BlockBefore

Mill Creek 2 and 3 Hydroelectric Systems, Mill Creek 2 and 3 Rubble Stone Walls and Cottages, Mill Creek, Yucaipa

Mill Creek 2 and 3 Hydroelectric Systems, Mill Creek 2 and 3 Rubble Stone Walls and Cottages, Mill Creek, Yucaipa, San Bernardino County, CA. Surveyed as HAER CA-2272-V, with a 776-word written history.

From the record

“The MC 2 and 3 Rubble Stone Walls are remnants of the original workers cottages at the MC 2 and 3 Powerhouse site.”

Written record, HAER CA-2272-V survey. Machine-read text.

Surveyed by the federal HAER program as HAER CA-2272-V · the record runs 776 words · one of 145 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

76 words

Source document Quoted word for word from HAER CA-2272-V. Not written, edited or summarised by this site.

The Mill Creek 2 and 3 Rubble Stone Walls (MC 2 and 3 Rubble Stone Walls) are located throughout the Mill Creek 2 and 3 Powerhouse site (MC 2 and 3 Powerhouse site). The MC 2 and 3 Powerhouse site is located southeast of California State Route 38 (SR immediately west and downhill from the penstocks. The site is located within Mill Creek Canyon in San Bernardino County, California. (USGS topographic map Yucaipa, Section 13; T.

Significance

289 words

Source document Quoted word for word from HAER CA-2272-V. Not written, edited or summarised by this site.

The MC 2 and 3 Rubble Stone Walls are remnants of the original workers cottages at the MC 2 and 3 Powerhouse site. The Mill Creek 2 and 3 Hydroelectric Systems are some of the earliest examples of a high-head hydroelectric system within the United States and are early examples of the first commercial three-phase alternating current stations in California. Three-phase alternating later became the industry standard. Description: The MC 2 and 3 Rubble Stone Walls are located throughout the property and consist of walls with rubble stones laid in concrete. They border the asphalt paved driveways and frame buildings like the MC 2 and 3 Weld Shop and Ice House. These walls, as well as concrete foundations, steps and landings are located on the west side of the property.

These structural elements are remnants from the workers' cottages which have since been demolished. There are also some trees remaining from the residential landscaping, primarily pepper trees. History: The MC 2 and 3 Rubble Stone Walls are the remnants from the early workers' cottages that were originally located on the MC 2 and 3 Powerhouse site. The MC 2 system was constructed between and and the MC 3 system was constructed between and Both systems were originally built by the Redlands Electric Light and Power Company, which was later absorbed by the Edison Electric Company of Los Angeles in MC 2 has not been in operation since when it was damaged in a flood and MC 3 is still in operation today. Both systems are currently owned by Southern California Edison.

Please see the Historic Context section in the general Historic American Engineering Record for the Mill Creek 2 and 3 Hydroelectric Systems (HAER No. CA-2272) for additional information.

Sources

142 words

Source document Quoted word for word from HAER CA-2272-V. Not written, edited or summarised by this site.

Fowler, Frederick Hall. Hydroelectric Power Systems of California and Their Extensions into Oregon and Nevada, Water-Supply Paper Washington, Government Printing Office, White, David R. M. "Cultural Resource Management Plan for the Southern California Edison Company Mill Creek Hydroelectric Project (FERC Project No. San Bernardino County, California," June Low, George P. "The Generating, Transmission and Distribution Systems of The Edison Electric Company of Los Angeles, Cal.," The Journal of Electricity, Power and Gas. vol. XIII, no. 1. January, MILL CREEK 2 AND 3HYDROELECTRIC SYSTEMS, MILL CREEK 2 AND 3 RUBBLE STONE WALLS AND COTTAGE SITES HAERNo. CA-2272-V (Page 2) "Means Much to Redlands: Big Light and Power Deal Closed," Los Angeles Times.

May 25, "Redlands Electric Light & Power Co., Edition Electric Co. of Los Angeles, Mill Creek Powerhouses," National Register of Historic Places Inventory Nomination Form, April 30, item number 7, 10.

Written history

167 words

Source document Quoted word for word from HAER CA-2272-V. Not written, edited or summarised by this site.

MC 2 has not operated since when it was damaged during floods. It was not, however, decommissioned. The Southern California Edison Company, in conjunction with the San Bernardino National Forest, the agency that owns the property, proposes to formally decommission the facility. This process will include filling the sandbox and forebay with slurry, and removing the metal features. Although MC 3 is still in operation, it is also being recorded as part of this project because of the system's close association with MC 2. MILL CREEK 2 AND 3 HYDROELECTRIC SYSTEMS, MILL CREEK 2 AND 3 RUBBLE STONE WALLS AND COTTAGE SITES HAERNo. CA-2272-V (Page 3) s>* ' - \ In SI- ' - Li Location of Mill Creek Hydro Project Elements.

(Map Courtesy of Southern California Edison) MILL CREEK 2 AND 3 HYDROELECTRIC SYSTEMS, MILL CREEK 2 AND 3 RUBBLE STONE WALLS AND COTTAGE SITES HAERNo. CA-2272-V (Page 4) z > - Mill Creek 2 and 3 Powerhouse, Rubble Stone Walls and Cottage Sites Site Plan.

In context

Yucaipa, California The place record: every map, photograph and survey of this town.
San Bernardino County, California 963 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Yucaipa

24 of 25 records shown

The federal surveyors worked through Yucaipa building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-22728,010 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-Q4,238 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-Y2,456 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-I1,878 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-J1,064 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-C1,039 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-O989 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-K974 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-P958 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-D917 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-H917 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-L893 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-W892 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-B878 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-N876 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-T862 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-X862 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-G848 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-E843 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-A841 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-S837 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-U827 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-R819 words
Mill Creek 2 and 3 Hydroelectric SystemsHAER CA-2272-F812 words

Provenance

  • Written history. Quoted verbatim from HAER CA-2272-V. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.