Ogden Arsenal, Warehouse, 6150 Lemon Lane, Layton

Ogden Arsenal, Warehouse, 6150 Lemon Lane, Layton, Davis County, UT. Surveyed as HAER UTAH,6-LAY.V,1Z-, with a 717-word written history.

From the record

“Building is one of only two buildings that remaining from Ogden Arsenal's World War II Bomb Loading Plant.”

Written record, HAER UTAH,6-LAY.V,1Z- survey. Machine-read text.

Surveyed by the federal HAER program as HAER UTAH,6-LAY.V,1Z- · the record runs 717 words · one of 99 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

605 words

Source document Quoted word for word from HAER UTAH,6-LAY.V,1Z-. Not written, edited or summarised by this site.

Building is one of only two buildings that remaining from Ogden Arsenal's World War II Bomb Loading Plant. Loaded bombs were painted and labeled in Building a process that protected them from rust damage while in storage or in the field. This building, along with other structures at the base, renders a unique picture of the U.S. Army build-up which occurred on the eve of and during World War II. History: Building was built in as part of the WPA Arsenal reconstruction after a windstorm destroyed most of the original structures. Although this building was originally a warehouse, it became part of the Bomb Loading Plant in The Bomb Loading Plant was the first production plant completed at the newly re-opened Ogden Arsenal.

In the first months of production, completed 100-pound Amatol/TNT bombs were painted and labeled (with lot number, date, and manufacturer) in Building immediately before they were packed and crated for storage or shipment. Painting was an essential step in the production of bombs because it sealed the metal and protected bombs from rust damage. Ogden Arsenal, Warehouse HAER No. UT-84-Z Page 2 The bombs were marked with the lot number, date, and manufacturer using rubber stamps and lithographic quick-drying ink. Small round brushes were used to paint yellow stripes on the nose and tail of 100 pound Amatol/TNT bombs. These markings were painted on manually using a roller device that was powered with a small air motor that rotated the bomb body.

This process was replaced in early by a safer method that required less handling of the loaded bombs. In the newer process, empty bomb bodies were dismantled and suspended in a vertical position on an overhead, power driven conveyor line in the Loading and Assembly Building. Lifting devices were inserted in the tail of the bombs, which were given one coat of lusterless olive drab ammunition paint. The painting was done in a DeVilbis water wash paint spray booth by two manually operated spray guns. The overhead conveyor was designed to permit complete drying of the painted bomb bodies before they were removed from the conveyor. Dry bombs were removed and placed on hardwood boats on a roller conveyor line. The interior of the bombs were painted with acid proof black paint.

The people who worked in Building wore special masks and coveralls, but no accommodations were made to the building's ventilation system when it was designated as a paint and stencil building in General Description: Building x is a one-story, gable-roofed building located in the original Bomb Loading Plant Area. It is elevated on concrete piers and accessed by steps on the south side or a ramp on the west side. A loading platform wraps around all four sides of the building. The building is divided in half by a concrete fire wall which extends through the roof line. The present roof appears to be in sheets of asbestos panels. A shed-roofed canopy on the south side extends across the length of the facade and is composed of 6 "I" beams and exposed trusses.

Lightening aerials line the ridge of the roof. The south elevation contains a single entry door on the west and two large industrial windows in the two other bays. The west elevation contains a single door and a double loading door. Minor additions include a concrete block room added to the west platform and a shed-roofed entry added to the north. The gable roof that was originally covered with mineral surface asphalt was re-roofed with cement asbestos shingles before Ogden Arsenal, Warehouse HAER No. UT-84-Z Page 3 .S ,v = u o l>3 L .1

In context

Layton, Utah The place record: every map, photograph and survey of this town.
Davis County, Utah 86 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Layton

24 of 94 records shown

The federal surveyors worked through Layton building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Ogden ArsenalHAER UTAH,6-LAY.V,1-30,989 words
Hill FieldHAER UTAH,6-LAY.V,2-18,424 words
Hill FieldHAER UTAH,6-LAY.V,2O-2,426 words
Hill FieldHAER UTAH,6-LAY.V,2Q-2,050 words
Hill FieldHAER UTAH,6-LAY.V,2AC-1,680 words
Hill FieldHAER UTAH,6-LAY.V,2T-1,647 words
Hill FieldHAER UTAH,6-LAY.V,2S-1,624 words
Hill FieldHAER UTAH,6-LAY.V,2F-1,480 words
Hill FieldHAER UTAH,6-LAY.V,2B-1,347 words
Ogden ArsenalHAER UTAH,6-LAY.V,1AO-1,067 words
Hill FieldHAER UTAH,6-LAY.V,2M-992 words
Ogden ArsenalHAER UTAH,6-LAY.V,1BL-951 words
Ogden ArsenalHAER UTAH,6-LAY.V,1BK-943 words
Ogden ArsenalHAER UTAH,6-LAY.V,1AN-939 words
Hill FieldHAER UTAH,6-LAY.V,2V-935 words
Ogden ArsenalHAER UTAH,6-LAY.V,1AU-934 words
Hill FieldHAER UTAH,6-LAY.V,2N-891 words
Ogden ArsenalHAER UTAH,6-LAY.V,1AV-861 words
Ogden ArsenalHAER UTAH,6-LAY.V,1L-848 words
Ogden ArsenalHAER UTAH,6-LAY.V,1K-846 words
Ogden ArsenalHAER UTAH,6-LAY.V,1N-846 words
Ogden ArsenalHAER UTAH,6-LAY.V,1T-844 words
Ogden ArsenalHAER UTAH,6-LAY.V,1Q-837 words
Hill FieldHAER UTAH,6-LAY.V,2Y-822 words

Provenance

  • Written history. Quoted verbatim from HAER UTAH,6-LAY.V,1Z-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.