Henry Hudson Parkway, Extending 11.2 miles from West 72nd Street to Bronx-Westchester border
Henry Hudson Parkway, Extending 11.2 miles from West 72nd Street to Bronx-Westchester border, New York County, NY. Surveyed as HAER NY-334, with a 69,071-word written history.
From the record
“Henry Hudson Parkway, Extending 11.2 miles from West 72nd Street to Bronx-Westchester border, New York County, NY”
Survey record header. Machine-read text.
Surveyed by the federal HAER program as HAER NY-334 · the record runs 69071 words · one of 297 surveyed structures published for this county.
Source document
Quoted word for word from HAER NY-334.
Not written, edited or summarised by this site.
HHP in Riverside Park at West to streets BIN: Date of Construction: Type: steel girder viaduct Description: The 830 -8 long viaduct carries the parkway over the railroad tracks. It is constructed of riveted steel girders carried on steel piers with jersey barriers placed on top of the steel parapet. The viaduct abuts a pedestrian underpass at West Street. Builder/Engineer/Architect: Henry Hudson Parkway Authority Current Owner: Amtrak View of west side of viaduct at West Street. July Detail of riveted steel construction. July HENRY HUDSON PARKWAY HAER No.
(Page 92) Name: West Street pedestrian underpass HHP in Riverside Park at West Street BIN: Date of Construction: Type: Concrete arch pedestrian underpass Description: Broken range work masonry faces the concrete arch underpass, and granite has been used in the quoins, voussoirs and coping. Concrete blocks form the barrel of the arch. The underpass connects paths on the east and west sides of the parkway, providing pedestrian access to the waterfront, which was an important component of Robert Moses plan. The underpass is part of the McKim, Mead and White plans for the park, which specified that the railroad would be enclosed in a tunnel designed to look like a Roman aqueduct. A highway would run on top of the enclosure with pedestrian tunnels underneath.
Robert Moses dismissed this plan, claiming that it would create a roller coaster of a parkway. The section of the McKim, Mead and White plan from West to streets remained, and this underpass is one feature of that era of construction. Builder/Engineer/Architect: McKim, Mead and White design, built by Henry Hudson Parkway Authority Current Owner: New York City Parks Department West Street underpass. July HENRY HUDSON PARKWAY HAER No. (Page 93) Name: West Street underpass HHP in Riverside Park at West Street entrance ramp to northbound parkway lanes BIN: Date of Construction: Type: Concrete arch underpass Description: Broken range work masonry clads the concrete arch underpass and abutments. The arches have granite voussoirs, and there are granite quoins as well.
The underpass measures 26 long and out to out. Builder/Engineer/Architect: Henry Hudson Parkway Authority Current Owner: New York City Parks Department West Street underpass. July HENRY HUDSON PARKWAY HAER No. (Page 94) Name: West Street pedestrian underpass HHP in Riverside Park at West to streets Date of Construction: ca. Type: Rigid frame concrete arch pedestrian underpass Description: The rigid frame concrete arch underpass allows pedestrians to cross under the parkway from one side of the park to the other. The underpass is faced with broken range work masonry while the arch has a granite voussoir. The barrel of the underpass is of concrete blocks painted white.
Builder/Engineer/Architect: Henry Hudson Parkway Authority Current Owner: New York City Parks Department West Street underpass. July Arch detail. July For more information, see New York Central Railroad, Roof Covering Over Tracks, Streets, Pedestrian Underpass at Street, available at New York City Department of Parks, Olmsted Center. Name: West Street underpass HHP in Riverside Park at West Street Date of Construction: ca. Type: Rigid frame concrete underpass Description: The underpass allows pedestrian access to the river as well as motorist access from the southbound to the northbound lanes of the parkway or to Riverside Drive. The underpass, which has a 12 -8 clearance, is clad in broken range West Street underpass work masonry. The elliptical arch has granite voussoirs, with roadway.
July and the abutments feature granite quoins. The coping is also of granite. Builder/Engineer/Architect: Henry Hudson Parkway Authority Current Owner: New York City Parks Department HENRY HUDSON PARKWAY HAER No. (Page 95) Name: West Street bridge Carries Riverside Drive over West Street BIN: Date of Construction: Type: Steel arched girder Description: Exemplifying City Beautiful aesthetics, the West Street bridge consists of riveted steel arched girders with a metal railing. Flanking both sides are symmetrical arches of articulated granite blocks defining the pedestrian walkways that flank West Street. The elliptical arches have granite voussoirs and decorative keystones of granite. Masonry wing walls extend from the granite arches and feature granite coping and granite pillars.
The masonry bridge abutments have a granite coping as well. A granite balustrade on both ends unifies the abutments and arches. The bridge measures out to out and 108 long and recently underwent a complete restoration. Bridge from West Street. March Interior of bridge showing riveted steel arches. March Detail of pedestrian walkway arch. March HENRY HUDSON PARKWAY HAER No. (Page 96) Name: West Street underpass HHP in Riverside Park at West Street Date of Construction: ca. Type: Rigid frame concrete arch underpass Description: This underpass is similar to that at West Street and is part of a ramp system in this location. A broken range work masonry wall separates the pedestrian traffic from motorists.
Granite quoins, voussoirs, and coping break up the expanse of broken range work masonry that clads the rigid frame concrete elliptical arch underpass. This underpass is part of a ramp system in this location. Builder/Engineer/Architect: Henry Hudson Parkway Authority Current Owner: New York City Parks Department West Street underpass with pedestrian walkway and road. July HENRY HUDSON PARKWAY HAER No. (Page 97) Name: Riverside Drive Viaduct Riverside Drive from St. Clair Place to West Street BIN: Date of Construction: rehabbed due to corrosion Type: Steel girder Description: The Manhattan Valley cuts through the landscape from West to streets, so a riveted steel viaduct with open spandrel parabolic arch ribs was built to carry Riverside Drive.
The viaduct terminates in a coursed stone masonry retaining wall with access stairs from Riverside Drive to St. Clair Place below. The viaduct measures long and 81 -7 out to out and extends over St. Clair Place and Twelfth Avenue (nicknamed Death Avenue for the perilous grade crossings located there). Currently, there are a number of commercial structures located along St. Clair Place, like the Fairways supermarket. The bridge had to undergo a major rehabilitation in the mid- because engineers discovered that the beams were rusting. Builder/Engineer/Architect: Francis Stuart Williamson Underside of Riverside Viaduct (left), access steps from St. Clair Place (right).
July Historic images of the viaduct include: Viaduct, Riverside Drive, One Hundred and Twenty-Fifth Street, in Mid-Manhattan Library Picture Collection, call no. PC NEW YC-Brid, dig. id. Manhattan- Street (West) Park Avenue, call no. dig.id: and Riverside Drive, St. Clair Place, Percy Loomis Sperr, Photographer, call no. 0967-E2, 0967-E3, dig. id. All available in Photographic Views of New York City, Humanities and Social Sciences Library, New York Public Library Digital Gallery; Riverside Drive Viaduct, Microfilm, Roll 9, DPR New York City Municipal Archives. HENRY HUDSON PARKWAY HAER No. (Page 98) Name: New York Central Railroad viaduct St. Clair Place to West Street, between the HHP and Avenue Type: Steel girder and frame BIN: Date of Construction: ca.
Description: The steel girder and frame viaduct measures 78 out to out and long and carries the railroad over a commercial area. The parkway viaduct was built adjacent to the elevated railway, which eliminated the dangerous grade crossings that gave Twelfth Avenue the nickname Death Avenue. Next to the railroad viaduct is a long and narrow brick building once used for railroad operations. Railroad building alongside viaduct. March Name: West Street access bridge Crosses the the railroad tracks and Riverside Park from Riverside Drive at West Street to Riverbank State Park Date of Construction: ca. Type: Girder pedestrian bridge Description: The bridge was built to provide secondary access to Riverbank State Park, mostly for use by pedestrians with some restricted vehicle access.
The steel girder overpass has been painted green, and it has concrete abutments, piers and parapet, with additional chain link fencing. The girders have been tagged with graffiti. Builder/Engineer/Architect: Unknown View from parkway of West Street access bridge. July HENRY HUDSON PARKWAY HAER No. (Page 99) Name: West Street access bridge Crosses the the railroad tracks, and Riverside Park from Riverside Drive at West Street to Riverbank State Park Date of Construction: ca. Type: Steel girder pedestrian bridge Description: Constructed to provide visitor access to Riverbank State Park, paired concrete piers support the steel girder overpass. The bridge has a concrete parapet an chain link fencing. It has been tagged with graffiti.
At the east end of the bridge, a visitor toll booth is located. Builder/Engineer/Architect: Unknown View of West Street access bridge from parkway. July HENRY HUDSON PARKWAY HAER No. (Page Name: West Street overpass Riverside Drive at West Street BIN: Date of Construction: Type: Concrete arch underpass Description: Before the construction of Riverbank State Park, West Street passed under Riverside Drive and across the tracks to the recreational area at West Street. Now closed, the concrete arch overpass measures 41 long and out to out with a sidewalk on the west side. The overpass was built as part of the extension of Riverside Drive. Overpass and retaining wall under the Riverbank State Park Access Bridge.
March Name: West Street underpass HHP in Riverside Park at West Street BIN: Date of Construction: Type: Concrete arch pedestrian underpass Description: The concrete arch underpass allows pedestrian access to both sides of the park from Palisades Playground along Riverside Drive to the Ten Mile River Playground along the riverfront. The underpass is different from the rest of the Riverside Park architecture because the concrete structure has been left exposed rather than faced in masonry. The concrete of the wingwalls has been left exposed too. The structure measures 80 out to out and 23 long. Builder/Engineer/Architect: Madigan & Hyland West Street underpass. March For image see Bridge at St and Henry Hudson Parkway from Metropolitan Transit Authority, Bridges & Tunnels Archives.
HENRY HUDSON PARKWAY HAER No. (Page Name: West Street railroad overpass Riverside Drive at West Street BIN: Date of Construction: Type: Steel girder pedestrian overpass Description: Extending from a terraced lookout at Riverside Drive and West Street at Palisades Playground, three flights of stairs lead to the green steel girder overpass, which crosses over the railroad to Ten Mile River Playground on the west side of the parkway. The stairs have masonry and metal handrails on the exterior sides as well as center metal handrail. Cast metal light standards with a decorative faunal motif at the base sit on stone piers flanking the overpass. The original fencing along the overpass is decorative with scrolls placed at regular intervals, with chain link fencing added later.
The overpass measures out to out and 105 long. At the west end of the overpass, a set of metal stairs leads down to Ten Mile River Playground. The stairs extend north and south from a broken range work masonry abutment with granite quoins. The stairway has two landings, the highest of which is supported by piers. The stairs end at a semi- circle landing of stone. View of Riverside Drive lookout and overpass. March HENRY HUDSON PARKWAY HAER No. (Page Lamppost detail. March Stairs leading down from overpass. March HENRY HUDSON PARKWAY HAER No.
(Page Name: West Street railroad overpass Riverside Drive at West Street, over the railroad tracks BIN: Date of Construction: Type: Steel Warren truss pedestrian bridge Description: The steel Warren through truss pedestrian bridge crosses the railroad tracks. It was constructed to provide access for pedestrians from Riverside Drive, which has a circular overlook at this location, over the railroad tracks and down to the shores of the Hudson, where there was a sand baseball field among the railroad structures. The bridge measures 8.5 out to out and 120 long. Builder/Engineer/Architect: Unknown Current Owner: New York City/Amtrak View looking north with Riverside Drive cantilever in background. March For historic images, see: West Side Improvement, South from St Viaduct, neg. no.
and View North from St, neg. no. both available at New York City Parks Department Photo Collection, the Arsenal; Riverside Drive, St, Percy Loomis Sperr, Photographer, call no. dig. id. in Photographic Views of New York City, Manhattan, Humanities and Social Sciences Library, in New York City Public Library Digital Gallery. HENRY HUDSON PARKWAY HAER No. (Page Name: West Street railroad overpass Riverside Drive at West Street, over the railroad tracks BIN: Date of Construction: Type: Riveted steel Pratt through truss pedestrian bridge Description: The pedestrian bridge extends out from the wall supporting the Riverside Drive cantilever section. The retaining wall was necessary because the railroad tracks are at a much lower grade level than Riverside Drive.
The bridge measures 109 long and 7.7 out to out. Builder/Engineer/Architect: Unknown Current Owner: New York City/Amtrak View of Riverside Drive cantilever and West Street pedestrian bridge. March HENRY HUDSON PARKWAY HAER No. (Page Name: West Street underpass Fort Washington Park at West 173 Street, beneath HHP southbound lanes BIN: Type: Pedestrian underpass Description: The underpass allowed pedestrian access to pathways in Fort Washington Park, starting at Riverside Drive and West Street, following a path along a George Washington Bridge ramp, through the underpass, and then across the tracks down to the riverfront near the Little Red Lighthouse. A ca. cast iron light standard still stands on the east side of the underpass. West Street underpass. July Light standard.
July HENRY HUDSON PARKWAY HAER No. (Page Name: West Street railroad overpass Fort Washington Park near West Street, over the railroad tracks BIN: Date of Construction: Type: Steel girder pedestrian bridge Description: This riveted steel girder pedestrian bridge crosses over the railroad tracks that run between the parkway and the river. The bridge and the scroll and wire mesh railing have been painted green. The bridge s abutments are broken range work masonry with granite quoins. Two cast light standards flank both ends of the bridge. On the west end of end of the bridge, two flights of stairs lead down to the Hudson River Valley Greenway trail. Broken range work masonry covers the stair walls, which have granite coping and landings. The bridge measures out to out and 120 long.
Builder/Engineer/Architect: New York City Parks Department Current Owner: New York City Parks Department/Amtrak Overpass with George Washington Bridge in background. March Stairwell. March HENRY HUDSON PARKWAY HAER No. (Page Name: Pedestrian overpass Fort Washington Park at West Street vicinity Date of Construction: Unknown Type: Steel Pratt pony truss pedestrian bridge Description: The steel Pratt pony truss with a wooden deck carries the Hudson Greenway trail over the railroad cut. Due to the construction of the Greenway trail, metal fencing was added to the sides for safety reasons. Current Owner: New York City Parks Department Side elevation of bridge with George Washington Bridge in background (top photo). Decking and fencing (middle photo).
View of railroad cut from bridge, looking south (bottom photo). March HENRY HUDSON PARKWAY HAER No. (Page Name of Feature: George Washington Bridge Hudson River between West Street, Manhattan and Fort Lee, New Jersey Date of Construction: two lanes added to upper deck; lower deck added; various dates for ramps Description: The monumental George Washington Bridge straddles the Hudson River between West Street on the Manhattan side and Fort Lee on the New Jersey shore, connecting the HHP and the greenway to the Palisades Interstate Parkway and greenway. The Port Authority, under the direction of its chief engineer Othmar Amman, built the bridge between When it opened, it was the longest suspension bridge in the world. Leon S.
Moissieff and Allston Dana served as consultants, and Cass Gilbert was the architect. Two lanes were added to the upper deck in In a lower deck was added, making it the world s only fourteen-lane suspension bridge. The span features massive steel abutments anchoring the bridge on either side of the Hudson River. On the New Jersey shore, the steel tower was anchored into rock rather than concrete. The steel towers themselves reflect a struggle over aesthetics. Amman ultimately decided that the towers should be clad in stone because the contrast between the solidity of the stone towers and the delicate suspension wires appealed to him. Gilbert as well wanted the towers clad in granite for both practical (it would protect the steel and add strength) as well as aesthetic reasons.
With the onset of the Depression, it was decided to simply paint the steel since that was cheaper than cladding. The debate between Amman and Gilbert was symptomatic of a larger discourse occurring in the between engineers and architects involved in bridge construction over bridge aesthetics and how much decorative embellishment was necessary on an engineered structure. Builder/Engineer/Architect: Port Authority, under direction of chief engineer Othmar Amman, Leon S. Moissieff and Allston Dana consultants, Cass Gilbert, architect Current Owner: Metropolitan Transportation Authority HENRY HUDSON PARKWAY HAER No. (Page Upper deck of George Washington Bridge, July See HAER No. for more information.
The George Washington Bridge was designated a Civil Engineering Landmark by the American Society of Civil Engineers in HENRY HUDSON PARKWAY HAER No. (Page Name: West Street overpass Crossing parkway at West Street BIN: Date of Construction: Type: Steel girder pedestrian overpass Description: The bridge crosses the northbound parkway lanes and runs under the George Washington Bridge approach, providing access to the Hudson Greenway. The steel girder bridge has a steel railing with chain link fencing, and measures 203 long and Pedestrian bridge from parkway. Note jersey 7.5 out to out. barriers with covered chain link fencing obscuring view of rockslide that occurred in May outside Castle Village on parkway. July Name: West Street underpass HHP at West Street Date of Construction: ca.
Type: Concrete arch pedestrian underpass Description: The underpass provides pedestrian access to the Hudson Greenway trail and runs under the southbound lanes of the parkway to Riverside Drive. It is faced in rustic stone, and the arch has a stone voussoir. Builder/Engineer/Architect: Henry Hudson Parkway Authority Current Owner: New York City Parks Department Underpass and pathway. March HENRY HUDSON PARKWAY HAER No. (Page Name: Fort Tryon Park bridge Fort Tryon Park at former Riverside Drive entrance BIN: Date of Construction: Type: Concrete arch Description: When entering Fort Tryon Park from the northbound parkway lanes, the drive passes under a concrete arch bridge clad in stone.
The bridge carries Margaret Corbin Drive, which loops around the Cloisters and connects to Riverside Drive and West Street. The parapet wall is clad in stone as well and has a stone coping (probably granite). The bridge measures 82 out to out and 40 long. The rustic stonework seen on this bridge is used throughout the park. Builder/Engineer/Architect: Guy Lowell, Olmsted Brothers Current Owner: New York City Parks Department View of bridge from entrance at Riverside Drive. March HENRY HUDSON PARKWAY HAER No. (Page Name: Fort Tryon Park underpass Fort Tryon Park BIN: Date of Construction: Type: Concrete arch, pedestrian underpass Description: As with the other structures in the park, this concrete segmental arch pedestrian underpass is faced in rustic masonry.
The underpass allows a pedestrian path to continue uninterrupted under Margaret Corbin Drive to the Pavilion. The underpass is long and 12 out to out. Builder/Engineer/Architect: Guy Lowell, Olmsted Brothers Current Owner: New York City Parks Department Underpass with stairs and path. March West face of underpass. March HENRY HUDSON PARKWAY HAER No. (Page Name: Fort Tryon Park underpass Fort Tryon Park BIN: Date of Construction: Type: Concrete arch pedestrian underpass Description: The underpass has a segmental arch and a parapet wall, and the whole fa ade is clad in rustic stone. The 12 long underpass is located near the former Riverside Drive entrance to the park.
Builder/Engineer/Architect: Guy Lowell, Olmsted Brothers Current Owner: New York City Parks Department Underpass in Fort Tryon Park. March Detail of barrel and stone cladding. March HENRY HUDSON PARKWAY HAER No. (Page Dyckman Street Bridge, carrying northbound lanes of the parkway. Photo by John Benfatti, April Name: Dyckman Street bridge, northbound Northbound Henry Hudson Parkway lanes at Dyckman Street BIN: Date of Construction: Ramp: Bridge: Type: Open spandrel concrete arch Description: This bridge originally carried both the north and southbound lanes (four total) of the parkway, but now it carries the three northbound lanes and a pedestrian lane. It is a continuous concrete arch bridge with a tied four-arch main span and features an ornamental metal balustrade atop the parapet.
The concrete abutments and battered walls have been treated to look like clapboard siding (although the original plans specified ashlar cladding). It has a 51 -18 clearance elevation and measures 234 long and 55 out to out. Builder/Engineer/Architect: Henry Hudson Parkway Authority, recommended by Gilmore D. Clarke, Consulting Landscape Architect; Waddell & Hardesty, Consulting Engineers; Madigan-Hyland, Consulting Engineers; approved by W. Earle Andrews, Chief Engineer and General Manager; Harry Taylor, Secretary; William H. Latham, Park Engineer Current Owner: Triborough Bridge & Tunnel Authority Drawings: Henry Hudson Parkway Authority, Henry Hudson Parkway, Dyckman Street Bridge, Architectural Elevations & Sections, June 1, Contract No. 3, available at the Olmsted Center.
HENRY HUDSON PARKWAY HAER No. (Page Southbound Dyckman Street Bridge with NYC railroad trestle below. Taken from a playground in Inwood Hill Park. March Name: Dyckman Street bridge, southbound HHP southbound lanes at Dyckman Street BIN: Date of Construction: Type: Steel girder and floorbeam system Description: The bridge was constructed to accommodate an alteration in the road alignment that occurred as the result of the construction of the upper deck of the Henry Hudson Bridge. The original parkway lanes became southbound lanes only, and a new road for the northbound lanes was built. The bridge measures long and 40 out to out. The deck has no sidewalk and is bounded by a green steel balustrade.
Builder/Engineer/Architect: Henry Hudson Parkway Authority Current Owner: Triborough Bridge & Tunnel Authority Name: Dyckman Street Exit Overpass (no photo) Dyckman Street vicinity, carrying northbound HHP over a southbound ramp BIN: Date of Construction: Type: Steel frame Description: The bridge measures 82 long and 55 out to out. There are concrete abutments and pylons with a concrete balustrade topped by a metal railing. In the vicinity of this bridge is a viaduct spanning the railroad tracks. Builder/Engineer/Architect: Henry Hudson Parkway Authority Current Owner: Triborough Bridge & Tunnel Authority HENRY HUDSON PARKWAY HAER No.
(Page Name: Inwood Hill Park footbridge Inwood Hill Park at approximately West Street Bin: Date of Construction: Type: Pedestrian arched steel girder Description: The footbridge carries the Hudson Greenway trail over the Amtrak right of way. The bridge abutments and walls along the stairs are stone masonry, and the coping is granite. The west side of the overpass has metal stairs with anti-slip treads and an anti- slip landing supported by riveted steel piers. There is a 2 pipe handrail with 5/8 square balusters. The east side of the overpass has a 40 concrete stepped ramp and 5 concrete treads. The concrete bridge deck has concrete curbs as well. The guardrail on the bridge has a bar shaped in a twisted scroll at each end welded to the baluster.
The rest of the guardrail has straight balusters with mesh attached. The length of the bridge is 71 , and the out to out measures 10 . Builder/Architect/Engineer: Henry Hudson Parkway Authority, recommended by Madigan-Hyland, Consulting Engineers; approved by Allyn R. Jennings, GM; Harry Taylor, Secretary; Latham, Park Engineer. Current Owner: New York City Parks Department View of footbridge. March HENRY HUDSON PARKWAY HAER No. (Page West end of bridge with stairs (left). Ramp on east end of bridge (right). March Drawings: Henry Hudson Parkway Authority, Henry Hudson Parkway, Pedestrian Overpass at Inwood Hill Park, Contract No. 24, available at the Olmsted Center.
Name: Inwood Hill Park underpass Inwood Hill Park at approximately West Street Date of Construction: Type: Concrete arch pedestrian underpass Description: This stone-faced concrete arch pedestrian underpass allows uninterrupted pedestrian access to a trail from the Hudson River to Inwood Hill Park under the southbound lanes of the Builder/Architect/Engineer: Henry Hudson Parkway Authority Current Owner: New York City Parks Department Pedestrian underpass in Inwood Hill Park, view from Hudson Greenway. April HENRY HUDSON PARKWAY HAER No.
(Page Name of Feature: Henry Hudson Bridge BINS: near Inwood Hill Park, spanning the Harlem River Date of Construction: upper deck added in Type: Fixed plate girder arch Description: The Henry Hudson Bridge spans the Harlem River and connects the Manhattan and Bronx sections of the Considered an engineering marvel of its time, the span was the longest fixed plate girder arch bridge in the world when built.
The bridge was part of a larger plan to extend Riverside Drive into the Bronx, spearheaded by Borough President George McAneny The construction of the bridge was part of the Regional Plan Association s push to create a comprehensive road network by connecting Manhattan with the Bronx and Riverside Park, the Henry Hudson Parkway, and the Saw Mill River Parkway in Westchester County and beyond. Residents also wanted the bridge because they thought it would help alleviate traffic congestion in the Bronx. The bridge s designers (Emil Praeger, Madigan-Hyland, Robinson & Steinman, and Waddell & Hardesty) had originally planned for a three-arch span to support six lanes on a single deck.
The bankers, however, were not convinced that enough motorists would want to use the bridge, so the final design became a two arch, four lane span with a 42 roadway on a single deck. Nevertheless, Robert Moses was so confident that the public would pay the 10-cent toll that the bridge was built to eventually support a second deck. This plan was structurally feasible because engineers used reinforced steel and built the bridge supports on solid rock on both sides of the canal. After Moses was finally able to convince bankers that the 10 cent toll on the bridge would be sufficient, he (through the Henry Hudson Parkway Authority) was able to sell million worth of bonds.
Workers began construction in June and the bridge opened to traffic in December Thomas Crimmins Contracting Company of 734 Lexington Avenue, New York, City, received the contract for the construction of the substructure, estimated to cost The company also had an alternate bid of that included stone cladding. The American Bridge Company won the contract to do the steel substructure with a bid of Its hingeless arch construction required accurate engineering analysis and stress control during all phases, and because river and railroad traffic continued unabated during construction, the insertion of the crown piece (of the arch) necessitated a new approach to jacking so as not to block the river.
When the bridge was completed, it was the longest fixed plate girder arch bridge in the world, with a main span of 840 . The mid-span clearance of above high water allowed ships to navigate under the bridge without needing a lift or swing mechanism. The bridge had to be built HENRY HUDSON PARKWAY HAER No. (Page off center of the Harlem River Channel to circumvent the New York Central Railroad, which ran under the north abutment. The upper deck carries three lanes northbound, while the lower deck carries four lanes southbound. The bridge once had two pedestrian walkways. One is still open on the west side of the lower level, while the one on the east side of the upper level is currently closed.
Granite faced tollbooths for both south and northbound traffic are located on the Manhattan end of the bridge. The current cost per pass through toll is The toll booth administration building for the bridge was originally of stone masonry with iron doors and window frames, which was specified on the drawings as having either shatterproof or bulletproof glass. The building was entered via a 6 wide vestibule on the ground floor. At the north end was the supervisor s room, which had a safe and closet. The vestibule also opened to a locker room to the north, which was connected to a restroom with a ceramic tile floor. Attached to the building at the north end of the building was a police station. The booths themselves were glass with sheet iron bases.
Neon indicators and overhead traffic lights directed the traffic. Builder/Engineer/Architect: David Steinman, Chief Engineer; Emil Praeger, Madigan- Hyland, Robinson & Steinman, Waddell & Hardesty, designers Current Owner: Metropolitan Transit Authority Toll booth from March HENRY HUDSON PARKWAY HAER No. (Page View of Henry Hudson Bridge from Spuyten Duyvil. March Drawings: Henry Hudson Parkway Authority, Henry Hudson Bridge Upper Deck, 42 sheets, Contract No. 15, available at the Olmsted Center. Henry Hudson Parkway Authority, Henry Hudson Parkway, Electric Lighting System, Henry Hudson Bridge Lighting, Division No. 2 Bridge Light Standard Details, available at the Olmsted Center.
Henry Hudson Parkway Authority, Henry Hudson Parkway, Administration Building and Toll Booths, no date noted, Contract No. 10, available at the Olmsted Center. Photographs: Construction and views of Henry Hudson Bridge (some with Spuyten Duyvil Swing Bridge in background), some courtesy of Steinman Engineers, some taken by Richard Averill Smith for Steinman Engineers, dated available at Metropolitan Transit Authority Bridges & Tunnels Archives. See also Henry Hudson Parkway Authority, Completion of the Henry Hudson Bridge and Henry Hudson Memorial Park: Published on the Occasion of the Completion of the Henry Hudson Bridge and Approaches, May 7, (New York: Henry Hudson Parkway Authority, HENRY HUDSON PARKWAY HAER No.
(Page Name of Feature: Spuyten Duyvil Swing Bridge crossing the Harlem River Ship Canal at Spuyten Duyvil, viewable from the Henry Hudson Bridge Date of Construction: Type: Steel Warren truss Description: This steel bridge replaced the original wooden bridge built in It is a Warren truss, subdivided with lattice sway braces. The 610 bridge has three fixed sections on the Manhattan side and one on the Bronx side. The 290 central section pivots on a turntable that was originally powered by a steam engine. An electric engine replaced it in The bridge carries Amtrak and allows Circle Line boats through, but it had to be rehabilitated in after one of the boats hit it. Builder/Engineer/Architect: Robert Giles, New York Central Railroad Current Owner: Amtrak Spuyten Duyvil Swing Bridge.
July HENRY HUDSON PARKWAY HAER No. (Page Name: Kappock Street overpass Carries Kappock Street over the HHP BIN: Date of Construction: Type: Rigid frame concrete Description: The Kappock Street Bridge is a single span segmental arch concrete bridge, which measures 47 -10 according to the original drawings. The portion of the abutments facing the roadway is clad in stone masonry like the retaining walls flanking the bridge, but the concrete abutments underneath the bridge and the ramp walls have been treated to look like clapboards. A study of the southeast access wall shows approval for building concrete clapboard walls and planting climbing vines. The abutments feature granite quoins and a granite coping measuring 8 deep. The concrete balustrade has a rubbed surface.
Chain link fencing was added at a later date. Builder/Engineer/Architect: Henry Hudson Parkway Authority, Gilmore D. Clarke, Consulting Landscape Architect; Waddell & Hardesty, Consulting Engineers; and Madigan-Hyland, Consulting Engineers, recommended the plans, and W. Earle Andrews, Chief Engineer and General Manager; Harry Taylor, Secretary; and William H. Latham, Park Engineer, approved it. Current Owner: New York City Elevation of bridge and retaining wall. July HENRY HUDSON PARKWAY HAER No. (Page Masonry retaining wall and concrete clapboard pattern. July Drawings: Henry Hudson Parkway Authority, Henry Hudson Parkway, Kappock Street Bridge, Contract No. 4, available at the Olmsted Center.
Name: West Street overpass Carries West Street over the HHP BIN: Date of Construction: Type: Rigid frame concrete Description: The rigid frame concrete bridge measures 63 out to out and 78 long. The double segmented arch bridge is faced in broken range work masonry, and there is a beveled-top cutwater on the center pier. The stone parapet has added chain link fencing. The wing walls have View of bridge from parkway. July been painted white. Builder/Engineer/Architect: Henry Hudson Parkway Authority Current Owner: New York City Drawings: Henry Hudson Parkway Authority, Street Bridge, Contract No. 7, available at the Olmsted Center. HENRY HUDSON PARKWAY HAER No.
(Page Name: Pedestrian overpass Passes over the HHP between West and streets BIN: Date of Construction: Type: Girder pedestrian bridge Description: The single span steel girder pedestrian bridge has been painted green. The steel picket railing has additional chain link fencing. The ramp walls are faced in random ashlar masonry. The bridge measures 11 out to out and 230 long. Builder/Engineer/Architect: Unknown Current Owner: New York City View of pedestrian bridge and ramp from parkway. July Name: West Street overpass Carries West Street over the HHP BIN: Date of Construction: Type: Rigid frame concrete Description: This double segmental arched overpass crosses the parkway with a 9 -9 clearance. It is faced in broken range work masonry, as are the abutments.
There is a rounded decorative cutwater with a corbelled cone top. The central pier is set in a median offset by a jersey barrier. Chain link fencing was installed on the sidewalk in front of the parapet at a later date. Builder/Engineer/Architect: Henry Hudson Parkway Authority Current Owner: New York City View of West Street overpass from parkway. July HENRY HUDSON PARKWAY HAER No. (Page Name: Manhattan College Parkway overpass Carries Manhattan College Parkway over the HHP BIN: Date of Construction: Type: Rigid frame concrete Description: The triple segmental arch bridge crosses the parkway with a 10 -10 clearance. It has a beveled top on a decorative cutwater, stone voussoir, and is clad in broken range work masonry. The parapet was originally masonry with a guardrail on top.
Chain link fencing was installed on the sidewalk in front of the parapet at a later date. The bridge measures 43 out to out and 143 long. Builder/Engineer/Architect: Henry Hudson Parkway Authority Current Owner: New York City View of Manhattan College overpass from parkway. July Name: West Street overpass Carries West Street over the HHP BIN: Date of Construction: Type: Rigid frame concrete Description: The single span random ashlar-faced bridge has a decorative cutwater with a beveled capstone. The abutments and ramp walls are faced in random ashlar masonry. Chain link fencing was installed on the sidewalk in front of the parapet at a later date. The bridge measures 67 out to out and 83 long.
Builder/Engineer/Architect: Henry Hudson Parkway Authority Current Owner: New York City View of West Street overpass from parkway. July HENRY HUDSON PARKWAY HAER No. (Page Name: West Street overpass Carries West Street over the HHP Bin: Date of Construction: Type: Rigid frame concrete Description: The rigid frame concrete double span bridge has segmental arches, a stepped voussoir, and broken range work masonry cladding on the bridge and wing walls. The decorative cutwater has a beveled capstone. The parapet has a granite coping. Chain link fencing was added later. The bridge measures 53 out to out and 85 long. Builder/Engineer/Architect: Henry Hudson Parkway Authority Current Owner: New York City View of West Street overpass from parkway (top).
Perspective view of bridge (left) View of parapet and fencing (right). July HENRY HUDSON PARKWAY HAER No. (Page Name: Riverdale Avenue overpass Carries Riverdale Avenue over the HHP BIN: Date of Construction: Type: Rigid frame concrete Description: This rigid frame concrete double segmental arched bridge crosses the It is faced in broken range work masonry with a granite voussoir and abutment, and there is a corbelled cone-topped decorative cutwater. Chain link fencing was installed on the sidewalk in front of the parapet at a later date. The bridge measures 52 out to out and 100 long. Builder/Engineer/Architect: Henry Hudson Parkway Authority Current Owner: New York City View of Riverdale Avenue overpass from parkway.
July Name: Fieldston Road overpass Carries Fieldston Road over the HHP BIN: Date of Construction: Type: Rigid frame concrete Description: This bridge has a single span elliptical arch and masonry cladding. Unlike the more refined cut masonry of similar bridges, this bridge used larger and more irregular quarry-faced stones that give the bridge a massive and rather rustic effect. Chain link fencing was installed on the sidewalk in front of the parapet at a later date. The bridge measures 83 out to out and 86 long. Builder/Engineer/Architect: Henry Hudson Parkway Authority Current Owner: New York City View of Fieldston Road overpass from parkway. July HENRY HUDSON PARKWAY HAER No.
(Page Name: Broadway Underpass HHP crosses over Broadway BIN: Date of Construction: Type: Steel arch girder Description: The riveted steel arch girder bridge has a metal balustrade with chain link fencing added to it. The coursed masonry abutments have a masonry parapet and a coping of the same type of stone. The bridge measures out to out and 94 long. Builder/Engineer/Architect: Henry Hudson Parkway Authority Current Owner: New York City View of overpass from Broadway. March HENRY HUDSON PARKWAY HAER No. (Page Name: Van Cortlandt Park Equestrian Path overpass Carries park equestrian path over HHP Bin: Date of Construction: Type: Girder Description: This concrete girder bridge has decorative granite cutwaters on its central pier.
It has a timber guardrail (which was a feature of the original plan) on the parapet. Chain link fencing was installed on the sidewalk in front of the parapet at a later date. The wing walls are clad in broken range work masonry. The central pier sits in the median with jersey barriers surrounding it. The bridge measures out to out and 81 long. Builder/Engineer/Architect: New York City Parks Department Current Owner: New York City Parks Department Side view of equestrian bridge (top). View of bridge deck with chain link fencing (bottom). July HENRY HUDSON PARKWAY HAER No.
(Page Name: Van Cortlandt Park Railroad Bridge Van Cortlandt Park at HHP BIN: Date of Construction: Type: Riveted steel girder railroad trestle Description: The former New York Central Railroad s Putnam Division built this riveted steel girder bridge as an overpass at the same time the parkway was being constructed. This line, originally known as the New York City & Northern, ran passenger service from the Bronx to Brewster, Putnam County from to Freight service ended in and Westchester County acquired the line in This section of the right-of-way is now part of a 14-mile trail called the South County Trailway in Westchester County that connects to a nature trail in Van Cortlandt Park.
The 116 long bridge has concrete piers and abutments faced in stonework in Chain link fencing was installed on the sidewalk in front of the parapet at a later date. Builder/Engineer/Architect: New York Central Railroad Current Owner: New York City Parks Department View of railroad bridge. July HENRY HUDSON PARKWAY HAER No. (Page Name: Mosholu Parkway overpass Carries Mosholu Parkway, near the Westchester County border, over the HHP Bin: Date of Construction: Type: Rigid frame concrete Description: The bridge crosses the northbound HHP lanes and interchange, taking traffic from Mosholu Parkway to the HHP southbound. The rigid frame bridge has one elliptical arch that spans the HHP s southbound lanes and one semi-circular arch that spans the lane to the Mosholu Parkway.
It is clad in broken rangework masonry with a stepped voussoir and a central pier set in the median, which is surrounded by jersey barriers. The arch over the ramp lane has a 7.3 clearance while the arch spanning the parkway has a 8.5 clearance. The bridge measures 68 out to out and 108 long. Builder/Engineer/Architect: Clarke, Rapuano & Holleran; Howard, Needles, Tammen & Bergendorff; Steinman Current Owner: New York City View south of Mosholu Parkway overpass. July HENRY HUDSON PARKWAY HAER No. (Page INTERCHANGES Name of Feature: Rotunda and traffic circle HHP in Riverside Park at West Street Date of Construction: traffic circle constructed Description: The Rotunda is the major landmark of Riverside Park since it is a gateway both to the park and to the waterfront.
It is one of four major interchanges on the The northbound lanes of the parkway have an exit ramp at West Street and an entrance ramp at West Street, which form a half cloverleaf on the east side of the parkway. Southbound lanes exit at a ramp at West Street before encountering a roundabout around the Rotunda. There is an exit ramp at this roundabout that leads to the southbound lanes of the parkway. This forms a traffic circle on the west side of the parkway. The structure is clad in broken range work masonry. Its top level is the parkway traffic circle on the west side of the parkway. At this level, there are low broken range work masonry walls with granite copings at the traffic circle and ramps. Circular piers with light standards atop punctuate the walls.
On the next level of the Rotunda is a courtyard with three arched openings leading from the courtyard to the seasonal West Street Boat Basin Caf , which visitors access by stone steps. This level used to feature a pool with a dolphin fountain in the center. The voussoirs of the arched openings are granite, as are the piers. Beyond the caf is a large terrace overlooking the marina. The terrace fa ade is elaborately detailed with a granite ledgement table supported by carved granite ovolo brackets. The basement level houses a 200-car garage, accessed by a curved ramp from the traffic circle. The Rotunda s terraces overlook the West Street Boat Basin. Builder/Engineer/Architect: New York City Parks Department Current Owner: New York City Parks Department View of Rotunda traffic circle.
July HENRY HUDSON PARKWAY HAER No.
(Page BINs for Rotunda interchange: Name of Feature: Plaza Covers West Street Boat Basin garage BIN: Date of Construction: Description: Steel girder, out to out and 194 long Current Owner: New York City Parks Department Name of Feature: Traffic Circle Covers West Street plaza BIN: Date of Construction: Description: Steel girder and floorbeam, 38 out to out and 635 long Current Owner: New York City Parks Department Name of Feature: Ramp Riverside Park at West Street, extends from HHP to West St over Boat Basin garage BIN: Date of Construction: Current Owner: New York City Parks Department Name of Feature: Ramp Riverside Park at West Street, ramp carries traffic from Boat Basin garage to HHP BIN: 226771A Date of Construction: Description: The walls and buttresses are clad with typical Riverside Park stonework, and the ramp has a segmental arch with a granite voussoir.
The ramp is 31 out to out and 101 long. Current Owner: New York City Parks Department View of West Street ramp. July HENRY HUDSON PARKWAY HAER No.
(Page Name of Feature: Ramp Riverside Park at West Street, carries traffic over Boat Basin garage to garage for staff and boat owners BIN: Date of Construction: Description: Measures out to out and 334 long Current Owner: New York City Parks Department Name of Feature: Ramp Riverside Park at West Street, carries traffic over Boat Basin garage to West Street BIN: Date of Construction: Description: Measures out to out and 427 long Current Owner: New York City Parks Department Name of Feature: Ramp Southbound HHP ramp to West Street BIN: Date of Construction: Description: Measures out to out and 86 long Current Owner: New York City Parks Department Name of Feature: Ramp Riverside Park at West Street, westbound on/off ramp from HHP over pedestrian path BIN: Date of Construction: Current Owner: New York City Parks Department Name of Feature: Ramp Riverside Park at West Street, eastbound on/off ramp from parkway over pedestrian path BIN: Date of Construction: Current Owner: New York City Parks Department Drawings: New York Central Railroad, West St to West St, Express Highway, Track Covering and West Street Grade Crossing Elimination, available at Olmsted Center.
HENRY HUDSON PARKWAY HAER No. (Page Name of Feature: Ramps HHP at West and streets Description: Between West and streets are ramps on both the south and northbound lanes of the The northbound ramp exits to Riverside Drive at West Street, and there is also an entrance ramp at this location. A triangular median separates the two ramps. The short entrance ramp here is typical of ramp design, with a tight curve requiring quick acceleration for cars entering the parkway and fast deceleration for exiting traffic.
Builder: New York City Parks Department Current Owner: New York City Parks Department Name of Feature: West Street interchange Description: This is the second major interchange of the parkway, and it consists of an exit ramp on the northbound lanes of the parkway as well as an entrance ramp that allows traffic to either enter the northbound lanes or travel under the parkway via the West Street underpass and then enter the southbound parkway lanes via an entrance ramp. Drivers on the southbound parkway lanes can exit at West Street and travel under the parkway via the West Street underpass. They can then either reenter the northbound parkway lanes or exit at West Street.
Drivers exiting the parkway at West Street traveling east pass under Riverside Drive, which is carried over West Street on a decorative bridge. Cars entering and exiting at West Street beneath Riverside Drive. March HENRY HUDSON PARKWAY HAER No.
(Page BINs: Name of Feature: Ramp Southbound from West Street BIN: Date of Construction: Description: out to out, 49 long Current Owner: New York City Name of Feature: Ramp Northbound from West Street BIN: Date of Construction: Description: out to out, 50 long Current Owner: New York City Name of Feature: Ramp Southbound to West Street BIN: Date of Construction: Description: out to out, 50 long Current Owner: New York City Name of Feature: Ramp Northbound to West Street BIN: Date of Construction: Description: out to out, 49 long Current Owner: New York City HENRY HUDSON PARKWAY HAER No. (Page Name of Feature: Ramps At West Street, two ramps carry traffic over southbound and northbound HHP lanes over West street.
BIN: Southbound, 222933A out to out, 630 long BIN: Northbound, out to out, 576 long Date of Construction: Unknown Owner: both owned by New York State Department of Transportation View of the West Street exit ramps from the West Street access bridge at Riverbank State Park. July HENRY HUDSON PARKWAY HAER No. (Page Name of Feature: George Washington Bridge interchange Hudson River between West Street, Manhattan and Fort Lee, New Jersey Date of Construction: Description: This is the third major interchange along the It is a complex network of ramps and bridges connecting I-95 and US 1 (both known as the Trans-Manhattan Expressway), Riverside Drive, and Broadway (US 9). The interchange has been reconfigured numerous times.
Between a new approach from the northbound parkway that bypassed Riverside Drive was added; workers also built two new ramps that crossed over Riverside Drive and completed a tunnel approach from West Street to Highbridge Park near the Harlem River Speedway. In a connection from the bridge to the southbound parkway was completed to avoid a tortuous path that included a hairpin turn and northward detour under the bridge before circling back south to join the southbound parkway lanes. In three new exits and approaches were added to the parkway.
On the Manhattan side, the Trans-Manhattan Expressway runs east from the bridge between West Street and West Street to the Harlem River; it connects both levels of the bridge with Amsterdam Avenue, Harlem River Drive, and the Street Bridge over Harlem River. The expressway also connects directly with the Alexander Hamilton Bridge, which is part of the Cross Bronx Expressway (I-95) and crosses the Harlem River. From both levels, ramps connect to the parkway, Riverside Drive and local streets.
Builder/Engineer/Architect: Port Authority Current Owner: Metropolitan Transportation Authority Bin Numbers for George Washington Bridge Interchange: Ramp Street Ramp UX Ramp Street 552250A West Bus Ramp 552250I East Bus Ramp 5522550O Bus Station Plaza Fort Washington Avenue Bridge 552258O South Bus Station Ramp 552259O Broadway Bridge 552257O North Bus Station Ramp 552260O Wadsworth Avenue Bridge 552261O St. Nicholas Avenue Bridge 552262O Audubon Avenue Bridge 552250E Bus Turnaround 552251O 552253O Amsterdam Avenue Bridge 552253O Exit ramp to Riverside Drive over 552252O southbound July Ramps 3 and 4 George Washington Bridge, Lower Level Ramp 552250A Ramp HENRY HUDSON PARKWAY HAER No.
(Page 552249O 552254A 552254I George Washington Bridge Upper Level Name of Feature: Van Cortlandt Park interchange HHP at Van Cortlandt Park Date of Construction: Unknown Description: A semi-cloverleaf design takes the north and southbound traffic to and from the parkway and Broadway. Current Owner: New York City Van Cortlandt Park interchange, view south. July Name of Feature: Mosholu Parkway interchange HHP at Mosholu Parkway Date of Construction: Description: This is the fourth major interchange of the Traffic from Mosholu Parkway converges with the left lane of the two northbound HHP lanes, just beyond the Major Deegan Extension Bridge. The HHP southbound lanes for the Mosholu Parkway diverge into one lane to the left and travel over the bridge.
Two lanes continue southbound, with southbound traffic from the Mosholu Parkway entering from the left just south of the bridge. Current Owner: New York City HENRY HUDSON PARKWAY HAER No. (Page
Guide Rail Types
The HHP features various types of guide rails. The New York City Parks Department designed the earliest Art Deco guide rail. The rail consists of panels overlapping vertical metal bars bent to form arcs that are welded to horizontal metal bars. The height of the rail is 2 -7 . Each panel is connected to a 2 7/8 wide post. The end posts are slightly more decorative, featuring a round knob on top. They are found primarily in Riverside Park and appear in a variety of shades of green, from a brilliant turquoise to a pale spring green. The latter color is a recreation of the original hue. It is unknown which guide rails of this type are original and which are reproductions. Art Deco Guide Rail Riverside Park, West Street (left). Railing detail at West Street (right).
July A second original guide rail type is the spring cable tension guide rail (no photo) located on the western side of the southbound lanes of the parkway between West and West streets. The third original guide rail type is a low wall of broken range work masonry located just before the Henry Hudson Bridge on the western side of the northbound lanes. There is also a masonry guide rail at the Rotunda traffic circle. Masonry Guide Rail Riverside Park at Street, traffic circle. July HENRY HUDSON PARKWAY HAER No.
(Page The most common types of guide rails are the galvanized steel W-beam barriers, located sporadically along the length of the parkway, and jersey barriers, located along the parkway and medians from West to streets in Riverside Park and all along the parkway north of Riverside Park. Jersey barriers replaced the original timber guide rails used in the Bronx. Wood railings are extant only along a ramp leading onto the northbound parkway at the Manhattan College Parkway Bridge and Van Cortlandt Park Equestrian Bridge, but it is doubtful these are original. Decorative cast jersey barriers have been placed along the Greenway Trail near West streets. W-beam Guide Rail At West Street pulloff on southbound lanes. March Jersey Barrier Parkway at West Street. July HENRY HUDSON PARKWAY HAER No.
(Page Greenway Trail Jersey Barrier Decorative concrete barriers along the greenway between West streets. March Henry Hudson Parkway, Contract No. 23, shows spring cable guide rail on northbound lanes north of Dyckman, available at the Olmsted Center. For images of this type, see Street Southbound, neg #s and Street Southbound, neg #s in Metropolitan Transit Authority Bridges & Tunnels Archives. HENRY HUDSON PARKWAY HAER No. (Page
Parking Areas and Scenic Overlooks
Name of Feature: Parking area HHP in Riverside Park at West Street Date of Construction: Unknown Description: This parking area is located on the west side of the HHP and overlooks the Hudson River. Since it is not currently in use, it has become overgrown with vegetation. The lot features broken Art Deco guide rails in turquoise and w-beam guide rails. Builder/Engineer/Architect: New York City Parks Department Current Owner: New York City Parks Department West street parking area. July Name of Feature: Parking area and scenic overlook HHP in Riverside Park at West Street Date of Construction: Unknown Description: The refurbished parking area provides a view of the Hudson River and across to New Jersey, as well as the promenade and tennis courts.
The ramp leading to the parking area has Art Deco guide rails as well as W-beam dividers. The parking area is paved in tarmac, and there is a new walkway of granite and tarmac with painted black metal picket fencing. Builder/Engineer/Architect: New York City Parks Department Current Owner: New York City Parks Department Promenade along West Hudson Street River. July Parking area. July HENRY HUDSON PARKWAY HAER No. (Page Name of Feature: Emergency Pulloff HHP Southbound at West Street Date of Construction: Description: As originally designed, the parkway had no emergency pulloffs. In Charles H. Sells, State Superintendent of Public Works announced that Del Balso Construction Company would construct twenty-six emergency turnouts between the George Washington Bridge and West Street.
The turnouts were to measure approximately 155 long and be separated from the parkway by a 2 wide curb. Originally the pulloffs were paved with blocks but have since been paved in asphalt. Very few survive. Builder/Engineer/Architect: Del Balso Construction Corporation Current Owner: New York City Parks Department West Street Pulloff. March A series of six photographs showing emergency turnouts at northbound West Street, northbound West Street, two of southbound West Street, northbound West Street, and southbound West Street is available at Metropolitan Transit Authority Bridges and Tunnels Archives. HENRY HUDSON PARKWAY HAER No. (Page Name of Feature: Riverside Park scenic overlook Riverside Drive at West to streets Date of Construction: ca.
Description: In this location, Riverside Drive is on a terrace. Since it sits at a higher grade than the a retaining wall had to be constructed. A parapet wall clad in the broken range work masonry with granite coping used throughout the park borders the terrace. A pair of light standards shaped like shepherd s crooks light the area. A flight of stairs with a masonry rail and granite coping provide access from the terrace and Riverside Drive to the park below. Builder/Engineer/Architect: New York City Parks Department Current Owner: New York City Parks Department Stairway and retaining wall. July Light standard detail. July View of overlook and retaining wall. July HENRY HUDSON PARKWAY HAER No.
(Page Name of Feature: Shelter and comfort station Riverside Drive near Grant s Tomb at West Street Date of Construction: Description: The shelter is very similar to Inspiration Point further north. It features Doric columns supporting a coffered wood ceiling, and there are decorative wood brackets. Stairs flank the structure and lead down to restrooms on the bottom floor. A drawing of the west elevation shows that to the left was the men s room and to the right was the women s. Both contained dressing rooms and toilets; there was also an attendant s room and a coal and boiler room. The building is in poor condition, evidenced by scaffolding being used to hold up the damaged roof.
Builder/Engineer/Architect: Theodore Videto, New York City Parks Department architect Current Owner: New York City Parks Department View of shelter from Riverside Drive. July Drawings: Riverside Drive Comfort Station, approved available at the Arsenal, Cabinet 4. HENRY HUDSON PARKWAY HAER No. (Page Name of Feature: Street Entry Ensemble Riverside Drive from West to West streets Date of Construction: Description: From West to streets, Riverside Drive has a heavy masonry block retaining wall underneath it, and from West to streets, the drive cantilevers over the exposed New York Central Railroad tracks. This section was built as part of the extension of the drive. At West Street, a circular terrace overlooked the park and river. A conical pavilion once topped the rotunda.
A set of stairs led down to a hillside terrace, from here the path continued across a pedestrian steel Warren truss bridge over the exposed railroad tracks at W. Street, which was built in This overlook is the last of four elements from the original Riverside Drive that remains intact (the others were destroyed by the construction of the Riverbank State Park) and may have been the inspiration for the design of the promenades, arches and loggias that appear throughout Riverside Park. Builder/Engineer/Architect: Rodgers, builder; George Stuart Williamson, Supervisor Current Owner: New York City Parks Department Panorama view of the Entry Ensemble. Photo by Massimo Strino. HENRY HUDSON PARKWAY HAER No. (Page Circular terrace. July Stairs. July Detail of wall.
July HENRY HUDSON PARKWAY HAER No. (Page Name of Feature: Inspiration Point Riverside Drive at West Street Date of Construction: pavilion Description: Inspiration Point was designed as a destination point on Riverside Drive. Located near Fort Tryon Park and the Cloisters, it overlooks the Hudson and Palisades beyond. The structure has Doric columns holding up what was originally a coffered wood ceiling. By the the shelter had deteriorated so much that plans were put in place to clean up the area, replace the missing stone, and construct an open trellis on the roof. Although jersey barriers have made it inaccessible from the it is still heavily used by those on the Hudson Greenway, which passes by the overlook.
Builder/Engineer/Architect: Gustav Steinacher, chief engineer of New York City Department of Parks Current Owner: New York City Department of Parks View of Inspiration Point from the road. Courtesy of John Benfatti. April HENRY HUDSON PARKWAY HAER No. (Page ADJACENT HIGHWAYS Name of Feature: Joe DiMaggio Highway (formerly the West Side Highway, Miller Highway) West streets, just south of the HHP Date of Construction: Description: The West Side Highway, later renamed the Miller Highway (after Manhattan Borough President Julius Miller), was one of the first elevated urban expressways built in America. When it opened, engineers praised it as a roadway that came close to being an ideal highway.
Despite the accolades, the highway became obsolete within the first two decades of its existence, a victim of its own design. It had been designed to avoid buildings on either side, so it had narrow lanes, sharp curves and short on- and off-ramps. The city commissioned the usual studies to improve the highway, but without adequate backing and maintenance, the structure slowly deteriorated over the years. The end came on December 16, when a truck crashed through a section of the highway at Gansevoort Street. In the midst of the fiscal crisis, the city declined to reconstruct the old West Side Highway (since renamed the Joe DiMaggio Highway).
Between and the original highway was systematically destroyed and a new one constructed consisting of a surface boulevard south of West Street and an elevated portion from West to streets. The current Joe DiMaggio Highway is built of steel and concrete, with handball courts under the highway at West and streets. Access steps go from Riverside Park South to West 68th/Riverside Boulevard (where the Trump property is located). The Empire State Development Corporation is currently seeking approval for its Miller Highway Project. To make way for further waterfront development between West and streets, the company would like to relocate the elevated portion of Route 9A or the Joe DiMaggio Highway (although the report refers to the Miller Highway) eastward into a tunnel.
The old Miller Highway remnant at West Street would be west of the proposed route and thus would be spared. As part of the proposal, New York City Department of Transportation now has permission from the courts to close the northbound parkway exit at West Street; this will allow developers to connect Riverside Boulevard to West Street. Builder/Engineer/Architect: New York City Current Owner: New York City HENRY HUDSON PARKWAY HAER No. (Page View of Joe DiMaggio Highway, July Underside of highway with handball courts, July View of Joe DiMaggio Highway. July HENRY HUDSON PARKWAY HAER No.
(Page Name of Feature: Miller Highway West to streets Date of Construction: Description: This is a remnant of the original highway and consists of a riveted steel arched viaduct with open spandrels and exposed girders, all of which have been painted green. Part of the original decking remains as well as two original Art Deco light standards. Builder/Engineer/Architect: Unknown Current Owner: New York City Remnant of Miller Highway with Joe DiMaggio Highway in back. July Detail from below. July HENRY HUDSON PARKWAY HAER No.
(Page Name of Feature: Riverside Drive West Street to Dyckman Street Date of Construction: Begun Description: Central Park Commissioner William Martin suggested a park and drive in the area as a way to boost housing development in the By the city had purchased land for a straight drive on the ridge and the hill sloping down to the Hudson for a park. An plan called for a straight avenue 100 wide on top of the rocky bluffs, which would have required extensive excavating, grading and filling, as well as constructing a very large and expensive retaining wall that would have limited pedestrian access to the park and the river. In with the success of Central Park behind them, Frederick Law Olmsted and Calvert Vaux drew up an alternative plan that solved the challenging topography problem.
Olmsted s plan was for a winding drive that would run for 3 miles and terminate in a circle at the Claremont Inn, which was near Grant s Tomb. They proposed merging the land for the drive with the land for the park, and designed the drive (then called Riverside Avenue) to be a curving road that took advantage of the topography and the spectacular vistas. The city built the park and drive more or less according to the Olmsted-Vaux plan between and and portions of Riverside Drive opened to the public in In the viaduct connecting the drive at West Street had been completed. As predicted, the opening of the drive and park was a catalyst for construction of single- family houses and apartment buildings. When first opened, Riverside Drive extended from West Street to West Street.
The drive had concrete curbs with four courses of masonry blocks alongside the curb. Cast light standards curved like a shepherd s crook with hanging lanterns light the area. Overlooks gave pedestrians the opportunity to pause and gaze out over the Hudson and across the river to New Jersey. In a graceful arched steel viaduct was finished that bridged West to streets, where the Manhattan Valley cut made road construction difficult. Francis Stuart Williamson designed the structure. Acquisition of land for the extension of Riverside Drive from West to streets occurred in and By the extension had been completed. This section included the cantilever over the New York Central Railroad tracks at West to streets.
The cantilever measured 100 long and 50 wide and cost It sat on a masonry block wall with arches. The Board of Estimate put further extension of the drive on hold in but by talk had resumed of extending Riverside Drive. Olmsted and Arnold Brunner presented plans for the extension of Riverside Drive, a great deal of which would be incorporated by Robert Moses in his West Side Improvement plan. The plans included a viaduct at West where Boulevard Lafayette terminated. Between West and Dyckman streets, the drive would be 60 wide with a sidewalk along its westerly edge. HENRY HUDSON PARKWAY HAER No. (Page The early twentieth century saw the construction of memorials and monuments along Riverside Drive up to West Street.
This began with the construction of Grant s tomb, where the drive at first terminated in a loop. These are noted separately in the following section of the inventory. Builder/Engineer/Architect: Frederick Law Olmsted/Calvert Vaux designed the original Riverside Drive; Francis Stuart Williamson designed the viaduct at West to streets; George Stuart Williamson and Rodgers built the West to section; Robert Moses, Gilmore D. Clark, Clinton Loyd would oversee the construction of the drive from West to its terminus View of wall with Riverside Drive retaining wall at West St. (top). Original terminus of Riverside Drive at Claremont (now Grant s Tomb), (bottom).
July There are many historic images of Riverside Drive available at the New York Public Library Digital Gallery and the New York City Parks Photo Archive in the Olmsted Center. The portion of Riverside Drive from West Street to Street is listed on the National Register of Historic Places; Riverside Park and Riverside Drive (from West Street to St. Clair Place) was designated a New York City Scenic Landmark in Riverside Drive West to Street Historic District and Riverside Drive West to Street Historic District are also listed on the National Register of Historic Places. HENRY HUDSON PARKWAY HAER No. (Page
Recreational Facilities
Name of Feature: Classic Playground Riverside Park at West streets Date of Construction: Description: The playground features an in-ground fountain and paired rectangular comfort stations clad in stone whose windows have the same decorative ceramic tile grating as at the Rotunda. Builder/Engineer/Architect: New York City Parks Department Current Owner: New York City Parks Department W. St. Comfort station. July Name of Feature: Henry Neufeld Elephant Playground Riverside Park at West Street Date of Construction: Description: The playground has an in-ground fountain consisting of elephant statues spraying water from their trunks. There are also several basketball courts and a brick comfort station with a hipped roof.
Builder/Engineer/Architect: New York City Parks Department Current Owner: New York City Parks Department View of elephant fountain. July West Street. Comfort station. July HENRY HUDSON PARKWAY HAER No. (Page Name of Feature: Street Boat Basin Riverside Park at West Street Date of Construction: Description: While the Boat Basin has a modern pier, there are also remains of old piers and slips. The basin holds 105 boat slips and has public launch sites and moorings. Builder/Engineer/Architect: New York City Parks Department Street Boat Basin. July Current Owner: New York City Parks Department Name of Feature: Street River Run Playground Riverside Park at West Street Date of Construction: Description: The gated playground features a stone comfort station.
Builder/Engineer/Architect: New York City Parks Department Current Owner: New York City Parks Department West Street. Comfort station. July HENRY HUDSON PARKWAY HAER No. (Page Name of Feature: Promenade (noted as Middle Promenade on drawings) Riverside Park, runs from West Street to West Street Date of Construction: ca. Description: The promenade covers the New York Central Railroad tracks, which previously had created an unsightly barrier to the river. The broken range work masonry cladding the promenade is used throughout the park. The promenade plan showed planting beds edged with granite blocks and circular end points. The plans also directed that from the outside edge of the promenade, there would be a bluestone border, then black top, followed by a grassy area edged in bluestone.
The grassy median had grates that served as ventilation for the railroad tracks. On the other side of the median, there would be black top paving and a bluestone border at the edge. A five arch arcade, granite quoins, engaged pillars, and corbelled coping set on top provide ornamentation to the structure s elevation. There are access steps to the Warsaw Ghetto Memorial, which marks the southern end of the promenade. The Street Garden marks the northern terminus. Built into the promenade was a comfort station at West Street. It had a five arch arcade with granite voussoirs and piers. Tile grilles covered the windows at each end. It was accessed via a flight of stairs from the promenade on top that had bluestone stairs and landings with a bronze handrail.
The comfort station contained a men s and women s toilet. The vestibule and toilets had hexagonal tile floors, glazed tile walls, and a hung plaster ceiling. Builder/Engineer/Architect: New York Central Railroad and New York City Parks Department Current Owner: New York City Parks Department Middle Promenade from West to streets. July HENRY HUDSON PARKWAY HAER No.
(Page Drawings: see New York Central Railroad, Roof Covering Over Tracks, W St to W St, Architectural Details, Ventilator and Ramp at St ; New York Central Railroad, Roof Covering Over Tracks, W St to W St, Plans and Elevations, Ventilator & Toilet Building, W St, New York Central Railroad, Roof Covering Over Tracks W St to W St, Architectural Plan of Track Covering St to St, New York Central Railroad, Roof Covering Over Tracks, W to W St, Architectural Plan of Track Covering St to St, all available at Arsenal and Olmsted Center. Name of Feature: Street Garden Riverside Park at West Street Date of Construction: ca. Description: Established in the by the Garden People, the garden is at the terminus of the West to West streets promenade in Riverside Park.
A black metal picket fence surrounds the garden and paths extend from the garden to the northeast and northwest. Builder/Engineer/Architect: Jenny Benitez, a neighborhood activist, along with others, transformed a drug-infested area into a flower, fruit and vegetable garden. Current Owner: New York City Parks Department West Street Garden. March HENRY HUDSON PARKWAY HAER No. (Page Name of Feature: Street Hippo Playground Riverside Park at West Street Date of Construction: park dates to sculpture dates from Description: Nestled in a shallow valley, the playground is so-named for the fiberglass sculpture of fourteen hippopotami, two of which spray water and create a fountain.
The playground also contains brick comfort station with a flat roof edged in metal flashing, wood and metal play equipment, swings, sand pit, and picnic tables and benches. Honey locusts shade the play area. Builder/Engineer/Architect: sculpture: Robert J. Cassilly park: New York City Parks Department Current Owner: New York City Parks Department View of hippos with Soldiers and Sailors Monument in background. March Detail of comfort station. March HENRY HUDSON PARKWAY HAER No. (Page Overview of playground. March Name of Feature: Riverside Clay Tennis Courts Riverside Park at West Street, between the Hudson River and the HHP Date of Construction: Builder/Engineer/Architect: New York City Parks Department Current Owner: New York City Parks Department Tennis Courts.
July HENRY HUDSON PARKWAY HAER No. (Page Name of Feature: Street Dinosaur Playground Riverside Park at West Street Date of Construction: Description: The playground is located in a shallow depression along a rather steep slope. Stairs lead down into the playground and flank a comfort station (built between that mimics the arcade of the structure covering the railroad tracks. The comfort station is clad in broken range work masonry and has three arches with granite voussoirs and piers. The playground s name comes from the fiberglass triceratops and hadrosaur in the play area. There is also the typical play equipment, including swings, sandboxes, climbing equipment and a spray shower. Mature London plane trees flank the playground.
Builder/Engineer/Architect: New York City Parks Department Current Owner: New York City Parks Department West Street Comfort station. March Dinosaur Playground. March HENRY HUDSON PARKWAY HAER No. (Page Name of Feature: Cherry Walk Riverside Park at West to streets Date of Construction: ca. Description: This pedestrian and cycling route runs between the parkway and the Hudson River and also encompasses the Hudson Greenway trail. It connects with the end of the waterside promenade (running from West to streets). The walk boasts a row of cherry trees along the western edge of Riverside Park between the parkway and the Hudson River. Builder/Engineer/Architect: New York City Parks Department Current Owner: New York City Parks Department Cherry Walk. July HENRY HUDSON PARKWAY HAER No.
(Page Name of Feature: Promenade Riverside Park at West to streets Date of Construction: Description: The promenade was built to cover the railroad tracks from West to streets. The western wall serves as the backdrop for various athletic fields along its base with stairs providing access from the promenade to the fields below. There are two types of fa ade treatments on the promenade: broken range work masonry and concrete treated to look like clapboard siding. The transition to ashlar masonry was fine point granite quoins. From West to streets, the wall has window openings that allowed railroad passengers to catch glimpses of the river and to provide ventilation. The windows have decorative tile grating, although it is missing in some places.
At West Street, the fa ade treatment is masonry with granite voussoirs and piers. The promenade itself had bluestone paving. The terrace and stairs had bronze hand railings that featured cast bronze supports with a stylized leaf support resting on granite coping. Built into the promenade at West and streets was a field house. At the center, the drawings show a loggia with bluestone paving. It was entered via three bronze doors with ashlar masonry around the openings. To the left was the boys toilet with a directors room and closet, while the girls toilet, also with the directors room and closet was to the right. The boys and girls toilets had glazed tile floors, rough tile and stone walls and furred plaster ceilings. The director s room had a cement floor and tile walls.
There was also a relay room with a cement floor, concrete walls and exposed concrete ceiling. The field house at West Street was also built into the promenade. A loggia with five arches on the exterior with granite voussoirs and paved in bluestone separated the north and south buildings. They were entered via doors off the loggia. Men used the north building. It had relay and heater rooms. At the rear were showers, a dressing room, men s toilet and an attendant s room. Women used the south building, which was identical to the men s. Stairs provided access from the promenade. At the landing was an arch with a granite voussoir and lamps on each side. There was a third field house located at West Street with toilets for men and women separated by a bluestone-paved loggia.
Builder/Engineer/Architect: New York Central Railroad/New York City Parks Department Current Owner: New York City Parks Department HENRY HUDSON PARKWAY HAER No. (Page Clapboard promenade wall with windows, West streets. July Top of promenade at West Street vicinity.
July Drawings: New York Central Railroad, Roof Covering Over Tracks, W St to W St, Architectural Plans and Elevations, Field House & West Wall St to St, New York Central Railroad, Roof Covering Over Tracks, W St to W St, Architectural Sections and Details, Field House at W Street, New York Central Railroad, Roof Covering Over Tracks, W St to W St, Architectural Details of Ventilators, Stepped Ramps, Etc., Field House at W St, New York Central Railroad, Roof Covering Over Tracks W St to W St, Field House at West all available at the Arsenal and Olmsted Center. HENRY HUDSON PARKWAY HAER No.
(Page Name of Feature: Soccer field and track Riverside Park at West streets Date of Construction: Description: Stairs lead from the promenade down to the soccer field, which is surrounded by a 267-meter track. The walls of the promenade are clad in broken range work masonry and form the backdrop to the fields. A field house was built into the promenade, signaled by the three arch arcade with granite voussoirs. Six doorways with the original bronze doors provide access to the field house. The soccer field has a manicured edge of London planes and bushes and a black chainlink fence. A gravel path runs between this and a 1930s-era black painted iron fence, which has been replaced in some areas by aluminum sectional fencing.
There is a grassy patch of about 8 with London planes between the iron fencing and a W-beam guide rail that runs along the parkway. Builder/Engineer/Architect: New York City Parks Department Current Owner: New York City Parks Department Recreational fields and covered railroad tracks with arched openings and stairs leading to top, which featured a pedestrian promenade. July HENRY HUDSON PARKWAY HAER No. (Page Name of Feature: Baseball fields (as of summer undergoing reconstruction) Riverside Park at West streets Date of Construction: Description: The promenade serves as the backdrop to the ball fields. It is faced in concrete treated to look like clapboard siding. Vines were planted along the wall in accordance with drawing specifications.
This section features two arched windows to the tracks with concrete voussoirs as well as stairs leading up to the pedestrian promenade. A combination of chain link fencing, W-beam guardrails, and 1930s-era metal picket fencing separates the parkway from the fields. The area also features Robert Moses-era concrete and wood benches, some without the wood seating. An allee of London planes divides the adjacent volleyball court area from the baseball fields. Builder/Engineer/Architect: New York City Parks Department Current Owner: New York City Parks Department Concrete clapboard promenade wall. July Path and fencing between fields and parkway. July Promenade wall and London plane allee. July HENRY HUDSON PARKWAY HAER No.
(Page Name of Feature: Hudson Beach Volleyball & Seasonal Caf Riverside Park at West streets Date of Construction: Description: The promenade forms the backdrop to the caf . Stairs lead from the promenade level to the caf , which overlooks the volleyball courts. The caf occupies a five arch arcade that has granite voussoirs and piers, which originally served as field house. A terrace overlooking the courts provides outdoor seating. A set of bluestone and granite steps in an elliptical shape accesses the sand volleyball courts. Builder/Engineer/Architect: New York City Parks Department Current Owner: New York City Parks Department Caf with arch motif and rusticated stonework. Promenade covering railroad tracks with arched opening.
Note July stonework on left and concrete louver cladding on right. July Volleyball court. July HENRY HUDSON PARKWAY HAER No. (Page Name of Feature: Ball field, under reconstruction Riverside Park at West streets Date of Construction: Description: The concrete promenade wall has been treated to look like clapboards and provides the backdrop for the ball fields. There are comfort stations built into the wall. The wall in the location of the comfort stations features the typical broken range work masonry, beveled granite coping, and arcade with granite voussoirs and pilasters that is seen throughout the park. Builder/Engineer/Architect: New York City Parks Department Current Owner: New York City Parks Department Concrete clapboard wall and field under construction.
July Masonry wall with triple arcade covering railroad tracks. July HENRY HUDSON PARKWAY HAER No. (Page Name of Feature: Skate park Riverside Park at West Street Date of Construction: Unknown; wall and overlook date from Description: The promenade in this section is clad in broken range work masonry. There is an overlook paved in bluestone and bordered by a black metal handrail set in granite capstone. A flight of stairs leads down to the skate park. An allee of London planes separates the park from the parkway as well as the park from the nearby ballfields. A chainlink fence runs along the skate park with a 1930s-era fence along the parkway.
Builder/Engineer/Architect: New York City Parks Department Current Owner: New York City Parks Department Overlook featuring typical masonry construction, skate park to left. July HENRY HUDSON PARKWAY HAER No. (Page Name of Feature: Basketball courts Riverside Park at West streets Date of Construction: Unknown; wall and access stairs date from Description: A flight of stairs provides access from the end of the promenade to the basketball courts, which are located adjacent to the northbound lanes of the Builder/Engineer/Architect: New York City Parks Department Current Owner: New York City Parks Basketball courts with parkway in background. July Typical masonry wall and steps leading down to basketball courts. July HENRY HUDSON PARKWAY HAER No.
(Page Name of Feature: Over the Tracks Tennis Courts (no photo) Riverside Park at West Street Date of Construction: Description: The tennis courts are screened from the parkway by plantings. Builder/Engineer/Architect: New York City Parks Department Current Owner: New York City Parks Department Name of Feature: Claremont Dolphin Playground Tiemann Place at Riverside Park Date of Construction: reconstruction project completed in Description: The playground is so-called because of the dolphin fountain feature and because of the Claremont Inn, which stood in this vicinity and marked the original terminus of Riverside Drive. The playground features play equipment, a spray shower and fountain, a boat-shaped sandbox and a peregrine falcon shaped weathervane.
Builder/Engineer/Architect: New York City Parks Department Current Owner: New York City Parks Department Dolphin Playground view. July HENRY HUDSON PARKWAY HAER No. (Page Name of Feature: Riverside Valley Community Garden Riverside Park at West streets Date of Construction: Unknown Description: The garden is located between Riverside Drive and the railroad with the HHP above and to the west. A nearby overpass goes to the southern end of Riverbank State Park. Builder/Engineer/Architect: Community, Jenny Benitez Current Owner: New York City Parks Department Riverside Valley Community Garden with overpass in background. July Retaining wall of Riverside Drive showing typical masonry construction. July HENRY HUDSON PARKWAY HAER No.
(Page Name of Feature: Riverbank State Park West streets Date of Construction: Description: The park sits on the roof of an arcaded concrete structure of the North River Water Pollution Control Plant that echoes the arcaded wall of Riverside Drive to the west. Construction of the control plant began in and preliminary sewage treatment operations began in marking the first time in New York City history that raw sewage was not dumped into the Hudson River. Philip Johnson originally was to have been the architect, and Riverbank State Park would have had four fountains and a reflecting pool. Instead, the park features active recreational facilities like a baseball field, tennis courts, playgrounds, swimming pool, track and skating rink.
There is also a cultural center, caf and waterfront amphitheater. Riverbank State Park is the only state park facility in Manhattan. It also has the distinction of being the only park built on top of a sewage treatment plant outside of Tokyo. Two steel girder bridges access the park: one at West and the other at West Builder/Engineer/Architect: Richard Dattner Current Owner: New York State Parks Main entrance at Riverbank State Park Courtesy of John Benfatti. April HENRY HUDSON PARKWAY HAER No. (Page Name of Feature: Palisades Tot Lot Riverside Park at West Street Date of Construction: unknown Description: This is one of several tot lots along Riverside Drive in the park. They are also located at West West West and West streets.
Builder/Engineer/Architect: New York City Parks Department Current Owner: New York City Parks Department Palisades Tot Lot. July Name of Feature: Ten Mile River Playground (no photo) West Street vicinity Date of Construction: reconstruction project, Description: The playground s name comes from its location 10 miles north of the southern tip of Manhattan. It features play equipment, basketball and volleyball courts, and baseball fields. There is also a spray shower and two bronze beaver statues that memorialize the fur trade that took place on the Hudson River.
Builder/Engineer/Architect: New York City Parks Department Current Owner: New York City Parks Department Name of Feature: Fort Washington Park (no photo) West to Dyckman streets Date of Construction: land taken for original park; added to in Description: Fort Washington Park encompasses over 158 acres and includes the site of Fort Washington (used during the Revolutionary War). It is located in what is now called Washington Heights and is adjacent to the famous landmarks of the George Washington Bridge and the Little Red Lighthouse. The park now contains baseball fields, basketball and tennis courts, and a playground. The Hudson Greenway trail extends through the park.
Builder/Engineer/Architect: New York City Parks Department Current Owner: New York City Parks Department HENRY HUDSON PARKWAY HAER No. (Page Name of Feature: Fort Tryon Park near Dyckman Street Date of Construction: Description: John D. Rockefeller, Jr. bought the Billings estate, which stood in the location of what is now Fort Tryon Park, in Rockefeller commissioned Frederick Law Olmsted, Jr. to design a park there in Development of the estate slowed after there were outcries over Rockefeller s wish to demolish the mansion on the property. In the mansion burned, so the city finally took the donation of the estate from Rockefeller.
The city had the 67-acre public park, called Fort Tryon Park, finished in The name came from the preserved remnants of Fort Tryon, a Revolutionary War fort named after Sir William Tryon, Major General and the last British Governor of the colony of New York. The park also contains Corbin Place, at the ridge road entrance to the Cloisters, which commemorates the area where Margaret Corbin took over fighting the British when her husband was killed in the Revolutionary War battle. The medieval branch of the Metropolitan Museum of Art, known as the Cloisters, is located at the park.
The park does not contain the active recreational facilities of Riverside Park, but it does have 8 miles of pedestrian paths, unparalleled views of the Hudson and Palisades across, two playgrounds, and a pavilion with a caf . There is also an Art Deco flagpole base with an eagle adorning it, and a monument to Margaret Corbin, for whom the park drive is named. The architecture of the park complements the medieval architecture of the Cloisters by utilizing heavy masonry blocks. The masonry- faced caf has casement windows and a hipped roof. Builder/Engineer/Architect: Guy Lowell, Olmsted Brothers Current Owner: New York City Parks Department Fort Tryon monument. March HENRY HUDSON PARKWAY HAER No. (Page Pavilion. March Pedestrian paths and Palisades beyond.
March March Fort Tryon Park was designated a New York City Scenic Landmark in and is listed on the National Register of Historic Places. HENRY HUDSON PARKWAY HAER No. (Page Name of Feature: Traffic light posts HHP Northbound at entrance to Fort Tryon Park & near Cloisters Date of Construction: Description: These two cast iron traffic light posts survive from the Riverside Drive extension to Fort Tryon Park, completed in One is located at the Fort Tryon entrance, the other a few hundred yards further north, below the Cloisters. They can be seen from the HHP northbound lanes, and are accessible along the Hudson Greenway between Dyckman Street and West Street. Builder/Engineer/Architect: City of New York Current Owner: New York City Parks Department Traffic light posts, ca.
at the entrance to Fort Tryon Park (left) and in the shadows of the Cloisters (right), The detail of the base proclaims Property of the City of New York. March HENRY HUDSON PARKWAY HAER No. (Page Name of Feature: Dyckman Street Marina Dyckman Street Date of Construction: Description: Located along the eastern shore of the Hudson at the end of Dyckman Street, the marina has sixteen slips and thirty moorings, and a restaurant concession called La Marina. Builder/Engineer/Architect: Unknown Current Owner: Dyckman Marine Group, Inc., concessionaire Marina entrance. March HENRY HUDSON PARKWAY HAER No.
(Page Name of Feature: Inwood Hill Park From Dyckman Street to the Harlem River Ship Canal Date of Construction: created in Description: The park encompasses 196 acres made up from lands bought by the New York City Parks Department from institutional and private owners and includes the Hudson Greenway trail. The park contains soccer and baseball fields, tennis courts, and trails, but its natural features are its biggest draw: two ridges with a valley between, veins of marble and schist, glacial potholes, Manhattan s only extant salt water marsh, and a network of wetlands. There are also American Indian caves in the park. The Dyckman and Nagel families obtained the land that now makes up Inwood Hill Park from its original inhabitants, the American Indians, and transformed it into farmland.
During the Revolutionary War, the area saw battle. In Samuel Thomson bought most of the land. It was then used as summer homes for the wealthy, and in the early there were also hospitals, asylums, and homes. Land acquisition for the park occurred from to Builder/Engineer/Architect: New York City Parks Department Current Owner: New York City Parks Department Hudson Greenway trail winds along the hillside in Inwood Hill Park. March HENRY HUDSON PARKWAY HAER No. (Page Name of Feature: Henry Hudson Memorial Park West Street and Spuyten Duyvil Date of Construction: rehabilitation in and Description: The park contains the 16 bronze figure of Henry Hudson atop a 100 column, funding for which came from the Henry Hudson Parkway Authority.
The base of the pedestal features bas-reliefs in addition to an inscription detailing its construction date and funding source. The statue had been planned since the Hudson-Fulton celebration of but it was not completed until when the Henry Hudson Parkway Authority, under the direction of Robert Moses, pushed it to completion. Karl H. Gruppe sculpted the monument using a model created by Karl Bitter, who due to the delay in construction was not able to sculpt it himself since he died in The park contains paths and benches, playgrounds and baseball fields. Builder/Engineer/Architect: Karl Bitter, designer; Karl H. Gruppe, sculptor Current Owner: New York City Parks Department Henry Hudson Statue. March HENRY HUDSON PARKWAY HAER No. (Page Henry Hudson statue. March For images, see neg. ca.
for construction of pedestal with scaffolding, see neg. January 3, and for completed statue, see neg. October 9, all at NYC Parks Photo Archive, the Olmsted Center. For drawings, see Henry Hudson Parkway Authority, Henry Hudson Memorial Park, Contract No. 21, the Olmsted Center. HENRY HUDSON PARKWAY HAER No. (Page Name of Feature: Van Cortlandt Park Bronx, just before Westchester County line Date of Construction: Unknown Description: The 1100-acre park contains recreational facilities, an historic house (Van Cortlandt Manor), an equestrian center and bridle paths, a golf course, sports fields, and trails. There is also a lake created by owner Jacobus Van Cortlandt who dammed Tippett s Brook, and a 43-acre level field used as militia parade grounds and athletic fields.
Builder/Engineer/Architect: New York City Parks Department Current Owner: New York City Parks Department View of trail through Van Cortlandt Park from the Equestrian Bridge over HENRY HUDSON PARKWAY HAER No. (Page
Structures and Monuments
Name of Feature: Pier D West Street, Hudson River, Riverside South Date of Construction: Unknown Description: The twisted steel remains of Pier D are all that survive from a fire that occurred in It now serves as a conservation ornamental grass area with a boardwalk that passes through the salt marsh grasses. Builder/Engineer/Architect: Unknown Current Owner: New York Conservation area with pier City Parks Department remains in background. July Name of Feature: Pier West Street, Riverside Park South Date of Construction: Unknown Description: A 750 recreational pier was built on top of the remains of the original wooden shipping Pier 1. Builder/Engineer/Architect: Unknown Current Owner: New York City Parks Department HENRY HUDSON PARKWAY HAER No. (Page View of transfer bridge remnants.
July Name of Feature: Gantry crane and Transfer Bridge West streets, Riverside South Date of Construction: Description: This is the remains of the transfer bridge or float bridge (also known as car floats ) of New York Central Railroad and Hudson River Railroad (Float Bridge #4) that was designed to take freight cars from the waterside rail yards to barges and vice versa. These were hinged bridge decks suspended by cables from the housing structure overhead. Motors inside the housing lifted and lowered the decks to align them with the floats. This is last remnant of an extensive rail yard site in this vicinity that was shut down in the Builder/Engineer/Architect: James B.
French and New York Central Railroad Current Owner: New York City Parks Department The site was listed on the National Register of Historic Places in HENRY HUDSON PARKWAY HAER No. (Page Name of Feature: Eleanor Roosevelt Memorial Riverside Drive at West Street Date of Construction: Description: The bronze statue depicts Eleanor Roosevelt leaning against a rock in a meditative pose and is located near the intersection of Riverside Drive with West Street, serving as a sort of gateway to the park. The site was chosen because of its proximity to the alleged site she took her son to see the shanty towns set up during the Depression. Builder/Engineer/Architect: Sculpted by Penelope Jencks Current Owner: New York City Parks Department Eleanor Roosevelt Memorial.
March HENRY HUDSON PARKWAY HAER No. (Page Name of Feature: Robert Ray Hamilton Fountain Riverside Drive at West Street Date of Construction: Description: The fountain is a good example of City Beautiful architecture. It was built in honor of Robert Ray Hamilton, property owner, political activist, sportsmen and big game hunter, who left to the city after his death for its construction. Located in a stone masonry retaining wall that fronts Riverside Drive, the Tennessee marble fountain features an eagle with spread wings sitting atop fanciful flora/fauna carvings. Beneath the eagle is a carved coat of arms flanked by more faunal carvings. A creature s head underneath the coat of arms spits water into a small shell-shaped basin that in turn spills over into the main basin at sidewalk level.
This basin has a decorative carved rim and holds aquatic plants. Short pillars with spheres on top flank the sides of the fountain and transition from the parapet wall in which the fountain is set to the carvings of the fountain itself. Builder/Engineer/Architect: Warren and Wetmore, architects of Grand Central Terminal, New York Yacht Club, and various Vanderbilt-owned hotels Current Owner: New York City Parks Hamilton Fountain. March Name of Feature: Warsaw Ghetto Memorial Riverside Park at West Street Date of Construction: Description: The circular memorial plaza has a granite plaque dating from underneath of which are two boxes with dirt from the Czechoslovakian concentration camps of Terezin and Sered.
Builder/Engineer/Architect: Unknown Current Owner: New York City Parks Department HENRY HUDSON PARKWAY HAER No. (Page Name of Feature: Soldiers and Sailors Monument Riverside Park at West and streets Date of Construction: Builder/Engineer/Architect: Charles and Arthur Stoughton designed the memorial, which is based on the Hellenistic Monument of Lysicrates in Athens. Paul E. Duboy carved the features. Current Owner: New York City Parks Department The monument was designated a New York City Landmark in Soldiers and Sailors Monument. July Name of Feature: Firemen s Memorial Riverside Drive at West Street Date of Construction: Description: A memorial committee and public funds from the Board of Estimate and Apportionment funded the construction of the memorial.
It consists of a wide set of stairs leading to a plaza on which rests the imposing memorial of Knoxville marble. The rectangular memorial has decorative molding around the top and then a bronze bas-relief depicting a horse-drawn fire wagon racing to put out a fire. This is a replica of the original. Below the bas-relief is a small carving through which water trickles into a basin below. On either side of the central memorial to the north and south are sculptures depicting Duty and Sacrifice. Builder/Engineer/Architect: H. Van Buren Magonigle designer, Attilio Piccirilli sculptor Current Owner: New York City Parks Department Firemen s Memorial with steps. March HENRY HUDSON PARKWAY HAER No.
(Page Name of Feature: Franz Sigel Monument Riverside Drive at West Street Date of Construction: Description: The bronze statue depicts Franz Sigel astride a horse. It sits atop a granite pedestal. Sigel was a military officer, educator, journalist and public servant. Builder/Engineer/Architect: Karl Bitter, sculptor Current Owner: New York City Parks Department Franz Sigel Monument. March HENRY HUDSON PARKWAY HAER No. (Page Name of Feature: Peter Jay Sharp Volunteer House Riverside Park at West Street Date of Construction: ground floor completed in upper level constructed in Description: Tucked inside the Olmsted part of Riverdale Park is the Peter Jay Sharp Volunteer House.
The ground floor dates to making it the oldest structure in the park, while the upper level was built in Volunteer Paul Kittas spearheaded the effort to clean up the house with the assistance of the Riverside Park Fund. The house was completely renovated, with the fa ade left intact but the interior gutted. The first floor serves as a tool shed, the mezzanine has a library and plant propagation area, and the second floor serves as a meeting room. Builder/Engineer/Architect: Unknown Current Owner: New York City Parks Department Sharp Volunteer House. July HENRY HUDSON PARKWAY HAER No.
(Page Name of Feature: Samuel Jones Tilden Statue Riverside Drive at West Street Date of Construction: Description: Tilden was an attorney, Governor of New York, and philanthropist whose book collection formed the basis of the New York Public Library. The bronze sculpture sits on a small terrace surrounded by a low granite wall and benches. The statue depicts Tilden standing with his hand touching, appropriately enough, a book sitting on a stand. The pedestal under the statue gives a brief biography of Tilden. Builder/Engineer/Architect: William Ordway Partridge Current Owner: New York City Parks Department Tilden Statue.
March Name of Feature: Lajos Kossuth Statue Riverside Drive at West Street Date of Construction: Description: The statue commemorates the movement for Hungarian independence from the Austrians. The figure of Lajos Kossuth stands atop a Milford pink granite pedestal and points downward to two male figures representing the Austrian regime and the newly freed Hungary in the form of a soldier and peasant. The pedestal is inscribed: Erected by a liberty loving race of Americans to Louis Kossoth [sic] the Great Champion of Liberty. Builder/Engineer/Architect: Janos Horvai, sculptor Current Owner: New York City Parks Department Kossuth Statue. March HENRY HUDSON PARKWAY HAER No.
(Page Name of Feature: Woman s Health Protective Association Fountain (WHPA) Riverside Drive at West Street Date of Construction: Description: Located on a terrace overlooking Riverside Park, the marble stele and drinking fountain commemorates the twenty-fifth anniversary of the WHPA in The stele features a low bas-relief of two female figures with an inscription, below which protrudes the basin of the drinking fountain. Builder/Engineer/Architect: Bruno Louis Zimm, sculptor WHPA Fountain. March Current Owner: New York City Parks Department Name of Feature: Riverside Church West Street Date of Construction: Description: Charles Collens and Henry C.
Pelton, the architects, designed the church with elements of Gothic architecture from France and Spain and based it on a thirteenth-century cathedral in Chartres, France. The church has a carillon of seventy-four bells that John D. Rockefeller Jr. donated. Builder/Engineer/Architect: Charles Collens of Allen & Collens, Henry C. Pelton Riverside Church. July Riverside Church was designated a New York City Landmark in HENRY HUDSON PARKWAY HAER No. (Page Name of Feature: General U.S. Grant National Monument (Grant s Tomb) Riverside Park at West Street Date of Construction: dedicated Description: The granite tomb with marble ornamentation is a scaled back version of John Duncan s original plans. Current Owner: National Park Service For more information, see HABS No.
It was designated a New York City Landmark in Grant s Tomb. July Name of Feature: Studebaker Building West and streets Date of Construction: Description: The building is constructed of brick and white terracotta/porcelain with blue Studebaker logos visible at the southwest corner of the roof. Centered on the west side of the building is a large elevator shaft, a remnant from when the building was used by Studebaker and the elevator would have moved cards and parts. The building now houses various Columbia University offices and art studios, as well as Madame Alexander Doll Company and Hospital and the American Museum of Natural History warehouse.
Builder/Engineer/Architect: Ferguson Current Owner: AB Partners LLC Name of Feature: Ralph Ellison Memorial Riverside Drive at West Street Date of Construction: dedicated Description: This is the newest addition to the monuments lining Riverside Drive. The memorial is a 15 high bronze sheet with a cutout of a man s profile in the center. The location of the memorial is important since it faces the apartment building in which Ellison lived for more than thirty years. Builder/Engineer/Architect: Elizabeth Catlett, sculptor Current Owner: New York City Parks Department Ellison Memorial. July HENRY HUDSON PARKWAY HAER No.
(Page Name of Feature: Trinity Cemetery Riverside Drive at West and streets Date of Construction: Description: John James Audubon, who formerly owned the land is one of many famous New Yorkers buried in the cemetery. It is located immediately adjacent to Riverside Drive. Builder/Engineer/Architect: Unknown Current Owner: Trinity Church, Manhattan Name of Feature: Little Red Lighthouse (also known as Jeffrey s Hook Lighthouse) Under George Washington Bridge, Fort Washington Park Date of Construction: reconstructed and moved deactivated Description: Located on Jeffries Point in Fort Washington Park at the base of the George Washington Bridge, the bridge is difficult to see from parkway. The U.S.
Coast Guard built the lighthouse at Sandy Hook, New Jersey, and it was moved to its present location in Hildegarde Swift s book, Little Red Lighthouse and the Great Grey Bridge helped save the lighthouse from being dismantled by the U.S. Coast Guard. Builder/Engineer/Architect: U.S. Coast Guard Little Red Lighthouse. Current Owner: New York City Parks Department March The lighthouse was designated a New York City Landmark in Name of Feature: Bus Station Plaza George Washington Bridge Bus Terminal Date of Construction: Builder/Engineer/Architect: Pier Luigi Nervi was an Italian civil engineer who experimented with building in reinforced concrete. Current Owner: Metropolitan Transportation Authority Bus Station. July HENRY HUDSON PARKWAY HAER No.
(Page Name of Feature: Castle Village Apartments Henry Hudson Parkway at West Street Date of Construction: Description: The apartments sit on the original site of Charles Paterno s Castle . Designed by John C. Watson and constructed between Paterno Castle reportedly had rooms of various motifs. The property encompasses 7 acres, with the crenellated retaining wall holding back the ridge on which the castle had been placed. In Paterno demolished the castle and built the Castle Village Apartments for $6 million, which consisted of five 13-story apartment towers. This shift from mansion to apartment houses was typical of the area after the construction of the parkway.
Portions of the retaining wall collapsed in May Builder/Engineer/Architect: Charles Paterno Current Owner: Unknown View of wall and Castle Village Apartments. July HENRY HUDSON PARKWAY HAER No. (Page Name of Feature: The Cloisters Fort Tryon Park Date of Construction: opened in Description: The museum holds the medieval arts branch of the Metropolitan Museum of Art. John D. Rockefeller Jr. purchased the medieval art collection of sculptor George Grey Bernard and donated it to the museum. He also purchased 700 acres of the New Jersey shoreline visible across the Hudson River and donated the land as a public park in order to maintain the natural view of the Palisades from the Cloisters.
Charles Collens of Allen, Collens and Willis of Boston along with museum staff designed the building and supervised its construction. The building used architectural elements from five French cloisters in addition to an original chapter house and a reconstructed chapel, all dating from the twelfth to fifteenth centuries. Builder/Engineer/Architect: Charles Collens Current Owner: Metropolitan Museum of Art The Cloisters. February The Cloisters was designated a New York City Landmark in It is also listed on the National Register of Historic Places. HENRY HUDSON PARKWAY HAER No. (Page Name of Feature: Riverdale Presbyterian Church and Manse Henry Hudson Parkway Date of Construction: Description: Local property owners funded the construction of this Gothic Revival stone church.
The adjoining stone manse is known as the Duff House. The Edgehill Church of Spuyten Duyvil (formerly called Riverdale Presbyterian Chapel and located at Independence Avenue) was originally a chapel of the Riverdale Presbyterian Church. It was designed by Francis H. Kimball, Builder/Engineer/Architect: James Renwick, Jr. Edgehill Church of Spuyten Duyvil. July The church and manse were designated New York City landmarks in and are also listed on the National Register of Historic Places. Edgehill Church of Spuyten Duyvil was designated a New York City landmark in and is listed on the National Register of Historic Places.
Name of Feature: Bell Tower War Memorial West Street, Riverdale Avenue, Henry Hudson Parkway, in Bell Tower Park Date of Construction: Tower, bell, Description: The memorial predates the parkway. It was repositioned from a site along the Spuyten Duyvil Parkway. The blue stone pavement is in disrepair. There is a bronze plaque that lists the names of WW II servicemen from Riverdale, Kingsbridge, and Spuyten Duyvil. Builder/Engineer/Architect: Dwight James Baum designed the tower. Current Owner: New York City Parks Department Memorial from road. July HENRY HUDSON PARKWAY HAER No.
(Page Name of Feature: Christ Church Henry Hudson Parkway, near West Street Date of Construction: Description: The Victorian Gothic church features a slate polychrome roof restored in the early Builder/Engineer/Architect: Richard Upjohn Current Owner: Episcopal Church Christ Church. July The church was made a New York City Landmark in and listed on the National Register of Historic Places in HENRY HUDSON PARKWAY HAER No. (Page
Bibliography
Anderson, Steve. Henry Hudson Parkway. Accessed 29 June, available at West Side (Joe DiMaggio) Highway. Accessed 8 July, available at Artnet. Embury, Aymar, II. Accessed 8 September, available at Adams, Arthur G. The Hudson through the Years. New York: Fordham University Press, Beers, Frederick W. Atlas of the Hudson River Valley from New York City to Troy, Including a Section of About 8 Miles in Width. New York: Watson & Co., Benepe, Adrian. Fort Tryon Park. New York: City of New York, Parks and Recreation, Bolton, Reginald Pelham. Guide to Named Streets. New York: Dyckman Institute, Inwood Hill Park on the Island of Manhattan. New York: Dyckman Institute, Washington Heights -- Its Eventful Past. New York: Dyckman Institute, Borough of Manhattan.
West Side Improvement: Published on the Occasion of the Opening October New York, Brashear, Philippa. Putting the Park Back in Parkway. Report, New Yorkers for Parks, Bromley, Atlas of the City of New York, Borough of Manhattan, from actual surveys and official plans. Philadelphia: Bromley and Co., and plates 90, 92, 94, 96, 98, Available at the New York Public Library, Map Division. Bruce, Wallace. Panorama of the Hudson, Showing Both Sides of the River from New York to Poughkeepsie, as Seen from the Deck of the Hudson River Day Line Steamers. New York: Bryant Literary Union, Burrows, Edwin G., and Mike Wallace. Gotham: A History of New York City to New York: Oxford University Press, HENRY HUDSON PARKWAY HAER No. (Page Caratzas, Michael Dimitrios.
Cross-Bronx, Trans-Manhattan: Preserving a Significant Urban Expressway and Its Megastructure. Master s thesis, Columbia University, Caro, Robert A. The Power Broker: Robert Moses and the Fall of New York. New York: Vintage Books, Chamberlain, Frank. Hudson Tercentenary. New York: Tercentenary Committee, Chernow, Ron. Titan: The Life of John D. Rockefeller, Sr. New York: Vintage Books, City of New York Department of Parks. Henry Hudson Parkway, Bronx, Alignment of Henry Hudson Parkway & Service Roads from Broadway to Riverdale Avenue & Street Showing Proposed Property Lines. 1 . Drawing no. New York City, September 5, Borough of Bronx, Tracing from General Plan Showing Henry Hudson Parkway from City Line South to Street. 1 . Drawing no. X-L-110-105A.
New York City, October 3, City of New York. NYC Cycling Map, 1 = 1 mile. New York City: Departments of City Planning and Transportation, Clarke, Gilmore D. The Parkway Idea. In The Highway and the Landscape, edited by W. Brewster Snow. New Brunswick, NJ: Rutgers University Press, Cromley, Elizabeth. Riverside Park and Issues of Historic Preservation. Journal of the Society of Architectural Historians 43, no. 3 (October Currey, Douglas A. Letter to John Benfatti dated 25 November, State of New York Department of Transportation, Region 11, Long Island City, New York. Memorandum dated 16 October, State of New York Department of Transportation, Region 11, Long Island City, New York. Dalbey, Matthew.
Regional Visionaries and Metropolitan Boosters: Decentralization, Regional Planning, and Parkways During the Interwar Years. Norwell, MA: Kluwer Academic Publishers, Davis, Timothy. A Pleasant Illusion of Unspoiled Countryside. In Constructing Image, Identity, and Place, Perspectives in Vernacular Architecture IX, edited by Alison K Hoagland and Kenneth A Breisch. Knoxville: The University of Tennessee Press, HENRY HUDSON PARKWAY HAER No. (Page Davis, Timothy, Todd Croteau, and Christopher Marston, eds. America s National Park Roads and Parkways: Drawings from the Historic American Engineering Record. Baltimore: The Johns Hopkins University Press, Edsall, Thomas H. History of the Kings Bridge.
New York: Privately Printed, Federal Writer s Project of the Works Progress Administration in New York City. New York City Guide (American Guide Series). New York: Random House, Fischer, Elizabeth E., Heidi Hohmann, and P. Daniel Marriott. Roadways and the Land: The Landscape Architect s Role. Public Roads March/April Fletcher, Tom. George Washington Bridge. Accessed 8 September, available at Gandy, Matthew. Concrete and Clay: Reworking Nature in New York City. Cambridge, MA: MIT Press, Gray, Christopher. Restoration for an All-but Ruined Hudson Temple. New York Times, February 26, 12. Golan, Michael. The Bronx Parks: A Wonder from the Past. Bronx County Historical Society 12 Golbrecht, Larry E. Riverside Park and Drive.
National Register of Historic Places Nomination Form, Landmarks Preservation Commission. New York, Greentree, Neil. Othmar Ammann s Glory. Smithsonian Magazine, October Accessed 8 September, available at Greztic, Edna. A Foundry Whistled in Spuyten Duyvil. Bronx County Historical Society 22 Guide to Fort Tryon Park. New York: New York City Parks Department, Hardesty and Hanover, Hardesty and Hanover History Timeline. Accessed 8 September, available at Hayden, Arthur G. The Rigid Frame Bridge. 2nd ed. New York: John Wiley & Sons, Henry Hudson Parkway Authority. Henry Hudson Parkway, Study for Kappock Street Walls, Southeast Access Wall J . =1 0 , 1/8 =1 0 . Drawing no. no date. HENRY HUDSON PARKWAY HAER No.
(Page Henry Hudson Parkway, Dyckman Street Bridge Architectural Elevation and Sections, Design A . 1/8 =1 0 . Drawing no. sheet 1 of 29. New York City, June 1, Henry Hudson Parkway, Kappock Street Bridge, West Portal. =1 0 . Drawing no. XE-110-17-109. New York City, August 5, Henry Hudson Parkway, Electric Lighting System, Henry Hudson Bridge Lighting Division No. 2 Bridge Light Standard Details. =1 0 , 3 =1 0 . Drawing no. XE-110-S50 to Contract 11, sheet 24 of 30. New York City, June 25, Henry Hudson Parkway, Pedestrian Overpass at Inwood Hill Park. 1/8 =1 0 , 3 =1 0 , =1 0 . Drawing no. XE-110-2402. New York City, December 20, Henry Hudson Parkway, Architectural Elevations of Bridge No. 2 at Riverdale Avenue and Street. 1/8 =1 0 . Sheet no. 37.
New York City, November 21, Henry Hudson Parkway, Riverdale Avenue Bridge No. 2 at Street. =1 0 . Sheet no. 39. New York City, January 28, Henry Hudson Parkway, Including Riverdale Avenue Bridges 1A, 2, & 2A. 1 =10 , =1 0 . New York City, February 7, Henry Hudson Parkway, Including Riverdale Avenue Bridges 1A, 2, & 2A, Timber Guardrails Type B, Type A. 1 =10 , 1 =5 , 3/8 =1 0 . February 7, Opening of the Henry Hudson Parkway and Progress on the West Side Improvement, 12 December, New York: Henry Hudson Parkway Authority, Completion of the Henry Hudson Bridge and Henry Hudson Memorial Park: Published on the Occasion of the Completion of the Henry Hudson Bridge and Approaches, May 7, New York: Henry Hudson Parkway Authority, Henry Hudson Parkway Task Force.
The Henry Hudson Parkway Scenic Byway Initiative. [document online]. New York: Henry Hudson Parkway Task Force, Accessed 6 June, available from www.henryhudsonparkway.org. Henry Hudson Parkway (9A) Scenic Byway Initiative: Public Outreach, July 15, Report, Henry Hudson Parkway Task Force, Riverdale Nature Preservancy, Hermalyn, Gary. The Harlem River Ship Canal. Bronx County Historical Society 20, no. 1 HENRY HUDSON PARKWAY HAER No. (Page Hewes, Laurence Ilsley. American Highway Practice. Vol. 1 of American Highway Practice. New York: John Wiley & Sons, Inc., Historic American Engineering Record, National Park Service, U.S. Department of the Interior. Arroyo Seco Parkway, HAER No. CA-265. Bronx River Parkway Reservation, HAER No. George Washington Memorial Parkway, HAER No. VA-69.
Merritt Parkway, HAER No. Taconic State Parkway, HAER No. Home is Where the Volunteers Are: Early Century House Renovated, Rejuvenated and Radiant. Parks and Recreation (September Hood, Clifton. The Impact of the IRT on New York City, Survey Number HAER Accessed 29 August, available at Inwood Hill Park, (by New York City Department of Parks and Recreation). Accessed 29 August, available at http://www.washington- Johnson, David A. Regional Planning for the Great American Metropolis: New York between the World Wars. Baltimore: Johns Hopkins University Press, Kane, Mary E. Yesterday in Riverdale and Spuyten Duyvil. New York: Riverdale Neighborhood and Library Association, Keller, Allan. Life Along the Hudson.
Tarrytown, Sleepy Hollow Restorations, King s How to See New York: A Complete Trustworthy Guidebook. New York: Moses King, Inc., LaFrank, Kathleen. Real and Ideal Landscapes Along the Taconic State Parkway. In Constructing Image, Identity, and Place, Perspectives in Vernacular Architecture IX, edited by Alison K. Hoagland and Kenneth A Breisch. Knoxville: The University of Tennessee Press, Mankiewicz, Paul S., Franco Montalto, and Julie A. Mankiewicz. Stormwater Capture HENRY HUDSON PARKWAY HAER No. (Page Parks along the Henry Hudson Parkway: Developing Endor Garden as a Watershed Model. Proposal, Gaia Institute, Marriott, Paul Daniel. Saving Historic Roads: Design and Policy Guidelines.
New York: National Trust for Historic Preservation and John Wiley & Sons, Inc., Historic Highway Design: A Look at the AASHTO Green Book. Cultural Resources Management Bulletin 17, no. 1 McKinney, Charles. Riverside Park Evolution and Restoration. Proposal, New York City Department of Parks and Recreation, Office of Planning and Preservation, Memorial to Famed Author Ralph Ellison is Unveiled in New York. Jet (May 19, Metropolitan Transportation Authority Bridges and Tunnels. MTA Bridges and Tunnels. New York: Metropolitan Transportation Authority, The Henry Hudson Bridge: Celebrating 60 Years. From the Archive, Winter Miller, Benjamin. Fat of the Land: Garbage in New York, the Last Two Hundred Years.
New York: Four Walls Eight Windows, Miller Highway Project, Final Environmental Impact Statement, Volume 1. Submitted by U.S. Department of Transportation, Federal Highway Administration, Empire State Development Corporation, and New York State Department of Transportation, Moses, Robert, Commissioner to Hon. F. H. LaGuardia, Mayor. Memorandum to the Mayor on the Park Department Revised Plan for West Side Improvement on Riverside Park. June 10, Available at New York City Department of Parks & Recreation, the Arsenal. Tomorrow s Cars and Roads. Reprinted by permission of Liberty Magazine, Inc., by the Triborough Bridge Authority, undated but from Public Works: A Dangerous Trade. New York: McGraw-Hill Book Co., Myers, Mary E.
Iron and Asphalt: The Evolution of the Spiral Curve in Railroads and Parkways. Public Roads 65, no. 2 New York Central Railroad. Architectural Details, Ventilator and Ramp at Street, Roof Covering Over Tracks St to St. =1 0 . Drawing file no. New York City, May 27, HENRY HUDSON PARKWAY HAER No. (Page Plans and Elevations, Ventilator and Toilet Building, Street, Roof Covering Over Tracks Street to Street. =1 0 . Drawing file no. New York City, May 27, Architectural Plan of Track Covering Street to Street, Roof Covering over Tracks St to St. 1 =2 0 . Drawing file no. New York City, May 27, Architectural Plan of Track Covering Street to Street, Roof Covering over Tracks St to St. 1 =20 0 , =1 0 . Drawing file no.
New York City, May 27, Architectural Plans and Elevations, Field House & West Wall Street to Street, Roof Covering Over Tracks Street to Street. Drawing file no. New York City, August 1, Architectural Details of Ventilators, Stepped Ramps, etc., Field House at West Street, Roof Covering Over Tracks Street to Street. =1 0 . Drawing file no. New York City, August 1, Elevation of frames F5a, b, c. Roof Covering Over Tracks Street to Street. =1 0 . Drawing file no. and New York City, August 1, New York City Department of Parks and Recreation. Riverside Park Restoration and Improvement Plan: Proposed Conceptual Design. 1 .
New York City Department of Parks and Recreation, Riverside Park Topographical Survey, New York City Department of Parks and Recreation, Available at the New York City Department of Parks and Recreation, Olmsted Center, Flushing, New York. New York City Department of Transportation. New York City Department of Transportation, Division of Bridges Bridges and Tunnels Annual Condition Report. [document online]. Accessed 25 July, Available from: Internet. New York State Department of Transportation. Local System Bridges, Region 11. Map No. 1, Sheet no. 12, for Henry Hudson Bridge; Map no. 3A, sheet no. 15, for George Washington Bridge. New York State Department of Transportation, circa Available at Landscape and Environmental Unit, New York State Department of Transportation.
HENRY HUDSON PARKWAY HAER No. (Page Interim Highway Safety and Drainage Improvements, Henry Hudson Parkway Northbound, Street to Cloisters, New York County Contract No. PIN Region 11, NYS DOT, September 22, Newton, Norman T. Parkways and Their Offspring. Chapter 39 in Design On the Land: The Development of Landscape Architecture. Cambridge, MA: The Belknap Press of Harvard University Press, Perry, Interchange of the Week, Monday, 18 August I-95, US 9 & NY 9A, Manhattan. [article online]. Accessed 25 August, available at Port Authority of New York and New Jersey, George Washington Bridge. Accessed 8 September, available at Rand McNally Hudson River Guide, with Maps and Illustrations, Including Reference Lists of Hotels, Places of Amusement, Steamship Piers, Etc., in New York City.
New York: Rand McNally, Report of the Board of Commissioners ... Relating to Improvements of Portions of the Counties of Westchester and New York ... Of Spuyten Duyvil Creek and Harlem River, and to Facilities of Communication between Said Counties. Edited by New York Department of Public Parks. Albany, The Argus Co., Report to the New York Legislature of the Commission to Select and Locate Lands for Public Parks. The River Hudson, Together with Descriptions and Illustrations of the City of New York. New York: Ross & Tousey, Rivera, Sonia A. Letter to Hilary Hinds Kitasei dated 14 January, State of New York Department of Transportation, Region 11, Long Island City, New York. Riverdale Historic District. Edited by New York Landmarks Preservation Commission.
New York: The Commission, Riverside Drive Extension: Plan Showing Possible Connection with Suggested Road above And Tracks North of Dyckman Street to Accompany Report Dated May Boston: Walker Lith. & Pub. Co., Robinson, E. Atlas of the City of New York: from official records, private plans, and actual surveys. Vol. 2. New York: E. Robinson, plates 39, 40, 41, 42. Available at the New York Public Library, Map Division. Atlas of the City of New York: from official records, private plans, and HENRY HUDSON PARKWAY HAER No. (Page actual surveys. Vol. 2. New York: E. Robinson, plates 39, 40, 41, 42. Available at the New York Public Library, Map Division. Rodgers, Cleveland. Robert Moses: Builder for Democracy. New York: Henry Holt and Company, Rorimer, James J. The Opening of the Cloisters.
The Metropolitan Museum of Art Bulletin 33, no. 4 (April Schwartz, Sam. Understanding Jurisdiction Along the Henry Hudson Parkway. Report, Riverdale Nature Preservancy, Simonson, Wilbur H. Landscape Design and Its Relation to the Modern Highway. [article online]. U.S. Department of Transportation, Federal Highway Administration, Accessed 31 July, available at Stanne, Stephen et. al. The Hudson River: An Illustrated Guide to the Living River. New Brunswick, Rutgers University Press, Stern, Robert A.M., Gregory Gilmartin, and Thomas Mellins. New York Architecture and Urbanism Between the Two World Wars. New York: Rizzoli International Publications, Inc., Stiles, William. Riverside Park. The Century: A Popular Quarterly 30, no. 1 (May True, Clarence. Riverside Drive.
New York, Tunnard, Christopher, and Boris Pushkarev. Man-made America: Chaos or Control. New Haven and New York: Yale University Press, U.S. Bureau of Public Roads. Toll Roads and Free Roads: Message from the President of the United States transmitting a letter from the Secretary of Agriculture, concurred in by the Secretary of War, enclosing a report of the Bureau of Public Roads, United States Department of Agriculture, on the feasibility of a system of transcontinental toll roads and a master plan for free highway development. Washington, DC: U.S. Government Printing Office, U.S. Department of Transportation, Federal Highway Administration, Empire State Development Corporation, New York State Department of Transportation. Miller Highway Project: Final Environmental Impact Statement.
Vol. 1. Wallace, Brendan. Driver Distraction by Advertising: Genuine Risk or Urban Municipal Engineer no. ME3 HENRY HUDSON PARKWAY HAER No. (Page Westside Improvement Engineering Committee. Plans for the Removal of the Tracks of the New York Central Railroad Company from the Public Streets Along the Hudson River Waterfront and for Related Public Improvements. Part 2, Land Maps, Sheets 2, 7, 9, New York, Available at Topographical Unit, Manhattan Borough President. Articles from the New York Times listed chronologically: Spuyten Duyvil Parkway. December 8, 2. The Park Department Commissioners Still Unable to Agree. February 3, 8. Mr. Beekman Initiated. The New Park Commissioner Meets His Associates. March 19, 8. Plans Ready for New Driveway. December 14, 27. Park Commissioner Joseph I.
Berry. Park System Known the World Over. May 17, B4. Opening Up Riverdale. September 19, Riverside Drive Extension. February 12, Planning to Extend Riverside Drive up to the Bronx. June 15, City s Last Colonial Estate to be Sold. September 21, Automobile Census Shows World Has Cars. March 8, To Open New Part of Riverside Drive. May 24, Bronx Takes Pride in Beautiful Parks. March 7, RE1. War Memorial Stone Laid in Spuyten Duyvil. July 5, 5. West Bronx Asks for Traffic Relief. October 19, 31. Robbins. Transforming the West Side: A Huge Project Marches On. June 3, E.L. Yordan. That Cars May Move. January 13, HENRY HUDSON PARKWAY HAER No. (Page A.D. Britton. Moses s Many Projects Are All Tied Together. February 10, E11. A Prophetic Bridge. February 12, 20. Moses Defends Inwood Park Road.
March 23, 17. Park Drive Censure Fails. March 26, 21. Gets Fund to Link Drive and Parkway. April 3, 25. City Issues Terms of Loan. April 5, 37. Parkway Span Approved. April 18, 25. Paid in for New Highway. April 20, 3. Changes Proposed in Hudson Parkway. May 3, 22. Spuyten Duyvil Asks Shift in Parkway. June 11, 19. Contracts for Parkway Bridge Let 4 Hours After City Approves Plan. June 15, 1. H.I. Brock. West Side Plan Proceeds on a New Basis. June 23, E10. Broadway Bridged in a Single Night. July 13, R. L. Duffus. New City Speedways. October 20, Victor H. Bernstein. Routes for Motorists Being Made More Open. November 3, AA9. Safer Motor Roads. December 1, Henry Hudson Parkway Advances. December 8, Bridge to be Link in Great Parkway. February 19. Proposals. May 21, 30.
Bids Asked June 14 on Inwood Bridge. May 21, 39. Ten Bid on Park Bridge. June 29, 5. Broadway Bridged in a Single Night. July 13, 15. HENRY HUDSON PARKWAY HAER No. (Page Low Bridge Bid November 16, 17. Bronx Bridge Bid January 2, 3. Low Bidder on Parkway Link. January 4, 13. Extending West Side Highway to the North. January 5, Work Speeded on City s Riverside Park. January 19, E10. Riverside Plans Put Before City. January 11, 17. Work Speeded on City s Riverside Park. January 19, West Side Project Adds to City Land. February 29, 17. Robbins. Our Highway Perils--And the Remedies. March 14, Riverside Project Pushed by Moses. April 24, 8. Moses to Continue West Side Project. July 16, 19. Bids Taken for Hudson Parkway. July 24, 5. Realty Conditions Reveal Signs of Growing Stability.
August 2, RE1. Hudson Parkway Opens Tomorrow. December 11, 5. The New Parkway. December 12, 18. Hudson Parkway Opens New Areas for Development. December 13, RE1. Freeway is Now Urged. December 13, Motor Speedway Proving a Success. February 7, 49. Henry Hudson Span to Get Upper Deck. March 27, 25. Statue of Hudson to Adorn Column. April 11, 52. Parkway Bids Received. July 21, 17. Widened Parkway to Speed Traffic. September 2, 23. Mr. Moses and Mr. Moses. September 3, 16. HENRY HUDSON PARKWAY HAER No. (Page West Side Project Will Open October 12. September 23, 29. Victor H. Bernstein. West Side Highway to Open. October 10, Parkway to Open on Upper West Side. October 11, 23. Dream Plus Elbow Grease. October 12, 24. Victor H. Bernstein. City Adds Many Highway Links.
October 24, Miller McClintock. Road Design is Aid to Safety. October 24, Nevertheless, It Moves. November 2, 24. George M. Mathieu. New Local Roads Open. December 26, Hudson Statue Mounted on Memorial Park Base. January 7, 3. New Link in Henry Hudson Parkway to be Opened Today. January 15, 32. Changes Planned at Inwood Hill Park. January 27, 23. Robbins. Our Park Creator Extraordinary. March 20, Signs Numbering Exits Installed on Parkway. April 24, 26. Henry Hudson Span Opens Upper Level. May 8, 47. George M. Mathieu. Better Bridge Approach. July 24, 3 New Lanes Opened on Hudson Parkway. November 18, 23. New Road Is Planned to Washington Span. March 27, 31. George M. Mathieu. New Approach to Span. April 2, Moses Ban on Road Numbers. May 3, 3. George M. Mathieu. City s Improved Exits Ready.
July 23, New Drive Link to Open. July 27, 16. Housing Planned for Riverdale. May 25, R1. HENRY HUDSON PARKWAY HAER No. (Page Plans Safety Turn-Outs . February 29, 41. Bronx Apartments Nearing Completion. December 7, 68. Will Repave Parkway. March 18, 48. Apartments Overlooking Hudson. April 29, R1. Parkway Repaving Set. August 21, 28. Luxury Housing Overlooking Hudson. June 8, R1. Joseph C. Ingraham. New Parkway Job to Delay Traffic. March 3, 29. Riverdale Suites in Strong Demand. October 4, R1. New Ramp at George Washington Bridge Nearly Ready. October 27, 38. 2 Arterial Links to Speed Traffic Will Be Opened in City Tomorrow. November 12, 1. Riverdale Loses Overpass Dispute. January 16, 58. Overpass Pressed. February 6, 61. Pier Job Slows Traffic. February 22, 23.
New Bridge Links Planned Uptown. February 18, 1. Road Work is Let for 2d Span Deck. August 15, 16. Bernard Stengren. Houses Giving Way for Roads to George Washington Bridge. September 24, Riverdale is a Contrast in Mansions and Skyscraper Apartment Houses. October 1, George McNickle. Post-War Change in Area is Great. October 1, R1. Joseph C. Ingraham. Double-Deck Span. August 26, Glenn Fowler. Castle Village, Overlooking River, Sold. August 2, Robert Lindsey. West Side Story Highway Repairs and Jams. August 8, 35. HENRY HUDSON PARKWAY HAER No. (Page Edward Hudson. City s Largest Sewage Plant is Going Up on the Hudson. September 2, 26. Edward C. Burks. Work to Resume on Parkway Here. August 20, 41. City to Rebuilt Part of Hudson Parkway. June 1, 1. Edwin McDowell.
Project Announced for Hudson Parkway. March 10, David E. Sanger. Work on Henry Hudson Begins. July 29, Paul Goldberger. Discovering the Pleasures of City s Great Boulevard. October 3, C1. Robert Moses, Master Builder, is Dead at 92. July 30, A1. The Associated Press. Hudson Parkway Gets $22 Million. August 27, B8. William G. Blair. Washington Heights Frustrated by a Billboard. November 3, B1. City and State Joust Over Removal of Billboard. November 21, 39. City Ready to Take Action on Giant Eyesore Billboard. January 16, 41. Joseph Berger. Viaduct Opened on Riverside Dr. Two Days Late. November 10, 27. Suzanne Daley. Rebuilding the Riverside Drive Viaduct. May 22, B1. Scott Aiges. An $80-Million Park Planned Atop Treatment Plant. August 4, R7. Andrew L. Yarrow.
Exploring Inwood Hill s Urban Wilderness. May 1, C1. New York Under Construction for Three Centuries. October 23, E24. Christopher Gray. Restoration for an All-but-Ruined Hudson Temple . February 26, David W. Dunlap. Atop a Harlem Waste Plant, a Park Grows. May 17, B1. Groups Propose Park at New Highway. December 3, 58. Joseph Berger. An Uphill Battle Against Roadside Squalor. April 28, 27. HENRY HUDSON PARKWAY HAER No. (Page Christopher Gray. Razed or Rebuilt, It s a Lost Cause. February 17, R6. Douglas Martin. Ex-First Lady s Latest First: Statue in New York City Park. October 5, 25. Christopher Gray. Monumental Remnant from a s Estate. December 22, R5. Shadows of an Uptown Castle, and Its Builder. September 10, RE7. Randal C. Archibold. For Some Taking in the View, A Close Call.
May 13, Michael Luo. Wall that Collapsed Onto New York Highway Had a Shaky Past. May 13, Robert D. McFadden. Wall Collapses Onto a Busy Manhattan Highway. May 13, James Barron. Years Before Landslide, Residents Complained of Wall s Instability. May 14, Sewell Chan. City Pushing to Clear Wall Debris by Monday. May 14, Repositories Consulted: Museum of the City of New York Fifth Avenue New York, NY Renderings: Riverside Drive Extension, Cross Section about Feet South of Dyckman Street, rendering, Frederick Law Olmsted (Landscape Architect) and Arnold W. Brunner (Architect), in Riverside Drive, St-End. Riverside Drive Extension, Cross Section about Feet South of Harlem River, rendering, Frederick Law Olmsted (Landscape Architect) and Arnold W. Brunner (Architect), in Riverside Drive, St-End.
Riverside Drive Extension, Study for Treatment of Concourse at North End of Inwood Hill, rendering, Frederick Law Olmsted (Landscape Architect) and Arnold W. Brunner (Architect), in Riverside Drive, St-End. Riverside Drive Extension, Study for Treatment at Inspiration Point, rendering, Frederick Law Olmsted (Landscape Architect) and Arnold W. Brunner (Architect), in Riverside Drive, St- End. Photographs: HENRY HUDSON PARKWAY HAER No. (Page Staircase to Riverside Park at St, photograph, in Riverside Drive, St-End. Postcards: Riverside Drive North from New York, Postcards, Box Riverside Drive Riverside Park and Hudson River, Showing U.S. Men O War at anchor, New York, Postcards, Box Riverside Drive. Riverside Drive Viaduct, Postcards, Box Riverside Drive.
Riverside Drive North from St, New York, Postcards, Box Riverside Drive. New York Public Library Digital Gallery, which includes digitized images from their collection, available at: John Reddick Postcard Collection Parks Photo Archive, City of New York Parks & Recreation, The Arsenal, Central Park, New York, New York. Squatter Shack, Texas Leasehold Estate, photo by Alajos Schuzler, neg. # West Side Improvement, View North from Viaduct, neg. # West Side Improvement, South from Street Viaduct, neg. # Landfill Operation, Street, Top of Hill, photo by Alajos Schuzler, neg. # View South from Street, Birds Eye, neg. # View North from Street, neg. # View North from S + S Mountain, neg. # Street Progress on West Side Highway, Looking North from Street, photo by Max Ulrich, neg.
# West Side Improvement Comparative Plan Drawing, neg. # Robert Moses Opening Ceremony, Street Rotunda, neg. # View North from Street, neg. # Airmap, neg. # View North, neg. # Riverside Drive Viaduct, Signs, photo by Max Ulrich, neg. # General View North, neg. # No caption, neg. # Henry Hudson Parkway, Cut & Cover for Existing Railroad Tracks, neg. # George Washington Bridge Interchange, photo by Flying Camera, Inc., neg. # Aerial in location of streets, with polo grounds, no date. HENRY HUDSON PARKWAY HAER No. (Page Drawings, City of New York Parks & Recreation, The Arsenal, Central Park, New York, New York. When applicable, cabinet number has been given.
The New York Central Railroad drawings are also located at the Park archives at the Olmsted Center but are bound and therefore not accessible for copying. New York Central Railroad, West St to St, Duffy Construction Company Contractor, St Field House Plans St Field House Plans New York Central Railroad, West St to St, PT Cox Construction Company Contractor, New York Central Railroad, West St to St, Del Balso Construction Company Contractor, Circuit Breaker House, probably one located St. New York Central Railroad, Roof Covering Tracks, West St to St. Pedestrian Underpass at St, 3 drawings of details. New York Central Railroad, West St to St, Poirier & McLane Corporation Contractor, Reconstruction of the Docks, St Marina, West St to St. Clair Place, grading and landscaping.
Riverside Park Section 11, West St to St, Contract Plan for the Construction of a Steel Viaduct and Approaches in Riverside Drive West from West to West St, authorized by Board of Estimate, Reconstruction of Fort Washington, shows grading, planting, tennis courts, plans. Restoration of Stone Parapet Walls, Teaco Construction Company Contractor, took place northbound at West St and northbound at St. Henry Neufeld Playground, and Cabinet 11. St tot lot and playground, Cabinet 11. Riverside Park Maintenance Action, Cabinet 11. Eleanor Roosevelt Memorial, Cabinet 11. Mt. Tom Plantings, Inwood Nature Center, Cabinet 11. Cherry Tree Planting, Cabinet 11. St tot lot, Cabinet 11. Street access to Ft Washington Park, Cabinet 11. Pruning plan, Cabinet 11. Bird Sanctuary, Cabinet 11.
Peter Dunleavy project, St, Cabinet 11. Planting Plan, Fireman s Memorial, Cabinet 11. New York Central Railroad, W St to Dyckman St, Charles Stumpf Contractor, Cabinet 4. Riverside Drive Comfort Station, Theodore E. Videto, architect, approved Cabinet 4. New York Central Railroad, W St to St, Cabinet 4. Riverside Park electrical layout, Cabinet 4. HENRY HUDSON PARKWAY HAER No. (Page New York Central Railroad, Claremont Park, St, topographical survey and plan prepared for John D. Rockefeller Jr. by Olmsted Brothers, Brookline, MA, Cabinet 4. W to St, Reconstruction of the Stone Retaining Wall at Riverside Park, Cabinet 4. Construction of Pathways and Drainage, Various Locations in Riverside Park, between and St and and St, Cabinet 4.
New York Central Railroad, W to St, grading plans, Cabinet 4. Topsoil for Riverside Park, West to St. Clair Place Cabinet 4. Reconstruction Drawings, including St Playground, Skate Park, Paths along Riverside Drive between construction of soccer field at West Cabinet 4. West St to St Clair Place Highway and Park Fences in Riverside Park, Vulcan Rail and Construction Company Contractor, Cabinet 2. West St to St, Highway and Picket Fence, North American Iron & Steel Company Contractor, Cabinet 2. W 72 St to St, Detail of Fences in Riverside Park and Fort Washington nd Park, Cabinet 2. Boat Basin at W St, Cabinet 2. Reconstruction of Firemen s Memorial, Street Rotunda, South Lawn work, St tot lot. Tennis Court, Inwood Hill Park.
Reconstruction of Seawall and Promenade, City of New York Parks & Recreation, Olmsted Center, Flushing Meadows-Corona Park, Flushing, New York, Steven Rizick, Director of Document Services, Capital Projects. New York Central Railroad drawings: W to St, Path Paving, Immick Company Contractor, 1-9 W to St, Landscaping Plans, W to St, Wading Pools, Walls, Misc, Walter Kidde Construction, Inc., Contractor, Electric Facilities, Hoffman & Elias, Inc. Contractor, to St. Clair, Planting, Yonkers Nursery Inc. Contractor, to St. Clair, Path Paving, Del Balso Inc. Contractor, W to St. Clair, Electric Facilities, Hoffman & Elias Inc. Contractor, 1- 3. W 158 to St, Electric Facilities, Hoffman & Elias Inc. Contractor, th W to St. Clair, Water Main, Bronx Water Works, Inc. Contractor, 1- 10.
W to St, Electric Facilities, Hoffman & Elias Inc. Contractor, HENRY HUDSON PARKWAY HAER No. (Page W to St, Water Main, ClevoRock, Inc. Contractor, W to St, Rehab Riverside Park, Elmhurst Contracting Contractor, W to St. Clair, Rehab Riverside Park, Del Balso, Inc. Contractor, 1- 1. W to St, Boring and Rock Cores, Sprague & Henwood Inc., 1- 17. W St, Resurfacing Running Track, Harlem Construction Co. Contractor, W to St, Electric Facilities, Hoffman & Elias, Inc. Contractor, W to St, Electric Facilities, HZ Altoergh Inc. Contractor, Henry Hudson Parkway Authority, Contract 3, Dyckman Street Bridge. Contract 4, Kappock Street Bridge. Contract 6, Riverside Drive connection. Contract 7, St (7 sheets). Contract 9, Paving. Contract 11, Parkway Lighting. Contract 14, Grading, Inwood Hill.
Contract 15, Henry Hudson Bridge, Upper Deck (42 total sheets). Contract 16, Paving and Underpass in Inwood Hill. Contract 18, Paving, at and Spuyten Duyvil. Contract 20, Northbound Parkway Lighting. Contract 21, Henry Hudson Memorial Park general plan. Contract 22, Chain link fencing at Dyckman. Contract 23, Guide rails. Contract 24, Inwood Hill Park pedestrian overpass. Contract 27, Henry Hudson Memorial Park, tool house. Parks Photo Archive, City of New York Parks & Recreation, Olmsted Center, Flushing Meadows-Corona Park, Flushing, New York, Sony Onishi, Parks Photo Archivist. Riverside Park. Henry Hudson Park. Van Cortlandt Park. Riverdale Park. Annual Reports Collection.
16 mm film, in color but silent, showing City of New York, Department of Parks, Revenue Producing Facilities, West Side Improvement with Henry Hudson Parkway. Metropolitan Transit Authority Bridges and Tunnels, Special Archives, Historic Photographs, 2 Broadway, Floor, New York, New York. Taken from East Sidewalk, Parkway Looking North, Block No. Lot No. Map No. 51, at approximately St at Spuyten Duyvil. HENRY HUDSON PARKWAY HAER No. (Page Taken from Parkway Looking Northeast, Block No. Lot No. Map No. 42. Taken from Parkway Looking East, Block No. 3707E, Lot No. Map No. 36. Taken from S. Side St. Looking South, Block No. Lot No. 75, Map No. 29. Taken from Service St. at Martins House Looking South, (which is Block No. Lot No. 75, Map No. 29.
Series of photographs (6 total) showing emergency pull outs at northbound St, northbound St, southbound St, northbound St, southbound St. Northbound entrance ramp and parkway at St. Series of photographs (10 total) showing construction and views of Henry Hudson Bridge. Some courtesy of Steinman Engineers, photographed by Richard Averill Smith for Steinman Engineers, dates include Bridge at St and Henry Hudson Pkway. Designed by Madigan & Hyland. Series of aerials of parkway. Map of George Washington Bridge interchange. New York City Municipal Archives. Microfilm, MN Roll 9, DPR Riverside Viaduct. Microfilm, MN Roll 9, DPR Riverside Drive retaining walls. Microfilm, MN Roll 11, DPR Riverside Park Maps. Microfilm, MN Roll 11, DPR Riverside Park Maps.
Microfilm, MN Roll 11, DPR Riverside Park Maps. Microfilm, MN Roll 11, DPR Riverside Park Maps. Box Box ADDENDUM TO: HAER HENRY HUDSON PARKWAY HAER Extending miles from West Street to Bronx-Westchester border New York New York County New York PHOTOGRAPHS HISTORIC AMERICAN ENGINEERING RECORD National Park Service U.S. Department of the Interior C Street NW Washington, DC
The federal surveyors worked through New York building by building. These are the other structures
they measured and filed a report on, longest report first.
Written history. Quoted verbatim from HAER NY-334. United States federal work, no copyright under 17 U.S.C. 105.
Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.