Warrior River, Lock No. 3 Wall, River Road at University Park, Tuscaloosa
Warrior River, Lock No. 3 Wall, River Road at University Park, Tuscaloosa, Tuscaloosa County, AL. Surveyed as HAER ALA,63-TUSLO,28-, with a 1,145-word written history.
From the record
“The Warrior River lock, dam and quarry sites along the Tuscaloosa riverfront constitute the best surviving remains of an extensive system of locks and dams that opened river transportation for the Birmingham District by creating the longest, channelized waterway in the world at time of its construction.”
Written record, HAER ALA,63-TUSLO,28- survey. Machine-read text.
Surveyed by the federal HAER program as HAER ALA,63-TUSLO,28- · the record runs 1145 words · one of 45 surveyed structures published for this county.
Source document
Quoted word for word from HAER ALA,63-TUSLO,28-.
Not written, edited or summarised by this site.
Warrior River Old Locks, Dams and Quarries- Tuscaloosa are located along River Road and the Black Warrior River extending from University Park on the east to River Bend Park on the west, Tuscaloosa, Tuscaloosa County, Alabama. Lock No. 3 (later No. 12) , is located 1/4 miles upstream from No. 2 in the University of Alabama's University Park. Ownership: University of Alabama, City of Tuscaloosa, Tuscaloosa County, U.S. Army Corps of Engineers Date of Construction: Builder/Architect/ Engineer: U.S. Army Corps of Engineers, William Powell, Major of Engineers
Written history
69 words
Source document
Quoted word for word from HAER ALA,63-TUSLO,28-.
Not written, edited or summarised by this site.
This report is based on written documentation donated by the Birmingham Historical Society, reformatted to HABS/HAER guidelines. Condition: Portions of the locks and dams are submerged to varying degrees due to fluctuations in water level of the river. Lock No. 3, the best preserved, forms the centerpiece of University Park, where it is used as a fishing pier. The lock walls are in danger of falling into the river.
Significance
842 words
The headings the report itself prints. Each one jumps to where it begins.
Source document
Quoted word for word from HAER ALA,63-TUSLO,28-.
Not written, edited or summarised by this site.
The Warrior River lock, dam and quarry sites along the Tuscaloosa riverfront constitute the best surviving remains of an extensive system of locks and dams that opened river transportation for the Birmingham District by creating the longest, channelized waterway in the world at time of its construction. These locks mark the efforts to create a commercial waterway through the Birmingham District to link it to southern ports and international markets. The massive engineering work represents the union of federal and commercial interests. WARRIOR RIVER LOCK NO. 3 WALL HAER No. AL-43 (Page 2)
Description
Located in a series of riverfront parks and wooded areas extending for a mile along the southern bank of the Black Warrior River are portions of the locks walls and guide cribs for the original Locks and Dams No. 1, No. 2 and No. 3, and evidence of stone cutting from the river bottom and adjacent hillside quarries (originally River Bed and Bank Quarries) . The entire bank wall at the No. 3 Lock and Dam, a x 49' x 20' structure constructed of sandstone blocks is located at University Park and currently used as a fishing pier. The Bank Quarry extending for .3 miles along both sides of River Road, just south of Lock No. 3, showcases clearly visible cuts.
Other lock walls, dams and the River Bed Quarry operation, submerged due to construction of the current locks and dams, are clearly visible during low water levels along the river. Iron and stone staircases lead from embankments to the structures. Lock No. 1 (later No. located near the shop of the U.S. Army Corps of Engineers, across from the Tuscaloosa Library, on River Road, is submerged, although the original rock dam is clearly visible. Lock No. 2 (later No. is located 1/4 mile upstream from No. l. Guide cribs, made of timber boxes filled with stone, placed above and below the locks to absorb the shock of boats and barges and to help guide them in and out of the locks, can still be seen. The lock wall remains about one foot above the water line.
Foundations to the lock tender houses, only recently demolished, and the plans remain. Lock No. 3 (later No. is located 1/4 miles upstream from No. 2 in the University of Alabama's University Park. The south lock wall is used as a fishing pier. Bank Quarry is located just east of Lock No. 3 on the southside of River Road, across from River Road Park East. The old cuts in the bank are clearly visible from the road. River Bed Quarry, just west of University Park, the island quarry is visible in the bed of the river. WARRIOR RIVER LOCK NO. 3 WALL HAER No. AL-43 (Page 3)
Historical Overview
The 19 original locks and dams along the Warrior and Black Warrior Rivers were authorized by a series of Congressional acts beginning in and constructed from to The Tuscaloosa Locks arid Dams were under construction from to At their completion, the 455-mile Warrior River system was said to be the longest channelized waterway in the world. The current system, containing six locks and dams completed from through replaced and partially flooded the original locks and dams. Tuscaloosa, the early capital of the state was located on the Warrior River at its early head of navigation. Its location made it a regional shipping center for the entire northern Alabama region. Beginning in the coal was transported here from surrounding areas and the Warrior coal fields for shipment to the port of Mobile.
However, due to abundant shoals, transportation was dangerous and strictly one-way. While steamboats and paddle wheel operations traveled the more navigable portions of the river below Tuscaloosa, flatboats were the most popular means of river transport. Upon reaching Mobile and disposing of their cargoes, usually coal, the flatboats themselves were dismantled and sold for lumber. State geologist Eugene Allen Smith's study of the obstructions to navigation and natural resources of the land adjacent to the river, (principally coal) completed in was instrumental in attracting federal investment. In the late and U. S.
Congressman John Hollis Bankhead from Jasper, located in the heart of the coal fields, successfully championed the cause at the Congressional level to construct the locks and dams. WARRIOR RIVER LOCK NO. 3 WALL HAER No. AL-43 (Page 4) Sources Consulted Willis, Kenneth D. , The Harnessing of the Black Warrior River, City of Tuscaloosa, Interview, Marjorie White with Kenneth D. Willis, September, Site Visit with Marvin Harper, September, Site Visit with Kenneth D. Willis, January 17, The Tuscaloosa Times. January 15, The Tuscaloosa Times. February 2, Geological Survey of Alabama, Report of Progress Tuscaloosa U.S. Army Corps of Engineers Photographic Collection and Annual Reports, (includes plans and construction details) Nichols, Of fa S. , Jr.
, "Warrior-Tombigbee Waterway," typescript, Summer, Warrior-Tombigbee Development Association, "The Warrior-Tombigbee Waterway-The Competitive Advantage, " brochure, "Warrior-Tombigbee Development Association- What it is, What it Does, Its Accomplishments," Brochure, Corps of Engineers Annual Reports and Photographs, at Tuscaloosa Office and U of A Special Collections.
The federal surveyors worked through Tuscaloosa building by building. These are the other structures
they measured and filed a report on, longest report first.
Written history. Quoted verbatim from HAER ALA,63-TUSLO,28-. United States federal work, no copyright under 17 U.S.C. 105.
Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.