This report is based on written documentation donated by the Birmingham Historical Society, reformatted to HABS/HAER guidelines.
Chartered in to link Mobile to the Ohio River, the Mobile and Ohio Railroad was not completed through Tuscaloosa until the late Its completion coincided with the construction of the original series of locks and dams that opened the Warrior River for commercial navigation north of Tuscaloosa. Upon completion of the mainline of the M. & O. from Mobile to St. Louis, the railroad extended spurs into the Cahaba and Warrior Coal fields, contributing significantly to industrialization at Holt, Kellerman and Brookwood along the Warrior River, and linking the entire Birmingham District to markets in the midwest and the south. The American Bridge Co. replaced the original steel spans across the Warrior with the current span in GULF, MOBILE & OHIO RAILROAD BRIDGE HAER No.
AL-12 (Page 3) sources Consulted Gulf, Mobile and Ohio Railroad Collection, Archives, University of South Alabama, Mobile (Collection includes some business records and photographs, Dunn Construction Company Collections, Birmingham. Ben Hardaway, Hardaway Construction Company, Columbus, Georgia. (His grandfather Col. Robert A. Hardaway served as U of A's first full time professor of engineering appointed Hardaway Hall as the school of engineering is named for him.) Interview with Jim Parker, author Alabama State Highway Department Bridge Inventory, Interview with Jerry Weeks, Engineering Department, Mid South Corporation, Jackson, Mississippi, (This department, responsible for bridge maintenance, may have engineering drawings of the bridge).
Interview with Betsy Haslip, Tuscaloosa Preservation Society, Interview with Marvin Harper, Willis, Kenneth D., The Harnessing of the Black Warrior River, City of Tuscaloosa, The Tuscaloosa Times, February 12, June 3, Site Visits, summer and fall January 17, Clinton, Matthew, Tuscaloosaf Alabama: Its Early Days, pp.