New York State Barge Canal, Lock E26, Off Tyre Road, approximately 2-3/4 miles southeast of NY 414 bridge, Clyde

New York State Barge Canal, Lock E26, Off Tyre Road, approximately 2-3/4 miles southeast of NY 414 bridge, Clyde, Wayne County, NY. Surveyed as HAER NY-438, with a 1,923-word written history.

From the record

“Lock E26, located on the Erie Canal, is a component of the nationally significant New York State Barge Canal.”

Written record, HAER NY-438 survey. Machine-read text.

Surveyed by the federal HAER program as HAER NY-438 · the record runs 1923 words · one of 21 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

41 words

Source document Quoted word for word from HAER NY-438. Not written, edited or summarised by this site.

Off Tyre Road, approximately miles southeast of NY 414 bridge, Clyde, Wayne County, New York Lock E26 is located at latitude: longitude: The point represents the lockhouse and was obtained in There is no restriction on its release to the public.

Significance

1133 words

Source document Quoted word for word from HAER NY-438. Not written, edited or summarised by this site.

Lock E26, located on the Erie Canal, is a component of the nationally significant New York State Barge Canal. Description: Lock E26 is located on the south bank of the Clyde River/Erie Canal.1 The lock is accessed by a gravel drive that leads to a gravel parking area. The interior driveways are also gravel. The site consists of the lock and associated structures, powerhouse, lockhouse, shed, garage, dam, and spillway. Lock E26 has a 6' lift to the west with normal pool elevations of below and above. The concrete chamber walls have been clad in steel plates with cast-iron quarter-round coping. The east chamber wall is exposed, revealing eighteen concrete arches.

There are double-leaf, steel miter lock gates at each end of the chamber operated by spars and gear trains powered by DC electro-mechanical gate machinery. The flow of water through the culverts in the chamber walls is controlled by valves also operated by DC electro-mechanical machinery. Control stand shelters are located on the west bank of the chamber at the upstream and downstream ends. Each is a single-story frame structure with horizontal-fiber cement siding. The shelters have gable- front asphalt roofs. The fenestration is comprised of vinyl sliding windows, and the entrances are pane-and-panel doors. The public access side of the lock chamber is surrounded by pipe railings and bulb-and-pipe railings.

Concrete-filled cast-iron bollards on concrete pads line either side of the chamber. Historic light fixtures illuminate the chamber. A steel truss cable bridge spans the center of the lock. The lock and shelters are in good condition. The only part of the powerhouse that remains is the basement and foundation, which are part of a grass-covered mound south of the lock chamber. The concrete foundation is pierced by a steel bulkhead door. The interior is a multi-chambered concrete structure with wood interior doors. While the basement contains operable electrical equipment, the generators are no longer extant. The powerhouse is lacking integrity. The lockhouse is centered on the south side of the lock chamber at the midpoint. The concrete block building sits on a concrete foundation.

The gable roof is covered with asphalt shingles, and there is a concrete chimney. Shiplap siding is located in the gable ends, and there is a two- 1 Description of current conditions is based on a site visit made by the HAER recording team in summer NEW YORK STATE BARGE CANAL, LOCK E26 HAER No. Page 2 light wood window. One-over-one-light sliding and awning vinyl windows are shaded by corrugated-metal awnings. The entrances are wood pane-and-panel doors. The lockhouse is in good condition. The garage, situated behind the lockhouse and adjacent to the operator s parking area, is a single- story concrete block building on a concrete pad. The gable roof is clad in asphalt shingles.

The fenestration consists of two-light steel hopper windows and a four-light window above the modern metal garage door. There is also a steel door. The garage is in good condition. Also located behind the garage is the shed, a single-story frame structure on a concrete block foundation. The shed is clad in shiplap siding. The gable-front roof is covered with asphalt shingles. It has four-light wood windows and a beadboard hinged double door. This building is in good condition. The northwest guide wall is scored concrete with cast-iron quarter-round coping along the edge nearest the lock gate. The concrete is heavily spalled and there is breakage. Steel ladders are located along this wall, as well as concrete-filled cast-iron bollards on concrete pads.

Historic light fixtures illuminate the wall, which is in fair condition. The other guide wall is located southeast of the lock. This one is also concrete and shows evidence of some spalling. Concrete- filled cast-iron bollards on concrete pads are set back from the wall s edge. The southeast guide wall is in good condition. To the east of the lock is the dam extending across the canal. A concrete spillway comprised of a single-span concrete apron is located immediately adjacent to the lock. This spillway is about long ending in two Tainter gate bays at the south end next to the lock. An I-beam, open- grate pedestrian and utility bridge spans the spillway and provides access to the two gate bays. The bridge is lined with bulb-and-pipe railing and appears to be in good condition.

One gate bay still has a Tainter gate within a bolted steel superstructure on concrete abutments. The gate operates using counterweights. The other gate bay is a fixed concrete spillway. The dam is in good condition. History: Lock E26 was built as part of Contract 47, described as essentially a hydraulic dredging contract that extended from the southeast corner of Galen to a point near the New York Central Railway crossing at Lyons for a total length of miles. It was let on November 30, to Crowell-Sherman-Stalter Company of Cleveland, Ohio, and work began in March The company used the hydraulic dredge Clyde and soon encountered hard gravel, clay, and soft shale, which seems to have made excavation difficult.

The Annual Report noted the progress of work was not in keeping with the pace set by the remainder of the work on the contract. During the contractor completed excavation and poured the concrete for the lock and approach walls. Work had not yet started on the dam. No work was completed on the contract in and in the remainder of the work included in Contract 47 was re-let as Contract 47A and awarded to Central Dredging Company.2 2 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, NEW YORK STATE BARGE CANAL, LOCK E26 HAER No.

Page 3 The power plant was built as part of Contract 94, a large contract that included the electrical equipment and machinery for locks E26, E27, E28A, E28B, E29, E30, E32, E33, E34, E35, and guard locks. It was let to MacArthur Brothers Co. & Lord Electric Co. on February 17, William M. Stieve was the State Assistant Engineer charged with overseeing the contract at this site. The work involved placing the outlet and inlet pipes to cooling systems and the drain pipe, erecting the gasoline-electric equipment, and installing the capstan controller cabinets and crane rails. By June the work was nearly finished.3 Later repairs and alterations were made at the site.

In the State of New York s Department of Public Works repaired the deteriorated concrete crest of the dam and the downstream face. New valves were installed, and the steel work was repainted in The lock was rehabilitated in

Sources

466 words

Source document Quoted word for word from HAER NY-438. Not written, edited or summarised by this site.

Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1.

Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1. Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, and Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol.

1 (Albany: Lyon Company, 3 Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, Annual Report, and Annual Report of the State Engineer and Surveyor of the State of New York for the Fiscal Year ended in September 30, Vol. 1 (Albany: Lyon Company, 4 State of New York, Department of Public Works, Annual Report of the Superintendent for the Year (Albany: Williams Press, Inc., State of New York, Department of Public Works, Annual Report of the Superintendent for the Year (Albany: and State of New York, Department of Public Works, Annual Report, (Albany: 76. NEW YORK STATE BARGE CANAL, LOCK E26 HAER No. Page 4 ended in September 30, Vol. 1. Albany: Lyon Company, Hay, Duncan. New York State Barge Canal.

National Register of Historic Places Registration Form, Series New York State Archives, Albany, New York. Western Division, Erie Canal, Section 8, Sta. to Sta. approved December 29, 6. State of New York, Department of Public Works. Annual Report of the Superintendent for the Year Albany: Williams Press, Inc., Annual Report of the Superintendent for the Year Albany: Annual Report, Albany: Historians: Laura S. Black and Jami Babb, summer

Written history

211 words

Source document Quoted word for word from HAER NY-438. Not written, edited or summarised by this site.

The Historic American Engineering Record (HAER) is a long- range program that documents and interprets historically significant engineering sites and structures throughout the United States. HAER is part of Heritage Documentation Programs (Richard O Connor, Manager), a division of the National Park Service, United States Department of the Interior. The New York State Barge Canal Survey was undertaken in summer in cooperation with the Erie Canalway National Heritage Corridor (ERIE), Beth Sciumeca, Executive Director. Justine Christianson, HAER Historian, and Duncan Hay, ERIE, served as project leaders. The staff of the New York State Canal Corporation provided access to the sites. Craig Williams of the New York State Museum provided research materials and assistance.

The HAER field team consisted of Jami Babb and Laura Black. NEW YORK STATE BARGE CANAL, LOCK E26 HAER No. Page 5 Appendix: Images of Current Conditions Image 1: Lock overview with lockhouse. Field photograph taken by HAER recording team, summer Image 2: Powerhouse. Field photograph taken by HAER recording team, summer NEW YORK STATE BARGE CANAL, LOCK E26 HAER No. Page 6 Image 3: Garage. Field photograph taken by HAER recording team, summer Image 4: Overview of dam with spillway, Tainter Gate, and fixed dam from left to right. Field photograph taken by HAER recording team, summer

In context

Clyde, New York The place record: every map, photograph and survey of this town.
Wayne County, New York 123 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Wayne County

20 records

The federal survey recorded these other structures elsewhere in Wayne County. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Aldrich Towing-Path Change BridgeHAER NY,59-PALM,1-10,183 words
Kellams BridgeHAER PA,64-STALK,1-2,804 words
New York State Barge CanalHAER NY-4522,071 words
New York State Barge CanalHAER NY-4401,811 words
New York State Barge CanalHAER NY-4451,524 words
New York State Barge CanalHAER NY-4411,463 words
New York State Barge CanalHAER NY-4541,414 words
New York State Barge CanalHAER NY-4431,305 words
Creager's BridgeHAER NY,59-LYO,2-1,243 words
New York State Barge CanalHAER NY-444787 words
New York State Barge CanalHAER NY-446748 words
New York State Barge CanalHAER NY-439741 words
New York State Barge CanalHAER NY-453684 words
New York State Barge CanalHAER NY-442677 words
New York State Barge CanalHAER NY-447649 words
New York State Barge CanalHAER NY-449636 words
New York State Barge CanalHAER NY-448556 words
New York State Barge CanalHAER NY-450526 words
New York State Barge CanalHAER NY-451390 words
Hotchkiss BuildingHABS NY,59-LYO,1-315 words

Provenance

  • Written history. Quoted verbatim from HAER NY-438. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.