Cape Canaveral Air Force Station, Launch Complex 39, Orbiter Payload Canisters, Cape Canaveral

Cape Canaveral Air Force Station, Launch Complex 39, Orbiter Payload Canisters, Cape Canaveral, Brevard County, FL. Surveyed as HAER FL-8-11-I, with a 11,347-word written history.

From the record

“The Orbiter Payload Canisters, also known as the canisters, were designed and built exclusively to protect and transport space shuttle payloads from various processing facilities to the launch pads or the Vehicle Assembly Building (VAB) where the payloads are subsequently transferred to the space shuttle orbiters.”

Written record, HAER FL-8-11-I survey. Machine-read text.

Surveyed by the federal HAER program as HAER FL-8-11-I · the record runs 11347 words · one of 123 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Location

56 words

Source document Quoted word for word from HAER FL-8-11-I. Not written, edited or summarised by this site.

John F. Kennedy Space Center, Cape Canaveral, Brevard County, Florida USGS Orsino, Florida, Quadrangle, Universal Transverse Mercator Coordinates: E N Zone 17, NAD Date of Construction: Architect: Dr. Hui-Han (Hank) Liu, lead engineer with McDonnell Douglas Space Systems Company, Kennedy Space Center, Florida. Builder: Belko Steel, Orlando, Florida, and Specialty Maintenance and Construction, Inc., Lakeland, Florida.

Significance

11206 words

Source document Quoted word for word from HAER FL-8-11-I. Not written, edited or summarised by this site.

The Orbiter Payload Canisters, also known as the canisters, were designed and built exclusively to protect and transport space shuttle payloads from various processing facilities to the launch pads or the Vehicle Assembly Building (VAB) where the payloads are subsequently transferred to the space shuttle orbiters. Only two canisters were constructed and they have served in the same capacity since Determined eligible for the National Register of Historic Places in a survey of U.S.

Space Shuttle Program facilities completed for NASA, the Orbiter Payload Canisters were one of twenty- six assets on Kennedy Space Center determined individually eligible for their role in the Report Prepared by: New South Associates, Stone Mountain, Georgia Date: May 15, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 2 PART I. HISTORICAL INFORMATION A. Physical History 1. Date of Construction The two canisters were completed between and 2.

Engineers Structural Engineers: Canister Lower Structure: Hui-Han Liu, Sudakar Bhide Main Door: Phil Kocol Analysis: Karl Meyer Mechanical Engineers: Door Latch: David Johnson Pull-Up Mechanism: David Johnson Door Actuation System: Harold Begley Outrigger: Jesse Harris ECS: Denis Testa Pneumatics: A. Curl 3. Builder/Contractor/Supplier Belko Steel of Orlando, Florida, built Canister 1, while Specialty Maintenance and Construction, Inc. of Lakeland, Florida, built Canister 2. The canisters cost approximately each. 4. Original Plans NASA's complete collection of engineering drawings for the canisters consists of 112 structural designs.

These drawings show the current state of the canisters, with the exception of minor modifications that may have been completed based on Engineering Orders (EO). Original plans, which do not show modifications, are not available. The canisters were not re-tasked and/or modified from an earlier NASA program, but were constructed in the late to serve their current function. Therefore, most changes have been minor; original drawings were produced in with minor modifications added occasionally until CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-S-11-I PAGE 3 March On each plan, the original drawing date is noted in the title block, as is each modification.

The twelve plans that were the most important for understanding the design of the canister were photographed and included in this HAER documentation. These drawings were chosen with the assistance of Dr. Hui-Han Liu, the lead structural engineer for the project. Some of the plans were also redrawn for use as photo keys in this documentation. The full set of 112 drawings is archived at KSC and can be accessed by interested researchers. The following description of the canisters, as originally designed, is derived from a comparison of the drawings described above with historic photography archived at Where appropriate, the KSC photograph number is included in a footnote.

The appendix to this document contains a number of images showing the canisters in use at various times in their history and at different locations at In the descriptions that follow, these are referenced by figure number. NASA and McDonnell Douglas designed and constructed the canisters to replicate the exact dimensions of the space shuttle orbiter's payload bay. This allows the payload to be pre loaded into a vessel shaped identically to the shuttle's payload bay. The canisters contain identical mounting points and exact environmental specifications, which are customized for each payload. The length of time the payload is in the canister varies on the type of payload, the number of payloads, and the overall shuttle schedule.

The average amount of time the payload spends in the canister is about seven days. The canisters usually deliver the payload to the shuttle's payload bay between two and four weeks before launch. The loaf-shaped canisters were designed to be long, lS'-O" wide, and high at their highest point. 1 The approximate weight, when empty, is pounds. The canisters were designed to carry payloads up to 15' in Sheets 3 and 4, January 17, from notebook of plans entitled, "Orbiter Payload Canister," on file CRF Offices; "Inside the Canister Rotation Facility," Spaceport News, January 11, p. 4. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 4 diameter and up to 60' in length. The carrying capacity is pounds.

2 The primary material used for construction was steel. The canisters are transported on two custom-built flatbed trucks called the Payload Canister Transporters. When the canister is mated to the transporter, it is often referred to as the TransCan or known as a transporter throughout the rest of this document. There have been two sets of transporters used for the canisters. One transporter from the first set was adapted from an older Solid Rocket Booster Transporter vehicle.

Based on photographs of the canisters from early the canisters appear to have been originally painted with gray paint or primer on the outside, while the interior surfaces were painted white (Figure By the time of the first shuttle launch in the canisters' exterior surfaces were painted white, with the red "worm" NASA logotype on each side. 4 This logo was in use from to (Figure The initial design of the canisters called for the capacity to process payloads horizontally and vertically and the hardware, software, and controls were designed to accommodate the needs of rotating the canister in the VAB. Most of the changes completed on the canisters since construction have been in response to changes in how the payload is loaded into the canisters and then into the shuttle's payload bay.

These changes, in turn, stemmed from the primary types of shuttle missions occurring at that time. While the early SSP focused on deploying satellites, later flights would emphasize Spacelab Missions and Mir support, until finally the shuttle became NASA Facts: canister Rotation Facility (National Aeronautics and Space Administration, John F. Kennedy Space Center, Florida. IS-2004-09-014-KSC, Revised 3 Kennedy Space Center photograph negative number dated August 13, from Kennedy Space Center Archives. 4 Kennedy Space Center photograph negative number Print001.jpg, undated from Kennedy Space Center Archives. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO.

FL-8-11-I PAGE 5 increasingly dedicated to transporting the components of the International Space Station (ISS). Spacelab, a joint effort of NASA and the European Space Agency (ESA) consisted of a reusable microgravity laboratory that was fixed within the shuttle's payload bay. Operated by payload and mission specialists from both agencies, Spacelab components flew on a total twenty-eight shuttle missions between and 5 Space shuttle support for the Russian Mir Space Station also played an important role in shuttle missions between and The joint U.S./Russian Shuttle-Mir program involved the shuttle docking with Mir nine times, delivering Russian and U.S. crew, as well as ferrying supplies and equipment to and from Mir.

6 Lessons learned from the joint work on Spacelab and the Shuttle-Mir program would contribute to the development of the ISS. The descriptions of the canisters in the following section focus on the original design. 7 The canisters are labeled with same designations as the orbiter: zenith (top), forward (front), starboard (right), aft (rear), port (left), and nadir (bottom). The top of the canister consists of two large clamshell doors, identical in size and shape to the payload doors of the orbiter. 8 These doors open to the starboard and port sides along the dorsal midline of the canister. Seven door latches are evenly spaced along the door seal.

9 Each door contains two door actuators, positioned vertically and lying halfway 5 Deming, Joan and Patricia Slovinac, NASA-Wide Survey and Evaluation of Historic Facilities in the Context of the u.S. Space Shuttle Program: Roll-Up Report (Prepared for the National Aeronautics and Space Administration, Environmental Management Division, Office of Infrastructure and Administration, Headquarters; Prepared by Archaeological Consultants, Inc., Sarasota, Florida, February revised July 6 Deming and Slovinac, Evaluation of Historic Facilities, Space Shuttle Program, 7 Notebook of plans entitled, "Orbiter Payload Canister," on file 8 "Orbiter Payload Canister," Sheet 3, on file KSC (HAER No. ll-I-28) 9 "Orbiter Payload Canister," Sheet 55, on file KSC (HAER No.

ll-I-32) CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 6 between the midline and forward and aft ends. These door actuators attach to the screw jacks and brackets on the starboard and port sides of the canister doors. The grab rails are positioned to the outside of each of these door actuators, with two on each door. 10 The forward end, as originally designed, is a flat vertical surface containing a personnel door leading into the canister payload bay and safety rails.ll The original steel safety railings were in eight sections (Figure 3). Each section is a two-railed unit that folds flat against the forward end when not in use.

Two longer sections of railing line the base of the canister, while the remaining smaller six sections ring the half oval side walls and top. The personnel door resides just starboard of the vertical midline and opens to the port. 12 The original railings served as safety features for the staff that would need to be on top of the canister after rotation to the vertical position when rotating in the VAB (Figure 6). These have since been removed. The forward end of the canister faces the aft of the transporter when the two are mated together. The starboard side of the canister contains a door actuator pneumatic drive located in the middle of the starboard side, slightly more than halfway above the horizontal midline.

13 This pneumatic drive is connected to the two screw jack bracket assemblies by the horizontal pipes of the pneumatic system, which extend forward and aft. When the door actuator system is activated in the horizontal configuration, the door actuator pneumatic drive pulls the screw jacks down vertically, tilting as necessary in their brackets to clear the opening doors. 14 To the outside of each screw jack bracket, there are access platforms aligned 10 "Orbiter Payload Canister," Sheet 3, on file KSC (HAER No. 11-I-28) . 11 Kennedy Space Center photograph negative number dated January 8, from Kennedy Space Center Archives. 12 "Orbiter Payload Canister," Sheet 3, on file KSC (HAER No. 11-I-28) . 13 "Orbiter Payload Canister," Sheet 4, on file KSC (HAER No. 11-I-27) .

14 "Orbiter Payload Canister," Sheet 52, on file KSC (HAER No. 11-I-3). CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 7 with the vertical grab rails on the doors. Beyond each of these platforms is a closely mounted ladder for accessing the platforms. At the forward end of the starboard side, there is one half of a pair of canister outriggers, the other being located on the forward end of the port side. These outriggers can be folded or extended as needed for transfer of the canister to the Payload Changeout Room at the launch pads.

15 In the extended position, the outrigger guides the canister as it is pulled up in a vertical position to the rotating service structure at the launch pad to mate with the The outriggers serve to keep the canister, and by extension the shuttle's payload, as stable as possible as it is lifted up to the The smooth guide on the outrigger is referred to as the guide shoe. At the aft end of the starboard side are a group of four instrumentation panels. The smallest panel, located above the other three, is an Instrumentation & Communication System (I&CS) panel with cable ports. These cables connect to the I&CS on the transporter. 16 This monitors variables such as temperature, humidity, or ammonia levels. Each payload has a carefully defined set of parameters for each variable.

If the instrumentation inside the canister's payload bay records a reading outside those parameters, it will send a signal to the I&CS located on the transporter, which will in turn send an alarm to the operators in the cab. The two closed panels below the cable ports, and closer to the aft end, provide additional instrumentation for the system. The fourth panel, the one farthest forward, provides instrumentation and access to the Environmental Control System (ECS). The ECS provides the specific environmental conditions to the payload housed in the canister. Like the 15 "Orbiter Payload Canister," Sheet 49, on file KSC (HAER No. .

16 Canister Rotation Facility Manager, Liz Boyd, Personal Communication, August 10, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 8 I&CS, the ECS for the canister ties to the ECS on the transporter. 17 On the starboard side, between the door actuator pneumatic drive and the forward ladder, there is a small door for access to the space immediately below the payload bay.ls This area carries an environmental warning, signaling that its conditions mirror those inside the payload bay. This door allows for access to the ECS ductwork, particularly the return ducts. At the top aft corner of the starboard side, there is an aft lifting trunnion used as an attachment point to rotate the canister to a vertical position.

At the forward end of the starboard side, below the outrigger and approximately halfway up the starboard side, lies the forward lifting trunnion. Like the aft lifting trunnion, this serves as a cable attachment for rotating the canister to the vertical position. The forward and aft lifting trunnions are located at different heights on the side of the canister to keep the cables from intersecting and interfering with one another as the canister is rotated to the vertical position. Where the starboard side meets the aft end of the canister, near the bottom of the canister and the door seal, are two rounded, flat steel structures with holes, oriented with their flat sides parallel to the transporter bed.

These hold-down clevises, which are flattened steel mounted rings, serve as anchor points for fastening the canister with large steel pins to the transporter deck when the canister is in the vertical position. The aft end of the canister originally duplicated the base of the shuttle with two llearlike" extensions on its top to mirror the profile of the rear half of the orbiter where the engines are located (Figure 3). The staff referred to 17 Canister Rotation Facility Manager, Liz Boyd, Personal Communication, August 10, 18 "Orbiter Payload Canister," Sheet 4, on file KSC (HAER No. l1-I-27) . CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 9 these extensions as "mouse ears.

They were intended to hold the canister more securely in the vertical position. The surface of the aft end is flat except for four shallow metal blocks that the canister rests on when it is in the vertical position. At the top of the aft end, the tail, which again mimics the shuttle, contains the upper door seal control panel. On the port side of the canister, certain elements are mirror images of their counterparts on the starboard side. 20 These include: the outrigger; the ladders, access platforms, door actuator pneumatic drive, and two screw jack bracket assemblies, which serve to open the port payload bay door; hold down clevis structures; and the forward and aft lifting trunnions.

The port side, however, lacks the small panel on the starboard side that allows access to the ECS underneath the floor of the payload bay. The primary difference in the port and starboard sides lies in the elements located at the aft end on either side. While the aft end of the starboard side holds the I&CS interfaces and panels, as well the ECS panel, the port side contains the personnel door, which leads to the payload bay, ECS duct attachments, and the pneumatic interface panel for the lower door seals. 21 Beneath the personnel door, which lies fairly close to the aft end, there is an access platform. Immediately aft or left of the door, the main ECS supply hoses are attached to the ECS supply duct.

Just forward of the door, level with the platform, the external ECS return hoses are attached to the ECS return duct. Finally, the door seal interface panel is located just forward of the personnel door, at the same height as the top of the door. 19 Canister Rotation Facility Manager, Liz Boyd, Personal Communication, August 9, Kennedy Space Center photograph negative number dated August 13, from Kennedy Space Center Archives. 20 "Orbiter Payload Canister," Sheet 4, on file KSC (HAER No. ll-I-27) . 21 "Orbiter Payload Canister, II Sheet 4, on file KSC (HAER No. ll-I-27) . CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO.

FL-8-11-I PAGE 10 Moving inside from the port side personnel door to the interior of the payload bay, there is an access door to the crawlspace below the interior of the payload bay; this lies to the left as you are entering. The interior open space of the payload bay is bilaterally symmetrical. 22 When the clamshell doors are closed, the top of the bay is rounded from one door hinge to the other. Along the long sides of the canister (port and starboard sides) the walls drop straight down for approximately 4' and then slope down toward the floor at approximately a 45-degree angle. 23 This leaves a flat section of the floor approximately 5' across, which runs the length of the payload bay. Attached along the centerline of the floor is a two-rail structure called the keel support structure.

This structure was intended to function as the payload attachment points. The entire interior of the payload bay featured white, painted steel. 24 Beneath the sloped portions of the walls, access crawlspaces run along both sides. These are reached by the interior hatch near the personnel door on the port side, and by the exterior access door on the starboard side. 25 Near the floor on both starboard and port sides, there are four return air vents for the ECS. Arrayed longitudinally along the interior surface of the doors, two supply air ECS ducts with multiple openings provide the appropriate mix for each payload.

26 Along the sloped surface of the interior starboard side are five payload interface panels labeled A_E.27 Plans called 22 "Orbiter Payload Canister," Sheet 1, on file KSC (HAER No. 23 "Orbiter Payload Canister," Sheet 11, on file KSC (HAER No. 24 Kennedy Space Center photograph negative number dated November 12, from Kennedy Space Center Archives. 25 "Orbiter Payload Canister," Sheet 4, on file KSC (HAER No. and HAER No. 26 "Orbiter Payload Canister," Sheet 1, on file KSC (HAER No. 27 "Orbiter Payload Canister," Sheet 1, on file KSC (HAER No. . CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 11 for these payload interface panels to be customized for each specific mission.

These panels include controls for the accelerometers, temperature, humidity, ammonia, fuel, and internal pressure. At the aft end of the starboard side, interior to the I&CS panels on the exterior of the canister there is an umbilical interface panel. Just above this, an ammonia sensor is mounted. Along the top of the sloped wall from aft to stern are an aft smoke detector, particulate level sensor, and forward smoke detector. Aft and forward fire detectors are located near the starboard wall on the aft and forward ends of the canisters. 28 Along the top, interior surface of the starboard and port walls, eight payload fitting assemblies lie identically spaced, with four along each side.

29 These assemblies anchor the payload trunnions in the exact same manner that they are mounted in the orbiter's payload bay. This ensures that the payloads are held and then transported to the orbiter's bay in the same manner that they will be in the shuttle, thereby assuring the load stresses on various components remain the same. At the far forward end of the interior space, immediately in front of the forward end wall, two symmetrical steel ladders with handrails allow access to the top of the canister doors while open in the horizontal position. The forward end of the canister payload bay features a personnel door, offset to the port side of the midline, with its top approximately level with the straight walls on the side of the canister.

An access platform on the inside of the door and a ladder allow safe access to the payload bay floor. The interior aft end of the canister is a flat, vertical steel wall. Behind this wall, the main ECS ducts provide air to the ducts along the doors. HEPA filters mounted in 28 "Orbiter Payload Canister," Sheet 1, on file KSC (HAER No. ll-I-29) . 29 "Orbiter Payload Canister," Sheets 5 and 6, on file KSC (HAER No. and HAER No. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO.

FL-8-11-I PAGE 12 these ducts remove particulates from the supply air before it enters the canister payload bay.30 Finally, each canister requires a specialized transporter, not only to transport it from one place to another, but also to supply the control systems to maintain the payload to individualized specifications and to rotate the canister between horizontal and vertical positions. 31 There have been two sets of transporters used for the canisters. While the second set was built specifically for the canisters, one of the earlier transporters was originally configured to carry the solid rocket boosters. 5. Alterations and Additions Since the canisters were constructed in NASA has completed a number of alterations to them.

While some of these may have been performance based, it appears that most have been in response to either changes in the mission types or a change in the primary method or location of payload processing and rotation. The major changes that can be determined from the engineering drawings, KSC archives, and those mentioned by the engineers responsible for the design or operation of the canisters are summarized below.

As originally designed, the canisters had "earlike" extensions on the aft end of the canister (Figure These can be clearly seen on certain images from and and it is obvious from these photographs that Canister 1 had these extensions removed by January of Pictures of what is presumed to be Canister 2 on delivery, dated August 13, show the original grey paint or primer color and the ears intact (Figure 3). 30 "Orbiter Payload Canister," Sheet 1, on file KSC (HAER No. ll-I-29) 31 "Orbiter Payload Canister," Sheet 4, and on file KSC (HAER No. and 32 Kennedy Space Center photograph negative number dated August 13, from Kennedy Space Center Archives. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO.

FL-8-11-I PAGE 13 Both canisters were initially painted white on all interior surfaces of the payload bay.33 It appears, however, that by possibly and definitely by October of the paint had been removed from all interior surfaces. 34 Current canister staff reported that the paint began to chip or flake, which could damage or contaminate the payloads. Workers used ground walnut shells to blast the paint from the interior walls. Ground walnut shell is a superior blasting material that is less likely to cause etching or other damage to the underlying surface.

Due to the invasive nature of blasting, the extremely small size of the medium, and the inaccessible locations in the interior walls and crawlspaces of the canister, employees working with the canister have reported finding small fragments of nutshell years later. The initial contingency plan for keeping the canister if it was caught outside in the rain, consisted of a specially made grey rain cover, which covered the entire top surface of the canister to below the door hinges (Figure Although this cover worked, it was difficult to put in place as it involved the use of two cranes. This rain cover was retired in favor of a small cover shaped like a long rectangular strip that was attached by Velcro and covered only the door seal from end to end.

36 At some point, one of the canisters was caught in the rain and the water seeped below the floor into grid-like pockets formed by the canister's support structure and outer skin. The trapped water had no outlet, so small drain holes were drilled into each of the square pockets on the bottom surfaces of both canisters and these were plugged with small rubber plugs. 37 33 Kennedy Space Center photograph negative number dated November 12, from Kennedy Space Center Archives. 34 Kennedy Space Center photograph negative number from Kennedy Space Center Archives; Kennedy Space Center photograph negative number from Kennedy Space Center Archives. 35 Kennedy Space Center photograph negative number dated November 11, from Kennedy Space Center Archives.

36 Kennedy Space Center photograph negative number dated October 21, from Kennedy Space Center Archives. 37 HAER No. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 14 The keel support railings have also been altered over time. They appear to have been, at various times, fully stretched along the floor of the payload bay, at about two-thirds length, to even about half length. 38 Overall, these were used infrequently, as the payload trunnion fittings along the tops of the walls were used more often. 39 In a detachable ladder was added to the forward end of each canister to make the top more accessible when the canister was horizontal.

40 Although it is not clear from the historic photographs, since the ladder is removed during certain tasks, the ladder was likely changed more than once, each time altering the safety rails or the cage. As noted earlier, most of the changes to the canister were either due to changes in rotating the canister due to location, or changes in payload processing due to the shifting mission objectives for the shuttle. Although this is described in more detail in later sections, over the history, certain payloads had to be processed horizontally and others vertically. This necessitated the canister transporting cargo either horizontally or vertically. Some payload protocols have even been complex enough to require multiple canister rotations before loading into the orbiter's payload bay.

41 One major change that has occurred in the rotation process since the beginning of the program is the location where the canister is routinely rotated. At the start of the program, this was completed in the VAB as it had high clearance and heavy lifting cranes (Figure While rotation could be safely accomplished in the VAB, it was 38 HAER No. FL-8-11-I-12. 39 Canister Rotation Facility Manager, Liz Boyd, Personal Communication, August 10, 40 "Orbiter Payload Canister," Sheet 3, on file KSC (HAER No. ll-I-28) 41 NASA Facts: Canister Rotation Facility (National Aeronautics and Space Administration, John F. Kennedy Space Center, Florida. IS-2004-09-014- KSC,Revised "Inside the Canister Rotation Facility," Spaceport News, January 11, pp.

42 Canister Rotation Facility Manager, Liz Boyd, Personal Communication, August 10, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 15 more difficult, required multiple cranes, and often created additional safety precautions as payloads were in closer proximity to the stack as it was assembled (Figures 5 and For this reason, a new facility was built in called the Canister Rotation Facility Although there have been many different types of missions for the generally there has been a pattern in the frequency of certain types of shuttle missions, which has resulted in a direct effect on payload processing. The early shuttle missions dealt with satellite deployment and Spacelab.

A number of changes were called for in after the first few shuttle flights had been completed. Spacelab missions began in and continued until Correspondingly, the engineering drawings may show a number of canister modifications in in preparation for Spacelab. Changes made to the canister in consisted in part of modifications to the door end restraint, spreader assemblies in the VAB, changes to the door latch and pull-up mechanism, and a hypergol sensor in the payload bay.45 The Hubble Space Telescope was launched in and was probably the most complex payload ever processed for the This likely contributed to the discussion that a dedicated space was needed to complete canister rotation.

The first Hubble servicing mission occurred in and that year, the CRF was constructed and other modifications were made to the canisters. Some modifications included changes to: the pneumatic controls, the ECS, the configuration of the forward part of the canister for 43 canister Rotation Facility Manager, Liz Boyd, Personal Communication, August 10, 44 The like other eligible components of the is covered by a separate HAER documentation. 45 The cover sheet of "Orbiter Payload Canister," (HAER No. I-26) notes in the title block that the following changes were made to the plans in June of "Revised picture this sheet. Sheet was 1 of 60. Added sheets 26A, 61, 62, and 63. Revised sheets 1 thru 17, 20, 21, 24, 26 thru 31, 35, 37 thru 48, 52, 54 thru 62.

Included EO 31, 32, 33, 35, 36, & EO 19, 30, 34, & 37 cancelled prior to release." CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 16 rotation in the adding a ladder to the forward end, and modifications to the outriggers. 46 Missions dedicated to the construction, servicing, and staffing of the ISS began in and have continued through present with almost all of the missions, except for servicing the Hubble, dedicated to the ISS since After the loss of the Columbia in a number of minor or cosmetic changes were made to the canisters while the shuttles were grounded. 47 B. Historical Context NASA was created in in response to the Soviet launching of Sputnik.

NASA's first series of missions were to send man into space, followed by manned orbits around the Earth, mastery of rendezvous and docking procedures, and finally, landing man on the moon. These goals defined the three main programs of the late and Mercury, Gemini, and Apollo. This effort culminated in the first moon landing, which occurred on July 20, Moon landings continued until when the Apollo program ended. By this time, it was clear that the next major program would be based on a reusable space shuttle, designed to serve orbiting space stations and related missions. President Nixon established the Space Task Group in to recommend the future course of the U.S. Space Program.

This led to the creation of the which was announced by Nixon in The SSP was based on the idea that a series of reusable space flight vehicles would make orbital space flight routine . II 46 The cover sheet of "Orbiter Payload Canister," (HAER No. notes in the title block that the following changes were made to the plans in July of "Inc EO 50 thru 68, 70 thru 73, 75 thru 88, 90 thru & 105 thru EO 69, 74, 89, cancelled. Revised Sheets 1 thru 8, 10, 14 thru 18, 20 thru 26, 28, 30 thru 36, 38 thru 44, 51, 52, 57 thru 63. Revised Logo (Rev E Sheets only). Sheet No. was 1 of 63.

Include EO 56, 58, & 117 this sheet." 47 Canister Rotation Facility Manager, Liz Boyd, Personal Communication, August 10, 48 Deming and Slovinac, Evaluation of Historic Facilities, Space Shuttle Program, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 17 The SSP started during the as contracts were awarded, new space vehicles were designed, old facilities were retro-fitted, and new facilities were built.

After a decade of preparation, the first shuttle flight occurred on April 12, After almost three decades of operations, the SSP is scheduled to retire in 49 During those twenty-nine years of operation, there have been over 130 different flights, using a total of five space shuttles: Columbia, Challenger, Discovery, Atlantis, and Endeavour (the prototype, Enterprise, never went into space). The SSP achieved a number of significant goals. In addition to supporting diverse space facilities such as Spacelab, the Hubble Space Telescope, the Mir Space Station, and the ISS, the shuttles contributed to many other space programs.

Among these were various satellite systems (from COMSAT to the Advanced Communications Technology Satellite, or ACTS), and the unmanned probes that were sent to Jupiter (Galileo), Venus (Magellan), and the Sun (Ulysses).5o Additionally, the shuttle has deployed a number of Department of Defense (DoD) payloads that remain classified. Two significant accidents have been associated with the The Challenger exploded shortly after lift-off on January 28, and the Columbia disintegrated on re-entry into the atmosphere, February 1, In both cases, the accidents killed all crew members on board. 51 Both of these accidents resulted in lengthy flight down time for the program, while exhaustive investigations led to extensive physical and procedural improvements.

Most of the Space Transportation System was in place by the time of the first shuttle launch in including the canisters. The basic STS components have not changed since reusable space shuttles were first designed in the however, as with any endeavor that occurs over almost a thirty- 49 Deming and Slovinac, Evaluation of Historic Facilities, Space Shuttle Program, 50 Deming and Slovinac, Evaluation of Historic Facilities, Space Shuttle Program, 51 Deming and Slovinac, Evaluation of Historic Facilities, Space Shuttle Program, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO.

FL-8-11-I PAGE 18 year period, changes were made to the its support structures, and its operational procedures based on mission shifts, the two accidents, and improvements in technology. To understand the function of the canisters, it is necessary to first understand the various components that comprise a typical space shuttle flight and the various steps required to prepare the shuttle and its payload for a launch. The final design for the space shuttle was chosen from twenty- nine different possibilities in After years of testing and preparation, the first shuttle vehicle, Columbia, arrived at Kennedy Space Center in Columbia, lifted off on April 12, as the first launch of the Most of the work required to prepare the vehicle for launch was done in the VAB.

After a series of test flights each with a crew of two through the first operational flight, occurred the following year, November 11, 52 These launches were conducted from Kennedy Space Center's Launch Complex 39, Pad A. By the mid-1980s, Launch Complex Pad B was also available for launch services. Since the beginning, there have been on average around five shuttle launches per year, with few or no launches for many months following each of the two major accidents. 53 The space shuttle, a vehicle designed to be launched vertically, orbit the Earth, and then land horizontally, is comprised of three main components that are clearly visible at the time of launch.

These are: 1) the reusable orbiter, as the main shuttle vehicle is called; 2) an external tank (ET), the large orange tank in the middle of the shuttle assembly; and 3) the two reusable solid rocket boosters that flank either side of the ET. Of these three parts, only the ET is expendable and is not recovered after each flight. 54 52 Deming and Slovinac, Evaluation of Historic Facilities, Space Shuttle Program, 53 Deming and Slovinac, Evaluation of Historic Facilities, Space Shuttle Program, Manager Howard Christy, Personal Communication, February 24, 54Deming and Slovinac, Evaluation of Historic Facilities, Space Shuttle Program, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO.

FL-8-11-I PAGE 19 The orbiter or space shuttle is the central component of any shuttle flight. The orbiter carries the shuttle astronauts and the payload. Equipped with its own engines, it is versatile in space and capable of re-entry into Earth's atmosphere, after which it can land like a glider. It is not, however, capable of leaving the Earth's gravitational pull upon launch. For this, it requires the ET and the two The ET is tall and in diameter. It serves as the structural backbone for the whole shuttle assembly; both the orbiter and the two are attached to it. Designed in the by Martin Marietta Corporation, the ET contains liquid hydrogen and liquid oxygen, which serve as a fuel and oxidizer for the orbiter's three main engines.

The fuel in the ET provides the shuttle with approximately 29 percent of the thrust needed to escape the Earth's gravitational pull and enter orbit. When expended, the ET is jettisoned over the Indian Ocean and is not recovered. 55 Most of it burns up upon re-entry. The are the workhorses of the shuttle, providing approximately 71 percent of the thrust for achieving orbit. Thiokol Chemical Company designed the in the The two are attached to either side of the ET and support the full weight of the ET and orbiter on the launch pad. Each booster is its own rocket, about tall, with an average diameter of When fully loaded with solid propellant, each booster weighs around 160 tons. Most of that weight is in the propellant.

56 The are comprised of four segments that when stacked together and ignited from the top of the uppermost segment will burn down the length of the booster like a gigantic Roman candle, beginning at the edge of the tube and working 55 Deming and Slovinac, Evaluation of Historic Facilities, Space Shuttle Program, Presidential Commission, Report of the Presidential Commission on the Space Shuttle Challenger Accident, June 6, (Washington, Steven J. Dick, NASA Chief Historian, Steve Garber, NASA History Web Curator. National Aeronautics and Space Administration, NASA History Office, Chapter IV.

56 Presidential Commission, Report on Challenger Accident, Chapter IV; Deming and Slovinac, Evaluation of Historic Facilities, Space Shuttle Program, 5; IISRB Complex Work Begins on Site North of VAB,II Spaceport News, Volume 21, No. 17, August 19, p. 7; NASA Facts: Solid Rocket Boosters and Post- Launch Processing (National Aeronautics and Space Administration, John F. Kennedy Space Center, Florida; www.nasa.gov, Rev. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 20 outward to the edge of the rocket casing, until the fuel is spent. By that point, two ,minutes into the flight, the two have driven the shuttle assembly more than twenty-six miles above the Earth's surface and have exhausted their fuel.

The spent booster rockets are jettisoned from the ET and the orbiter and fall back to Earth, landing in the Atlantic Ocean. S7 The Liberty Star and Freedom Star, two ships designed for this purpose, retrieve the two boosters and return them to Cape Canaveral Air Force Station, Hangar AF Complex. While in orbit on a typical mission, the shuttle crew completes their specific mission objectives, including deploying payload, conducting experiments, and performing extravehicular activities (EVAs). Space shuttle payloads have historically been diverse, including: Spacelab; scientific observatories, such has the Hubble Space Telescope or the Chandra X-Ray Observatory; classified DoD payloads; communications satellites; and all the components necessary to construct the ISS.

At the end of the mission, the shuttle lands at KSC as the preferred landing site, although alternate landing locations include Edwards Air Force Base, California, and White Sands Test Facility, New Mexico, for emergency landings. NASA has identified designated airports around the world with runways of sufficient lengths and personnel for either an abort during launch or an alternate emergency-landing site. II. STRUCTURAL/DESIGN INFORMATION A. General Description: 1. Character.

Canisters are unique structures designed for one very specific purpose - the transportation of fully integrated space shuttle payloads from one location to another, in an environmentally-controlled space identical in shape and size to the orbiter's payload bay, until it is transferred from the canister to the orbiter just prior to launch. As part of the NASA-Wide Survey and Evaluation of 57 NASA Facts: Solid Rocket Boosters. (National Aeronautics and Space Administration, John F. Kennedy Space Center, Florida. IS-2004-09-014-KSC, Revised CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. PAGE 21 Historic Facilities in the Context of the U.S.

Space Shuttle Program: Roll-Up Report, the two canisters were evaluated as eligible under Criteria A and C for their unique payload transport capabilities, as well as design and construction. 58 All historic resources at KSC were grouped by functional types under the study and the canisters were determined to be Type 1, "Resources Associated with Transportation and Type 12, "Resources Associated with Processing Payloads." The payload canister transporters were evaluated at the same time and determined not eligible. 59 2. Condition of Fabric. The condition of both canisters is excellent and fully operational. Maintenance has been ongoing and some upgrades were completed in after the loss of Columbia. B.

Construction: Belko Steel of Orlando, Florida, built Canister 1, while Specialty Maintenance and Construction, Inc. of Lakeland, Florida, built Canister 2. The canisters cost approximately each and were based on plans provided to NASA by McDonnell Douglas Space Systems Company, Kennedy Space Center Florida. C. Mechanical/Operation: One of the critical functions of the space shuttle is to deliver payloads into orbit, either as satellites or as part of supporting, constructing, or repairing, an orbiting space station or observatory. The process of preparing, loading, and unloading shuttle payload is complex and involves many skilled individuals and unique equipment and facilities.

Understanding this process is key to understanding the initial design of the canisters, as well as its revisions. 58 Deming and Slovinac, Evaluation of Historic Facilities, Space Shuttle Program, 59 Deming and Slovinac, Evaluation of Historic Facilities, Space Shuttle Program, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 22 The following section summarizes the payload processing steps that have been in effect for the majority of the missions since the CRF was built in and since the mission shift to almost entirely ISS payloads. GO A canister begins preparations for a new payload mission in the maintenance high bay of the This space serves as the maintenance area for the canisters and the transporters.

Once a canister arrives at the it can be demated from the transporter and the transporter can be moved to the low bay. At this point, the canister bay doors can be opened using the pneumatic screws and any routine maintenance and or modifications can be made to the canister or the transporters. When maintenance is complete, the canister is mated to the transporter and moved in the horizontal position to the From the horizontal position in the the payload fittings can be installed at the correct distances for attachment of the payload trunnions. These will be attached with fittings identical to those in the orbiter. This serves to ensure that the weight of the payload is distributed in the same manner it will be when it is attached to the orbiter's payload bay.

This avoids placing stress on parts of the payload that were not intended for it. After the payload fittings have been configured for the next mission, the canister is ready to be cleaned. 62 For the first stage of cleaning, the Multi-Mission Support Equipment (MMSE) team or Canister (Can) Crew closes the doors and then rotates the canister to the vertical position using the 100-ton crane (Figures The doors are opened manually, not pneumatically, from the vertical position and the canister is ready for a vertical cleaning. First, the entire interior of the canister is cleaned with alcohol and approved clean room 60 NASA Facts: Canister Rotation Facility. IS-2004-09-014-KSC (Rev.

61 The term Canister Rotation Facility refers to both the single large, high-bay, clean room where rotation is complete and the complete facility, which includes the CRF and the attached offices, high and low maintenance bays, and maintenance buildings. In this document Canister 1 was photographed outside the CRF and in the CRF High Bay. Canister 2 was photographed inside the maintenance high bay of the 62 NASA Facts: Canister Rotation Facility (National Aeronautics and Space Administration, John F. Kennedy Space Center, Florida. IS-2004-09-014-KSC (Revised CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 23 wipes.

Next, using a lift, technicians use compressed air and vacuums to blow down all interior surfaces to remove dust and small pieces of debris (Figure After cleaning, the staff completes a check to verify that the telemetry data is correct for the specific mission parameters. This test of the I&CS ensures that the accelerometers inside the canister have the correct parameters for g-force movements, fires, temperature, and any gases that are inside the canister. 64 If the I&CS check is favorable, then the doors of the canister can be closed and sealed. Air inside the payload bay is then sampled and checked for particulates and hydrocarbons.

65 Once the configuration, cleaning, testing, and sealing of the canister is complete, it cannot be re-opened until it reaches the specific payload processing facility that is specified in the mission. The canister is now returned to the horizontal position. The day before the canister is moved to the appropriate payload processing facility, the transporter is steam cleaned to prevent it from bringing contaminants into the clean room areas of the Space Station Processing Facility Today, the Boeing payload team completes most payload processing horizontally at the (Figure However in the past, payload processing was completed both vertically and horizontally at the Vertical Processing Facility or at the Operations and Checkout Building (O&C)(Figures 7-9 and Figures respectively).

66 When it is time to load the payload, the transporter carries the horizontal canister to the Once in place, the doors are 63 CRF Manager, Liz Boyd, Personal Communication, August 9, 64 NASA Facts: Canister Rotation Facility (National Aeronautics and Space Administration, John F. Kennedy Space Center, Florida. IS-2004-09-014-KSC (Revised 65 NASA Facts: Canister Rotation Facility (National Aeronautics and Space Administration, John F. Kennedy Space Center, Florida. IS-2004-09-014-KSC, (Revised 66 Ragusa, James M. Payload Processing at the Launch Site, p. 72. This article discusses in detail vertical payload processing at the vertical Processing Facility. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 24 opened pneumatically.

For most ISS missions, the payload is loaded using the payload strongback (Figure This unique device is capable of lifting and supporting multiple types of payloads at multiple facilities. Once the payload is loaded into the canister, the doors are closed and the appropriate environmental parameters are established inside the canister. This is done with the integration of three systems located partly on both the canister and the transporter. These systems are the I&CS, ECS, and The transporter's ECS is on the front of the transporter, adjacent to the cab, while the I&CS and are located on the aft starboard corner of the transporter.

Once the canister is disconnected from power and controls in the the canister interfaces with the systems on the transporter to maintain the necessary environmental parameters. Payload is usually loaded into the orbiter from the Payload Changeout Room (PCR)(Figures There is a PCR at both Launch Complexes 39A and B. In order for the payload to be loaded into the the canister must be in the vertical position. Since construction of the facility in all canister rotations have been completed at the Before the canister was rotated in the VAB. In the rotation is accomplished using the 100-ton bridge crane attached to a spreader bar.

67 The hoist sling from the spreader bar hooks into the forward canister trunnion (Figure As the crane lifts the canister from the forward end attached to the forward trunnions, the canister pivots around the aft trunnions until it is over its center of gravity (Figure It is then lifted straight up vertically and placed gently onto the transporter (Figure The bed of the transporter is then tipped to match the planarity of the canister and the canister's hold-down clevis is attached to the transporter's hold-down fittings. 68 67 "Inside the Canister Rotation Facility," Spaceport News, January 11, p. 4. 68 CRF Manager, Liz Boyd, Personal Communication, August 9, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO.

FL-8-11-I PAGE 25 The process of completing a rotation in the from set-up to break down, takes approximately six hours .69 Before the construction of the rotation involved two cranes and difficult manual manipulation of heavy cables and hooks.

70 Worker History NASA has always used contractors and subcontractors in the day- to-day operation of the canister at the as well as at most of its other operations at other facilities within Since the first shuttle launch in Boeing crews (initially McDonnell Douglas employees) have been responsible for all payload processing for the Up through Boeing completed this work under the Payload Ground Operations Contract (PGOC), which was responsible for the processing of more than two million pounds of payload at In NASA awarded Boeing the Checkout, Assembly, & Payload Processing Services (CAPPS) contract, which included mission cargo preparations, payload processing, testing for launch vehicle compatibility, post-mission payload extraction, and operation and maintenance of associated facilities and ground facilities.

72 The number of crewmembers varies for different tasks associated with the canister. For example, moving a canister in the horizontal position out of the CRF requires a number of trained staff members. There are individuals in the cab, spotters on each stanchion, spotters on the ground at each corner, and someone in front of the vehicle. Other types of moves, each of which would have a specifically tailored Boeing staffing plan, include: transporting the canister to the in the horizontal position; returning to the rotating the fully-loaded canister to the vertical position, and moving the canister to the launch pad to transfer the payload to the Specific staff assignments are proprietary to Boeing. 69 "Inside the Canister Rotation Facility," Spaceport News, January 11, p. 4.

70 II Inside the Canister Rotation Facility," Spaceport News, January 11, p. 4. 71 Boeing Backgrounder, January Boeing's Role Processing NASA Payloads. 72 Boeing Backgrounder, January Boeing's Role Processing NASA Payloads. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 26 Until recently, as the program has begun to come to fruition, there have been three shifts of workers at the which included engineers and technicians. This allows the canister to be turned around for the next mission quickly and also allows the team to complete some of the work at night when temperatures are cooler.

Transfer of the canister and payload to the PCR is frequently done at night as it is easier to maintain temperature parameters inside the canister and lightning and high winds are less of a risk. Weather is a factor in when the canister can be transported to various locations at Lightning and high winds are the main concerns. Wind limits are lower when the canister is in the horizontal position. The KSC Weather Officer is involved in all decisions concerning canister moves outside of building facilities. D. Site Information: As the canisters are mobile structures and generally found with their transporters, this section briefly describes the most common locations for the canisters (Figures 1 and 2).

The canisters are predominately used in the KSC Industrial Area and the Launch Complex 39A and B areas. However, there have been occasions where the canisters have been transported to other locations on KSC or Cape Canaveral Air Station (CCAS), including trips to pick up classified DoD payloads (Figure 1). within the Industrial Area, the primary location for the canisters is the CRF (Figure 2). As mentioned earlier, this area serves as the rotation site, as well as the storage and maintenance site for the canisters. The also lies within the Industrial Area along with the O&C Building and formally the VPF was located here as well (Figure 2).

The VPF was demolished in In the Launch Complex 39 Area, the canisters may be found at the VAB and at Launch Pads 39A and B, where the payloads are transferred to the shuttle orbiters at the (Figure 1). CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. PAGE 27 III. Sources of Information: A. Engineering Plans and Drawings The construction plans for the canisters are housed at administered by NASA. While initial plans were completed by McDonnell Douglas Space Systems Company, Kennedy Space Center Division, later plans list Boeing (who purchased McDonnell Douglas in as the designer. A total of 112 plans detail . the structure of the canisters. These 112 plans are the only plans available for the canisters.

The plans date from January 17, and show the approximate current state of the canisters by including a number of modifications between and These modifications are noted on the title block for each plan. Some specify what change was made in the title block, while other minor changes are noted only by EO number. As part of this study, the canisters' lead structural engineer and the author selected ten of these engineering drawings for reproduction in this documentation. They show the important facets of the canister's plans, including elevations, floor plans, details, and sections. The remaining two plans reproduced in this documentation are of the transporter and were included to illustrate how the canister connects with its transporter. B.

Early Views and Historical Data KSC maintains a large and rich collection of historic photographs that show the canisters in use at various locations within Some of these views are included in the Appendix along with maps showing locations where the canisters are frequently used. All views are captioned and dated as available. The other historical data comes from a variety of sources cited in the Bibliography below. The historic photographs and most of the historical data used in this documentation came from sources within specifically the KSC Archivist, Elaine E. Liston, whose office and data files are in the main Headquarters Building.

Another source was the Photograph Archivist, Vera Van Hooser, of IMCS Photo and Media CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 28 Services, also located in the KSC Headquarters Building. Other more current imagery was obtained from the online KSC Media Archive. 73 C. Interviews: The following knowledgeable employees, working for NASA through the Boeing contract, were interviewed for this documentation. Each provided a significant amount of information about the design, operation, and history of the canisters. Most of the canister-specific information was obtained from a series of walking tours and personal interviews from the CRF Manager, Elizabeth Boyd, as well as other engineers, and technicians working in the 74 Dr.

Hui-Han (Hank) Liu, the Structural Engineer who designed the canisters, also provided much useful information and suggested which plans were the most important to illustrate the overall and unique features of the canisters. 75 D. References llBoeing Provides Expertise in Hubble Payload Integration, Processing," Boeing Backgrounder, January 11, pp. 4- 5. Accessed on October 1, at www.boeing.com/defense ... er.pdf. llBoeing's Role Processing NASA Payloads," Boeing Backgrounder, January pp. Accessed on August 29, at Deming, Joan, and Patricia Slovinac. February revised July NASA-Wide Survey and Evaluation of Historic Facilities in the Context of the u.S. Space Shuttle Program: Roll-Up Report. Archaeological Consultants, Inc.

Submitted to the National Aeronautics and Space Administration, Environmental Management Branch. 73 NASA, Kennedy Space Center Online Media Archive. Accessed September at 74 Boyd, Elizabeth, Canister Rotation Facility Manager. Personal Interviews, August 75 Liu, Hui-Han, Lead Engineer, Boeing, Personal Interview, August 10, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 29 Heumann, A. Comprehensive View of the Transporter. Unpublished Manuscript. August 15, pp. On file, Canister Rotation Facility. "Inside the Canister Rotation Facility," Spaceport News, January 11, pp. On file, Kennedy Space Center Archives. "NASA Will Attempt Salvage of Boosters," Spaceport News, Volume 21, Number 17, August 19, pp. 1.

On file, Kennedy Space Center Archives. NASA Facts: Solid Rocket Boosters and Post-Launch Processing. National Aeronautics and Space Administration, Kennedy Space Center, Florida. (Rev. NASA Facts: Canister Rotation Facility. National Aeronautics and Space Administration, John F. Kennedy Space Center, Kennedy Space Center, Florida IS-2004-07-014-KSC (Rev. Accessed on October 1, at "Orbiter Payload Canister." Notebook of Engineering Drawings and Plans. Drawing: 65 sheets, dated February 13, On file, Canister Rotation Facility. Presidential Commission. Report of the Presidential Commission on the Space Shuttle Challenger Accident, June 6, Washington, Steven J. Dick, NASA Chief Historian, Steve Garber, NASA History Web Curator.

National Aeronautics and Space Administration, NASA History Office. Accessed on August 1, at Ragusa, James M. Payload/Cargo Processing at the Launch Site. Document On file, Kennedy Space Center Archives. Report to the President: Actions to Implement the Recommendations of the Presidential Commission on the Space Shuttle Challenger Accident, July 14, Steven J. Dick, NASA Chief Historian, Steve Garber, NASA History Web Curator. National Aeronautics and Space Administration, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 30 NASA History Office. Accessed on August 1, at Report to the President, Implementation of the Recommendations of the Presidential Commission on the Space Shuttle Challenger Accident, June Steven J.

Dick, NASA Chief Historian, Steve Garber, NASA History Web Curator. National Aeronautics and Space Administration, NASA History Office. Accessed on August 1, at Space Transportation System: Facilities and Operations, Kennedy Space Center, Florida. National Aeronautics and Space Administration, John F. Kennedy Space Center. K-STSM-Ol, Appendix A, April Revision A. On file, Kennedy Space Center Archives. E. Likely Sources Not Yet Investigated Research was conducted at KSC using primary and secondary sources. Sources that were not investigated that may contain secondary information include NASA Headquarters and the offices of Belko Steel of Orlando, Florida, and Specialty Maintenance and Construction, Inc. of Lakeland, Florida.

Additional oral history interviews with other engineers and technicians could also prove useful. Part IV. PROJECT INFORMATION NASA determined that the canisters were eligible to the National Register of Historic Places under Criteria A and C in the areas of Space Exploration and Transportation, and Engineering. This determination was made by NASA's "Shuttle Transition Historic Preservation Working Group" or which looked at 335 facilities at thirteen NASA Centers. 76 As a result of this work, seventy properties were identified as either listed, determined eligible, or were potentially eligible to the National Register.

Out of twelve property types identified for NASA's the 76Deming and Slovinac, Evaluation of Historic Facilities, Space Shuttle Program, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 31 canisters were identified as falling within Types 1 and 12, which are Resources Associated with Transportation and Resources Associated with processing Payloads, respectively.77 NASA completed this evaluation as the SSP is scheduled for termination in A Programmatic Agreement (PA) was developed to document the identified eligible resources and streamline the Section 106 consultation process.

Per Section V.A of the PA between NASA, the Advisory Council on Historic Preservation, and the Florida State Historic Preservation Officer, dated May and the Statement of Work provided to New south Associates by KSC/Innovative Health Applications (IHA) as part of the Task Order Contract dated February the documentation package for the Orbiter Payload Canisters includes the following items: a written narrative; a series of photographs showing both exterior and interior views using large format negatives; and a selection of existing drawings, which were photographed with large format negatives. This HAER documentation fulfills the recordation requirements of the PA for the canisters.

New South Associates, under contract with IHA, a subcontractor to NASA, conducted the HAER documentation and historic research for this project in August With the end of the the canisters or payload canister transporters may be adapted and modified for future space missions. Therefore, NASA is completing HAER documentation of the canisters and other KSC properties to record these as they appear and as they existed during the David Diener served as the project photographer. J. W. Joseph served as principal Investigator, while Julie Coco served as project Historian. Historian Mark Swanson authored portions of the historic context.

In order to complete the project, New South Associates personnel were allowed full access to the facility, under the supervision of Mark Mercandante, an Environmental Engineer with IHA, and Liz Boyd and Steve Kelly of the Canister Rotation Facility staff of Photographs were taken of the canisters outside the as well as, in the CRF and in the Maintenance high and low bays. 77Deming and Slovinac, Evaluation of Historic Facilities, Space Shuttle Program, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 32 Shannah Trout, also of IHA, assisted with early coordination efforts and editing. Julie Coco conducted a limited number of oral interviews and otherwise compiled the historic documentation required for the project.

Among the people interviewed for this project were: Liz Boyd, Canister Rotation Facility Manager and Systems Engineer, and Dr. Hui-Han (Hank) Liu, lead engineer with Boeing, at the Kennedy Space Center. These individuals provided much of the historical information used in this project. Elaine Liston and Vera Van Hooser also provided much information through their offices in the KSC Headquarters Building. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 33 Appendix- Location Map and Historical Views CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO.

FL - 8- 11 - I PAGE 34 LAUNCH COMPLEX 3g, PAl ACTIVE, NASA, SPACE SHI (SATURN V/APOLlO) LAUNCH COMPLEX 3 COMPI USAFII (TITAN FALSE INEDY R,NASA 'tOBERTS RD ') I JEROME AD I I / CENTRAL INDUSTRY ASSISTANCE OFFICE ~ ~; ~Z Figure 1. Map of Kennedy Space Center showing use locations for the orbiter payload canisters . (Courtesy of Kennedy Space Center) CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 35 Figure 2. Map of Kennedy Space Center Industrial Area showing locations for the Canister Rotation Facility and the Space Station Processing Facility . (Courtesy of Kennedy Space Center) . CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 36 Figure 3.

Original appearance of the orbiter payload canister before painting, view to north, August 13, (Courtesy of Kennedy Space Center, Image CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL- 8- 11 - I PAGE 37 Figure 4 . Payload canister exiting the Vehicle Assembly Building (VAB), undated . (Courtesy of Kennedy Space Center, Image l08 - KSC - 80P - 367 . . CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 38 Figure SA. Canister 1 and canister 2 inside the VAB, undated. (Courtesy of Kennedy Space Center, Print OOl.jpg). Figure SB. Manual manipulation of the cables during canister rotation in the VAB, undated. (Courtesy of Kennedy Space Center, Image Print .

CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 39 Figure 6. Canister rotation in the VAB, undated. (Courtesy of Kennedy Space Center, Print CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 40 Figure 7. Canister in the March 30, (Courtesy of Kennedy Space Center, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 41 Figure 8. Canister inside clean room of VPF with doors partially open and payload visible, undated. (Courtesy of Kennedy Space Center, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 42 Figure 9.

Canister open in Payload for STS - 5, and Anik being loaded into canister, undated. (Courtesy of Kennedy Space Center, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 43 Figure 10. Payload canister with the original rain cover en route from the Operations and Checkout Building (O&C) to the VAB. November 11, (Courtesy of Kennedy Space Center, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 44 Figure 11 . Horizontal loading and unloading of orbiter payload canister with test weights in the O&C Building High Bay. November 12, (Courtesy of Kennedy Space Center, 108 - KSC - - CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO.

FL-8-11-I PAGE 45 Figure 12 . Removal of payload from the canister to the work stand in the O&C Building high bay. November 18, (Courtesy of Kennedy Space Center, 108 - CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 46 Figure 13. Loading payload trunnion into the payload canister fitting in O&C high bay. March 6, (Courtesy of Kennedy Space Center, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 47 Figure 14. Transferring the Long Duration Exposure Facility (LDEF) into Canister 1 for the Mission. O&C Building high bay. March 6, (Courtesy of Kennedy Space Center,108-KSC-384C-941 CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO.

FL-8-11-I PAGE 48 Figure 15. Installing the Long Duration Exposure Facility (LDEF), using the payload strongback, into Canister Building high bay. March 6, (Courtesy of Kennedy Space Center, 108 - KSC - - 941 FROl . CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 49 Figure 16. Orbiter payload canister being raised into the Payload Changeout Room at Launch Pad 39A. (Courtesy of Kennedy Space Center, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. - I PAGE 50 Figure 17. Orbiter payload canister being raised into the PCR at Launch Pad 39A. Note continued connection of ECS and I&CS to the Transporter.

(Courtesy of Kennedy Space Center, - CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. - 11-I PAGE 51 Figure 18. Orbiter payload canister being raised into the PCR at Launch Pad 39A. Note the outrigger guiding the canister as it is raised. December 9, (Courtesy of Kennedy Space Center, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. - 11 - I PAGE 52 Figure 19. Attaching cables to the canister for rotation in the March 11, . (Courtesy of Kennedy Space Center, KSC - - - 11 - CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL-8-11-I PAGE 53 \ \ \ , I<";{:- ,Jt "H: - , I Figure 20.

Rotation in progress at the April 13, (Courtesy of Kennedy Space Center, 13 CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. - 11 - I PAGE 54 Figure 21 . Lowering canister to the transporter bed in the vertical position at the April 13, (Courtesy of Kennedy Space Center, KSC - - 4_ . CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO . FL- 8- 11 - I PAGE 55 .. .. '. Figure 22A . Canister in the October 21, (Courtesy of Kennedy Space Center, - 10_ 21_ . Figure Canister's doors open in the . October 21, (Courtesy of Kennedy Space Center,KSC - 10_ 21_ 08 . . CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, ORBITER PAYLOAD CANISTERS HAER NO. FL- 8- 11 - I PAGE 56 Figure 23.

vertical cleaning of the canister prior to payload processing, undated. (Courtesy of Kennedy Space Center, 108 - KSC - -

In context

Cape Canaveral, Florida The place record: every map, photograph and survey of this town.
Brevard County, Florida 134 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Cape Canaveral

24 of 118 records shown

The federal surveyors worked through Cape Canaveral building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Cape Canaveral Air StationHAER FLA,5-CACAN,1-32,823 words
Cape Canaveral Air Force StationHAER FL-8-1232,234 words
Cape Canaveral Air Force StationHAER FL-8-AO27,461 words
Cape Canaveral Air Force StationHAER FL-8-11-B25,294 words
Cape Canaveral Air Force StationHAER FL-8-11-F22,264 words
Cape Canaveral Air Force StationHAER FL-8-11-O19,777 words
Cape Canaveral Air Force StationHAER FL-8-AV18,663 words
Cape Canaveral Air Force StationHAER FL-8-618,475 words
Cape Canaveral Air Force StationHAER FL-8-11-M17,593 words
Cape Canaveral Air Force StationHABS FL-581-A17,410 words
Cape Canaveral Air Force StationHAER FL-8-11-G17,133 words
Cape Canaveral Air Force StationHAER FL-8-11-J16,548 words
Cape Canaveral Air Force StationHABS FL-581-B14,684 words
Cape Canaveral Air Force StationHAER FL-8-11-L13,962 words
Cape Canaveral Air Force StationHABS FL-583-A13,824 words
Cape Canaveral Air Force StationHAER FL-8-11-R13,738 words
Cape Canaveral Air Force StationHABS FL-581-C13,646 words
Cape Canaveral Air Force StationHAER FL-8-713,389 words
Cape Canaveral Air Force StationHAER FL-8-A12,671 words
Cape Canaveral Air Force StationHAER FL-8-11-D12,041 words
Cape Canaveral Air Force StationHAER FL-8-11-K12,011 words
Cape Canaveral Air Force StationHAER FL-8-11-A11,934 words
Cape Canaveral Air Force StationHAER FL-8-11-P11,823 words
Cape Canaveral Air Force StationHAER FL-8-11-S11,622 words

Provenance

  • Written history. Quoted verbatim from HAER FL-8-11-I. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.