Fort Edward Terminal, located on the Champlain Canal, is a component of the nationally significant New York State Barge Canal. It was one of several terminals constructed along the Barge Canal to provide points for freight transfer. Description: The terminal consists of a 635'-long concrete terminal wall and some recreational amenities.1 The terminal wall is located on the north edge of the channel and has cast-iron quarter-round coping, modern steel cleats, and modern utility hookups. Most of the wall is surrounded by a fence. A set of stairs with pipe railings leads down to the water. Concrete-filled cast-iron bollards set on concrete pads are located in the grassy area behind the terminal wall. Historic light fixtures illuminate the site.
Modern benches, a bathroom facility, and pavilion provide recreational amenities for visitors. History: Chapter 746 of the Laws of authorized the issuing of bonds in the amount of for the purpose of constructing terminals for the Barge canal system throughout the state. The State Engineer, State Surveyor, and Superintendent of Public Works were tasked with choosing terminal locations, which would ultimately be approved by the Canal Board. By the board had approved terminals for Ithaca, Albany, Little Falls, Utica, Gowanus Bay (South Brooklyn), Schuylerville, Schenectady, Rome, Lockport, Mechanicville, Fonda, Fort Edward, Greenpoint (North Brooklyn), Amsterdam, Erie Basin (Buffalo), Herkimer, Ilion, Troy Constantia, Syracuse, Cleveland, Watkins, Port of Call (New York City), and Dresden.
There was great interest in completing the terminals quickly so that the people may avail themselves of the use of this means of transporting their products and place the greater percentage of the people of the state of New York in water communication, not only with one another, but with the neighboring states and those bordering upon the Great Lakes and along the Atlantic coast. 2 The Fort Edward Terminal was built under contracts 7 and 7A, which the Annual Report noted provide for the construction of a dockwall on the north bank of the Hudson River and for the dredging of the harbor.
Contract 7 was awarded on October 3, to Aldrich & Hall, Inc., while Contract 7A went to the New York State Dredging Corporation of Rochester on October 1 Description of current conditions is based on a site visit made by the HAER recording team in summer 2 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 33. NEW YORK STATE BARGE CANAL, FORT EDWARD TERMINAL HAER No. (Page 2) 14, State Assistant Engineer Bratton oversaw the contracts. 3 Aldrich & Hall began work at the site in June by excavating at the eastern end of the wall using a traveling derrick and clam-shell bucket. Next, sections of crib were filled with stone and sunk in position.
The concrete wall was then poured and stone placed on the wall slopes. The terminal dock wall was completed and accepted by the Canal Board in May On December 29, Contract 203 was awarded to Collins Brothers to construct frame freight-houses at four terminals, including Fort Edward. The freighthouse was originally located at nearly the center point of the terminal wall, but is no longer standing.5