HISTORICAL INFORMATION The Bush and Denzlow Manufacturing Company built about half of later Bush Terminal Pier 7 in the early as part of its oil refining operations. Standard Oil Company, which purchased Bush and Denzlow prior to retained ownership of the pier until when it removed the refining facilities. Irving T. Bush immediately bought the pier, enlarged the pier substructure c. and had the existing piershed built in The piershed was the first built at the terminal, and one of the earliest in the Port of New York with a steel frame. Rapid shed erection by Post &McCord attracted professional attention. Sometime after completion of the shed, Bush Terminal Company leased Pier 7 to a series of shipping and stevedoring firms engaged in general cargo handling.
Information on pier tenants is incomplete. Firms using Pier 7 included Phelps Brothers, operators for the Cosulich Line, in the Lloyd Brasiliero in the and and American Stevedors, Inc. in the and Bush Terminal Company operated the pier itself in the until c. Within a few yeArs of the cessation of operations, the pier began suffering a series of fires which destroyed most of the shed (Army Corps of Engineers Engineering Record [Appendix]; Bush Part II: DESCRIPTIVE INFORMATION A. Conditions A series of fire since has destroyed most of the Pier 7 shed, but the east end retains about three hundred feet of partly intact shed, with standing columns, trusses, roof sections, and offices.; The rest of the piershed is Bush Terminal Company, Pier 7 (Bush Terminal, Pier 7) HAER No.
NY-201-A (Page 3) essentially a twisted metal sculpture. Considerable debris covers the inshore end of the pier, and the offices are in places badly deteriorated. Landwards access is blocked by impromptu barriers of well-placed abandoned cars. Despite these indignities, the east end of Pier 7 has the distinctive shed sides, cargo doors, and Bush Terminal colors which once highlighted the South Brooklyn waterfront [see HAER Photographs No. NY-201-A-l, NY-201-A-2, NY-201-A-3, and NY-201-A-4. B. Original Constructions, c. The Bush and Denzlow Manufacturing Company pier, forming the core of later Pier 7, is not well documented.
Historic maps and later descriptions indicate it was about 150 feet wide, 930 feet long on the north side including part of slip approaching First Avenue, and 620 feet long on the south side where a timber bulkhead projected further outshore. The substructure consisted of a solid fill core retained by timber cribwork, and perhaps pile-supported timber decks along the outer edges. Ashes from the oil refining operations formed much of the fill material, probably with some stratified sand and gravel dredged from the shallow bottoms to allow for deepwater vessel access. Sand and gravel appear to form most of the fill added when the pier was enlarged c. although slag visible in upper fill deposits also suggests some use of industrial refuse, perhaps during century pier maintenance.
The height and foundation supports of the cribwork are unknown, but piles probably provided a firm base in the offshore sand. Although the Bush and Denzlow pier was apparently the same width as Pier 7, the original width of the solid fill core is also unclear. Fill appears under the deck in areas generally reported to have timber aprons, representing either a wider core than previously indicated, slumping of fill through deteriorated retaining structures, or additional fill and rip-rap placed under the aprons during century construction and maintenance.
Above the substructure, the Bush and Denzlow firm erected a large number of undocumented brick and frame structures, removed by Standard in (Robinson Bromley Hyde Department of Docks and Ferries Army Corps of Engineers Bush 45; Dravo Van Houten, Inc., HAER The substructure completed by c. included an outshore extension of the century pier, about 600 feet long, so that the Bush Terminal structure is about 152 feet wide, feet long on the north side, and 1, 220 long on the south side; as with the outer ends of all the terminal piers, this one was angled slightly to follow the federal pierhead line in New York Bay. The later section had a solid fill core about 95 feet wide, also primarily of sand and gravel.
Unlike the timber cribwork of the earlier pier section, timber sheet piling retained the fill of the later one, typical of Bush Terminal pier construction; tie rods join the two sheet piling walls, with rip-rap providing additional support. After the older cribwork was at various times reinforced or replaced with sheeting of timber, concrete, and steel. Bush Terminal Company, Pier 7 (Bush Terminal, Pier 7) HAER No. NY-201-A (Page 4) Pile-supported timber decks about 30 feet wide abutted the later section on the long sides of the pier, with similar structures of less certain width along the earlier section. Transverse pile rows under the decks occurred at about 15-foot intervals along the older section, and at 10-foot intervals along the later one.
The fender system included timber, and later steel, sheeting. Details of the extreme outshore substructure beyond the piershed are unknown, but this section probably had denser pile arrays and thicker fender protection against vessel impacts. The pier deck pitched down between 2 and 3 degrees from the longitudinal center, and was finished at about 10 feet above mean low water. As of c. the deck generally consisted of 2.5-by-10-inch timber, laid at 45 degree angles on 6-by-6-inch timber supports, which in turn rested on solid fill or on pile-supported underdecks. The center of the deck appears to have been of small timber blocks.
Two railroad tracks from the terminal eventually ran along the pier center, entering on the north half of the east or inshore pier end, but may not have been installed until c. (Figures 2 and 4; Army Corps of Engineers Dravo Van Houten, Inc., [see HAER Photograph No. NY-201-A-6]. The piershed was a one-story, steel-framed, wood-sided structure feet wide and to feet long, depending on which documentary source one relies. Recent fires make precise measurement impossible. Four longitudinal rows of columns give the shed a three-bay width, with the center bay slightly more narrow at 45 feet wide. The peaked roof rises to about 30 feet above the pier deck.
The two outer column rows are set about four feet from the extreme outer north and south pier edges, at 15-foot intervals, in transverse alignment with every third pair of outer columns. The larger interior columns are riveted, composite 8-by-10-inch I-beams, and rise vertically about 28 feet above 3-foot-square, 5-foot-high concrete pedestals, which in turn rest of four-pile clusters set in the pier fill. Similar pedestals support the outer columns, which are riveted, composite 6-by-10-inch I-beams rising to about 25 feet above the pier deck at angles of about 20 degrees. The lower 32 inches of each outer column are encased in concrete as fire prevention.
Transverse roof trusses of paired, riveted steel angles connect each pair of outer columns and pass through the interior columns, supporting 4-by-12-inch timber purlins and a gabled, 3-inch timber roof most recently covered with composite tar-based material. Paired, riveted steel angles form two rows of longitudinal trusses which join the interior columns. The upper and lower chords of all trusses are at identical elevations, leaving to feet of headroom above the deck. Corrugated metal firewalls cover transverse trusses a t every second set of interior columns, or every 90 feet, beginning about 180 feet from the east end of the shed (for further details, see Figures 2, 3, 4 and Engineering Record [Appendix]) [also see HAER Photographs No. NY-201-A-6 and NY-201-A-9].
The light olive-green paint which once marked the Bush Terminal waterfront covered the outside of the wood cargo doors and the 1-inch-thick, horizontal wood piershed siding. Except where occupied by offices or undocumented sheds, Bush Terminal Company, Pier 7 (Bush Terminal, Pier 7) HAER No. NY-201-A (Page 5) virtually every opening between the sloped outer rows of piershed columns had a cargo door, hinged at the top and manually lifted from the interior bottom edges towards the roof. Surviving iron hooks in the timber purlins probably once supported block and tackle used for this task. Iron bolts on either side of a door bottom secured access from the inside simply sliding into the composite piershed columns.
Two sizes of 15-foot-wide sloping doors survived in about 12 feet high, found in some northern bays, and about 23 feet high in all other bays. Most of the longer doors had been shortened at the bottoms (Army Corps of Engineers) [see HAER Photographs No. NY-201-A-2, NY-201-A-4, NY-201-A-5, NY-201-A-6, NY-201-A-7, NY-201-A-8, and NY-201-A-9]. The sloping doors, and some of the office doors and windows described below, comprised most of the original exterior piershed openings. There were pairs of skylights over each 15-foot transverse bay, staggered along the len~th of the pier relative to the roof peak [see HAER Photograph No. NY-201-A-lj. The end walls of the shed had no decoration, and undocumented arrays of doors.
The outshore or west facade, now completely destroyed, probably had two 10-by-10-foot cargo doors. The surviving inshore facade had one 12-by-17-foot vehicular door, possibly in the central bay; larger roll-up doors installed in the removed much of the original central and northern bays. The south bay of this facade retains what was probably an original array of pedestrian doors and windows leading to office spaces, described below. One additional 6-by-3-foot pedestrian door also gave access through the east facade, in the northern bay (Figure 4; Army Corps of Engineers [see HAER Photograph No. NY-201-A-3]. In there were small groups of wood-framed offices in the inshore corners of the shed.
The northern group, protruding through the side of the shed and angled along a former track alignment, probably represents a post-1905 addition. Some or all of the five rooms in the southern group, arrayed as shown in Figure 4, are probably original. All five rooms are feet high, with plank or plywood floors and vertical sides. The two southernmost rooms thus have southern walls separate from the wood-clad shed sides, into which two office windows are framed out. The five rooms have exterior walls of gray-painted horizontal l-by-6-inch boards. The northern three of the five rooms have interior and ceiling surfaces of green-painted 2.5-by-.5-inch, tongue-and-groove novelty siding; slightly larger siding covers the walls and ceiling of the southwesternmost room.
The larger, southeasternmost room, once used as a timekeeper's office, is finished with gypsum board painted green above a gray wainscot. The five 4/4 sash office windows on the east shed facade are each 2.7 by 6 feet; the less intact windows through the south shed sides are and feet [see HAER Photographs No. NY-201-A-3 and NY-201-A-7]. When first completed, Pier 7 evidently had no sprinkler system, relying on municipal fire protection. A 4-inch main supplied water to the pier and, by way of hose connections, to the vessels alongside. Brooklyn Edison Company Bush Terminal Company, Pier 7 (Bush Terminal, Pier 7) HAER NO. NY-201-A (Page 6) supplied A.C.
120 volt, 3-phase, 60-cycle electric power, used for incandescent lights in the offices and suspended from piershed trusses (Army Corps of Engineers C. Improvements Made Prior to World War II Somewhat ambiguous Corps of Engineers data on Bush Terminal suggests that the tracks on Pier 7 were not installed until after Track installation may have been contemporary with construction of the northern group of offices, which closely paralleled the track alignment. As shown in Figure 4, this nearly-triangular office block has three larger rooms and two small toilets. Construction evidently involved removal of the original sloping shed wall, with the shed columns left in place inside the offices.
As with the southern floors, with a light-and-dark green checked pattern, rest on 2-by-6-inch under- floor supported by pile caps. Green-painted, l-by-4-inch tongue-and-groove siding cover the office exterior; interior walls consist of two-toned, green-painted gypsum board, with baseboatd and 2.8-foot-high wainscot. The ceilings are gypsum board painted light green. The offices are equipped with radiators and fluorescent lights. Most of the windows are 2.8 by 5.8 feet, with 4/4 sash; two larger windows facing the shed interior are 6.7 by 5.9 feet. The office doors are 2.8 by 7 feet. D.
Post-War Alternative By Bush Terminal Company had installed sprinklers, standpipe hose connections, and manual firebox alarms on Pier 7, with the hose connections housed in wood sheds at approximately 70-foot intervals along the southern row of interior piershed columns. The limited available documentation for Pier 7 indicates that in the company may have installed trenches with removable timbers on all of its piers, for firefighting purposes; construction and location of these features remains undocumented. After c. the increasing importance of truck traffic in the port led to several major Pier 7 modifications, removal of the tracks inside the shed by c.
paving the central shed bay with an 8-inch concrete slab at or about this time, and installation of two large steel roll-up doors in the east facade c. (Army Corps of Engineers Department of Marine and Aviation [plans]; Department of Ports and Trade [see HAER Photograph No. NY-201-A-3]. PART III. SOURCES OF INFORMATION This section lists only documents directly relevant to Pier 7. For other sources on Bush Terminal, see HAER No. Bush Terminal Company, Pier 7 (Bush Terminal, Pier 7) HAER No. NY-201-A (Page 7) Plans and Drawings No original drawings of Bush Terminal Pier 7 appear to survive at the New York City Department of Ports and Trade, which is the only known repository of such material. The only available drawing of Pier 5 (HAER No.
matches most of the structural details found at Pier 7: American Bridge Company Street Pier - S. Brooklyn - N.Y./Water Front Improvements for the Bush Company, Ltd/Erection Diagram. Order No. Al343, Sheet No. 5. Drawing No. On file, Department of Ports and Trade, City of New York, Battery Maritime Building, 1 Whitehall Street, New York, NY Later plans pertinent to Pier 7 include limited information on modifications: Department of Marine and Aviation, city of New York Sprinkler Lines/Bush Terminal/Brooklyn, Drawing dated October 2, Original source of drawing uncertain. On file, Department of Ports and Trade, City of New York, Battery Maritime Building, 1 Whitehall Street, New York, NY Department of Ports and trade, City of New York Permit files, c.
1928-present with indices, include plans of repairs or modifications planned by the Bush Terminal Company. The only permit of interest for this documentation is 2235A [currently missing] for possible installation of trenches for firefighting purposes. On file at department offices, Battery Maritime Building, 1 Whitehall Street, New York, NY Historic Views No historic views focused on Pier 7 have yet been located. For views of this pier in the context of the terminal, see HAER No. Bibliography Unpublished