Pier Four was built during the original phase of construction of the Brooklyn Army Terminal (BAT), and was designed by Cass Gilbert. It was one of four piers at the terminal used by the U.S. Army to send troops and supplies to Europe on an emergency basis immediately after World War I and during World War II.
Written history
1891 words
Source document
Quoted word for word from HAER NY,24-BROK,53D-.
Not written, edited or summarised by this site.
It is the present intention to rehabilitate Pier Four for use as a Tark-And-Sail Ferry Operation". The proposed ferry would provide passenger service from BAT Pier Four to Manhattan for bus and car commuters. As part of EDCs efforts to restore and upgrade the terminal, Han-Padron Associates, Consulting Engineers, were engaged to investigate the condition of the piers. According to these recent evaluations of the structure and sub-structure and follow-up reports conducted in and the deterioration of the pier has become so advanced that local collapses are imminent. Demolition is advised. j Judith Saltzman Li/Saltzman Architects, Preservation Consultants 375 West Broadway New York, NY BROOKLYN ARMY SUPPLY BASE, PIER 4 (U.S. Army Military Ocean Terminal, Pier 4) HAER NO.
Page 2 Summary Description of Pier 4 and Setting: The Brooklyn Army Terminal (BAT) is a former military installation containing 97 acres; its original construction dates to Originally known as The United States Army Military Ocean Terminal and the former New York Port of Embarkation, it is listed on the National Register of Historic Places. BAT was vacated by the U.S. Government in and was acquired by the City of New York in Pier 4, along with sister piers 2 and 3, are part of BAT and extend west toward Manhattan.
The base is comprised of two warehouses, the piers 2,3 and 4 with covered sheds (Pier 1 was uncovered), an administration building, a boiler house, a machine shop with garages and a storage yard with numerous railroad tracks and trucking areas.1 The BAT complex was the largest of five Army Supply Bases constructed, along the east and gulf coasts, on an emergency basis at the end of World War I. According to the National Register Nomination, "The complex played a vital role in the mass movement of military goods and troops immediately after World War I and throughout World War II...
During World War II, it was one of the main points of debarkation for troops and supplies."2 The complex is on a acre site, and the size and boundaries of the present site are those of the original development site. This particular site was selected because it was in a commercial waterfront area of sufficient size; it was located immediately adjacent to a deep water channel and it was immediately available.
An investigation of the underlying soil conditions revealed the fact that it was possible to obtain excellent foundations for the warehouses as well as the piers.3 In addition, the site was strategically located between, and directly connected to, existing railroad yards for the Pennsylvania and Long Island Railroads and the Bush Terminal Industrial Complex.4 Eleven of the existing nineteen structures are listed as "contributing" on the National Register nomination for the "U.S.
Army Military Ocean Terminal." Eight of these contributing structures, including Piers and 4, were part of the initial construction campaign in The cost of the initial construction was approximately Construction was authorized by the Department of the Army to facilitate the movement of material, and the transport of troops, to Europe. The base served the Army in this capacity until decommissioned in then served various governmental uses until It was turned over to the City of New York in All work on the base was under the direction of the Construction Division of the U.S. Army. Planning and design services were provided by Mr. Cass Gilbert, one of the greatest architects of that period. Recognizable works of Mr. Gilbert are the Woolworth Building and the U.S.
Custom House, both located in New York City. Mr. Gilbert commented on the architectural simplicity of the BAT design: "If it (the base) has in any respect been successful as a work of architecture (aside from its practical efficiency), it is because of its manifest simplicity. I have emphasized the importance of simplicity of outline and surface, and have decried the use of extraneous 1 "United States Army Supply Base," The Architectural Review (January 1. 2 National Register Nomination (July 2. 3 "United States Army Supply Base," The American Architect (November 4 Ibid. 5 Nimmons, George C, "Modern Industrial Plants," The Architectural Record (date unknown): BROOKLYN ARMY SUPPLY BASE, PIER 4 (U.S. Army Military Ocean Terminal, Pier 4) HAERNO.
Page 3 ornament especially in industrial buildings, as out of character with the direct and practical "" purpose of such substrates.'* The BAT complex is one of the earliest examples of large-scale industrial design in a bold, modem language. The original buildings, the east facades of the two-story sheds on Piers and 4, and the connecting bridges from the second deck of the pier sheds to the adjacent warehouse structure, were all constructed of reinforced concrete. All of the structures conform to the overall stylistic plan used in development of the site. The construction techniques were innovative to that time period, in that they departed from the Beaux-Arts embellishments, and the use of more traditional materials such as brick.
It was necessary to use reinforced concrete in lieu of structural steel, which was hard to acquire in large quantities at the time of construction Aside from the Gilbert-designed reinforced concrete facade, which is located along the bulkhead wall at the inshore end of the piers, the construction of Piers and 4, is typical of piers built in New York Harbor early in the century. Pier 4's description and present condition is very similar to Piers 2 and 3. Pier 4, along with Piers 2 and 3, were each 150 feet wide and extended feet out into the harbor, from the shoreline bulkhead wall.** Each of the three enclosed piers was comprised of three basic parts: timber piles (the substructure), a concrete deck, and a two-story shed.
Pier 4 was supported on timber piles driven into the harbor bottom and timber framing, which formed the substructure and support for the pier deck and shed. The reinforced concrete pier deck slab was supported directly by the timber framing, and in turn, on the timber piles. Each pier contained approximately timber piles.9 The two-story shed was 140 feet wide, feet long, and its greatest height was 60 feet. The pier shed elevations which faced Warehouse 'A' were concrete, which reflected the composition of the warehouse. The two story shed was steel frame construction with corrugated metal siding and metal cargo doors along the length . The columns supporting the pier shed framing were founded on unreinforced concrete footings.
The column foundations and the pier deck substructure were independent of each other. The original drawings by Cass Gilbert documented the materials used. According to a side elevation, cement plaster finish with metal paneling was applied. There were vertical sliding doors for handling cargo. Metal windows utilized clear wire glass. Each floor was paved with asphalt block.^ Railroad tracks ran down the length of the pier. A distinctive feature of BATs piers was the connecting bridge that linked the second floor of each pier to Warehouse 'A'. While the BAT complex was constructed on an emergency basis due to size and capacity of the facility, the design considered the long term effects of such a project on handling commerce at the Port of New York.
Project planning also included the ultimate conversion of the warehouses into buildings for manufacture.^ The layout of the complex provided an effective plan for receiving, storing, and transferring cargo from the rail yards, the warehouses and the piers. An outstanding feature of the base was the simplicity of the transportation facilities. The planning of the storage yards, streets, ramps, railroads, connecting bridges, and tunnels made it a practical achievement in freight handling. 6 Gilbert, Cass, "Industrial Architecture in Concrete," The Architectural Forum (Sept. 85. 7 The American Architect: 8 Han Padron Assoc, Inspection & Structural Evaluation of Pier Nos. and 4, (April 2. 9 Inspection & Structural Evaluation of Pier Nos. and 4, (April 2.
10 Gilbert, Cass, Architectural Drawings no. P101A and 11 The American Architect: BROOKLYN ARMY SUPPLY BASE, PIER 4 (U.S. Army Military Ocean Terminal, Pier 4) HAERNO. Page 4 Operations on the piers were unique in that direct access was provided, from upland storage areas mid warehouses, to both the main pier deck and to the second floor of the pier shed. Cargo could be loaded and/or offloaded onto the lower or upper deck level of the pier sheds. Ships gear was used to handle cargo to and from the lower deck. The cargo was landed on the apron (approximately 5 feet wide) provided by the difference between the width of the pier deck and the shed. Inside the shed, cargo was moved by battery operated mobile equipment (forklifts, dollies, etc.) for loading onto trucks and rail cars.
The BAT complex had, on its own, extensive track and marshalling areas for rail cars with eventual access to main line service. On the piers rail access was provided over the full length of the shed. At the second deck level there was direct access to the warehouses via a bridge connecting to the third level of the warehouse. Cargo was handled on the pier to and from the warehouse using battery operated equipment. Cargo was transferred, between the vessel and the pier, using a combination of ships gear and burton frame system constructed along the face of the shed roof.1^ The use of chain falls was required to handle the cargo to or from the ship directly to the second deck.
Cargo could also be moved between the lower and upper pier decks using one of six cargo elevators located on each pier. Up to 20 vessels could berth simultaneously at the piers*3. During World War II, it is surprising to note that over troops and tons of supplies passed through this port during its principal use.14 It was a remarkable feat at the time for the U.S. government to produce such an elaborate complex in the hopes for its future use, and for the future economic needs of the Brooklyn population. Several minor alterations occurred at the pier over the years. An estimate of repairs was conducted by the Army in (the form is attached in the Supplemental Material Section). Inspections and condition studies were conducted for the City to insure proper maintenance.
Technology developed; one elevator was replaced by a passenger escalator at Pier 4, With its close proximity to the water, weathering damaged areas along the piers. Most of the original metal cargo doors were removed after years of deterioration and replaced with metal roll-up doors. The fenders surrounding each pier were reconstructed. Areas at the concrete floor decking needed replacement. The original buildings of the Brooklyn Army Terminal, including Pier 4, will be remembered as an early success in modern design, due to the confluence of ideas regarding emergency construction, practical efficiency, bold use of modern materials, simplicity in appearance, and efficient coordination between architect, engineer, and contractor.
12 Han Padron Assoc, Inspection & Structural Evaluation of Pier No. 4, (October Attachment 13 The Architectural Review (January 1. 14 National Register-Nomination Form: 6. 15 URS Company, Suitability for Future Use & Assessment of Present Condition, (June 6. BROOKLYN ARMY SUPPLY BASE, PIER 4 (U.S. Army Military Ocean Terminal, Pier 4) HAERNO. Page 5 SOURCES OF INFORMATION/BIBLIOGRAPHY: HISTORIC VIEWS: New York Historical Society Collection. "Unidentified Warehouses: Army Supply Base (Cass Gilbert and Hugh Ferriss renderings). New York City, New York: Clipping File Collection. PUBLISHED AND UNPUBLISHED
SOURCES
237 words
Source document
Quoted word for word from HAER NY,24-BROK,53D-.
Not written, edited or summarised by this site.
Gilbert, Cass. "Industrial Architecture in Concrete." The Architectural Forum, vol. 39, no. 3, (September Han-Padron Associates, Consulting Engineers. Inspection and Structural Evaluation of Pier No. 4: Brooklyn Army Terminal Contract No. Assignment No. 4, April Han-Padron Associates, Consulting Engineers. Inspection and Structural Evaluation of Pier No. 4: Brooklyn Army Terminal, Contract No. Assignment No. 4 (revised), October National Register of Historic Places - Nomination Form, under "United States Army Military Ocean Terminal." (July Nimmons, George C. "Modern Industrial Plants." The Architectural Record, date not known: "United States Army Supply Base." The American Architect, vol. number (November "United States Army Supply Base." The Architectural Review, vol.
10, number 1, (January BROOKLYN ARMY SUPPLY BASE, PIER 4 (U.S. Army Military Ocean Terminal, Pier 4) HAER NO. Page 6 INFORMATION NOT YET INVESTIGATED: "Freight Handling at the Brooklyn Army Base." Engineering News-Record 83 (September REPORTS ON FILE AT NYC ECONOMIC DEVELOPMENT CORPORATION: Jerome Haims Realty Inc.: Rental Appraisers and Consultants. "Appraisal Report of Rental Value of Pier Four - Brooklyn-Army Terminal." March Architects and Engineers. "Brooklyn Army Terminal: Physical Requirements for Pier Reuse." December URS Company Inc. "Brooklyn Army Terminal: Piers No. 3 and No. 4: Suitability for Future Use and Assessment of Present Condition." June FURTHER INFORMATION FOUND AT THE NEW YORK HISTORICAL SOCIETY: In Cass Gilbert List of Holdings: U.S.
Army Supply Base Brooklyn, New York 1 volume letterbooks 13 packages blueprints Presentation Drawings: Stack LOCATION OF LEGAL
DESCRIPTION
2770 words
The headings the report itself prints. Each one jumps to where it begins.
Source document
Quoted word for word from HAER NY,24-BROK,53D-.
Not written, edited or summarised by this site.
Hall of Records, 31 Chambers Street, New York City. BROOKLYN ARMY SUPPLY BASE, PIER 4 (U.S. Army Military Ocean Terminal, Pier 4) HAER NO. Page 7 SUPPLEMENTAL MATERIAL: New York Historical Society Collection. "Unidentified Warehouses: Army Supply Base" (Cass Gilbert and Hugh Ferriss renderings, New York City, New York: Clipping File Collection. Brooklyn Historical Society Collection. Brooklyn Photographs: under "Army - Supply Bases" (Clippings from Architecture and Building, no date) Brooklyn New York: Visual Collection. "United States Army Supply Base." The Architectural Review, vol. 10, number 1, (January pages plates I and II.
Letters: regarding Pier Shed Roofing, from Cass Gilbert/Gun vald Aus Company, (June Letter: to the Constructing Quartermaster, from Construction Division, (June DA AGO Form "Individual Project Estimate - Repairs and Utilities" for New York Port of Embarkation - Brooklyn Army Base; Request no. Detail Acct. no February HAGR,NY,24-6R-:>K,53D~ BROOKLYN ARMY SUPPLY BASE, PIER 4 (U.S. Army Military Ocean Terminal, Pier 4) HAER NO. Page 8 THE-ARCHITECTURAL-KLVI EW- si 5 uJ 5 Ml -:- I. a ' ' ' A * ># "General Layout: United States Army Supply Base, Brooklyn, New York City - Cass Gilbert, Architect." The Architectural Review, vol. 10, number 1 (January page 2. BROOKLYN ARMY SUPPLY BASE, PIER 4 (U.S. Army Military Ocean Terminal, Pier 4) HAERNO. Page 9 8 O a oo o > CO w East view of overall complex.
Warehouse 'B' in foreground, with Warehouse 'A' and piers in background. Design by Cass Gilbert, rendering by Hugh Ferriss, New York Historical Society Collection. BROOKLYN ARMY SUPPLY BASE, PIER 4 (U.S. Army Military Ocean Terminal, Pier 4) HAERNO. Page 10 5! o en o o 9 o V & Z. Northeast view of proposed design for terminal and piers. Design by Cass Gilbert, rendering by Hugh Ferriss, February New York Historical Society Collection. BROOKLYN ARMY SUPPLY BASE, PIER 4 (U.S. Army Military Ocean Terminal, Pier 4) HAER NO. Page 11 .-I 5 PS CO O EC g d go Northeast view of proposed design for terminal and piers. Design by Cass Gilbert, February, New York Historical Society Collection. BROOKLYN ARMY SUPPLY BASE, PIER 4 (U.S. Army Military Ocean Terminal, Pier 4) HAER NO.
Page 12 North view, with piers and 2 in foreground, and terminal in background. Rendering by Hugh Ferriss, date unknown. New York Historical Society Collection. BROOKLYN ARMY SUPPLY BASE, PIER 4 (U.S. Army Military Ocean Terminal, Pier 4) HAERNO. . Page 13 Southeast view toward the waterfront area, with Warehouse 'A' connecting with Administration Building. Design by Cass Gilbert, rendering by Hugh Feniss, New York Historical Society Collection. BROOKLYN ARMY SUPPLY BASE, PIER 4 (U.S. Army Military Ocean Terminal, Pier 4) HAER NO. Page 14 3 ~j Po North view looking from water to complex. Boiler House, Administration Building, and bridge connecting to Warehouse 'A'. Design by Cass Gilbert, rendering by Hugh Ferriss, New York Historical Society Collection.
BROOKLYN ARMY SUPPLY BASE, PIER 4 (U.S. Army Military Ocean Terminal, Pier 4) HAERNO. Page 15 Northeast view of Warehouse 'B' and 'A', showing trucks and rail system loading and unloading cargo. Design by Cass Gilbert, rendering by Hugh Ferriss, New York Historical Society Collection. BROOKLYN ARMY SUPPLY BASE, PIER 4 (U.S. Army Military Ocean Terminal, Pier 4) HAER NO. Page 16 <-J < o cc o H 3 o > CO u m z. tq X H Southeast view of Warehouse showing in foreground loading and unloading from piers using rail system. Design by Cass Gilbert, rendering by Hugh Ferriss, February, New York Historical Society Collection. BROOKLYN ARMY SUPPLY BASE, PIER 4 (U.S. Army Military Ocean Terminal, Pier 4) HAER NO. Page 17
Collections of the New-York Historical
Connection between Warehouse 'A' and Warehouse Train and trucks in foreground. Design by Cass Gilbert, rendering by Hugh Ferriss, New York Historical Society Collection. BROOKLYN ARMY SUPPLY BASE, PIER 4 (U.S. Army Military Ocean Terminal, Pier 4) HAER NO. Page 18 Connection between Warehouse 'A' and Warehouse Train and trucks in foreground. Design by Cass Gilbert, rendering by Hugh Ferriss, New York Historical Society Collection. BROOKLYN ARMY SUPPLY BASE, PIER 4 (U.S. Army Military Ocean Terminal, Pier 4) HAERNO. Page 19
Collections of the New-York Historical Society
Atrium view of Warehouse showing transport of cargo. Design by Cass Gilbert, rendering by Hugh Ferriss, February New York Historical Society Collection. BROOKLYN ARMY SUPPLY BASE, PIER 4 (U.S. Army Military Ocean Terminal, Pier 4) HAERNO. Page 20 THE-ARCHITECT UI\AL-PREVIEW- VOL X, N.. i UNITED STATES ARMY SUPPLY BASE. BROOKLYN, NEW YORK CITY CASS GILBERT, ARCHITECT Bridges connecting Warehouse 'B' and Warehouse 'A'. "United States Army Supply Base, Brooklyn, New York City - Cass Gilbert, Architect." The Architectural Review, vol. 10, number 1 (January plate I. BROOKLYN ARMY SUPPLY BASE, PIER 4 (U.S. Army Military Ocean Terminal, Pier 4) HAER NO. Page 21 THE ARCHITECT UKAL-PREVIEW- UNrTED STATES ARMY SUPPLY BASE, BROOKLYN,
New York City Cass Gilbert. Architect
Warehouse 'A', Southeast view. "United States Army Supply Base, Brooklyn, New York City - Cass Gilbert, Architect." The Architectural Review, vol. 10, number 1 (January plate II. BROOKLYN ARMY SUPPLY BASE, PIER 4 (U.S. Army Military Ocean Terminal, Pier 4) HAERNO. Page 22 ^^ UHi^i X en > o I H O 5< SECOND DECK OF ONB OF THE PIERS UNITED STATES ARMY SUPPLY BASE, BROOKLYN, NEW YORK CITY GILBERT. ARCHITECT "Second Deck of One of the Piers: United States Army Supply Base, Brooklyn, New York City - Cass Gilbert, Architect." The Architectural Review, vol. 10, number 1 (January page 4. BROOKLYN ARMY SUPPLY BASE, PIER 4 (U.S. Army Military Ocean Terminal, Pier 4) HAERNO. Page 23 AlCHITKTVH SB BlILOHO. Plait 7*. Buill br Turntr Conumtiion Co.; plumbing contrjctor G. J. Sum; vtniilatbn Mturcr Bn .
Co., Int.; Chrrtman A Ellioll DaiiMl UKd an building! in<f purij concrete pile* ni Concrete Pile Co. Can Gilbtrl, Archill LONG ISLAND WATSON COLLECTION HISTORICAL SOCIETY top half: "United States Army Supply Base Upper View Showing Piers, South Brooklyn, New York- Cass Gilbert, Architect." Rendering by Hugh Ferriss. Architecture and Building, plate 76, no date. Watson Collection/Brooklyn Historical Society Collection. , bottom half: Northwest view of terminal. Architecture and Building, plate 76. Watson Collection/Brooklyn Historical Society Collection. BROOKLYN ARMY SUPPLY BASE, PIER 4 (U.S. Army Military Ocean Terminal, Pier 4) HAER NO. Page 24 niv oh' <;AN.M;K AXII IJIAIIIM; IT.ATMIHMS. s'owrit KM> oh- iirii.nivc: A, IMIKIJ M'ATKS AH1IV jifl'l'IA' MASK, Til II Hi K iKI.VN, VUKK.
, PHK ., I/??Y. , t rir.rc r. .?HJ*'?:A. uiffMC S J?.?.?.Ki.y.* , UMITt ITeo STATES ARMY SUPPLY BASE. SOUTH JJROOKLYN, NEW YORK. C I Gilbert, Aichiltct. AkCltlTKTt'Ht Ann liiwiiic rijlf JJ. Hiiill hy Tiirnrr fmulruclinit Co.; alkali htocfct-Tliutiiim Pivrmtnl Co.j i|iRl Ulclal n>k mil byliirlili I Irrrniami * linct Co.; Savour *1 iwi>n Kultt UKil; litinkler >rtLi'in Korkwootl S|iriukW IX "Top of Garage and Loading Platforms, North end of Building 'A', United States Army Supply Base, South Brooklyn, New York." Architecture and Building, plate 77, no date. Watson Collection/Brooklyn Historical Society Collection. Tier No. 4, Lower Deck, United States Army Supply Base, South Brooklyn, New York- Cass Gilbert, Architect." Architecture and Building, plate 77, no date.
Watson Collection/Brooklyn Historical Society Collection. BROOKLYN ARMY SUPPLY BASE, PIER 4 (U.S. Army Military Ocean Terminal, Pier 4) HAERNO. Page 25 ARItf BASE V., June 14, ,'DlaIOKA ICX^U IKATIOffS MFOH1S I concur in thie recommendation but under the TROCPURAt. naonroRcuD CONOHBTK ^ I'OOHnATIONlt written instructions of the Construction Division CASS oinj-:^ ARCHITE'-;"- the design should be made of wood purlins, I have verbally protested against this. I wish also to 'UN 7- J9I3 ANS'D 'for their consideration an alter u^Wr^for alternative for pre cast != "* "~ ' ~ concrete purlins and roof slabs. COLLECTIONS Q SNV I OF -Loa-LiHoav mxm msroiucAV'sOcJErr .
"T^?iO Siit/O With reference to the Pier Bheda of the Army Supply *" Ease /you told us that you have been advised of the decio-s ion to make the roof construction wood purlins and sheath- ing. V7a urgently recommend that thie matter be reconsider- ed, if possible, in favor of pre-cast reinforced concrete purlins and roof slabs as shown by sketch herewith. Our argument for the adoption of ouch construction in lieu of wood is not only that it will at least r tard a possible fire and practically insure against the spread of fire from one pier to another or to ships alongside, but also that the placing o* the pre-cact concrete roof will require less time and labor.
As rerards the cost, we have inquired of the"Pre- cast Concrete Company" and they have advised us that their price for the purlin3 and slabs in place complete, ready for the gravel roof covering, would probably not exceed forty-five cents per square foot which seems reasonable. We strongly recommend that such roof conotruction be Letters: regarding Pier Shed Roofing, written by Cass Gilbert; June (top half), to Cass Gilbert written by Gunvald Aus Company; June (bottom half)/ page 1 of 2. New York Historical Society Collection. BROOKLYN ARMY SUPPLY BASE, PIER 4 (U.S. Army Military Ocean Terminal, Pier 4) HAERNO. Page 26 " wwxuftumwmn SfcttrfWii steel trusses at the earliest possible moment. Very truly yours, -^ ";,ONb craavALD AUS CO:IPAHY. COLlX 01 " '&J~ft(hH!i- iff N0 * * ^^w x^o^J*^* /.
Letters; regarding Pier Shed Roofing, to Cass Gilbert/written by Gunvald Aus Company, June page 2 of 2. New York Historical Society Collection. BROOKLYN ARMY SUPPLY BASE, PIER 4 (U.S. Army Military Ocean Terminal, Pier 4) HAER NO. Page 27 IT w SOCCT ex*? c:- nit / ; .O: r.'i-.'s.i1 CR*E "' TO: The Constructing Quartermaster* : AN3T FROSIt Construction Division, Construction Eronoh. SUBJECT: Army Supply Base, Brooklyn, 1. At a meeting In the. of floe of It. Colonel Such on Thursday, June tho following items mire discussed and decisions reached aa follows: ... . 2* Referring to 1 otter'from Mr.
Cass Glitert to tf&Jor Crooner dated June Slut, with reference to railroad trades in - relation to the piers* It eras decided that the 300 ft* radius should be maintained and that columns of pier abed were to be moved to permit proper oleum no o where curve extended on to tho piers. 3* Traok layout of the Eaat and South of the project to be studied end report to bo made at the meeting on Thursday next, in the office of Lt* Colonel Bush* 7 fl4?toend thoof piers* r 4* Drawinpo 'to be revised to show pier sheds extended center line of the firut double bent of pileo back from 6.
Arrangement of pier Ho.l to be as follows: To be 60 feet in width, and to be provided with Z railroad traoko, y 18 feot o en tor to center, the tracks on the water side of the pier to bo 12 feet from center of traok to the edge of tho pier, and the pier to be designed for loo emotive loads* Pier to be paved with blocks, of nake to be de- termined later, and paving to be graded so that it will bo flush at tho top of the rails so as to permit trucking cvor the entire . width* ... - 6* Property lying between Third and Fourth Ave#, and along Street, to be condemned at once for neoessary track facilities* Colonel Shelby's office has been notified and ' ' neoessary aotion has begun* Memorandum: to the Constructing Quartermaster, from Construction Division, June page 1 of 3.
New York Historical Society Collection. BROOKLYN ARMY SUPPLY BASE, PIER 4 (U.S. Army Military Ocean Terminal, Pier 4) HAERNO. Page 28 2 -- 7.. All paring to be in acoordanoo with, the original pro- gram, i.e. oonoreto unless data to be furnished by Ur. Gilbert with reference to oosts and upkeep shows more favorable reference to paring blocks as a substitute for concrete. The apace between building A and bulkhead line to be pared with brick or some other smooth eurfaoed paring material on a o on ere to base* - Hat oriel recommended for paring to be submitted to the Construction Division for approval- . , ., 6.
There rill be no cranes used on piers Dumber 1, other than lo oo motive oranes, and there Trill be no ol no trio power required on this pier other than for necessary electrio lighting* There will be no stationary oranes provided in space between buildings A and bulkhead line* * 9. 9* Space for barracks, guards and stevedore regiments, will not be provided on the piers* Drawings are now being perfected to provide suitable accommodations for these men on land adjacent to the projeot. Mr.
Oilbort is to locate suitable quarters for first aid oases in the buildings, oases are to be sent to city or other public hospitals or to Infirmaries in guard, or stevedore regiment ocaps as may be determined by the Surgeon General who now has this mat tor under consideration* 10* a- Power plugs for tiering machines are not to be pro- vided on the piers* . / . b- Soale pits in buildings A and B to be located East Of ijC*reach-'elevator bank. Pits only to bo Installed at tills time and f * . ;oponing floored over, pending the installation of the scales. Mr. !'',"\TI Gilbert to work out program for placing other scales and submit U* layout to the Construction Division. ** ! % o- Scheme showing now looation of boiler room and.
' Adm inlet rat ire building as submitted by Mr* Gilbert, was approved. Keoesaary drawings to be prepared at once. d- Study for dining rooms, toilet rooms, etc., for Administrative forces to be propared by Hr. Gilbert and submitted for approval. e- Contracts for elevators to be submitted to the Con- struction Division for examination by the Legal Department* / H f- Both electrio and steam locomotives to be provided for ' AsicLtching purposes, electrio looomotiro to be of storage battery ,<srj;-.4type and used for handling oars inside the buildings.
g- She Signal Corps desires wireless towers and room for operator as a part of the project, data for the same to be obtained from the Electric Engineering Seotlon of Land Division, of Signal A Corps, who will also furnish information with referenoe to telephone faollitles for this projeot* ") .' COLLECTIONS -K Memorandum: to the Constructing Quartermaster, from Construction Division, June page 2 of 3. New York Historical Society Collection. BROOKLYN ARMY SUPPLY BASE, PIER 4 (US. Army Military Ocean Terminal, Pier 4) HAER NO. Page 29 3 h- Plumb in c and heating pi on a aro boing o hooked and will ho available shortly. 1- Arrangements of office facilities for Administrative force to be token up with Colonel Veils, ana determined as soon as possible* J- Mr* Morth. to confer with Kr.
Eorris on tho completion of layout for tho open storage tracks, layout to bo submitted to Gilbert for his Inspection and then referred to It.Colonel Bush for presentation to Mr. F el ton. ' COLLECTIONS H. C. Marshall, Jr* /- Colonel <i* M* Corps, H. A., OF In Charge of Construction Division. BY: Clinton H. fide* tfajor, '^.il.Corps, E.A, cHy/Girc/s Memorandum: to the Constructing Quartermaster, from Construction Division, June page 3 of 3. New York Historical Sodety Collection. BROOKLYN ARMY SUPPLY BASE, PIER 4 (U.S. Army Military Ocean Terminal, Pier 4) HAER NO. Page 30 ftv.iv.-:-.-.. .- ft . 1 I:t \ -*.-i- DA AGO Form Individual Project Estimate - Repairs and Utilities" for New York Port of Embarkation - Brooklyn Army Base, Request no. Detail Acct. no February page 1 of 3.
On file at the New York City Economic Development Corporation. BROOKLYN ARMY SUPPLY BASE, PIER 4 (U.S. Army Military Ocean Terminal, Pier 4) HAERNO. Page 31 f'vW^-itWr^-V^,-.*:. *: *. Vi fe* ^ii- 3& ^^f^il^^ilill^fe^fe % . <C- 4 >- ; ;.' -* - - - DA AGO Form Individual Project Estimate - Repairs and Utilities" for New York Port of Embarkation - Brooklyn Army Base, Request no. Detail Acct no February page 2 of 3. On tile at the New York Gty Economic Development Corporation. BROOKLYN ARMY SUPPLY BASE, PIER 4 (U.S. Army Military Ocean Terminal, Pier 4) HAER NO. Page 32 * K^Tr>;iVU .: - - * t-r it* ^:^ i " V; &; ;*1 ->: . -- ;: ' -" gas - sill lit jfef * "' ' " '-- '-, *' ' - .
*& ;: W ' ' Si DA AGO Form "Individual Project Estimate - Repairs and Utilities" for New York Port of Embarkation - Brooklyn Army Base, Request no. Detail Acct no February page 3 of 3. On file at the New York Gty Economic Development Corporation.
The federal surveyors worked through Brooklyn building by building. These are the other structures
they measured and filed a report on, longest report first.
Written history. Quoted verbatim from HAER NY,24-BROK,53D-. United States federal work, no copyright under 17 U.S.C. 105.
Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.