BlockBefore

Brooklyn Army Supply Base, Pier 1, Upper New York Bay, opposite Sixty-third Street, Brooklyn

Brooklyn Army Supply Base, Pier 1, Upper New York Bay, opposite Sixty-third Street, Brooklyn, Kings County, NY. Surveyed as HAER NY,24-BROK,53-A-, with a 1,595-word written history.

From the record

“Pier 1 was the only open pier at the Brooklyn Army SUpply Base.”

Written record, HAER NY,24-BROK,53-A- survey. Machine-read text.

Surveyed by the federal HAER program as HAER NY,24-BROK,53-A- · the record runs 1595 words · one of 52 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

1459 words

Source document Quoted word for word from HAER NY,24-BROK,53-A-. Not written, edited or summarised by this site.

Pier 1 was the only open pier at the Brooklyn Army SUpply Base. It was de- signed for lighterage and handling of very heavy equipment, and provided the most direct connection to the base's principal rail link through the adjacent long Island Railroad yards. The pier was largely intact in J:RX>KI.;m' ARMY SUPPLY BASE: PIER_:-1 (Brooklyn Military ocean Temina1: Pier-1.) (Brooklyn Anny Tenninal.: Pier 1) HAER No. NY-202-A -(Page 2) Project_Infonnation: '!he Brooklyn Anny SUpply Base, also known as the Brooklyn Military Ocean Ter- minal (IM::11'), is listed on the National Register of Historic Places. As part of the New York Hart>or collection arrl Rem:>va1. of Drift Project inplemented by the Anny CO:rps of Err;Jineers, the outer 619 feet of Pier 1 will be rerocwed.

'!his documentation meets corrli.tions for mitigatinJ adverse effects to the base, according to the tenn.s of a Mem:>rarrlum of .Agreement anong the Mviso:cy Council on Historic Preservation, the New York State Historic Preservation Officer, arrl the New York District, CO:rps of Err;Jineers. Project actions may occur as early as Principal researcher arrl author Michael s. Raber Raber Associates 81 Dayton Road South Glastonbury, er Project photographer 'lhomas R. Flagg Photo Recording Associates 366 Orchard Terrace Bogota, NJ ARMY SUPPLY BASE: PIER 1 {Brooklyn Militai:y OOean Tenninal: Pier l) (Brooklyn-Anrr:f Tenninal: Pier 1) HAER No.

NY-202-A (Page 3) Part I: Historical Infm:matian* Pier 1 was built am IOOdifie:l with gantry cranes durin;J World War II~ As discussed below, the cranes have been :remove:l {Figures 1am 2). Part II: Descr.iptive Infm:maticn A. Camitiais '1he Pier 1 substructure suffers from the same problems seen at the other lM1I' piers, am includes many repairs made above mean low water. Where the pier stretches northwest beyond the bulkhead to the south, ten feet of deck has been deliberately remove:l, presumably to inhibit unauthorize:l use of the outer pier end. 'Ihe deck is otherwise intact, am retains its double set of rail- road tracks on the north side am its gantry crane rails alon;J either edge; the crane is gone.

Some deck sections have relatively recent bituminous as- phalt am gravel finishes over the original concrete deck, although original asphalt block paving also SUIVives in places {PIER 1 'ID WEST; PIER 1 '10 F.AST; PIER 1 DECK, '10 SCOIHFAST; PIER 1, CROSS SECI'ION AT TRUNCATED DECK.) B. Original a:nstruct.ian Pier 1 is an open, 60-foot-wide concrete deck, supported by wood piles. '!he north side of the pier exterrls feet from the main IMJI' bulkhead; the south side exterrls only 619 feet from the bulkhead south of the pier (Figures 4 am 6) Original wocxi fourrlations include piles arraye:l in transverse rows or bents 10 feet apart, with the piles within each row driven at 4-foot cen- ters. Bents also include diagonal timber braces. Timber pile caps top each bent.

On the north side of the pier, there are lon;Jitudinal stringers or ~ers below the caps, provi~ additional support under deck sections with railroad tracks. '!he 18-inch-thick concrete deck, with 5/8-inch reinforcing rods am 500 capacity, was poured directly on the pile caps, in 10-foot-lon;J sections acting essentially as beams. Pier sections fronting water had timber fender systems, whidl in consiste:l of pilings set in 36-inch wide arrays. 'Ihe outer end of the pier has a denser, solid cluster of fender piles.

Alon;J the southeast 727 feet, abutting fill which supported rail yard am marine repair facilities, the side of Pier 1 has vertical timbers bolte:l to fender piles (Figure 3; Anrr:f Corps of Engin- eers PIER 1 '10 FAST) * capitalize:l references are to photographs in this documentation. _ :ERX>KLYN ARMY SUPPIX BASE: PIER~ - -(Brooklyn Military Ocean _'J:'enninal: Pier 1) (Brooklyn Anny Tenninal: Pier 1r HAER No. NY-202-A (Page 4) '1he original deck surface consisted of 8S{ilal.t blook paving. Two ~ts of starrlarcl --gauge, eighty-pourrl r.ailroad tr.acks run alorq the ~rthem side of the pier, between arrl. 30. 7 feet fran the deck edge (Figure 7).

'!here was no other pennanent equiprent built for the original pier, which shared portable hamling equipnent with Pier 2 until pe:rhaps World War II. 'lhe port- able equiprent included electric 5-ton elevators, battery-operated tr.actors, platfonn tr.ailers, a-ton hoists, electric 5-ton trucks, arrl. electric winches. It is possible that the crane r.ail described below dates to however, since gantry cranes were part of original base design (crocker original construction also probably included three small warehouses on the bulkhead inunediately south of, arrl. parallel to, the pier.

'!he warehouses may have served for terrporary stor.age of items designated for inunediate shipnent, but available infonnation on this point is very limited, as is any data on a small laurrlry building built on or near the pier (Anny Corps of Engineers New York State Office of Parks, Recreation arrl. Historic Preserva- tion PIER 1 DECK, 'IO SOUIH.FAST) c. Modificatioos turing additions made to the Anny Base in World War II, the Anny added heavy lift cranes to Pier 1 facilities. '!be Port Series for lists three steam- powered cranes arrl.

one gas-pOl,lered crane, although we have no other document- ary or gr.aphic data on the location of these units (Anny Corps of Engineers '!be installation of 2-inch-wide crane r.ails along either side of the pier, 6 or 7 feet fran the deck edges, probably dates to this period, arrl. in- dicates that some or all of the cranes were movable gantry units (Figure 3). By the time the Anny closed the base in the only crane on Pier 1 was a stationary revolving gantry unit, located about midway along the outshore 619 feet of the pier. '!be crane was rem::,ved by (Anny Corps of Engineers arrl. (plans arrl.-dr.awings]; 'lbomas Flagg Collection [historic views]; PIER 1 DECK, 'IO SOUIH.FAST). World War II changes to Pier 1 arrl.

vicinity also included reilK)Val of the laun- dry building, and replacement of the three bulkhead warehouses with a 604-foot steel-framed, metal sided marine repair shop. 'lbere were also very small star.age buildings associated with the latter structure. Marine repair shop functions remain urrlocumented, but may have included maintenance of small military vessels, arrl. private lighters or tugboats needed to meet demarrling wartime shipping requirements. '!be repair shop was apparently rem::,ved by (Anny Corps of Engineers arrl. [plans arrl. dr.awingsJ; 'lbomas Flagg Collection [historic views]). BROOKLYN ARMY SUPPLY BASE: PIER 1 (Brooklyn Military ocean Tenni.nal: Pier 1) (Brooklyn Anny-Tenni.nal: Pier 1) HAER No.

NY-202-A (Page 5) Part m: Souroes of I'nfcmnati.al Plans am DrawirxJs Anny Corps of Engineers Plot PlaiyBrooklyn Anny Tenni.nal. On file, New York City Department of Ports and Trade, Battery Maritime BuildirXJ, 1 Whitehall Street, New York, NY Historic Views Published and unpublished aerial views of the Brooklyn Anny Base are probably fairly widespread. Pier 1 appears in some views, including one taken shortly after the base was completed, published in Anny Corps of Engineers and 'IWo unpublished aerial views in the 'Ihomas Flagg Collection show the revelving gantry crane and the marine repair shop at Pier 1; rights to these views were not obtained for this documentation. BibliograpIY Unplblished Sources Dravo Van Houten, Inc.

General Design Melrorarrlu:rn, Ibase II-Project Design, City of New York, Brooklyn Reach 2. New York Harl:>or Collection and Removal of Drift Project. Draft, on file New York District, Anny Corps of Engi- neers. New York State Office of Parks, Recreation and Historic Preservation National Register of Historic Places Inventory - Nomination Fonn. United States Anny Military Ocean Tenninal. Published Sources Anny Corps of Engineers 'Ihe Port of New York. and Port Series No.5.

Washington: Goverrnnent Printing Office As above, revised " " " " " II " " Likely Sources Not Yet Investigated Original Deparbnent of the Anny archives are the principal source not explored for this documentation, and might provide original drawings, and IOC>re infonna- tion on original design or planning considerations, or on later tenn.inal use. It is also possible that photographs showing different handling equipnent at Pier 1 exist in these archives, or perhaps in contenporary newspapers. ARMY SUPPLY BASE: PIER 1 (Brooklyn !'fi-1.itary Ocean Terminal.: Pier 1) (Brooklyn Arrrr.i Terminal.: Pier 1) ~ HAER No. NY-202-A {Page 6) Bu1h Army Supply Bue PIER 1 ~-~ ( ~ former LIRR yards Figure 1. PIER 1 I.OG'd'ICE Ql 'lllE lRXlKUlN ~ base map: Jersey City U.S.G.S.

qua~le sheet Bfo:)KL)'.N ARMY SUPPLY BASE: PIER 1 (Brooklyn Military Q:ean Tenninal: Pier 1) (Brooklyn Anny Tenninal: Pier 1) 0 HAER No. NY-202-A (Page 7) Figure 2. A1'MY SUPPIX ~ rnINCIPAL !a;T-1920 AIDITICNS BRCOKLYN ARMY SUPPLY B.?\SE: PIER l- (Brooklyn Military o:ean Terminal: Pier 1) (Brooklyn Arrcrf Tenninaj.: ~ier 1) HAER No. NY-202-A (Page 8) r-- I ~o 1 I ~ 1 I IZA~E. RAIL I :2 ,c Figure 3. 'IYPICAL ~-sECTICN OF ~ ~ BASE PIER 1, 'ID RRIHWEST base drawirq: Dravo van Houten, Inc.,

In context

Brooklyn, New York The place record: every map, photograph and survey of this town.
Kings County, New York 93 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Brooklyn

24 of 50 records shown

The federal surveyors worked through Brooklyn building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Fox TheatreHABS NY,24-BROK,41-18,296 words
American Sugar Refining CompanyHAER NY-54816,559 words
New York Barge CanalHAER NY,24-BROK,51A-15,106 words
Stillwell Avenue StationHAER NY-32511,437 words
Bush Terminal CompanyHAER NY,24-BROK,54-7,145 words
South Brooklyn Freight TerminalHAER NY,24-BROK,55-6,185 words
Brooklyn Army Supply BaseHAER NY,24-BROK,53-6,103 words
U.S. Navy Fleet Supply BaseHAER NY,24-BROK,56-5,867 words
Brooklyn Army Supply BaseHAER NY,24-BROK,53D-5,095 words
Baptist HomeHABS NY,24-BROK,58-4,888 words
Bush Terminal CompanyHAER NY,24-BROK,54-A-4,148 words
Floyd Bennett FieldHAER NY-555-A3,955 words
Floyd Bennett FieldHAER NY-555-B3,204 words
Cypress Hills National CemeteryHALS NY-2-D2,559 words
Bethany Deaconess HospitalHABS NY,24-BROK,47-2,529 words
Johannes Van Nuyse HouseHABS NY,24-BROK,3-2,527 words
Bush Terminal CompanyHAER NY,24-BROK,54-B-2,493 words
Long Island Historical Society BuildingHABS NY,24-BROK,46-1,839 words
Lefferts HouseHABS NY,24-BROK,2-1,408 words
Plymouth ChurchHABS NY,24-BROK,31-1,281 words
Brooklyn City HallHABS NY,24-BROK,42-1,200 words
Peter Wyckoff HouseHABS NY,24-BROK,32-1,176 words
Schenck-Crooke HouseHABS NY,24-BROK,9-1,047 words
Cypress Hills National CemeteryHALS NY-2-E1,038 words

Provenance

  • Written history. Quoted verbatim from HAER NY,24-BROK,53-A-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.