BlockBefore

Mill Creek 2 and 3 Hydroelectric Systems, Mill Creek 3 Sandbox, Mill Creek, Yucaipa

Mill Creek 2 and 3 Hydroelectric Systems, Mill Creek 3 Sandbox, Mill Creek, Yucaipa, San Bernardino County, CA. Surveyed as HAER CA-2272-J, with a 1,064-word written history.

From the record

“The Mill Creek 3 Sandbox is one of the key components of the Mill Creek 3 Hydroelectric System (MC 3).”

Written record, HAER CA-2272-J survey. Machine-read text.

Surveyed by the federal HAER program as HAER CA-2272-J · the record runs 1064 words · one of 145 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

384 words

Source document Quoted word for word from HAER CA-2272-J. Not written, edited or summarised by this site.

The Mill Creek 3 Sandbox is one of the key components of the Mill Creek 3 Hydroelectric System (MC 3). The MC 3 Sandbox allows sand and gravel to settle out of the water before traveling to the powerhouse. If this is not done, the abrasiveness of the sandy water would rapidly wear out the water wheel and related equipment. MC 3 is one of the earliest examples of a high-head hydroelectric system within the United States and one of the first commercial three-phase alternating current stations in California. Three-phase alternating later became the industry standard. Description: Located approximately 322 feet northwest of the MC 3 Intake. The MC 3 Sandbox was constructed in same design as the sandbox for MC 2. It is 52 feet wide (east to west) and 102 feet long (north to south).

It has eight settling chambers with concrete cross walls. Each chamber is V-shaped in order to help collect the sand, which is then sluiced through gates at the lower end of the sandbox. The water enters from the southeast corner of the sandbox through bypass gates. At the south end of the sandbox there is a trash rack to help keep debris out and there is a leaf rack, which is no longer operational, that used to keep leaves away from the sandbox screen. There is a stilling well used to monitor the water level in the sandbox. Eight drain gates line the western edge of the sandbox, one for each section of the structure. Connected to the southwest corner of the sandbox, and located west of the sandbox, is the get away channel.

This feature is made of rubble stone embedded in concrete and is used to drain excess sandbox water. This feature is also used drain the sandbox during routine maintenance. History: The MC 3 Sandbox was constructed as part of the Mill Creek 3 Hydroelectric System. The MC 3 system was constructed between and by the Redlands Electric Light and Power Company, later absorbed by Edison Electric Company of Los Angeles in MC 3 is still in operation today and is owned by Southern California Edison. Please see the Historic Context section in the general Historic American Engineering Record for the Mill Creek 2 and 3 Hydroelectric Systems (HAER No. CA-2272) for additional information.

Sources

179 words

Source document Quoted word for word from HAER CA-2272-J. Not written, edited or summarised by this site.

Fowler, Frederick Hall. Hydroelectric Power Systems of California and Their Extensions into Oregon and Nevada, Water-Supply Paper Washington, Government Printing Office. 1 Darrell W. Heinrich, Project Manager, Eastern Hydro Division, Southern California Edison, telephone interview by Christeen Taniguchi, November 18, 67 Frederick Hall Fowler, Hydroelectric Power Systems of California and Their Extensions into Oregon and Nevada, Water-Supply Paper Washington, D. C: Government Printing Office, MILL CREEK 2 AND 3 HYDROELECTRIC SYSTEMS, MILL CREEK 3 SANDBOX HAERNo. CA-2272-J (Page 2) White, David R. M. "Cultural Resource Management Plan for the Southern California Edison Company Mill Creek Hydroelectric Project (FERC Project No. San Bernardino County, California," June Low, George P.

"The Generating, Transmission and Distribution Systems of The Edison Electric Company of Los Angeles, Cal.," The Journal of Electricity, Power and Gas. vol. XIII, no. 1. January, "Means Much to Redlands: Big Light and Power Deal Closed," Los Angeles Times. May 25, "Redlands Electric Light & Power Co., Edition Electric Co. of Los Angeles, Mill Creek Powerhouses," National Register of Historic Places Inventory Nomination Form, April 30, item number 7, 10.

Written history

374 words

Source document Quoted word for word from HAER CA-2272-J. Not written, edited or summarised by this site.

MC 2 has not operated since when it was damaged during floods. It was not, however, decommissioned. The Southern California Edison Company, in conjunction with the San Bernardino National Forest, the agency that owns the property, proposes to formally decommission the facility. This process will include filling the sandbox and forebay with slurry, and removing the metal features. Although MC 3 is still in operation, it is also being recorded as part of this project because of the system's close association with MC 2. MILL CREEK 2 AND 3 HYDROELECTRIC SYSTEMS, MILL CREEK 3 SANDBOX HAERNo. CA-2272-J (Page 3) i / : ; - Location of Mill Creek Hydro Project Elements. (Map Courtesy of Southern California Edison) MILL CREEK 2 AND 3 HYDROELECTRIC SYSTEMS, MILL CREEK 3 SANDBOX HAERNo.

CA-2272-J (Page 4) , , . I v- -l'i Site Plan for Mill Creek 2 and 3 Powerhouse and Mill Creek 3 Intake and Sandbox. (Plan Courtesy of Southern California Edison) MILL CREEK 2 AND 3 HYDROELECTRIC SYSTEMS, MILL CREEK 3 SANDBOX HAERNo. CA-2272-J (Page 5) MILL CREEK NO. 3 INTAKE Mill Creek 3 Intake and Sandbox Detail Taken From Previous Site Plan (Courtesy of Southern California Edison). MILL CREEK 2 AND 3 HYDROELECTRIC SYSTEMS, MILL CREEK 3 SANDBOX HAERNo. CA-2272-J (Page 6) r* p p r o o m m m m w w > O m ** p. m > a H < W ^-' P r m m & w > z o o X w H m m -< "13 m Mill Creek 3 Sandbox Site Plan and Drawing Details (Plan and Drawings Courtesy of Southern California Edison). MILL CREEK 2 AND 3 HYDROELECTRIC SYSTEMS, MILL CREEK 3 SANDBOX HAERNo. CA-2272-J (Page 7) Plan of Mill Creek No.

3 Sandbox. (Plan Courtesy of Southern California Edison). MILL CREEK 2 AND 3 HYDROELECTRIC SYSTEMS, MILL CREEK 3 SANDBOX HAERNo. CA-2272-J (Page 8) ^ \ ' S f! : k /r* T /< / // I &> i wj i Section View of Mill Creek 3 Sandbox (Courtesy of Southern California Edison) MILL CREEK 2 AND 3 HYDROELECTRIC SYSTEMS, MILL CREEK 3 SANDBOX HAERNo. CA-2272-J (Page 9) * i.L.i ipf m Plan view of Mill Creek 3 Sandbox. (Courtesy of Southern California Edison)

In context

Yucaipa, California The place record: every map, photograph and survey of this town.
San Bernardino County, California 963 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Yucaipa

24 of 25 records shown

The federal surveyors worked through Yucaipa building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-22728,010 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-Q4,238 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-Y2,456 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-I1,878 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-C1,039 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-O989 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-K974 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-P958 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-D917 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-H917 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-L893 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-W892 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-B878 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-N876 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-T862 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-X862 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-G848 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-E843 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-A841 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-S837 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-U827 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-R819 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-F812 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-M801 words

Provenance

  • Written history. Quoted verbatim from HAER CA-2272-J. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.