BlockBefore

New York State Barge Canal, Lock C8, 1 East Road, Fort Edward

New York State Barge Canal, Lock C8, 1 East Road, Fort Edward, Washington County, NY. Surveyed as HAER NY-362, with a 1,677-word written history.

From the record

“Lock C8, located on the Champlain Canal, is a component of the nationally significant New York State Barge Canal.”

Written record, HAER NY-362 survey. Machine-read text.

Surveyed by the federal HAER program as HAER NY-362 · the record runs 1677 words · one of 25 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

1159 words

Source document Quoted word for word from HAER NY-362. Not written, edited or summarised by this site.

Lock C8, located on the Champlain Canal, is a component of the nationally significant New York State Barge Canal. The lock retains the original DC electro-mechanical gate and valve operating machinery. It is unique on the system because the powerhouse was located at the upstream end of the lock chamber. Description: Lock C8 is located 2 miles north of Lock C7 on the Champlain Canal. The site consists of the lock and associated structures and operating equipment and the lockhouse.1 The original asphalt access road extending from East Road was gated and blocked off for the construction of a river dredging project site facility. A new asphalt access road was built from Route 196 around The new roadway has steel and concrete bridges and a steel guard rail.

The lock has a new asphalt parking lot, as well as an original gravel parking area located south of the lock. The lockhouse, located on the northwest side of the upstream end of the lock chamber, is a one-story concrete-block building with horizontal wood siding in the gable ends that sits on a concrete foundation. Asphalt shingles cover the gable-front roof. One-over-one vinyl windows light the building, and a pane-and-panel door provides access. A partially-enclosed shiplap siding-clad porch shelters the side entrance. A shallow concrete-block extension at the rear of the building houses a well pump. The building is in good condition. The one-story storehouse on the northwest side of the lock and near the lockhouse is a frame structure clad in shiplap novelty siding.

The building sits on a concrete foundation. The gable- front roof features asphalt shingles and exposed rafter tails. Hinged wood double doors provide access to the building, and nine-pane wood windows provide light. A shed extension at the rear of the building features similar construction materials. The building is in good condition. The only remnant of the powerhouse at the northwest corner of the upstream end of the lock chamber is a cracked concrete foundation. A sluice gate is also in that area. 1 Description of current conditions is based on a site visit made by the HAER recording team in summer and historical maps from Series New York State Archives, Albany, New York. See Eastern Division, Champlain Canal, Section 2, Sta. + 50 to Sta. + 00, approved April 2, 73.

NEW YORK STATE BARGE CANAL, LOCK C8 HAER No. (Page 2) The lock has an 11' lift at the north end with normal pool elevations below and above. The concrete chamber walls appear to be original and are in fair to poor condition with significant breakage and spalling. There are double-leaf, steel miter lock gates at each end of the lock chamber, operated by spars and gear trains powered by the original DC electro-mechanical gate machinery. This machinery, along with the valve operating machinery used to control the flow of water through the culverts in the chamber walls, is housed in steel cabinets on the chamber walls. There are also modern electrical boxes.

The lock features diamond-plate and wood plank covers, open grate catwalks, and concrete stairs that exhibit minor spalling and are in fair condition. The stairs have modern steel railings that are different from the pipe railings used elsewhere on the lock. A red/green light signal at the north end of the lock appears to be historic, but the rest of the lock s light fixtures are probably modern. At the south end of the lock is a utility bridge. The lock gates and valves are operated from two control stand shelters on the northwest side of the lock chamber. These are frame structures with shiplap siding, asphalt- shingle pyramidal roofs, single-pane wood pop-out windows, and wood doors. The lock is in generally fair condition. The concrete approach walls are all in poor condition.

The northwest wall exhibits severe spalling, and a portion has been replaced with steel sheeting. The northeast wall is also severely spalling, with a section leaning into the canal. The southeast and southwest walls are spalling, so much so that the southwest one is cracked. History: The construction of Lock C8 was originally included in Contract 27, which encompassed the construction of Champlain Canal locks 7 and 8 as well as the prism between Fort Edward and Dunhams Basin. Work stopped on the contract after a slide occurred at the original location of Lock C7 in December The proposed site for Lock C7 was then moved south and assigned to a new contract. The original contractor awarded Contract 27, The Kinser Construction Company, refused to complete the work.

The remainder of the job was placed under a new contract, 27A, and awarded to Holler & Shepard of Rochester, New York, under the supervision of State Assistant Engineer Belding. The contract required building the lock, substructure for a powerhouse, junction lock, four bridge abutments, two plate girder bridges and abutments over Bond Creek, one siphon spillway, two dive culverts, and an embankment and wash wall for the entire length of the contract, and leveling spoil banks. An outlet ditch was built on the west side of Lock C8 extending from Bond Creek to within of the west lock wall.

In the contractor completed the concrete work for the northwest and southwest approach walls and the bridge abutments.2 The construction of the lock gates, needle beams, needles, and lock valves at Lock C8 was covered under Contract No. 32, which was awarded to Penn Bridge Company on April 19, The contract also covered Champlain Canal locks 6 and 9. C.A. Curtis, State Assistant Engineer, 2 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol.

1 (Albany: Lyon Company, 86- 87; Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Noble E. Whitford, History of the Barge Canal of New York State (Albany: Lyon Company, NEW YORK STATE BARGE CANAL, LOCK C8 HAER No. (Page 3) had oversight of the project, which began in December and had been completed by May The powerhouse was built as part of Contract 92, awarded on February 17, to MacArthur Bros. Co. & Lord Electric Co. The contract covered construction of power plants and the installation of electrical equipment at multiple locks along the Erie and Champlain canals, including Lock C8.

It is not known why the powerhouse was built at the upstream end of the channel instead of the more typical locations of midpoint or downstream.4 Later work at Lock C8 including the removal of the existing gates and installing new gates and electrical equipment at Champlain Canal locks 8 and 9 in as part of Contract The retaining wall was repaired in under Contract

Sources

247 words

Source document Quoted word for word from HAER NY-362. Not written, edited or summarised by this site.

Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Department of Public Works, State of New York. Annual Report, Hay, Duncan. New York State Barge Canal. National Register of Historic Places Registration Form, Series New York State Archives, Albany, New York.

Eastern Division, Champlain Canal, Section 2, Sta. + 50 to Sta. + 00, approved April 2, 73. Whitford, Noble E. History of the Barge Canal of New York State. Albany: Lyon Company, Historians: Laura S. Black and Jami Babb, summer 3 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 91; Whitford, 4 Whitford, Duncan Hay, New York State Barge Canal, National Register of Historic Places Registration Form, Section 7, Page 43. 5 Canal Corporation Maintenance Contract records. NEW YORK STATE BARGE CANAL, LOCK C8 HAER No. (Page 4)

Written history

170 words

Source document Quoted word for word from HAER NY-362. Not written, edited or summarised by this site.

The Historic American Engineering Record (HAER) is a long- range program that documents and interprets historically significant engineering sites and structures throughout the United States. HAER is part of Heritage Documentation Programs (Richard O Connor, Manager), a division of the National Park Service, United States Department of the Interior. The New York State Barge Canal Survey was undertaken in summer in cooperation with the Erie Canalway National Heritage Corridor (ERIE), Beth Sciumeca, Executive Director. Justine Christianson, HAER Historian, and Duncan Hay, ERIE, served as project leaders. The staff of the New York State Canal Corporation provided access to the sites. Craig Williams of the New York State Museum provided research materials and assistance.

The HAER field team consisted of Jami Babb and Laura Black. NEW YORK STATE BARGE CANAL, LOCK C8 HAER No. (Page 5) Appendix: Images of Current Conditions Image 1: Lock C8 overview. Field photograph taken by HAER recording team, summer Image 2: Lockhouse at right and storehouse at left. Field photograph taken by HAER recording team, summer

In context

Fort Edward, New York The place record: every map, photograph and survey of this town.
Washington County, New York 259 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Fort Edward

5 records

The federal surveyors worked through Fort Edward building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
New York State Barge CanalHAER NY-3581,370 words
New York State Barge CanalHAER NY-3571,118 words
New York State Barge CanalHAER NY-3601,023 words
New York State Barge CanalHAER NY-359906 words
New York State Barge CanalHAER NY-361593 words

Provenance

  • Written history. Quoted verbatim from HAER NY-362. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.