From the record

“The MC 2 and 3 Garage aids in the maintenance of the MC 2 and 3 Powerhouse site.”

Written record, HAER CA-2272-S survey. Machine-read text.

Surveyed by the federal HAER program as HAER CA-2272-S · the record runs 837 words · one of 145 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

66 words

Source document Quoted word for word from HAER CA-2272-S. Not written, edited or summarised by this site.

The Mill Creek 2 and 3 Garage (MC 2 and 3 Garage) is located on the east side of the Mill Creek 2 and 3 Powerhouse site (MC 2 and 3 Powerhouse), southeast of California State Route 38 (SR immediately west and downhill from the penstocks. The site is located within Mill Creek Canyon in San Bernardino County, California. (USGS topographic map Yucaipa, Section 13; T.

Significance

284 words

Source document Quoted word for word from HAER CA-2272-S. Not written, edited or summarised by this site.

The MC 2 and 3 Garage aids in the maintenance of the MC 2 and 3 Powerhouse site. The Mill Creek 2 and 3 Hydroelectric Systems are some of the earliest examples of a high- head hydroelectric system within the United States and are early examples of the first commercial three-phase alternating current stations in California. Three-phase alternating later became the industry standard. Description: The MC 2 and 3 Garage was constructed circa and is located at the east side of the property. This one-story building has a rectangular plan. The west facade is asymmetrical and the building sits on a concrete foundation. The exterior is clad with corrugated metal sheets. The moderately pitched side gabled roof is clad with corrugated metal sheets. The roof has moderately overhanging open eaves.

The west facade has two wood channel drop single garage doors and a single wood paneled pedestrian door. History: The MC 2 and 3 Garage was one of the earliest buildings constructed on the MC 2 and 3 Powerhouse site that aided in the maintenance and operation of the MC 2 and 3 systems. This building has since been demolished. The MC 2 system was constructed between and and the MC 3 system was constructed between and Both systems were originally built by the Redlands Electric Light and Power Company, which was later absorbed by the Edison Electric Company of Los Angeles in MC 2 has not been in operation since when it was damaged in a flood and MC 3 is still in operation today.

Please see the Historic Context section in the general Historic American Engineering Record for the Mill Creek 2 and 3 Hydroelectric Systems (HAER No. CA-2272) for additional information.

Sources

139 words

Source document Quoted word for word from HAER CA-2272-S. Not written, edited or summarised by this site.

Fowler, Frederick Hall. Hydroelectric Power Systems of California and Their Extensions into Oregon and Nevada, Water-Supply Paper Washington, Government Printing Office, White, David R. M. "Cultural Resource Management Plan for the Southern California Edison Company Mill Creek Hydroelectric Project (FERC Project No. San Bernardino County, California," June Low, George P. "The Generating, Transmission and Distribution Systems of The Edison Electric Company of Los Angeles, Cal.," The Journal of Electricity, Power and Gas. vol. XIII, no. 1. January, MILL CREEK 2 AND 3 HYDROELECTRIC SYSTEMS, MILL CREEK 2 AND 3 GARAGE HAER No. CA-2272-S (Page 2) "Means Much to Redlands: Big Light and Power Deal Closed," Los Angeles Times. May 25, "Redlands Electric Light & Power Co., Edition Electric Co.

of Los Angeles, Mill Creek Powerhouses," National Register of Historic Places Inventory Nomination Form, April 30, item number 7, 10.

Written history

255 words

Source document Quoted word for word from HAER CA-2272-S. Not written, edited or summarised by this site.

MC 2 has not operated since when it was damaged during floods. It was not, however, decommissioned. The Southern California Edison Company, in conjunction with the San Bernardino National Forest, the agency that owns the property, proposes to formally decommission the facility. This process will include filling the sandbox and forebay with slurry, and removing the metal features. Although MC 3 is still in operation, it is also being recorded as part of this project because of the system's close association with MC 2. MILL CREEK 2 AND 3 HYDROELECTRIC SYSTEMS, MILL CREEK 2 AND 3 GARAGE HAER No. CA-2272-S (Page 3) * * " : Location of Mill Creek Hydro Project Elements. (Map Courtesy of Southern California Edison) MILL CREEK 2 AND 3 HYDROELECTRIC SYSTEMS, MILL CREEK 2 AND 3 GARAGE HAER No.

CA-2272-S (Page 4) 'WE'LL OIL HOUSE Detail taken from March 26, Plot Plan, illustrating the original location of the Mill Creek 2 and 2 Garage (Plan Courtesy of Southern California Edison). MILL CREEK 2 AND 3 HYDROELECTRIC SYSTEMS, MILL CREEK 2 AND 3 GARAGE HAER No. CA-2272-S (Page 5) I, \*1 > n. - ' 1 s- !!: ' i;...:' J B - * J *Sj ... i3 m 'i! ti! I 1 a {,. JJ t/s : Site Map of the Mill Creek 2 and 3 Powerhouse Site (Map Courtesy of Southern California Edison) MILL CREEK 2 AND 3 HYDROELECTRIC SYSTEMS, MILL CREEK 2 AND 3 GARAGE HAER No. CA-2272-S (Page 6) Mill Creek 2 and 3 Garage Site Map.

In context

Yucaipa, California The place record: every map, photograph and survey of this town.
San Bernardino County, California 963 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Yucaipa

24 of 25 records shown

The federal surveyors worked through Yucaipa building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-22728,010 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-Q4,238 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-Y2,456 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-I1,878 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-J1,064 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-C1,039 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-O989 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-K974 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-P958 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-D917 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-H917 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-L893 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-W892 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-B878 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-N876 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-T862 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-X862 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-G848 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-E843 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-A841 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-U827 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-R819 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-F812 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-M801 words

Provenance

  • Written history. Quoted verbatim from HAER CA-2272-S. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.