormitory Building, Commissioner Williams was actively calling for another major expansion. He testified before the House Rules Committee in that Congress had consistently ignored the real needs at Ellis Island, granting only one-third to one-half of appropriations requested.
Ellis Island was the last place this false economy should occur, he argued, since it was the place of first impressions to most newcomers to the United States. 52 He was ready to lay the blame for continued problems at the feet of Congress, and said so in no uncertain terms: The responsibility for the continuance of the bad conditions described in the dormitories must rest with Congress. The executive authorities can not remedy them until Congress furnishes the means. 53 Williams descriptions in the Annual Report for are very useful for understanding the continuing problems of overcrowding at Ellis Island, and particularly at the Baggage & Dormitory. He specifically singled out the upper floor of what is known as the new Baggage & Dormitory building.
Though the building was in most respects an excellent one, the Baggage & Dormitory was often required to house as many as or despite there being not over beds on Ellis Island. Particularly troubling to Williams was the sheer density of the quarters, since almost all beds were in tiers of three. Even worse, in the largest men s dormitory, which packed in 432 beds, the width of the passageway between each line of tiers was only two feet leading to a near suffocating density. To add insult to injury in a room where the congestion in this room is very great, Williams added that summer temperatures in that dormitory often reached 100 degrees because of its easterly exposure to the sun.
He continued to enumerate problem after problem in the dormitory, adding that the ventilation is very imperfect. They were forced to use the dorm as a day detention room as well, which was very problematic since it was encumbered with beds and obviously inappropriate for this purpose. Due to the schedules of the steamers that returned excluded immigrants overseas, it was frequently necessary to keep individuals in the oppressive room for a week. While Williams had singled out that men s dormitory for description, he cautioned his readers to not think it was an isolated problem, since the conditions in the other large dormitories are not unlike those just described.
Lastly, he pointed out an old problem that was yet to be solved that the habits of some immigrants are cleanly, of others filthy, and that both classes object seriously to detention in the same room. Williams felt it was obvious that these populations needed to be segregated. To remedy these serious problems, Williams requested an appropriation of to construct a third story to the new building, with well ventilated dormitories and separate day rooms, as well as a two-story metal and masonry projection on the north side. The third story would create more dormitory space and eliminate the need for three- three tier beds, allowing the use of more comfortable two-tier bunks.
The two-story 52 Pitkin, 53 William Williams, Annual Report of the Commissioner of Immigration for the Port of New York, With Reference to Ellis Island Affairs for the Year Ended June 30, Document No. Senate Congress, 2nd Session. (Washington, DC: GPO, 5. ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 18) projection on the north side of the building would serve multiple purposes, creating more space for baggage handling on the ground level while adding a large, open veranda for detainees on the second story. 54 Williams sharp and elaborate request for relief was fairly successful.
In his fiscal year report, Williams was happy to report that at the last session of Congress provision was made, as suggested in my last annual report, for the construction of additional detention quarters for immigrants at a cost of and in due course our dormitory building will have an additional story and open-air porches. With the optimism of previous commissioners overseeing expansions, Williams believed this was a very considerable step . . . toward making the Ellis Island plant a complete one. 55 In reality, the first Congressional appropriation was only for an amount that would cover only the third story, and not yet the porch addition.
Williams immediately went to work to secure the remaining for the more costly porch project, which would be more expensive due to the heavy underwater foundation work. 56 This appropriation was clearly made soon after, since the call for proposals in June included specifications for both the third story and the porch addition. The third story of the building was to essentially match the rest of the Baggage & Dormitory in its style and overall dimensions. Bids were solicited on June 9, for four separate contracts: the construction of the third story (exclusive of mechanicals); the installation of a new heating system; performing all necessary electrical work; and completion of the plumbing and tile work.
57 The drawing for the large porch addition, called the Metal and Masonry Projection, specified that the porch would be built at the dimensions of 226 feet wide and 50 feet deep (84 feet deep on the side with the nook where the sanitizer room is now located). However, the portion on the northwest end that extends past the nook, and measures 60 feet wide by 84 feet deep, may have been seen as optional, since drawings all indicate a separate bid requirement for that portion of the building. 58 Though records during the construction process are not available, it is clear that the work commenced soon after the proposal process, since a photograph dating October 29, shows that a significant amount of the brick and stone work had been completed (Figure 7).
By the following summer, the Commissioner-General of Immigration was able to report, that the new story of the Baggage & Dormitory Building was nearing completion and would be ready for occupancy early in November. He added that the new arrangements would include more adequate facilities for bathing than have heretofore existed, though it was up to the immigrants whether they utilized them. In that regard, the Commissioner-General advanced that it was not unreasonable to require 54 Ibid., 4. 55 Annual Report of William Williams, Commissioner of Immigration at New York, In Reference to Ellis Island Affairs for the Year Ended June 30, Document No. Congress, 3rd Session (Washington, DC: GPO, 13.
56 Unrau 57 Unrau 58 See the June drawings such as First Floor Plan and Second Floor and Roof Framing Plan. ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 19) that each alien who is detained here overnight should be compelled first to bathe and have his clothing disinfected. He saw this an a proper safety measure and an important safeguard to the health not just of the immigrants, but also to the others held here and to the communities to which the passengers ultimately go. 59 It is unclear whether bathing and other efforts to promote cleanliness were instituted as requirements.
Yet the Commissioner reported the next year that the efforts to promote sanitation in the detention quarters had created an environment where not serious results had taken place and the health and well-being of the detained persons have been fully safeguarded at all times, despite higher than average detentions. 60 The Layout of the New Floors The addition of the third story in allowed the administration to create new, improved dormitories on the third floor, while leaving the second story mostly to detention functions. The new third story featured four dormitories, one on each side of the light court (Figure 8). There were three men s dormitories (labeled wards on the drawings) and one dedicated to women and children.
Rather than a central hallway circling the light court like the one on the second floor, the large dormitories were accessed from the three stairways all of which were extended to the third story, connecting all three floors. A floor plan for the third floor shows the approximate arrangement of bunks at that time, including a wide central isle to allow circulation through all four dormitories (Figure 9). The three men s dormitories all had access to one restroom, as well as washrooms. The women s dormitory included even more amenities, including access to two toilet rooms, a wash room, and a bath room with several bathtubs. The small corridors adjacent to the women s ward also included three isolation rooms possibly for nursing, family privacy, or illness.
Each of these isolation rooms included a private toilet and sink. The western corridor also featured storage closets for blankets and utensils, and connected to the Kitchen & Laundry corridor, which had also been raised an additional story. A door from the north stair hall led to the roof of the new porch addition, which was dedicated to recreation. 61 The enclosed floors of the porch at the first and second stories featured walls full of large, operable windows, allowing ample light and air into the rooms. The second floor was used as a recreation porch for the second floor detainees (Figure The first floor porch space allowed the expansion of the baggage handling space in the center of the original building.
It is not entirely clear how the porch addition affected the pattern of baggage in and out of the building, but it likely remained similar to the system established with the original building. The rear of the porch included three doorways, the central one aligned with the original central door and being accessed by a ramp rather than stairs. This might have been the primary entry point for baggage. However, each 59 Annual Report of the Commissioner-General of Immigration for the Fiscal Year as quoted in Unrau 60 Quoted in Unrau 61 Sheet 6 - Third Floor Plan, Alfred Brooks Chief Engineer, and Frank S. Howell, Civil Engineer, Additional Story, Baggage and Dormitory Building and Metal and Masonry Projection, (2 June NPS Drawing No. eTIC, Denver Service Center.
ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 20) side of the porch also featured a swinging double door and a ramp, as did another door on the east end of the rear wall. Thus, the flow of baggage was likely fairly complex. 62 The sorting, storage, and transportation of baggage by ferry were complicated by the immigrants many options for railroad travel. In there were seven railway companies operating out of five different railroad stations, from which immigrants departed to points west of New York. These included the Pennsylvania Railroad Terminal, the Central Railroad of New Jersey Terminal, the Erie Railroad Terminal (all in Jersey City), the Delaware, Lackawanna & Western Terminal (Hoboken), and the West Shore Railroad Terminal (Weehawken).
63 In addition, separate ferries handled New York-bound immigrants. A Block Plan shows the layout of the Baggage & Dormitory at that time, reflecting some important alterations that had been made sometime after the original plans were drawn (Figure Besides the above partitions, many rooms had already changed from their original purposes. The main lobby was now dedicated as a West Waiting Room, while the former Custom House Storage room had been converted to the East Waiting Room. The West Waiting Room featured many benches on the north side of the room, while the south side, where the footprint of the building projects forward about 10 feet, included a long Lunch Counter.
Adjacent to the main entrance to the lobby from the Main Building, a small, walled Baggage Carrel had been added in front of a window at that corner, which was at some point converted to a door. One of the offices in the New York Baggage Room was labeled Express Office. The Scale Room of the original drawings was no longer labeled, but a large Baggage Scale, for which the pit is still extant, was situated on the northwest side of the new porch addition. Outside, the large courtyard created between the Baggage & Dormitory and the Main Building was labeled New York Room Yard, an indication that it primarily served the Main Building s New York Room rather than the Baggage & Dormitory.
Behind the building, the seawall appears to be quite close to the back of the Baggage & Dormitory porch, with just a small plank dock between the Harbor and the porch addition. Two inclined entry ramps extended to the seawall for direct unloading from ships. These entryways are still intact, though the seawall has been extended further from the building. At the back east corner of the porch, in a room currently used for the storage of decorative copper ornament from the roof, was an Immigrants Transfer Office. This was adjacent to a large doorway on the east end of the building, accessed by a large, cascading stairs from a large dock.
This arrangement of spaces, recorded in June shows the configuration of the Baggage & Dormitory s first floor after the major additions were finished in The additional quarters and the concurrent improvements in accommodations in were apparently quite effective. Indeed, following completion, the Commissioner- General reported that the new dormitories and large open-air porches were among the 62 Sheets 17 and 22, First Floor Plan and First Floor Framing Plan, Alfred Brooks Chief Engineer, and Frank S. Howell, Civil Engineer, Additional Story, Baggage and Dormitory Building and Metal and Masonry Projection (2 June NPS Drawing No. eTIC, Denver Service Center. 63 Erkkila, ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 21) most important improvements on the island.
64 When Frederic C. Howe, a progressive reformer, took over as immigration commissioner at New York, he made a strong effort to humanize the facilities at the island. Yet as far as the dormitories, a newspaper reported that, Little change has been made by Commissioner Howe in sleeping and boarding accommodations on the island . . . The bunks are not bad, he says, and new provision has just been completed for over immigrants. 65 Commissioner Howe, having been struck by the dreadful idleness of these poor people, created playgrounds on the lawns for mothers and children and he wished to create a common hall where families could spend time together each day. He decided that the Baggage & Dormitory s inclosed porch overlooking the city makes a capital social room.
66 The expanded Baggage & Dormitory seemed to have finally realized its full potential and was answering the demands placed upon it, just as World War I erupted in Europe. The Tide Ebbs - World War One & Military Uses of the B&D In his Annual Report, the Commissioner General of Immigration acknowledged his speculation that immigration had permanently reached the million mark, and yet recently, the world was shocked and amazed at the opening of a conflict which soon involved, directly or indirectly, practically every country from which our heaviest immigration has come in recent decades.
As a result, he observed, the million-a-year pace which had been kept up for so long a time would be materially slackened and that the current year s immigration would be the smallest number in more than a decade. 67 Indeed, in the fiscal year the number of immigrants passing through Ellis Island still totaled but just a year later, the total had plummeted to By only immigrants were processed on the island, a mere 3% of the total just five years earlier. Besides the wartime interruptions that caused this dramatic drop, the Immigration Act of had created further barriers for new immigrants. It instituted a literacy test and codified the exclusion of 33 different classes of arriving aliens. 68 World War I also forced longer detentions and significant long-term populations at Ellis Island.
In July Commissioner Howe proclaimed that World War I had essentially turned Ellis Island into a detention camp because Germans, Russians, or Austrian- Hungarians could not be deported. As a result, the island soon had hundreds that had to be kept here until the end of the war, or some disposition made for them. This was not really appropriate, he pointed out, since the station is not built like a prison, it merely has a number of big dormitories and little ones and three big day detention rooms. 69 Yet 64 Unrau 65 Turning Ellis Island Inside Out, The Survey 33 (17 October 63, as quoted in Harlan D. Unrau, Historic Resource Study (Historical Component) Volume III of III: Ellis Island Statue of Liberty National Monument, New York-New Jersey (U.S.
Department of the Interior, National Park Service, 66 For a Better Ellis Island, Outlook, 108 (21 October as quoted in Unrau 67 Quoted in Unrau 68 Unrau 69 New York Times, 3 July as quoted in Unrau ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 22) the Baggage & Dormitory was soon to act increasingly as a prison as the United States entered into military conflict. In April after the United States declared war against Germany, the military seized the crews of German and Austrian ships in New York Harbor and at New London, Connecticut, and sent them to Ellis Island for internment. With around officers and crewmen captured, Ellis Island faced real challenges to accommodate its new emergency function as an internment facility.
This required a complete rearrangement of quarters, the shifting of detained aliens to other rooms, and even the reorganization of the administration. The Baggage & Dormitory Building played a central role, as the entire detention and dormitory quarters there were dedicated to military internment, while the first floor was used for a barracks to house the American soldiers serving as guards on the island. 70 The men were housed in four large, well-ventilated dormitories with woven wire beds and adequate blankets for everyone. The interned men were not allowed to use recreation grounds on the island, but they were granted use of the Baggage & Dormitory s immense porch, described by the New York Times as 200 feet long and 150 wide, for exercise.
71 By July 1, the number of interned men had been reduced to about half after transfers to North Carolina, leaving somewhere between 500 and total captives on Ellis Island. 72 The number of war-related detainees fluctuated, especially as the Department of Justice sent suspicious aliens and spies to Ellis Island for containment. This further complicated the task of separating the various classes of interned individuals and arriving immigrants. 73 In a letter dated July 3, Assistant Commissioner Byron Uhl pointed out to the Commissioner General that the many classes of detainees are all confined in the Baggage & Dormitory Building, but should not be. 74 A complaint letter from German detainees in sheds some interesting light on the living conditions inside the Baggage & Dormitory Building.
They were dissatisfied that their quarters were entirely built of stone, dutch tile and floor stone, and that every man in the United States will tell you that Ellis Island was only built for one purpose, that is for temporary detention of immigrants, but not for keeping healthy men interned indefinitely. They acknowledged two hours of allotted recreation time on the one half acre courtyard, but as winter set in, they only had a veranda at our disposal, (about 100 by 30 feet), situated alongside our building, built entirely out of stone and tiles with a heavy concrete roof overhead. It has a very cellar like appearance.
The one open length- and the two open broad-sides cause always a dangerous draughty condition, 70 Annual Report of the Commissioner General of Immigration, as quoted in Unrau 71 New York Times, 15 April as quoted in Unrau There is evidence that these internees were later allowed access to the lawn, at least in the afternoons. See Unrau 72 Annual Report of the Commissioner General of Immigration, as quoted in Unrau 73 Unrau 74 Letter, Commissioner Uhl to Commissioner General of Immigration, July 3, as quoted in Unrau, ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 23) which has given us colds, which we seem to be unable to get rid of. The poor clothing and the little nourishment of the food make it impossible for many of us to go on this porch.
Those gentlemen are obliged to keep to the rooms with its stone floors and stonewalls. 75 The First Red Scare Early in the Navy Department took over the Baggage & Dormitory, and portions of the Main Building, for the quartering of enlisted men who were awaiting assignment to ships, and several thousand passed through its doors in the process. The Army also took over the hospital facilities on Ellis Island. During this period, the regular inspections of arriving immigrants were performed either on board incoming ships or at the steamship piers.
76 The Immigration Service, despite its reduced presence on the island, remained in control of the physical plant there and continued to provide the heat, light, power, refrigeration, telephone service, and general maintenance, while retaining just minimal space for its own operations. During this time, a significant amount of pipes in the Baggage & Dormitory Building including hot, cold, and salt water pipes were replaced because the corrosion had rendered them almost useless. When the war ended in November of the Navy Department no longer needed the space at Ellis Island, and initiated the removal of their operations there.
This included the removal of a galley and several storerooms that the Navy had installed, which were gone by the time the Navy officially vacated on April 1, 77 During the war, the Immigration Service also granted space to the Department of Justice for the detention of suspected enemy aliens. In and the national fear of Germans softened while paranoia over radical leftists took hold, resulting in the first Red Scare. The Sedition Act of placed much tighter restrictions on speech that might be perceived as anti-government, and for two years, suspicious aliens were rounded up, detained, and deported. Ellis Island became the principle point of concentration for this class of undesirables.
78 After he retired, Commissioner Howe summed up his feelings about the internment era at Ellis Island: I became a jailer instead of a commissioner of immigration; a jailer not of convicted offenders but of suspected persons who had been arrested and railroaded to Ellis Island as the most available dumping-ground under the successive waves of hysteria which swept the country. 79 For two years, the United States experienced widespread panic of fear over the Red revolutionaries, anarchists, and enemies of the Republic who were said to be ready to overthrow the government.
80 Despite 600 aliens being rounded up and sent to Ellis Island for deportation, only 60 were actually shipped out a fact that owed much to Commissioner Howe s belief that the Bill of Rights was being dangerously violated, and 75 Harloff et al. to the U.S. Department of Justice, (5 January and Special Assistant to the Attorney General to Secretary of Labor, (14 January as quoted in Unrau 76 Pitkin, 77 Unrau 78 Unrau 79 Frederic C. Howe, The Confessions of a Reformer, quoted in Unrau 80 Pitkin, ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 24) he refused to become merely a rubber stamp during the panic. 81 Commissioner Howe was soon replaced by Byron Uhl, who was more amenable to expediting deportations.
Hundreds of communists and other perceived radicals were expelled from the United States before the hysteria finally faded in The Restricting the New Wave of Immigrants; Deterioration & Refurbishing Almost as soon as the war ended, there was a sizable new increase in immigration. By the end of the fiscal year in over immigrants had been processed through New York. There had been differing opinions about what would happen to immigration numbers after the smoke of war had cleared. One theory was that the stupendous task of reclaiming Europe from the devastation and waste inflicted by the war would appeal to the patriotic motives of would-be immigrants, prompting them to remain in their home countries.
Others speculated that an irresistible spirit of unrest because of political and economic interruptions in Europe, coupled with the safe opening of shipping lanes when hostilities ceased, would unleash a flood of eager immigrants to U.S. shores. As immigration numbers picked up substantially in the months after the war ended, the Commissioner General of Immigration Husband sided with the probable accuracy of an unprecedented flood of immigration unless new legislation restricted the flow. 82 This is exactly what Congress did in and when it passed highly restrictive laws based on a quota system for each country. The quota system stipulated that, for each nationality, only 2% of that country s population numbers could be admitted per year.
The entire annual total of immigration to the United States could not exceed just a fraction of even Ellis Island s prewar numbers, alone. 83 Immigration declined precipitously as a result of these new barriers, and the Ellis Island station became less important for receiving immigrants, and instead, functioned increasingly as a detention and deportation base. 84 Yet after the war, Ellis Island would still witness a half decade of large immigration numbers before the new laws reduced immigration to a trickle. With the military gone and the Ellis Island facilities firmly back in the hands of the Immigration Service, the staff was increased to its pre-war size and steerage passengers were once again processed on the island.
The new, more stringent inspections required by the Immigration Act of including the literacy test, resulted in more work for the staff and more detentions of incoming aliens. Thus, expansion work continued on Ellis Island, including around the Baggage & Dormitory. In October the wharf behind the building was connected to the new granite-faced seawall that was being completed on the northeast edge of the island. The connection was accomplished by building a ramp on pilings. Further, a fender pile 81 Pitkin, 82 U.S. Department of Labor, Bureau of Immigration, Annual Report of the Commissioner General of Immigration, Fiscal Year Ended June 30, (Washington, DC: GPO, 5. 83 Benton, 84 Benton, ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No.
NY-6086-E (Page 25) system feet long with 34 fender piles) was to be erected along the entire face of the seawall in front of the building to enable the transfer boats to moor alongside while discharging or receiving passengers and baggage. 85 Yet there were much larger scale problems to deal with at Ellis Island. Despite the immensity of the structures on the island, the Commissioner General anticipated in his Annual Report the need for another large, new dormitory. While this may seem surprising, since immigration numbers had not reached their pre-war numbers, there had been neglect of the physical plant during the war.
As one historian observed, the wear- and-tear on the sprawling facilities at Ellis Island had resulted in an outdated, oversized, and now under-utilized complex of buildings that was becoming a white elephant that was very costly to maintain. In less than a decade from completion of the expansion, conditions had deteriorated significantly. An editorial in the New York Times in claimed that the Ellis Island facilities for detaining, examining and distributing the arriving immigrants are inadequate to a degree that it is a disgrace as well as a danger to the country. The conditions were an embarrassing introduction to American life, for they inspire disgust with, and distrust of, our Government.
86 Other stories and accusations of abuses at Ellis Island showed up in the press on a fairly regular basis. One sensational, front page headline in announced, Three More Radicals Die in Ellis Island Pen, Assert Bailed Aliens, and elaborated, Prisoner Chokes to Death After Hour s Torture, With Medical Aid Denied Him, Despite Companions Frantic Pleas Men s Families Destitute and Starving. 87 In September a South African named Mark Glanville and his family filed an official complaint and published an account in a South African newspaper detailing their experience at Ellis Island and the story seems to have been widely reported in the American press, and eventually discussed in Congress.
88 The South African newspaper clipping, kept on file at the immigration offices, screamed, Just Hell on Earth, with subtitles such as Horrors of Ellis Island, Cruelty, Disease and Filth, How Immigrants Are Treated by the Americans. Glanville s account was obviously quite alarming to those who read it: we were locked up and guarded with thousands of foreigners. Some of them were the worst type of human beings, so low, common and filthy that it beggars description. Among the throng were Greeks, negroes and Chinese, some diseased, some criminal . . . It was such a shock to us and will leave a mark on us for life. Our poor innocent baby suffered, and there were no baths, no fresh air, and no sleeping place except my arms . . . It was terrifically hot and the stench was abominable.
I felt my strength ebbing fast, and the life would have killed us had we remained a day or 85 Unrau 86 Editorial, New York Times, 14 December as quoted in Unrau 87 Unidentified newspaper clipping. Copy does not display masthead title or date, though listed as in records. File Entry 9, NARA I. 88 Congressional Record House, (23 November ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 26) two longer. I really felt like committing suicide to get out of the horrors of cruelty, disease and terrible filth. 89 Glanville also claimed they were herded, yelled at, pushed and cursed from morning till night.
Though it is not clear which space they occupied, she claimed to have been locked up in a small room with canvas stretchers in tiers of three to sleep on no mattress or pillow, just bare canvas with vermin infested and evil-smelling blankets. The Glanville s only escape was to beg to be deported to England, which they accomplished only because they were assisted by a Canadian of some influence who saw they were at the breaking point. 90 In the face of accusations like these during the early as sensational as they may have been, the Surgeon General of the U.S. Public Health Service ordered an investigation of the housing facilities at Ellis Island.
The resulting report, which was released in November and focused primarily on ventilation, made many frank observations about the conditions at Ellis Island, and provided many recommendations to improve the overcrowded and uncomfortable day and night detention rooms. The report also illuminates the flow of immigrants through the Island 1 buildings, including the uses of the Baggage & Dormitory. The report pointed out that most of the arriving immigrants passed through the island in just an hour or two, but the committee s focus was on the small number of detained immigrants. The committee identified three classes of detainees at this time.
The first class was those immigrants who were approved but needed to remain perhaps for the arrival of friends, or for additional funds, or perhaps for the release of a member of the family from the hospital. These s (temporarily detained) remained in the Main Building s day detention room. The second class, the S.I. or special inquiry cases, consisted mostly of persons about whom their exists some doubt regarding admissibility. This group also was kept in rooms inside the Main Building. If they were not admitted, they would enter the third class of immigrants, the excluded and deferred group.
Even many of this class of immigrants, who waited for deportation, were housed in the Main Building though those rooms were mostly reserved for women and children who had arrived by first- or second-class tickets. All other excluded persons were housed in five large dormitories in the Baggage & Dormitory Building, including Room 203 at the front (south side) of the second floor and Rooms A, B, C, and D on the third floor. 91 The committee s methodology in studying the air and ventilation was highly scientific, employing quantitative evaluation and considering the most modern studies for proper air quality at the time.
The report found an insufficient amount of window space in Room 203 because the windows opened to an enclosed courtyard, and so the rooms were decidedly overheated, with temperatures ranging from 70 to 78 degrees Fahrenheit. The sleeping bunks were also determined to be in need of renewal and repair, and the 89 Just Hell on Earth; Horrors of Ellis Island, Rand Daily Mail (Johannesburg, South Africa), 6 September File Entry 9, NARA I. 90 Ibid. 91 Typescript, U.S Public Health Service, A Study of Housing Facilities at the U.S. Immigration Station at Ellis Island, (15 November File Box Entry 9, NARA I. ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 27) upper tier of the bunks was just 20 inches above the lower, instead of the recommended 30 inches.
The committee recommended a maximum capacity of 200 persons. 92 For the third floor dormitories, the report was mostly satisfied with the conditions. Each room had a row of outside windows with unobstructed daylight and inside windows to the light court, allowing free access to the outer air. The rooms were well arranged with two-tier bunks, and the temperature in all of the rooms was typically less than 70 degrees. Ultimately, they agreed that the rooms were satisfactory for their purposes and the bunks were also satisfactory from the standpoint of sanitation and ease of maintenance. Still, they suggested that all bunks in the Baggage & Dormitory be upgraded to actual double decker beds.
They also recommended windows be left open and maximum capacities for the dormitories be set at 310 (A), 200 375 (C) and 250 Less than ideal, the report noted, was that the bunks are enclosed in a wire grille work which serves to keep the occupants away from the windows at all times, though they did not detect any hardships or objections from the occupants. 93 Over the next three years, some of the most important changes recommended in the report were addressed. Many of those recommendations were reflected in new Commissioner Henry C. Curran s major request in December for in work to relieve congestion and address significant problems at Ellis Island.
For the Baggage & Dormitory, his plans included a new railroad waiting room, the conversion of an upstairs dormitory into an interview room, an exterior access stairway to the new interview room, a new mattress disinfecting plant, new laundry equipment, new self- syphoning ventilators in the detention rooms, and plumbing updates. 94 Although Curran s ambitious request was answered with only a appropriation from Congress, he moved forward with many of the more pressing changes. During a period of remodeling from to one of the most significant updates occurred when the wire cage bunks were replaced with individual beds with mattresses, taking care of a long-standing criticism.
This change required many other modifications at the Baggage & Dormitory, where new plaster work and painting was required in the dormitories, where the old wire cage bunk systems had been bolted to the walls. More importantly, since it was necessary to sterilize the new mattresses, a large, cyanide disinfecting plant was constructed on the third story. This two-room addition was essentially built atop the porch addition roof, in the nook at the original building s north corner. The work required the roof and columns to be reinforced. The disinfecting plant featured three large disinfectors, sitting within recessed foundation wells, and connected to steam supply lines and returns.
The disinfecting units pierced the wall that bisected the plant, and a new doorway was opened between the northwest room and the adjacent dormitory for the removal of the clean mattresses. 95 92 A Study of Housing Facilities, 93 A Study of Housing Facilities, 94 Unrau 95 Unrau ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 28) The improvements ushered in by the new beds with mattresses, and the accompanying renovations, were highly significant. The New York Times proclaimed the change as the most important of all the renovations then occurring.
Commissioner Curran would later recall the layout inside the dormitories before the real beds were installed: The four big dormitories, two for men and boys, two for women and children, each held four hundred people, packed away one apiece in four hundred of these small wire cages. The cages were in three steel tiers, one above another, with narrow aisles between the tiers. Head and foot the cages adjoined, with wire between. On the wire base of each cage was one blanket. Nothing else . . . the cage structure filled nearly the whole room, wall to wall and floor to ceiling, and each cage was a tight fit, except for children. There was little ventilation.
96 A few years later, the character of the new beds was described in the Commissioner s Annual Report, when he noted that each person is allotted a white enameled single bed with woven-wire spring, good quality mattress, pillow, blankets, and clean linen. 97 This was a dramatic improvement from previous descriptions of the bunks. Also from to some significant reconfigurations were made to the first floor plan (Figure The ticket office partitions in the back of the Main Building were transferred to the front lobby of the Baggage & Dormitory, and a postcard from the mid- shows the entire front of the lobby partitioned along the first row of structural columns, nearly from end to end of the room.
98 Around the same time, the major wall with large doorways and transoms between the front lobby and the central Baggage Room was removed, not to be replaced until the current wood and screen partition wall was erected in Another major wall of the central Baggage Room, on the northwest side, adjacent to the Scale Room, was removed almost entirely. A small section on the north end was left to adjoin a new wall that ran to former New York Baggage Room wall, creating a small room and a vestibule-like area at the large north entrance from the rear porch addition.
After the renovations of the mid-1920s, the first floor contained a baggage room, baggage storage, toilets, a lunch packing room, the front lobby had partitioned spaces on both sides for railway baggage checks, Southern Pacific, a postal telegraph, Western Union, a post office, steamship agents, railroad east and west ticket offices, a money exchange, and a New York passage.
99 On the second floor, the front dormitory room was converted to an interview room (Figure This was accessed by a large, iron staircase connecting the first floor of the Main Building s west wing to a new doorway cut into the Baggage & Dormitory s front 96 Curran s memoirs are quoted in Unrau 97 Quoted in Unrau 98 See image 2A in the Interior section between Exhibits 27 and 28 of Beyer Blinder Belle/Anderson Notter Finegold, Ellis Island Statue of Liberty National Monument, New York-New Jersey: Historic Structure Report: Unit One Buildings, Volume 2, Part 1. (US Department of the Interior, National Park Service, [hereafter BBB/ANF Historic Structure Report]. 99 BBB/ANF Historic Structure Report, 73; Unrau ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No.
NY-6086-E (Page 29) wall at the second story. A women s restroom was added within the new interview room on the northwest side, and a wooden vestibule, with a large window, acted as an entryway for entering visitors from the new exterior stairway. Another exterior metal staircase was added on the southeast side of the building, where a new door opening in the second story porch addition connected detainees to the new recreation area on the east side of the island, behind the Main Building. 100 In July a large-scale renewal project for the steam lines was funded by the Department of Labor, since a considerable quantity of steam was escaping the pipes between the Powerhouse and the Baggage & Dormitory.
101 The following summer, major repairs and replacements were made to the heating and plumbing systems in the Baggage & Dormitory Building, including the renewal of the heating system in the tunnel and corridors connecting to the Kitchen & Laundry Building. Several supply lines for hot, cold, and salt water mains and other pipes were also replaced. In significant roof repairs were performed at the Baggage & Dormitory. This included the repair of leaky gutters, resecuring the copper ridges on the skylights, repairing flashings, laying new flashings around all skylights, and replacing broken skylight glass. 102 More extensive roof repairs were made in and in when a new four-ply tar felt and one-ply ruberoid roof was installed, as well as two new skylights.
103 The Continuing Use Primarily for Detention & Deportation After the stock market crash of the Great Depression had a major effect on immigration to the United States. By there were more people leaving the country than trying to enter. 104 Under the leadership of Commissioner Edward Corsi, and upon his recommendation, the Franklin D. Roosevelt administration would appropriate more than million from various public works funds for improvements at Ellis Island. The funds begged for by decades of commissioners had finally come, at a time when immigration was grinding to a near halt in the United States. In Secretary of Labor Frances Perkins established the Ellis Island Committee in order to investigate conditions and to consider options for improving facilities at the island.
The committee of fifty-two members, led by Carleton H. Palmer, worked closely with Commissioner Edward Corsi, whose administration they determined to be quite competent. As federal monies continued to fund major projects during the Great Depression, the committee encouraged large-scale improvements at Ellis Island including the construction of a new immigration building, a new ferry house, new landfill 100 Unrau BBB/ANF Historic Structure Report, 64. 101 Unrau 102 Unrau 103 BBB/ANF Historic Structure Report, 67. For a list of the extensive repairs in see Unrau 104 Benton, ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 30) operations, landscaping, and extensive repair and remodeling.
105 The report acknowledged up front that there was widespread belief that Ellis Island is a place of harsh treatment, of dread suspense, of poor housing and worse food in short, a dungeon from which the immigrant to escape, while dismissing these stories as exaggeration. 106 Still, the committee acknowledged that the housing facilities had always taken on something of the quality of barracks due to the volume of immigrants. The report pointed out that even though the dormitory and detention rooms had proper sanitation and more than adequate light and air, they also represented an outmoded institutional plant unsuited to present day needs. 107 The report made direct reference to spaces in the Baggage & Dormitory Building, recommending several changes there.
The fiscal year ending in had witnessed immigrants who were detained at Ellis Island, but over outgoing aliens who were being deported including illegal immigrants, tuberculosis patients, criminals, welfare cases, and voluntary repatriates. These outgoing classes generally stayed much longer on the island as they awaited passports from their home consuls and made travel arrangements. 108 With an average of 150 to 200 detainees on the island at any given time, the committee recommended better segregation of the incoming and outgoing classes which could best be accomplished by remodeling B & D building for deportees . . . and by adding a new building, of the cottage or pavilion type, to hold the incoming immigrants and repatriates.
109 Within the the Baggage & Dormitory, the Committee made substantial recommendations for rearrangement, including: the entire ground floor, east of partition, be cleaned out and used for day detention rooms for deportees, with a common room and reading rooms; that the steamship agents, ticket offices and telegraph office now in this space go in the old Ice Plant with access from corridor on ground floor of K & L building; that baggage be accommodated west of the partition mentioned above; that detention rooms Nos. 206 and 222 and dining rooms in K & L building be subdivided; that new syphon ventilation be provided in detention rooms Nos.
206 and the old ventilation system be repaired where desirable and additional windows cut in easterly wall; that additional plumbing and shower baths be provided in various departments (Rooms 206 and that ample steel locker space for luggage in day detention rooms be provided, west of partition on the ground floor; that adequate rooms be provided 1) for occupational work, in present location but enlarged, 2) for library and reading rooms, barber shop, rooms for laundry work, dry cleaning and shoe repairing done by deportees, 3) for social workers, including rest rooms, toilets, etc., on ground floor, 4) for rest rooms, etc., for employees; that these rooms be 105 Barry Moreno, Encyclopedia of Ellis Island (Westport, CT: Greenwood Press, 73.
106 Report of the Ellis Island Committee, March Reprint, The American Immigration Library; Facsimile Reprint Collection (New York: Jerome S. Ozer, 10. 107 Ibid, 12. 108 Ibid, 12. 109 Ibid, 13. ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 31) refurnished where necessary and that windows throughout be provided with screens. 110 The report also recommended the roof of the Baggage & Dormitory be enclosed for additional recreational space. The Committee ended their review of Ellis Island by noting that it was pleased that the Public Works Administration was already facilitating many of the improvements they were recommending. 111 Several projects had already been completed at the Baggage & Dormitory during the first years of the In April Commissioner Benjamin M.
Day submitted a request for a significant amount of plumbing and tiling work that was needed on the second floor, including 21 water closets, 16 lavatories, 11 urinals, 4 slop sinks, 3 drinking fountains, 450 square feet of floor tiling, 17 toilet partitions, 21 toilet doors, and feet of piping. The original equipment had been in use for over two decades, and was both outmoded and unsanitary. Day asserted that the toilet conditions were so bad that they would not be permitted in any public building under the jurisdiction of the Health Department of the City of New York.
112 These renovations proceeded in October, when a contractor was hired to remove cast-iron toilet partitions and old bathroom fixtures, and then install new white glazed tiling, plastering, marble toilet partitions, lavatories, toilets, slop sinks, urinals, and supply, vent, and soil lines. In a 28-station Faraday Series closed circuit fire alarm system was installed across Ellis Island, including in the Baggage & Dormitory Building. 113 In and the administration hired contractors for several sizable projects at the Baggage & Dormitory. In large-scale plumbing and heating work was performed on the third and first floors, with some also on the second.
A contract let in the amount of covered the replacement of 190 plumbing fixtures, as well as the: entire renewal of 8 large wash rooms and toilet rooms on the third floor including tile work and some renewals in 16 small rooms on the first and second floors; renewals of the entire house drain system under the first floor and the renewal of all concealed leader lines; new water supply mains on the first floor with new risers to the third floor and new supplies to valves in the power house so that salt water can be supplied to water closets, urinals, and fire hoses in case of shortage of fresh water supply.
Another contract for covered the installation of new black welded steel pipe for the steam supply and return lines and a new low pressure steam heating system as part of the general island vacuum system, designed to operate at a 5-pound gauge pressure. 114 Also in two other contracts related to the Baggage & Dormitory were issued: one 110 Ibid, 111 Ibid, 14, 17. 112 Unrau 113 Unrau 114 Unrau ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 32) for the repointing exterior masonry on the Islands 1 and 2, and another for the installation of new non-conducting pipes on the island, including significant trenching around the Baggage & Dormitory. In a new tile floor was laid in the second floor corridor to the Kitchen & Laundry Building.
115 In the administration s projects reflected some of the recommendations of the Ellis Island Committee, though the committee s recommendations seem to have been in some cases an affirming rubber stamp of efforts already underway. As early as August 22, plans had been drawn up for significant rearrangements on the first floor. When the work proceeded in the partitions on the first floor, which had provided spaces for the steamship agents, money exchange, ticket office, and telegraph offices, were removed to the first floor of the Kitchen & Laundry Building. Many of the other recommendations listed by the Ellis Island Committee seem to have been addressed that year. 116 Six new reading rooms and a new laundry and shower rooms were added to the second floor s southeast dormitory.
A red quarry tile floor was laid in the northernmost portion of the second floor porch addition. 117 Many lighting fixtures were replaced in the Baggage & Dormitory, including 30 in the second floor reading rooms, and 20 more in second floor toilets, the laundry room, and the lounge room. On the first floor, 59 light fixtures were replaced in the large Recreation Room, with others installed in the stairs, toilet, storeroom, the vestibule at toilet, and Storage Room A. 118 A year later, in the first floor of the Baggage & Dormitory was almost entirely repurposed. That year, the administration outfitted the room for clerical card work.
Drawings from May through July of show the layout of a Manifest Copy Room, which spanned the majority of the Baggage & Dormitory except for the porch addition and west storage room (Figure The first floor was laid out to include forty-six large, rectangular wooden tables, which were to be covered with linoleum and feature red and green signal flags (Figure The tables were circled by eleven chairs each, and covered with cushions. A coat room enclosure was added, and alterations were made for four toilet- and wash-rooms. Fourteen units of metal shelving were ordered, and the administration planned to install square yards of linoleum, at least some of which was to cover the new tables. 119 During the late other various repairs were made at the Baggage & Dormitory.
In two new windows were cut into the southeast wall on the second floor. 120 These 115 Unrau 116 Unrau 117 BBB/ANF Historic Structure Report, 76. 118 Treasury Department, Procurement, Division Public Works Branch, Specification for Remodeling in the United States Immigration Station at Ellis Island, New York, (12 July Box 1, Entry 9, RG 79 Records of the National Park Service, NARA-Northeast Region, New York, NY [hereafter RG 79, NARA-NE]. 119 U.S. Department of Labor, Immigration and Naturalization Service, Specifications for Wooden Tables, Coat Room Enclosures and Equipment, and Other Work, First Floor, Baggage and Dormitory and several other related documents, FF Box 1, Entry 9, RG 79, NARA-NE. 120 BBB/ANF Historic Structure Report, 73.
ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 33) windows are smaller than the others on the wall, and do not have the same limestone quoining around their exterior openings. This work may have been executed in conjunction with the reading room installation, to ensure each room had natural light. In June a contractor was hired to repair and replace over 80 window insect screens in every third-floor dormitory. One source speculates that was the year the wood partition walls were installed to segregate populations on the second floor porch addition, since a plan from that year shows the divisions between Chinese, Colored, and White rooms. The same plan indicates the third story was entirely dedicated to detainees with warrant cases.
121 In the electrical system was overhauled, including wiring on the second and third floors, cleaning ten light panels and a distribution panel. 122 The same year, the roof covering was replaced, flashings were repaired, and two new skylights were installed. 123 World War II and the U.S. Coast Guard Era at the Baggage & Dormitory World War II ignited an immediate upsurge of immigration from Europe. Soon, applications for certificates of arrival needed to be processed, and at any given time, an average of 340 aliens were detained at Ellis Island for investigation. On October 14, Secretary of Labor Frances Perkins granted permission to the U.S. Coast Guard to use the Immigrants Reception Building and the ground floor of the Baggage & Dormitory.
After the implementation of the Neutrality Act, the Coast Guard performed extensive patrols to enforce it, and Ellis Island was an ideal location for their operations. Shortly after receiving legal rights to use the facilities at both Ellis Island and at Port Townsend, New York, the Coast Guard moved forward with the construction of training facilities for recruits. The Coast Guard s use of the island was not without conditions and restrictions. Most importantly, title and control of the island was to remain with the Department of Labor. In regards to the physical plant, the Coast Guard was to assume full responsibility for the cleanliness and upkeep and defray any and all expenses incident to occupancy, such as light, heat, water, power, sewage, toilet facilities, or any other items.
When the Coast Guard left the island, the premises were to be restored to the same condition as they were found, minus ordinary wear and tear. The Coast Guard would need to vacate the premises within 30 days of receiving written notice to do so. 124 Outside the Baggage & Dormitory Building, the Coast Guard created a recreation area between the porch addition and seawall, extending to the west around the porch addition and abutting the Recreation Shelter behind the Powerhouse. 125 Inside, a drawing reveals the Coast Guard s new spatial arrangements of the Baggage & Dormitory Building first floor (Figure The porch was used as a drill room, and the small room 121 BBB/ANF Historic Structure Report, 76. 122 Unrau 123 BBB/ANF Historic Structure Report, 67.
124 Unrau 125 Unrau A General Plan from is reproduced on page with the spaces used by the Coast Guard shaded. ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 34) in the east corner was used as an armory. At the wider north end of the porch, which includes the nook in the original footprint, the Coast Guard erected a boatsman store room, a carpenter shop, a machine shop, and a general storage room. The old baggage room in the center of the building recently used for clerical, manifest card work was used for a bunk room and a mess room, divided by a partition. The bunk room contained beds and lockers for 538 men, while the mess room contained tables and benches for 500 men.
On the southeast end of the building, the Coast Guard continued to use three existing restrooms and a wash room, while adding a large new shower room, a dressing room, a galley with service and steam tables, a locker room, commissary storage, and a workroom. The walls of the porch addition were painted with a large amount of wall graphics, including a navigational chart, a compass with degrees, signaling flags and pennants. These graphics are still visible, though deteriorated, and are currently covered by protective plastic sheets. 126 The training station would remain on Ellis Island for seven years, until it was closed on August 15, as the Coast Guard operations were transferred to Staten Island. By that time, around enlisted men and officers had trained on Ellis Island.
127 Detention and Internment During World War II On June 14, the Immigration and Naturalization Service was transferred from the Department of Labor to the Department of Justice, as a result of the Reorganization Act of This effectively transferred legal control and administration of Ellis Island while the Coast Guard continued to use much of the station. 128 In the U.S. Attorney General pointed out that wartime conditions forced the Immigration and Naturalization Service to increase its scrutiny of every immigrant arriving on America s shores.
Furthermore, due to the breakdown in transportation and the refusal of many nations to accept a return of deportable aliens, deportation was no longer an efficacious means of protecting this country against that small percentage of aliens who prove unworthy of this country. 129 The main role of the Immigration and Naturalization Service involved the enemy alien program, which had been established before the United States entered the war. Operating under laws already existing and Presidential proclamation all German, Italian, and Japanese aliens were designated enemy aliens, subject to the conditions of travel, conduct, and behavior laid down for them.
Further, all were subject to apprehension and internment or limited liberty in the discretion of the Attorney General based on their threat to national security. As such, after December all registered Italian aliens, Germans, and around Japanese were all enemy aliens. The Immigration Service was charged with housing any enemy aliens taken into custody by the Federal Bureau of Investigation, at stations across the country, including Ellis Island. Within days of Pearl Harbor, over 126 BBB/ANF Historic Structure Report, 74, 82. 127 Unrau 128 Unrau 129 Unrau ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 35) total enemy aliens had been taken into custody, and by the end of the year, were held in detention.
The result at Ellis Island was a tripling or even quadrupling of its average number of prewar detainees. While there were 214 in custody at the close of the number had peaked to 829 by the end of Already by June almost enemy aliens had cycled through the island. It was not uncommon for these detainees to stay at Ellis Island for several months while their case was being considered. 130 An immigration official pointed out in November that it was of the utmost importance that separate spaces be designated for apprehended alien enemies, normal alien detainees, and deportation cases. The island was crowded enough that a search was made for additional quarters in New York City.
Instead, the following month, the decision was made to move the administrative offices to Manhattan, leaving Ellis Island to only those activities incident to the care and maintenance of detained aliens. 131 It is not entirely clear which spaces in Baggage & Dormitory were dedicated to each of the various classes of detainees, though the second and third floors played a critical role as the administration struggled to properly segregate the population. A Survey of Detention Facilities and Office Space on Ellis Island reported that the second floor was being used mostly for day detention, with some night detention, and also space for detainees to meet with their visitors. The third story dormitories were being used as both day and night rooms.
132 In the Department of Justice finalized the closure of internment camps and discharged any remaining enemy aliens. In the Baggage & Dormitory Building s first floor dining room for detainees, located on the south end of the building, was expanded to the north (Figure The west corner of the first floor was used as a commissary storeroom and a dish washing machine room. Toilet rooms in the east side of the first floor were converted to a kitchen bake shop and kosher kitchen. 133 A photograph from shows the ground floor of the porch addition with baggage racks and apparently used as a baggage room.
134 and Beyond: Desertion and a New National Park Service Era During the early the maintenance of the vast, unused buildings became an expensive problem and it became more and more impractical to continue funding the facilities at Ellis Island. Only a couple hundred detainees, at most, remained at the station at any given time. A decision was made that the administrative offices for the Immigration and Naturalization Service could be moved permanently to a government office building in Manhattan.
In November a humanitarian ruling announced by the Attorney General declared that there would no longer be alien detainees, except 130 Unrau 131 Unrau 132 Survey of Detention Facilities and Office Space on Ellis Island, December reprinted as Appendix E in Unrau 133 Unrau 134 Porch Area, Room View Toward West at Baggage Racks, reproduced in BBB/ANF Historic Structure Report, between Exhibits 31 and 32. ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 36) those regarded as likely to abscond, or who might be risks to national security or public safety. With this new policy in place, the population at Ellis Island was reduced to just 25 detainees within ten days of the announcement. On November 29, the ferry boat Ellis Island made its final run to Battery Park.
135 Along with the rest of the buildings on Ellis Island, Baggage & Dormitory was effectively shuttered and its rooms went quiet for the first time in 45 years. For a decade after Ellis Island was shut down, the General Services Administration (GSA) attempted to dispose of Ellis Island and encourage private redevelopment, but no viable solutions emerged. In May Lyndon B. Johnson declared Ellis Island part of Statue of Liberty National Monument. The following year, Secretary of the Interior Stewart L. Udall commissioned a New York architect, Philip Johnson, to create a redevelopment plan for the island. Abandonment and pillaging had taken a toll on the island, and so Johnson s proposal played on the ruinous aspects of the island.
Were his plans followed, only the Main Building, Kitchen & Laundry, and the hospital complex would have remained, while the rest of the buildings, including Baggage & Dormitory, were demolished. At the remaining buildings, vines would be encouraged to grow around and through the buildings . . . creating a sense of nostalgia, while trees would be planted to create an atmosphere of a traditional park. Due to mixed reviews and a lack of funding, Johnson s concept was never implemented. 136 The Baggage & Dormitory Building again avoided demolition after when a committee of architects, landscape architects, museum professionals, and historians created a new Master Plan.
This plan prioritized the preservation and rehabilitation of the Main Building, while planning to raze nearly all other structures at Ellis Island, making way for sprawling public park areas and activity grounds. Yet this plan, too, failed to fully materialize due to scarce public support and funding. 137 An additional two decades of neglect had led to further deterioration of the buildings at Ellis Island, and photographs from the mid-1970s show Island 1 largely overgrown by trees, brush, and weeds. The seawall in the ferry basin in front of the Main Building had collapsed. Finally, in the late the National Park Service moved forward with efforts to clean up the grounds and eventually open the Main Building to public visitation. In perhaps spurred on by the patriotic pride of the U.S.
Bicentennial, the NPS made major improvements at Ellis Island including dredging the ferry basin, constructing a new dock, stabilizing sections of the seawall, updating main water lines from Jersey City, installing a new sewage treatment system, and removing bags of debris from a large-scale cleanup on Island 1. That year, a portion of the island was opened to visitors. 135 Benton, 136 J. Tracy Stakely, Cultural Landscape Report for Ellis Island Statue of Liberty National Monument: Site History, Existing Conditions, Analysis (Brookline, MA: National Park Service, Olmsted Center for Landscape Preservation, May 137 Stakely, ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No.
NY-6086-E (Page 37) Assessments of Baggage & Dormitory; Stabilization Efforts The Baggage & Dormitory Building still sat neglected, even after when a comprehensive rehabilitation of both the exterior and interior of the Main Building began the costliest renovation of a historic structure ever in the United States. This work resulted in the opening of the Ellis Island Immigration Museum in the Main Building in 138 However, several studies of the structures at Ellis Island during the included research, assessment, and detailed examination of Baggage & Dormitory. These included a major historic structure report by Harlan D.
Unrau in and another by the firm Beyer Blinder Belle/Anderson Notter Finegold in As of the only buildings on Island 1 that had not been renovated were the Baggage & Dormitory and the small Recreation Shelter. In December and January a conditions survey of the Baggage & Dormitory was performed by Oehrlein & Associates Architects, Robert Silman Associates, and AAS Environmental, Inc. The purpose of the survey was to identify and document conditions that were detrimental to the overall stability of the building.
A second survey in January further assessed the integrity of the steel and concrete systems and evaluated the building shell to consider options for stabilization.139 In the American Recovery and Reinvestment Act funded a construction project to stabilize the Baggage & Dormitory, including significant structural work at the light court and the disinfecting plant, a new roof (including a new roof structure covering the light court), and braced shuttering of every opening on all three floors. Currently the Baggage & Dormitory Building is empty and awaits future renovation and reuse. PART II. ARCHITECTURAL INFORMATION A. General Statement: 1.
Architectural character: The Baggage & Dormitory Building is a large institutional building located on Island 1, to the north of the Ellis Island Main Immigration Building. It has a large open light court at the center of the building extending to skylights over the first floor. The footprint of the three-story, twelve-bay structure was originally roughly rectangular, but was rendered nearly square by the addition of the large projecting porch on its northeast side in The porch is two stories high, and spans nearly the entire northeast elevation. Designed with influences from Beaux Arts Neoclassicism, the Baggage & Dormitory echoes the general architectural unity of the other buildings at Ellis Island.
138 Stakely, 139 Oehrlein & Associates Architects, Robert Silman Associates, and Brown Associates, Baggage and Dormitory Building Assessment and Stabilization Plan, Ellis Island National Historic Site, Statue of Liberty National Monument (Department of the Interior, National Park Service, 1. ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 38) The front elevation of the Baggage & Dormitory Building faces southwest, but due to its positioning behind earlier buildings, and appendages to its front, the building s fa ade has never presented as a visual whole. Still, the southwest elevation is designed in a symmetrical Georgian Revival mode with incorporated elements common to Beaux Arts design.
The southwest fa ade also includes a center projection across the middle four bays, extending ten feet from the main footprint of the building. One of the most visually distinguishing features of Baggage & Dormitory Building is the heavy quoining at the corners and around openings, including the tall, arched doorways and windows. This is executed in pale limestone, contrasting with the red brick to create a polychrome effect on all wall surfaces. All four corners of the original building feature two-foot, single-bay projections, a visual nod to the corner towers of the adjacent Main Building. This tower aesthetic was formerly heightened by rooftop corner pavilions, which were part of an original pergola structure around the perimeter of the rooftop recreation porch.
The pergola structure was removed in with the addition of the third story. The northeast elevation, with its two story projecting porch, faces New York Harbor and Manhattan and presents itself as a secondary, de facto main fa ade when viewed from the north side of the island. The main porch elevation is dominated by large, square windows, but carries on the design idiom of the rest of the building through brick walls with limestone bands on the square columns between windows. 2. Condition of fabric: Poor/Fair.
Due to decades of neglect, the Baggage & Dormitory Building suffers from significant deterioration, though it was extensively stabilized in On the exterior, vertical cracking is visible on porch columns and through portions of the terra cotta cornice, which also suffers from occasional broken and missing sections. Heavy iron staining is visible on limestone and terra cotta decorative elements, especially on the water table, foundation, and window sills. Vegetation is visible on the roof of the passage between Baggage & Dormitory and the Main Building, threatening the integrity of its tile surface. At the northwest elevation, where the porch addition meets the original building, there is a deep washout of soil against the foundation that has created a hole that may continue to expand.
The exterior stairway between the Baggage & Dormitory and Main Building s west wing is in very poor condition, as its iron frame is rusted and it is missing its original walls, skylight glass, and some window panes. In the interior, due to deferred maintenance and moisture infiltration, walls and ceilings exhibit widespread loss of plaster surfaces, exposing the structural clay tile and brick beneath. In much of the Baggage & Dormitory, due to deterioration, wall and ceilings appear as a patchwork mixture of plaster-finished walls and exposed walls showing mesh lath, furring, and structural masonry. The white tile wainscoting found in many of the rooms is also missing or removed, usually in isolated places where deterioration occurred or building repair necessitated the removal.
Piles of brick dust at the base of walls and columns reveal significant spalling and crumbling of brick and terra cotta tile. Steel structural posts and beams are exposed where large loss of plaster and terra cotta have occurred, and at least a couple of steel beams are ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 39) flaking. Wood door and window frames exhibit various level of rot where moisture has infiltrated. The courtyard skylights have deteriorated significantly and are entirely missing in many places. The Baggage & Dormitory appears to remain structurally sound, and recent efforts have been made to weatherize the building by covering windows and door openings, and by constructing a protective roof over the middle light court.
A new roof was also recently installed including new beams over the sterilization room on the third story. B. Description of Exterior 1. Overall dimensions: Approximately 235 feet x 200 feet, excluding passageways 2. Foundations: The base of the foundation is composed of a slightly projecting, 18 inch course of granite with a rusticated face and sloped top. Above, a nearly three- foot slab of smoothly dressed limestone facing is topped by a limestone water table, which is approximately one foot high and protrudes nine inches. The lower edge of the water table forms a cavetto molding. The porch addition continues this foundation composition, with an additional concrete foundation visible below the rusticated granite in some areas, especially at the north corner. 3.
Walls: All walls of the Baggage & Dormitory Building, including those of the porch and third story additions, are composed of red brick, laid in Flemish bond. Belt courses of smoothly dressed limestone, laid flush with the brick, span the length of all walls and intersect the second and third story windows at their sills and near their tops. The original cornice, which now sits between the second and third story, forms a dramatic decorative band that interrupts the planar surface of the wall. It is visible on every elevation except on most of the rear wall, where the porch obscures it. Parts of that cornice are still visible at the ceiling level inside the second floor porch. The original cornice is larger and more ornate than the current roof cornice topping the third story.
Dominating the center of the second story decorative band is a large-scale dentil molding, which sits below a box cornice with a double fascia and an eave that is slightly projecting and clad in copper. An ovolo glazed terra cotta molding sits beneath the row of dentils. The four walls of the inner light court feature tan brick laid in a running bond. The wall surface is smooth and planar with no interruptions except for the plainly dressed window openings. A slight difference in brick color is visible between the second and third stories, where the building height was increased in 4. Structural system, framing: The primary structural system is composed of steel beams and concrete reinforced girders.
The first floor framing is supported by concrete piers on piles, as well as terra cotta floor arches. Walls are built in both structural and partition grade terra cotta blocks, which also boxes many of the steel support posts throughout the building. The disinfecting plant addition on the third ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 40) floor features a steel mono truss supporting its shed roof, and beneath it, on both the first and second floors of the porch, the sanitation room is supported by steel I-beams. 5. Porches, stoops, and ramps: a. Porches: The two-story rear enclosed porch addition, which was constructed five years after the building was completed, spans nearly the entire length of the original rear wall of the Baggage & Dormitory Building.
Though its large windows are now weatherized with protective wood sheathing, these openings dominate the walls at both levels of the porch. The typical first floor window on the porch addition features a very large 15-over-15-over-15 light center, flanked by 12-over-12-over-12 sidelights, with double-hung metal sashes, metal muntins, and metal transom rails. There are several variations of this configuration, including some 9-over-9-over-9 sidelights, especially on the side walls. Generally, windows feature movable sashes while the transom-level windows are operable, side-pivot. The porch windows on the second floor have been removed during stabilization. Older photos show each window opening contained six 4-light sashes.
The windows are separated only by limestone-banded brick piers, which support entablatures at both the first and second stories. Though now dismantled and stored on the ground in large blocks, the second story entablature was bolder than that of the first, copying the general characteristics of the original Baggage & Dormitory cornice at the same level, including a large band of dentil moldings. The porch sets back slightly at the middle of the first floor entablature, which is composed of a lower section of limestone box cornice with a two part molding below, and a upper section of brick topped by a two part limestone molding with an ovolo topped by a cavetto molding.
The porch roof originally had a brick parapet topped by circular iron grillwork and limestone coping, forming a balustrade for the third story rooftop terrace, which was accessible from a third floor stair hall. A one-story brick portico extends from the southwest elevation, on the west corner, opening into the curvilinear, covered corridor leading to the Powerhouse. The portico was built with an arched opening on its northwest and southeast elevations, though the northwest wall is now closed with common bond brick infill. The southwest wall is attached to the arched opening of the covered way, and features no other openings or embellishments.
The southeast archway leads into an enclosed courtyard created by the Baggage & Dormitory Building, the Kitchen & Laundry Building, and two covered ways. The archways all feature brick segmental arches topped with a keystone of dressed limestone, terminating upon dressed limestone imposts. The portico includes a parapet above, in the same style and materials as the porch addition, including brick columns at the corners and iron grillwork in a pattern of circles. The parapet is topped with a limestone coping. Inside the portico, a concrete ramp leads from the ground level in the covered way to the elevated first floor of the Baggage & Dormitory Building. ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 41) b.
Corridors, Passages, and Ways : The curvilinear covered way that connects the northwest portico of the Baggage & Dormitory to the Powerhouse and Bakery/Carpenters Shop is one-story, constructed of brick, and covered with flat, shingle-style terra cotta with copper gutters. The passageway structure features repeating openings with brick, segmental arches and plain rectangular brick piers. The structure appears to have been significantly altered, with brick infill enclosing each of the arched openings on the curved portion of the north side, and several more courses of brick were at some point added to the wall above the arches to raise the roof structure, possibly to accommodate plumbing.
The brick infill within the arches shows a sill halfway up, laid in common bond below and running bond above, suggesting the possibility that these arches had been only partially enclosed at one time, leaving the top half open. Original drawings show a balustrade in each archway, rather than a brick wall. Besides the brick infill on the north curvilinear side of the covered way, all other arches are open. Rectangular metal vents are located above each archway. The interior of the passage is paved with a concrete floor and has a plaster ceiling.
The three-story corridor structure to the Kitchen & Laundry Building continues the wall and fenestration characteristics of the Baggage & Dormitory s adjacent southwest elevation, with the exception of the decorative cornice that marks the former second floor roof on the original building. On the Kitchen & Laundry corridor, that space is marked by a simple limestone band that projects very slightly from the brick wall. The passage from Main Building s ticket room also features very similar characteristics as the Baggage & Dormitory, though it is only one story high, with a parapet wall above a limestone band above the windows. The bay closest to the Baggage & Dormitory on the northwest wall still has a doorway that was cut through a window for the New York Passage in c.
Stairways and Ramps: A formerly enclosed iron-framed staircase connects the first floor of the Main Building s northwest wing to the second floor of the Baggage & Dormitory s southwest elevation. The staircase rises from a small rear porch on the Main Building and includes two small landings before reaching the doorway to the Baggage & Dormitory Building. The stair treads are cast iron, and the landings are concrete with iron reinforcements. The stairway structure was originally clad in corrugated copper siding, and features two six-over six sash windows at both landings and small skylights above the landings, all framed in iron. The landings are supported by steel I-beam posts with pyramidal concrete footings.
Some panes of glass remain on the windows, but the skylight glass and corrugated copper siding have been entirely removed. An exterior fire escape stairway formerly led from the second story of the porch addition on its southeast elevation, but is no longer extant. The scarring from the structural anchors and its doorway are still visible on the southeast exterior wall and inside the porch on the second floor. ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 42) A concrete ramp extends northwest from the covered way connecting the Baggage & Dormitory to the Kitchen & Laundry. The ramp is bracketed by concrete knee walls, and rises from the ground level in the courtyard to the raised first story of the covered way.
A modern concrete ramp extends northwest from the side of the Main Building passageway, and includes an iron balustrade and aluminum handrails. On the opposite side of the passage to the Main Building, another modern concrete ramp and adjacent stairs, separated by a large concrete wall, provide access from the rear yard of the Main Building into the passageway between the Baggage & Dormitory and the Main Building. 6. Chimneys: There are no masonry chimneys; see below for description of roof ventilators. 7. Openings: a. Doorways and doors: Many of the primary exterior doors are not visible from the outside, due to their placement within covered walkways or inside the porch addition.
Generally, the masonry surrounds of the doorways adhere to the arched limestone quoining featured on nearly all of the building s openings at the first floor. The largest doorways on the southwest fa ade of the Baggage & Dormitory (facing the Main Immigration Building) were placed at the end bays. Additional doorways on the southwest elevation lead to the Kitchen & Laundry Building covered way and to the New York Passage (after Historically, the main entry door was at the southern end of the southwest elevation, accessed through the covered passageway from the Main Building to the Baggage & Dormitory Building. This door has an arched opening surrounded by limestone quoining of alternating widths that form a keystone motif around the arch.
The doorway features wood two leaf doors topped with an arched transom that nearly equals the height of the doors themselves. The doors each have a large single light in the top half, with two wood panels below. The doors are flanked by thin pilasters, which support a cornice separating the doors from the transom windows. The arched transom features a nine-over-six central window, with two sidelights flanking each sash for a total of four sidelights. The lower sash can pivot on side hinges. The top two sidelights taper with the curved arch. This treatment is typical of the other first floor exterior doorways. b.
Windows: The building features regular and generally symmetrical fenestration on all elevations, with the window openings appearing nearly identical in their treatment to the doorways. The first story openings are taller than the second and third story openings, a similar hierarchy seen on other Ellis Island buildings. The level of style and ornament are consistent on all four elevations, though the ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 43) northeast porch addition covers the original openings of the first and second story, and features a different character due to the dominance of large porch windows.
The typical first floor window features a large circular arch with a wood framed nine-over-one rectangular, double-hung sash at the center, flanked by sidelights with six lights. Above the central window is a large, nine-light fixed transom, also framed in wood. Wide, limestone quoining surrounds the opening. A deviation from the typical arched window opening is located on the northeast elevation, where brick infill and two smaller rectangular windows fill the larger arch. This is an original design that accommodated a pair of restrooms in the interior, where a wall divided the two windows and in the middle of the arched opening.
A similar original window configuration can be found on the northwest elevation, where the interior wall is still present between the restrooms in the original New York Baggage Room. A typical second floor window opening on the exterior is rectangular with a wide limestone surround, including quoining on the sides. The sloped, projecting limestone sill has a large cavetto molding underneath and rectangular limestone brackets under each corner. The wood frame sash is set directly into the wall. Each opening includes a pair of windows separated by a wood mullion of two thick beads. The sash is four lights over one, with a two light transom that tilts inward. The opening is covered on the exterior by a woven metal grate. There is sheet metal in the sash track.
On the southeast elevation, two smaller windows between the decorative limestone banding were later additions, during the installation of reading rooms in Though they are now covered for stabilization, drawings indicate that these windows feature simple trim with no decorative sills or crowns. Windows at toilet rooms, wash rooms, and various other spaces commonly include opaque, patterned privacy glass. A typical third floor window opening is rectangular, slightly taller than the second story openings, and holds a pair of four-over-one light, steel double hung sash with handle pulls, and a plain, flat metal sill and trim. Each window sash has a two light steel transom above, which tilts inward.
Exterior windows on the disinfecting plant walls are set in nearly square openings, featuring 6-over-1 and 4-over-1 metal sashes, with limestone sills and simple metal moldings. The central light court features exterior windows at the second and third stories, though currently the space is covered by a modern roof has been installed for stabilization. These pairs of windows are fitted in rectangular openings, with 4- over-4 wood sashes, and no transoms. Brick flat arches above and 6-inch limestone sills below are the only decorative embellishments to an otherwise plain opening. Wood frame screen windows are located on the exterior side of the main sashes. Most of the windows at the third story are covered with inset metal security screens or cages of large woven wire.
The second story features a mixture of security screens, with some inset in the openings and others attached directly to the exterior ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 44) masonry. The inset security screens are concave from the inside, allowing room to operate the window sashes. 8. Roof: a. Shape, covering: Both the original Baggage & Dormitory Building and the porch addition feature flat roofs. These roofs are covered in a rubberized membrane. Currently, a modern protective roof covers the light court in the center portion of the building, and is built with a single slant with a flounder style profile. b.
Cornice, eaves: The roofline has a boxed cornice cast in buff colored, molded terra cotta, beneath a slightly projecting eave that is sheathed in metal. Originally, the eave was topped by a decorative copper crown, which was removed and stored inside the building during stabilization efforts. Below the box cornice is a large ovolo molding, also of terra cotta. c. Ventilators: At the center of the building, four large ventilation chimneys pierce the roof around the perimeter of the former light court opening. These vents are the endpoints of an elaborate ventilation system to provide clean air inside the Baggage & Dormitory Building. The tops of the vents are slanted, with slatted metal vents on the side facing away from the light court.
Missing from the slanted tops are round, metal vents, which are recorded in previous drawings of the building, but have since been removed. These are now stored in the former Baggage Room on the first floor. d. Skylights: Ten skylight structures of various sizes rise a few feet above the roofline, many clustered on the west side of the building, above the former women s dormitories. Some of these openings have been boarded over and others covered with replacement metal and glazed skylights. C. Description of Interior: 1. Floor plans: The original first floor plan of the Baggage & Dormitory Building featured a large central baggage handling room and another large rectangular room dedicated to New York baggage on the northwest end of the building.
The public spaces consisted mostly of a long public lobby that spanned the front third of the first story, which was accessed from the Main Building through a connecting passageway. Adjoining the large front lobby, a narrower lobby running front-to-back split the main baggage room and New York baggage room. Offices, toilet rooms, a scale room, a lunch counter, and storage rooms occupied spaces in the corners of these larger baggage and lobby spaces. The construction of the large rear porch at the rear of the building allowed for significant expansion of the baggage handling capacity on the first floor. ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No.
NY-6086-E (Page 45) The rooms of the second and third stories wrap around a large, rectangular light court in the center of the building, which was originally covered with skylights only at the first floor to shelter and illuminate the baggage room. The second and third story floor plans are thus shaped in a roughly rectangular ring, and primarily consist of large, rectangular rooms that were used for dormitories and detention spaces. The second story, to the northeast of the light court, features a double-loaded hallway with a series of smaller dormitory rooms with their own toilets and sinks. The second story also includes the upper level of the porch addition, which was used for recreation and detention space.
The third story floor plan consists mostly of large dormitory rooms and bathroom facilities, but also includes a mattress sanitation room that was built atop the north corner of the porch addition. The roof of the porch addition, which overlooks Jersey City, Manhattan, and New York Harbor, is still accessible by a door from the north stair hall, though the parapet was removed during stabilization and the floor is now composition sheets rather than the original tile. 2. Stairways: The Baggage & Dormitory contains three primary staircases, all of which travel from the first to third floors. Two of the staircases are located off the original front lobby, in the west corner and at the southern corner of the light court.
A third staircase is located in the original north corner, now adjacent to the porch addition. This staircase includes an additional flight to the cellar which is too damaged for use. Though the stairs are currently not attached original drawings show iron construction that appears to match the detached set of stairs visible from the landing above. The three stairways are open well with a series of quarter turn landings. All of the stairway walls are lined with a white, four-inch, rectangular, subway tile wainscot about five feet above stair level. All three stairways have similar materials and structures with cast iron stringers, risers, newel posts and balusters. Decorative, cast iron newel drops are located under most posts.
The balustrades are fairly simple, constructed of iron, excepting the wood handrails, with thin square balusters braced occasionally by sweeping iron arms that attach to the stringers. The first floor newel posts feature multiple rings of decorative molding and an octagonal footprint resembling a Greek cross. The posts at the landings and higher floors are simpler, with a square footprint and caps, and paneled sides. The stairs have marble slab treads, including one or two rounded curtail steps at the first floor. The marble treads of the northwest stair were at some point replaced with slate.
The flights of stairs at the west corner between the second and third floors have an additional wire mesh protective screen at the open parts of the stairwell, including the top landing, extending about three feet above the handrails. 3. Flooring: White, two-inch, hexagonal vitrified tiles cover the floors in all three stories, including stairways and the corridors to the Kitchen & Laundry Building. Floor surfaces are usually slightly pitched toward rounded floor drains, which are present in every room, including multiple drains in larger dormitories. The floor of one toilet room on the second story is laid is slightly larger, 2.5 hexagonal tiles, and ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No.
NY-6086-E (Page 46) on the third story, about half of the rooms are covered in a speckled gray/tan two-inch hexagonal tile rather than white. The floor of the second story of the porch addition is covered in rectangular, red quarry tile measuring approximately 6 x 8 . Concrete floors appear in several spaces on the first floor, and a few on the third floor. On the first story, the original baggage room spaces have concrete floors, as do the porch addition, the original fan room, and the Coast Guard era restrooms on the east side of the building. On the third story, the sanitizer room addition and two wash rooms adjacent to the female dormitories have concrete floors. 4. Wall and ceiling finish: a.
Walls: The majority of the interior wall spaces were treated with hard plaster over wire mesh lath, covering structural terra cotta block or terra cotta furring. The lower parts of the walls feature a glazed, subway tile wainscot, generally finished with a round molded tile at the top and a cove at the base. The original design specified wainscot height at 5 0 in public lobbies and corridors, 5 6 high in toilet rooms, and 7 0 in dormitories, and the wall finishes generally still correspond to this original design, with some alterations such as the 7 0 wainscot now present in some toilet rooms. Wall finishes are duplicated on the structural columns present in most rooms in the building.
On the first floor, a tan glazed concrete block wall that likely dates to remains on the northeast side of the light court, the former refrigeration room, on the northwest side of the Coast Guard shower room and restroom, and between the Coast Guard shower room and restroom. Wood partition walls are present on both the first and second floors, but represent different eras. On the first floor, a plywood panel and screen wall divides the light court and original Baggage Room, probably dating to around On the second floor porch, two wood clapboard partition walls divide the porch space into three sections. These walls are likely much earlier, likely dating to World War I era or soon after.
Wire partition walls or guards, similar to the wire mesh covering many windows, survive to some degree in all stairwells. If not in place after the original construction, they were likely installed during the renovations. A drawing of Wire Mesh Partitions and Guards details a partition and folding gate, as well as window and door guards. b. Ceilings: The ceilings of the first floor are plaster, applied to terra cotta block. On the second and third floors, the ceiling is composed of plaster on wire mesh, which is applied to a light metal framing system that is suspended from the main ceiling I-beams, creating an industrial scale drop-ceiling effect. 5. Openings: ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 47) a.
Doorways and doors: Doorways to the exterior on the first floor typically feature wide, molded wood trim and mullions. Original drawings and at least one unaltered doorway show narrow, decorative, fluted wood pilasters flanking each set of two-leaf swinging doors. At the south corner of the building, at the passageway to the Main Building, the primary interior doorway features two-leaf wood doors topped with an arched transom that nearly equals the height of the doors themselves. The doors each have a large single light, with two wood panels below. These doors are likely later restorations, but architectural drawings indicate that they are very similar to the original doors. The arched transom features a nine- over-six central window, with two sidelights flanking each sash.
The top two sidelights taper with the curved arch. The wood trim has been removed, but the doorway otherwise reflects the typical exterior doorway. There is a wide variety of replacement doors from different periods on the first floor. Wide, sliding doors with rollers and tracks are located on a circa wall that partitions the original lobby from the west stairway, as well as at the main exterior door in the west corner of the original New York Baggage Room, which leads to the curved covered way. Interior doors on the second floor vary widely. Typical original doorways feature standard rectangular openings and mitered-corner wood moldings, accented by ogee moldings and floor plinths.
The doors are typically wood, usually with three horizontal wood panels on the bottom two-thirds and a large single light on the top one-third, with three pin hinges. Most doors feature metal escutcheons with beveled edges, simple metal turn handles, and key bolts. There are wide variations and alterations, including many doors with opaque privacy glass in various patterns, some with wire glass and/or security screens over the window, and some lights replaced with wood panels. Second floor doors that are later additions or repairs are often of metal construction, similar to doors on the third floor. A few doors, such as those leading to the double-loaded hall to the original family rooms, are sheathed in metal.
The family room hallway doors are large double doors that swing in either direction, and feature 3-light, side-pivot transoms. On the third floor, doorways generally are standard rectangular openings surrounded by flat metal trim. Doors are often metal and feature one light over one metal panel. Most doors feature metal escutcheons with beveled edges, simple metal turn handles, and key bolts. Many doors include early autoclosers. At restrooms, the door windows usually feature privacy glass, sometimes with wire. Doors to storage closets or hallways are usually similar in character and materials, except sometimes wider and with no light, instead featuring just two metal panels. Transoms sometimes appear over doorways to utility sink closets, restrooms, and occasionally in hallways spaces.
The transom windows are usually operated with a slide bar mechanism affixed to the doorway. ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 48) A number of existing doors in the Baggage & Dormitory are converted windows. These apparently occurred during several different periods of renovation and modification. On the southeast elevation, near the primary entry door, a window was converted to a door sometime after Like all original first floor windows, the design is of a similar character to the original doorways, with a couple of notable differences. The set of doors is narrower and shorter than the primary entry doors adjacent, apparently leaving the original top nine-over-nine upper sash in place as a transom.
The sidelights of the original window also survive, flanking the transoms and the top half of the doorway. This modified opening is flush with the floor, while the primary door requires a step down to enter the building from the Main Building passage. A nearly identical modification survives in the Kitchen & Laundry Building tunnel s northwest wall. In a rear room adjacent to the porch addition, originally the Fan Room but labeled a Baggage Room by the an original arched window opening was similarly converted to a door, except it does not retain the upper sash as a transom, and instead features a five-panel wooden door with a wire mesh transom above.
Probably during the Coast Guard occupation, another arched window opening was filled entirely with plaster on metal studs and wire mesh lath, except a slim, metal-sheathed wood door with a single square light near the top. On the second floor, two window openings on the northeast elevation were converted to doorways in to access the new enclosed porch addition. Neither opening currently holds a door. Another smaller door to the porch was cut through the wall at the rear north stairway. This door, which was in place by is a plain wood door with a single light, with wire security mesh only.
In when a disinfecting plant was built on the third floor, an original arched window opening in the west dormitory was converted to a double door to remove treated mattresses from the rear room of the plant. These doors are metal-sheathed wood, with simple metal trim, and a large, square, fixed 9-light transom with metal muntins and wire glass. b. Windows: Typical interior window trim on the first floor windows is wide, decorative wood molding, approximately 10 inches wide and composed of an ogee shaped piece at the inner edge and a thick bead with a section of flat molding at the outer edge. Beneath the window opening is a projecting sill, with a cavetto molding directly beneath and a plain, tapered wood apron below.
The central windows are 9-over-1 double-hung sash, with sash locks and recessed finger plates. The mullions between the sash and sidelights have a flat decorative recess at the center, approximately three inches wide. The sash windows are topped by a 9-light transom, which opens with a side-pivot hinge and metal latch above. The functional window unit is flanked with rectangular fixed sidelights, with six adjacent to the main sash window and three additional lights flanking the transom. These transom sidelights taper as they follow the curve of the arched opening, and the top light is a very small triangle that is only a couple inches in height. Though there are several deviations from this window type, the majority of first floor ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No.
NY-6086-E (Page 49) windows on each original exterior wall match this description, including in the Kitchen & Laundry corridor. Occasional variations of this configuration exist, including several 4-light bottom sashes, instead of one light, as found in the original New York Baggage room and in a bathroom on the east end. These are apparent repairs or replacements, since the muntins project slightly from the original frames. A 9-over-9 sash window remains in an office in the north corner of the original building. A former office, last used as a toilet room, in the east corner of the original building features a 9- over-2 sash, with a single horizontal muntin in the bottom sash.
Still, the arched opening, transom, sidelights, and wood trim on the variants are all the same as the typical first floor arched window. Typical second floor window openings have trim similar in scale and character to the typical first floor window, with applied rounded moldings accenting a wide trim board, which is miter cut at the corners. Beneath the window is a slightly projecting sill and a tapered apron, accented with thin decorative ogee moldings above and below. On the southeast elevation, two smaller windows added during the installation of reading rooms are smaller, without transoms, and have six-over- one sashes. The window trim has been removed.
The typical window on the third floor features the same general arrangement of the second floor, except they are taller, and most notably, constructed of galvanized steel over wood. These third-story metal windows have flush, simple sills, metal muntins, and typically metal pull handles on the interior. In the interior courtyard, second- and third-story windows are set in a rectangular opening with a four-over-four wood sash, surrounded by a plain, flat metal molding. There are remnants of insect screens covering the sashes, and metal security screens on the exterior. Each opening has a long section of patched brick above the window, visible from the interior, suggesting a modification.
On the southwest side of the courtyard, at the second story, several replacement windows are spaced evenly apart in wide rectangular openings. Two of the openings contain metal sash, two-over-two hopper windows with top latches. Small, rectangular fixed lights, also framed in metal, surround the window. The exterior side of the window unit is covered in a grill in a thick rectangular pattern. The second floor dormitory walls that ring the light court hallways feature nearly- square, side-pivot, two-light windows that resemble the transoms over many doors in the dormitory spaces. Configurations vary, and sometimes include one, two, or three windows the latter generally over doorways, lending the appearance of extended transoms.
At some doorways, similar windows flank only one side of the transom, reflecting modifications. These windows are generally located about seven feet high, above the tile wainscot, and feature wood sashes, with decorative wood moldings. Some feature heavy, woven-wire security screens, which are concave to accommodate window movement. The bathrooms in all of the family ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 50) rooms each feature one of these windows in the wall to the hallway, though they are awning type with top hinges. There are no similar windows on the third story, which was built five years after the original building.
Over time, several original doorways in the first floor of Baggage & Dormitory were removed and filled in, while leaving large transom windows. On the wall between the original New York Baggage room and the original Public Lobby, three original double doors were enclosed around leaving large, 6-light fixed square windows (former transoms) overhead, which continue to lend borrowed light to the center of the building. These windows are trimmed in wide wood moldings and have slightly projecting sills. The former transom window on the westernmost end of the wall, closest to the west stair, features four fixed, four-light sashes. Hinges on the southeast side of the openings indicate possible security screens that are no longer extant. c.
Other Openings: Several later partition walls feature cut-out openings that act as windows between rooms. On the first floor, the west side of the original public lobby, which was later partitioned and used as a dishwashing room, has several rectangular cut-out windows with simple trim, possibly to enable dishes to be passed through from the detainee dining room (the original baggage room). A clapboarded partition wall on the second story porch also features two cut-out windows, with wire cage mesh covering both. Other partition walls feature similar makeshift windows, some enclosed, some covered in wire mesh security wire, and some retaining sashes with lights intact. A makeshift mail slot was cut into the other wood partition wall on the second story porch. 6.
Wall Surface Markings: Painted Coast Guard-era training graphics remain on many of the walls in the first story porch, though they are in deteriorated condition. Included on the walls is a navigational chart, a compass with degrees, and vertical panels of signaling flags on the brick southwest wall (the former exterior wall). The walls of the Baggage & Dormitory also feature a large amount of historic graffiti, especially on the second floor, where it was probably executed by enemy aliens during wartime detention or immigrant detainees awaiting deportation. Most graffiti consists of names, dates, and/or place of origin, with occasional figural sketches or pictures. 7.
Hardware: Door hardware throughout the Baggage & Dormitory Building tends to be simple, with pin hinges, plain brass escutcheons, rounded brass handles, and keyed deadbolts above. Some doors also feature auto closer units, especially at toilet and wash rooms, though their presence is inconsistent. Window hardware is a mixture of types from different eras, including recessed metal finger plates, curled metal finger lifts, and metal pull handles. Most windows have rotating sash locks. 8. Mechanical equipment: ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 51) a. Heating, air conditioning, ventilation: There are several remaining elements of the early forced steam heating system, including up-feed, one-pipe floor radiators, as well as some wall mounted steam pipes.
Radiator types are fairly consistent across all three stories of the Baggage & Dormitory. Most floor radiators are approximately 3 feet tall, utilitarian in appearance, with simple fins and plain, tapered legs. The most common units are 7 feet, 5 feet, and 3 feet units, with occasional variations. The 7 feet units are more frequent on the first story, while the second and third stories contain more 5 feet units. Radiators are typically located under windows, and in larger rooms such as dormitories, a radiator is located beneath every window. Some disconnected radiators remaining in the building feature more decorative, Victorian patterns. The porch addition is also equipped with wall-mounted, steam pipe radiators on both stories.
On the first floor, the pipes are affixed at the ceiling level around the perimeter of the exterior walls, and on the second story, near floor level of the interior wall (former exterior). The ductwork of an elaborate ventilation system remains mostly intact. Rectangular galvanized steel ducts connect to nearly every room in the Baggage & Dormitory Building, some of which include original metal vents. This network of air ducts converge at several consolidation points, where large exhaust chimneys rise to the rooftop ventilation chimneys. b. Lighting: Light fixtures suspended from the ceiling by long chains hang at regular intervals in most rooms on all three floors. These fixtures contain large incandescent bulbs, shielded by round, enameled metal shades.
Glass globes were affixed beneath the shades in many rooms. Many of the metal fixtures, and all of the glass globes, have now been removed or taken down for storage. A significant number of rooms feature similar light fixtures that are affixed directly to the ceiling, including the original New York Baggage room, the first floor of the north (rear) stairway, much of the first floor porch addition, and a few rooms on the third floor. Many rooms on the third floor currently contain only exposed light bulbs with no fixtures. On the second story of the porch addition, large metal cages protect two of the exposed incandescent light bulbs. Besides the typical ceiling suspended lights and the skylights, very few other lighting fixtures are in the Baggage & Dormitory.
One exception is a bathroom on the third floor that has a decorative wall sconce with an extended arm that forms a spiral armback. There are occasional plain, unembellished porcelain or metal wall sockets for single light bulbs. c. Plumbing: On the first floor, one large bathroom in the east corner is a later modification of offices or other spaces, probably by the Coast Guard. Typical fixtures on the first floor include tankless, vitreous china toilets surrounded by metal-sheathed plywood stalls, vitreous china sinks arranged in back to back rows on metal stands with separate hot and cold faucets, vitreous china utility sinks, and ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 52) Standard brand vitreous china urinals in both bowl and floor models.
One room modified for Coast Guard use in the early contains rows of group showers with metal surrounds, placed on a raised concrete base. There are also several examples of c. porcelain coated cast iron sinks supported on a single turned leg. The dormitories on the second and third floors include a number of large and small bathrooms, shower and tub rooms, water closets, and utility closets containing several styles of fixtures dating from c. to c.
Bathrooms on the second floor also feature marble toilet surrounds with pipe supports and solid or louvered wood doors on spring hinges; vitreous china tankless toilets (some Sanlif brand); porcelain coated cast iron sinks with a single turned leg and non-mixer faucets; larger ceramic sinks with two turned legs; Standard brand floor urinals (same as first floor); vitreous china tankless toilets, with either a stepped or plain rounded base; and metal shower stalls on a concrete base; and wall mounted water fountains. The small individual bathrooms in the detention rooms on the second floor generally have a later vitreous china sink (c. with a squared basin and single squared leg.
However, several other types of replacement sinks appear in these rooms that are not found elsewhere in the building. Third floor bathrooms feature metal-sheathed plywood shower and toilet stalls, typical vitreous china toilets, vitreous china sinks on metals stands (like first floor), or c. vitreous china sink with square leg (like second floor); ceramic utility sinks; floor and wall-mounted vitreous china urinals. One room has a series of ceramic tubs, possibly original to incorporated into tile surrounds, with small marble seats attached to the tile on one side and supported by a single metal leg. d. Mattress Sanitizers: Three large sanitation units remain on the third story addition to the north corner.
These units are recessed into a sunken floor, and traverse a partition wall between two rooms, one side representing the entry point for soiled mattresses, and the other room the receiving end for treated mattresses. e. Kitchen equipment: A large amount of commercial-grade kitchen equipment remains in the south section of the building, the area of kitchen operations during the Remaining equipment includes a long steam-table/buffet, a large oven unit, coffee urns, and in two adjacent rooms, a large industrial grade mixer, preparation counters, oven and warming cabinet, and utility sink. To accommodate the kitchen equipment, concrete curbing and platforms, faced with red quarry tile, surround the vats and the sink area. f.
Refrigerators: A small refrigeration room, likely dating to the or is located adjacent to the Coast Guard era shower room on the south end of the building. It retains its cork wall insulation, though the ceiling and refrigeration equipment has been removed. ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 53) D. Site: 1. Historic landscape design: Historically, officials attempted to maintain a clean and attractive appearance to the buildings and grounds on Ellis Island. However, due to the utilitarian functions of the building, the many appendages on the fa ade, and the lack of public spaces around its exterior, prevent a cohesive landscaping design.
On the southwest side of the building, the courtyard created between the Baggage & Dormitory Building and the Main Building is paved, as it was historically, and now has concrete picnic tables, though the space is clearly unused and not maintained. A similarly enclosed space between the Baggage & Dormitory and the Kitchen & Laundry Buildings is not paved, and is currently overgrown with vegetation and apparently unmaintained. To the southeast, the area directly adjacent to the Baggage & Dormitory and the Main Building has a sidewalk, entrance ramp, and steps leading to the doorway in the passageway between buildings. Further to the north, the area adjacent to the wall is currently used for the storage of cornice blocks that have been removed from the building.
The area in front of the porch addition, on the northeast side of the building, is now used for temporary construction offices, storage, and as a driveway for vehicular traffic and pedestrians. Beyond this driveway is the harbor. The northwest side of the building is a service area, currently used for temporary storage units, piles of soil, a driveway to the Powerhouse and a water tower. At the foot of the Baggage & Dormitory, on the northern half of the wall, more cornice blocks are stored. PART III. SOURCES OF INFORMATION A. Architectural drawings: A computerized Drawings Index System for all types of Ellis Island architectural and engineering drawings is located at the Technical Information Center (eTIC), Denver Service Center, National Park Service.
Original drawings are digitized and available at http://etic.nps.gov. A large number of original architectural drawings and plans survive for the Baggage & Dormitory Building, including site plans, floor plans, sections, and detail drawings of doors, windows, and many fixtures. Particularly useful is the final set of original drawings from December (containing 28 sheets), including a location plan, floor plans, elevations, transverse and longitudinal sections, interior and exterior details, and construction details. A set of drawings also shows the electrical plans. For the additions, another full set of drawings totals 30 sheets.
Many drawings survive from the mid-1920s renovations, including plans for the first, second, and third floors, the new interview room on the second floor, the exterior metal stairway, and the disinfecting plant on the third floor. A large number of drawings are available from the for a wide range or repairs and alterations, including utility work. Extensive sets of drawings are also available from the historic structures report and from the stabilization project. Some of the most useful drawings when preparing this report were: Chief Engineer and Superintendent, U.S. Public Buildings, NY City, Tentative Plan Showing Proposed New Building, Alterations, Etc., U.S. Immigration Station Ellis Island, New York Harbor (13 February NPS Drawing No. [early conceptual plan for new building].
ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 54) Supervising Architect, Treasury Department, James Knox Taylor, U.S. Immigration Station, Ellis Island, (Baggage & Dormitory), (12 December NPS Drawing No. 462/41,902A, Sheets [original location plan, floor plans, elevations, sections, details, framing, plumbing plan, structural work, and test pits]. Alfred Brooks Chief Engineer, and Frank S. Howell, Civil Engineer, Additional Story, Baggage & Dormitory Building and Metal and Masonry Projection (2 June NPS Drawing No. Sheets [third floor and porch plans, framing plans, ventilation, details of fireproof windows and doors, wiremesh partitions and guards, and fan houses and skylights, framing plans, and new elevations]. Albert Brooks Chief Engineer, Drawing No.
E777, Description Location Plan of Island 1 (June NPS Drawing No. Sheets 7 and [general plans with descriptive room labels, showing entire Island 1 by floor level]. U.S. Department of Labor, Immigration Service, Drawing No. Repairs, Alterations, & Additions, Baggage & Dormitory Building, Island No. 1 (30 April NPS Drawing No. Sheets 1-8 floor dismantling work, general reconstruction, heating plumbing & electrical, second floor plumbing and ventilators, exterior stairway to interview room, plumbing details for interview room]. U.S. Department of Labor, Immigration Service, Drawing No. Plumbing & Heating, B&D (6 February NPS Drawing No. Sheets 1-7 [plans show layouts of every floor, including roof and basement]. U.S.
Department of Labor, Immigration and Naturalization Service, General Plan of the Manifest Copy Room, First Floor - Baggage & Dormitory Building (26 June NPS Drawing No. [shows layout for clerical card work in U.S. Coast Guard, District Civil Engineers Office, Alterations to 1st Floor, B&D Building, Ellis Island, for Coast Guard Training Quarters (18 November NPS Drawing No. Sheets 1-5 [first floor plan, plumbing, electrical, and details]. B. Early Views: Historic images of the Baggage & Dormitory are limited, and almost no construction photographs have been identified.
One photograph shows a portion of the site during foundation work, and another shows the construction during the addition of the third story in The exterior of the building also shows up in several historic exterior shots of the island, especially aerials (Figure At least two images of the Baggage & Dormitory can be found in the William Williams Collection, The Miriam and Ira D. Wallach Division of Art, Prints and Photographs, New York Public Library Digital Collections. The construction photo showing the addition of the third story is located in Record Group Still Pictures Branch, National Archives and Records Administration, College Park, MD.
Also of note is a collection of historic photos showing the main lobby during the era, and interiors of dormitories in the ELLIS ISLAND, BAGGAGE & DORMITORY BUILDING HABS No. NY-6086-E (Page 55) reproduced in Beyer Blinder Belle/Anderson Notter Finegold Historic Structure Report (see below). C.