Ogden Arsenal, Fuze Warehouse, 6275 Hickory Avenue, Layton

Ogden Arsenal, Fuze Warehouse, 6275 Hickory Avenue, Layton, Davis County, UT. Surveyed as HAER UTAH,6-LAY.V,1AH-, with a 734-word written history.

From the record

“Anti-tank ammunition fuzes were tested in Building which provides particularly vivid images of the processes involved in the manufacture of munitions at Ogden Arsenal during World War II.”

Written record, HAER UTAH,6-LAY.V,1AH- survey. Machine-read text.

Surveyed by the federal HAER program as HAER UTAH,6-LAY.V,1AH- · the record runs 734 words · one of 99 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

621 words

Source document Quoted word for word from HAER UTAH,6-LAY.V,1AH-. Not written, edited or summarised by this site.

Anti-tank ammunition fuzes were tested in Building which provides particularly vivid images of the processes involved in the manufacture of munitions at Ogden Arsenal during World War II. This building, along with other structures at the base, renders a unique picture of the U.S. Army build-up which occurred on the eve of and during World War II. History: Building housed the testing and inspection facilities for anti-tank ammunition fuzes that were produced at Ogden Arsenal during World War II. Random samples of completed fuzes were transferred to Building from the Fuze Loading Building (Building where they were tested and evaluated for reliability. The interior spaces of the building consist of a detonator test room, test disassembly room, jumble room, and a jolt & jumble room.

Metal parts such as cartridge cases, projectiles, and fuze components were shipped to Ogden Arsenal from outside manufacturers in a finished state. Although components used in the loading and assembly of shells had been inspected before shipment to the Arsenal, it was found that a further inspection of critical items before loading would save much time and trouble in OGDEN ARSENAL, FUZE WAREHOUSE HAER No. UT-84-AH Page 2 the loading operation. All dimensions of a representative sample of the inert fuzes were measured and the threads and recesses checked before they were loaded with Tetryl pellets and sealed with glue. (Tetryl is a very powerful explosive that is commonly used in the manufacture of primary and secondary charges for blasting caps).

Because of its very high melting point it was pressed into pellets rather than melted and cast.) Fuze bodies were disassembled, inspected, and reassembled with Tetryl pellets in the Fuze Assembly Building (Building Tetryl pellets were secured in the closing caps of the fuzes with aluminum discs and then screwed onto the fuze body, which contained the firing pin and detonator. Completed fuzes were packed in fiber containers (50 per container) that were placed in wooden packing boxes (8 per box). Loaded skids of fuzes were transferred to the Loading Plants for assembly into anti-tank ammunition.

Due to the highly volatile nature of the chemicals involved, this building was designed in the "Arsenal Style," with concrete fire-walls that extend through the roofline separating all rooms that housed explosives. This concrete skeleton supports exterior walls that are constructed of lightweight hollow tile blocks that were engineered to absorb and deflect the force of an explosion outward, away from the rest of the building. The broad hip-roof overhang provides shelter for circulation between rooms. General Description: Building x is a concrete hollow tile structure. These walls are articulated by exposed concrete columns which divide the longitudinal facades into three uneven bays.

Each of the two smaller bays have a set of double steel doors with two window lights, while the larger bay has two steel-framed, nine- pane windows, sitting on a plain lug sill. The remaining windows are original to the structure. The east, north, and south walls maintain their original configurations, though the west wall has been altered by the addition of a steel door and two wall-hung mechanical units. The roof is supported by a light- framed steel truss that is covered with corrugated asbestos roofing. It overhangs approximately five feet from the east wall, with the steel framing exposed on the underside of the eave. Two lightning aerials and two 12-inch diameter copper ventilators with dampers are located along the roof ridge.

A third ventilator is located on the back side of the building, off of the ridge line. OGDEN ARSENAL, FUZE WAREHOUSE HAER No. UT-84-AH AQ' | Page 3 h ^ o '^ > I 4l 89 & to /f'-O 4 '3 Y- =<2 v; ^5. yl ^ - $ v. ^ (T-

In context

Layton, Utah The place record: every map, photograph and survey of this town.
Davis County, Utah 86 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Layton

24 of 94 records shown

The federal surveyors worked through Layton building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Ogden ArsenalHAER UTAH,6-LAY.V,1-30,989 words
Hill FieldHAER UTAH,6-LAY.V,2-18,424 words
Hill FieldHAER UTAH,6-LAY.V,2O-2,426 words
Hill FieldHAER UTAH,6-LAY.V,2Q-2,050 words
Hill FieldHAER UTAH,6-LAY.V,2AC-1,680 words
Hill FieldHAER UTAH,6-LAY.V,2T-1,647 words
Hill FieldHAER UTAH,6-LAY.V,2S-1,624 words
Hill FieldHAER UTAH,6-LAY.V,2F-1,480 words
Hill FieldHAER UTAH,6-LAY.V,2B-1,347 words
Ogden ArsenalHAER UTAH,6-LAY.V,1AO-1,067 words
Hill FieldHAER UTAH,6-LAY.V,2M-992 words
Ogden ArsenalHAER UTAH,6-LAY.V,1BL-951 words
Ogden ArsenalHAER UTAH,6-LAY.V,1BK-943 words
Ogden ArsenalHAER UTAH,6-LAY.V,1AN-939 words
Hill FieldHAER UTAH,6-LAY.V,2V-935 words
Ogden ArsenalHAER UTAH,6-LAY.V,1AU-934 words
Hill FieldHAER UTAH,6-LAY.V,2N-891 words
Ogden ArsenalHAER UTAH,6-LAY.V,1AV-861 words
Ogden ArsenalHAER UTAH,6-LAY.V,1L-848 words
Ogden ArsenalHAER UTAH,6-LAY.V,1K-846 words
Ogden ArsenalHAER UTAH,6-LAY.V,1N-846 words
Ogden ArsenalHAER UTAH,6-LAY.V,1T-844 words
Ogden ArsenalHAER UTAH,6-LAY.V,1Q-837 words
Hill FieldHAER UTAH,6-LAY.V,2Y-822 words

Provenance

  • Written history. Quoted verbatim from HAER UTAH,6-LAY.V,1AH-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.