From the record

“This monument was erected in memory of Henry Harbinson Sinclair who was a pioneer in the hydroelectric industry in California.”

Written record, HAER CA-2272-Y survey. Machine-read text.

Surveyed by the federal HAER program as HAER CA-2272-Y · the record runs 2456 words · one of 145 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

2335 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HAER CA-2272-Y. Not written, edited or summarised by this site.

This monument was erected in memory of Henry Harbinson Sinclair who was a pioneer in the hydroelectric industry in California. Additionally, the Sinclair Monument has been identified as a contributing feature of the Mill Creek Hydroelectric System Historic District. The Mill Creek 2 and 3 Hydroelectric Systems are significant as early examples of high-head hydroelectric systems that still exist today in the United States. These were also some of the first commercial three-phase alternating current stations in California. Mill Creek 1 was the first to use this system in California and possibly the United States. This became the industry standard. Previous systems used either single-phase alternating current or direct current.

The Mill Creek facilities also played an important role in the growth and development of the City of Redlands. Report Prepared by: Christeen Taniguchi, Senior Architectural Historian and Nicole Collum, Architectural Historian II Galvin Preservation Associates S. Pacific Coast Highway, Redondo Beach, CA Date: May, MILL CREEK 2 AND 3 HYDROELECTRIC SYSTEMS, SINCLAIR MONUMENT HAERNo. CA-2272-Y (Page 2) Part I: Description Location and Overview of Mill Creek 2 and_3 The Sinclair Monument is located on the powerhouse site for the Mill Creek 2 and 3 Hydroelectric Systems.

The MC 2 and 3 facilities are high-head hydroelectric systems located in a mountainous area east of the City of Redlands in San Bernardino County, California, just south of California State Route 38 (SR MC 2 and 3 are owned and operated by Southern California Edison (SCE), and located in the San Bernardino National Forest, with a small western section situated on unincorporated San Bernardino County land. MC 2 construction started in and was completed the following year. Work on MC 3 began in and completed in They are both situated in Mill Creek Canyon, with altitudes that range from to feet. MC 2 and 3's western boundary is about 2/3 of a mile to the east of the eastern boundary of the City of Redlands.

Yucaipa is the nearest city, located several miles to the south of the MC 2 and 3 powerhouse. The first of the Mill Creek facilities, Mill Creek 1 (MC 1), is located further below along Mill Creek Canyon, about two miles southwest of MC 2 and 3. MC 2 has been non-operational since although much of its features still remain, while MC 3 is still operating. All three systems are accessible off of SR 38. Mill Creek is the source of water that runs MC 2 and 3. The creek originates near Galena Peak in the eastern San Bernardino Mountains. The water then flows into the Santa Ana River at the Santa Ana Wash, located just north of Redlands and it then heads towards the San Bernardino Valley. Mountain Home Creek was also a supplemental source for MC 2.

Its intake is located in the middle of the Mountain Home Village, a residential community that was established in the Water from Monkeyface Falls, which originates from Monkeyface Creek, was also taken from this intake until the Each system has separate intakes, flowlines, sandboxes and forebays to collect and process the water, but then flow west into the same powerhouse to create electrical energy. They power an electrical system that originally served the City of Redlands, but later also provided bulk electricity for the cities of Colton and Riverside. Description of the Powerhouse Site for MC 2 and MC 3 The powerhouse site for MC 2 and 3 is located southeast of SR 38 and immediately west and downhill from the associated penstocks for MC 2 and 3.

The powerhouse site is located on an elevated parcel of land approximately three to four acres in size. The most prominent building on this site is the powerhouse, which serves both MC 2 and 3. Smaller ancillary buildings that help serve the needs of the facility surround the powerhouse and include: an office, machine shop, switch rack, weld shop, ice house, garage, chlorine storage shed, walls with rubble stones laid in concrete, and two domestic water tanks. There are asphalt paved driveways throughout the property, including one that connects to the adjacent street. There are some trees landscaping 1 Mill Creek 1 was the first of the Mill Creek hydroelectric systems, and was completed in It was the first commercial three-phase alternating current station.

The three-phase system has become standard. Mill Creek 1 is still standing and operational. 2 Philip de Barros and Carmen Weber, "Cultural Resources Inventory and Evaluation of the Mill Creek Hydroelectric Project FERC Project No March MILL CREEK 2 AND 3 HYDROELECTRIC SYSTEMS, SINCLAIR MONUMENT HAERNo. CA-2272-Y (Page 3) the property, including olive and pine trees. The Sinclair Monument is located near the entrance to the powerhouse site. Description of The Henry Harbinson Sinclair Monument The Henry Harbinson Sinclair Monument is located near the entrance to the powerhouse site and adjacent to a wooden identification marker for this facility. The identification marker for this facility is made out of four wood planks mounted on two wood posts and reads: "Mill Creek Nos.

2 & 3 Hydroelectric Project". The Henry Harbinson Sinclair Monument consists of a large natural stone, with a centered inset bronze plaque. The stone edges surrounding the plaque are rough and uneven. The lettering on the plaque is raised and the monument reads as follows: IN MEMORY OF HENRY HARBINSON SINCLAIR A TESTIMONIAL TO HIS HIGH AND USEFUL SERVICE AS A PIONEER IN THE ESTABLISHMENT AND DEVELOPMENT OF THE HYDRO ELECTRIC INDUSTRY IN CALIFORNIA THIS TABLET IS ERECTED BY

The Southern California Edison Company November

Part II: Historical Context Henry Harbinson Sinclair Henry Harbinson Sinclair Sinclair) was born in Brooklyn, New York, in As a young man, Mr. Sinclair spent several years as a sailor and between and he attended Cornell University and studied science. Directly, following his time at Cornell, Mr. Sinclair operated a successful shipping business located in New York from to In Sinclair moved to the City of Redlands, California and purchased a 30-acre fruit ranch. Soon after his arrival, in Redlands, Sinclair quickly became involved in civic activities throughout the city. He was on the first Board of Trustees of Redlands University; director of the Lugonia Water Company and South Fork Ditch Association, he had interests in a major local hotel and a street railroad in Redlands.

Sinclair was president and general manager, of both, the Redlands Electric Light and Power Company and the Southern California Power Company. He was appointed general manager of the Southern California Power Company in shortly after the 3 Paul R. Secord, "National Register Nomination: Southern California Edison Company, Mill Creek Hydroelectric System," National Park Service, p. 8. 4 Ibid. p. 8. MILL CREEK 2 AND 3 HYDROELECTRIC SYSTEMS, SINCLAIR MONUMENT HAERNo. CA-2272-Y (Page 4) company was incorporated, on April 29, Sinclair remained an officer of both the California Power Company, and the Edison Electric Company, until when he resigned, intending to retire. However, retirement did not suit him and Sinclair continued on as vice- president and director of the Edison Electric Company.

On June Mr. Sinclair took charge of the Great Western Power Company of San Francisco as vice-president and general manager. Following his new appointment at the Great Western Power Company, Mr. Sinclair had this to say: I am reluctant to leave Southern California where I have lived twenty-two years. But I can hardly refuse to take up a task that has such wonderful developments ahead of it. In undertaking this work I cannot but appreciate the possibilities of California as a manufacturing center. This company is building for the future, and within ten years it will be equipped to supply horse power where it is now supplying See what has been accomplished in Southern California in the development of manufacturing industries as the result of cheap electrical power.

I tell you that electrical power is the biggest business of the future today, and California, with its wonderful resources for power, is to become the loom of the Orient and the storehouse of all Western America. He continued to work in Northern California in the development of hydro-electric facilities until Mr. Sinclair passed away in Sinclair lived in the City of Redlands for 15 years; he installed the first multiphase transmission plant in the United States and the second in the world, at MC 1, in Mr. Sinclair was with the Edison Electric Company since its conception and has been considered an important figure in the company's early success.

12 years, following his death, the Southern California Edison Company, dedicated a natural stone monument with a bronze tablet descriptive of the pioneer work of Mr. Sinclair in the development of hydroelectric power. This monument is located just outside the powerhouse for MC 2 and 3. Prominent speakers and leaders in the western power industry were on hand to participate in the monument's dedication ceremony, honoring Mr. Sinclair's role in the completion of MC 2 and 3. The design of this plant was later copied by the engineers at Niagara Falls. Mr.

Sinclair was credited as the man largely responsible for the creation of MC 2 and 3 and the multiphase system utilized here later became the standard system throughout the United States.9 5 "Redlands: Southern California Power Company Nearly Ready for Business". Los Angeles Times, June 26, p. B5. 6 "Takes Charge of Great Work: Edison Man Will Handle Big Northern Enterprise". Los Angeles Times. May 24, p I 16. 7 Secordp. 8. 8 Ibid p. 9 "Monument Dedicated: Henry Harbinson Sinclair, Pioneer in Hydroelectric Work in West, Honored at Redlands," Los Angeles Times. Febuary 26, p. 6. MILL CREEK 2 AND 3 HYDROELECTRIC SYSTEMS, SINCLAIR MONUMENT HAERNo.

CA-2272-Y (Page 5) Mill Creek 2 and 3 Please see the Historic Context section in the general Historic American Engineering Record for the Mill Creek 2 and 3 Hydroelectric Systems (HAER No. CA-2272). Part III: Sources of Information Barros, Philip de and Carmen Weber. "Cultural Resources Inventory and Evaluation of the Mill Creek Hydroelectric Project FERC Project No March "Big Deal Completed: Merger of Subsidiary Organizations of the Edison Electric Company Finally Consummated and Bonds Delivered," Los Angeles Times. November 8, 12. Caskey, Dean, Civil Crew Foreman, Eastern Hydro Division, Southern California Edison. Personal interview by Christeen Taniguchi. June 3, "Country Life: Water Power," Los Angeles Times. August 15, 15. "Development of Electric Power," Los Angeles Times.

January 1, A20. Doble, Robert Member of the Technical Society of the Pacific Coast. "Hydro- Electric Power Development and Transmission in California," Journal of the Association of Engineering Societies. Vol. 2272IV, no. 3, March Eley, F. L. "Historical Notes [of Southern California Edison Company]," May 27, Fowler, Frederick Hall. Hydroelectric Power Systems of California and Their Extensions into Oregon and Nevada, Water-Supply Paper Washington, D. C: Government Printing Office, Heinrich, Darrell W., Project Manager, Eastern Hydro Division, Southern California Edison. Telephone interview by Christeen Taniguchi. November 18, Hinson, Noel B.

"Pioneering in Hydroelectric Generation and Transmission: Chronological History of all Plants of the Southern California Edison Company, "In-Service Plants." Mill Creek 1, 2 and 3. Low, George P. "The Generating, Transmission and Distribution Systems of The Edison Electric Company of Los Angeles, Cal.," The Journal of Electricity, Power and Gas. vol. XIII, no. 1. January, MILL CREEK 2 AND 3 HYDROELECTRIC SYSTEMS, SINCLAIR MONUMENT HAERNo. CA-2272-Y (Page 6) "Means Much to Redlands: Big Light and Power Deal Closed," Los Angeles Times. May 25, "Mill Creek #1 Hydro Plant: America's First Commercial 3-Phase Alternating Current Power Plant." [circa late "Monument Dedicated: Henry Harbinson Sinclair, Pioneer in Hydroelectric Work in West, Honored at Redlands," Los Angeles Times. February 26, 6.

Myers, William A. Iron Men and Copper Wires: A Centennial History of the Southern California Edison Company. Glendale, California: Trans-Anglo Books, Owens, Charles. "The Birthplace of Hydroelectric Power," Los Angeles Times. June 8, Gl. "Property Data - Southern California Edison Company: Mill Creek No. 2 & No. 3 Power House." "Redlands: Electric Light and Power Company is Reaching Out," Los Angeles Times. January 30, "Redlands Electric Light & Power Co., Edition Electric Co. of Los Angeles, Mill Creek Powerhouses." National Register of Historic Places Inventory Nomination Form, April 30, "Redlands: New Power Plant," Los Angeles Times. May 25, 10. Rushmore, David B. and Eric A. Lof. Hydro-Electric Power Stations.

New York: John Wiley & Sons, Inc.; London: Chapman & Hall, Limited, Taylor, Thomas T. "Photographs, and Written Historical and Descriptive Data: Bishop Creek Hydroelectric System, Bishop Creek, Bishop Vicinity, Inyo County, California, HAER No. CA-145," February 7, White, David R. M. "Cultural Resource Management Plan for the Southern California Edison Company Mill Creek Hydroelectric Project (FERC Project No. San Bernardino County, California," June "Work on New Electric Plant," Los Angeles Times. March 27, 9. Part IV: Project Information MC 2 has not operated since when it was damaged during floods. It was not, however, decommissioned. The Southern California Edison Company, in conjunction with the San MILL CREEK 2 AND 3 HYDROELECTRIC SYSTEMS, SINCLAIR MONUMENT HAERNo.

CA-2272-Y (Page 7) Bernardino National Forest, the agency that owns the property, proposes to formally decommission the facility. This process will include filling the sandbox and forebay with slurry, and removing the metal features. Although MC 3 is still in operation, it is also being recorded as part of this project because of the system's close association with MC 2. MILL CREEK 2 AND 3 HYDROELECTRIC SYSTEMS, SINCLAIR MONUMENT HAERNo. CA-2272-Y (Page 8) '" . > Location of Mill Creek Hydro Project Elements. (Map Courtesy of Southern California Edison) MILL CREEK 2 AND 3 HYDROELECTRIC SYSTEMS, SINCLAIR MONUMENT HAERNo. CA-2272-Y (Page 9) I, \*1 > n. - ' 1 s- !!: ' i;...:' J B - * J *Sj ... i3 m 'i! ti! *t 1 a {,.

JJ t/s : Site Map of the Mill Creek 2 and 3 Powerhouse Site (Map Courtesy of Southern California Edison) MILL CREEK 2 AND 3 HYDROELECTRIC SYSTEMS, SINCLAIR MONUMENT HAERNo. CA-2272-Y (Page 10) l I Mill Creek 2 and 3 Sinclair Monument Site Map. Sinclair Monument is located within the red square.

In context

Yucaipa, California The place record: every map, photograph and survey of this town.
San Bernardino County, California 963 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Yucaipa

24 of 25 records shown

The federal surveyors worked through Yucaipa building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-22728,010 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-Q4,238 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-I1,878 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-J1,064 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-C1,039 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-O989 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-K974 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-P958 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-D917 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-H917 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-L893 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-W892 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-B878 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-N876 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-T862 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-X862 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-G848 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-E843 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-A841 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-S837 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-U827 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-R819 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-F812 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-M801 words

Provenance

  • Written history. Quoted verbatim from HAER CA-2272-Y. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.