BlockBefore

Cape Canaveral Air Force Station, Missile Assembly Building AE, Cape Canaveral

Cape Canaveral Air Force Station, Missile Assembly Building AE, Cape Canaveral, Brevard County, FL. Surveyed as HAER FL-8-B, with a 10,504-word written history.

From the record

“Missile Assembly Building AE, commonly called Hangar AE, is nationally significant as the telemetry station for NASA KSC s unmanned Expendable Launch Vehicle (ELV) program.”

Written record, HAER FL-8-B survey. Machine-read text.

Surveyed by the federal HAER program as HAER FL-8-B · the record runs 10504 words · one of 123 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

10371 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HAER FL-8-B. Not written, edited or summarised by this site.

Missile Assembly Building AE, commonly called Hangar AE, is nationally significant as the telemetry station for NASA KSC s unmanned Expendable Launch Vehicle (ELV) program. Since the building has been the principal facility for monitoring telemetry communications data during ELV launches and until it processed scientifically significant ELV satellite payloads.

Still in operation, Hangar AE is essential to the continuing mission and success of NASA s unmanned rocket launch program at It is eligible for listing on the National Register of Historic Places under Criterion A in the area of Space Exploration as Kennedy Space Center s original Mission Control Center for its program of unmanned launch missions and under Criterion C as a contributing resource in the CCAFS Industrial Area Historic District. Report Prepared by: New South Associates, Stone Mountain, Georgia Date: November 13, CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO. Page 2 PART

Historical Information

List of Acronyms CCAFS Cape Canaveral Air Force Station CIF Central Instrumentation Facility ELV Expendable Launch Vehicle Program GN2 Gaseous Nitrogen GOES-6 Geostationary Operational Environmental Satellite 6 GSE Ground Servicing Equipment JPL Jet Propulsion Laboratory KSC John F. Kennedy Space Center LSP Launch Services Program Launch Vehicle Data Center MCC Mission Control Center MDC Mission Director s Center NASA National Aeronautics and Space Administration National Register of Historic Places OGO Orbiting Geophysical Observatory PPF Payload Processing Facility SSP Space Shuttle Program A. Physical History 1. Date(s) of Construction: with significant modifications and additions from 2. Architects/Engineers: Original Building Hardwick & Lee, Architects High Bay Test Area Addition J.E.

Greiner Company Renovation AJT & Associates MDC Renovation Space Gateway Support Lobby Renovation Jones Edmunds 1 NASA, Real Property Record Missile Assembly Building AE, on file at the NASA KSC Real Property Office. CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO. Page 3 3. Builder/Contractor/Supplier: Not known 4. Original Plans and Construction: Hangar AE originally featured a standardized metal warehouse design with a gable roof, corrugated metal exterior, hangar bay doors, and a rectangular plan. The original hangar building now forms the central portion of the building between the entrance lobby and the rear high bay test area. 5.

Alterations and Additions: Hangar AE has undergone several alterations and additions over the years to keep pace with the evolution of launch vehicle telemetry technology. The hangar s original sliding doors on the east elevation were replaced with a one-story gable-roof addition in The original building was expanded in with construction of the high bay test area on its west end. By the original hangar was largely transformed into its current appearance. It also had two timber antenna towers that are no longer standing. In NASA improved the high bay test area to meet Class cleanliness standards.

This included constructing new interior walls to modify laboratory and office space, adding recessed lighting fixtures, new photography lighting, and completely renovating the existing air conditioning and ventilation system. The Agency also constructed a new air lock enclosure on the CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO. Page 4 west end of the building s high bay to minimize contamination from the outside.2 Since the mid-1960s, several interior areas of Hangar AE were modified to keep pace with the evolving telemetry and computer technology of modern rocket programs.

The early one-room, 950-square foot added in the mid-1970s was replaced in with a new three-room, 2,511-square foot The new could support telemetry data processing for multiple test operations running at the same time or a single large launch operation.3 In NASA built a new Mission Director s Center which worked in tandem with the adjacent Finally, in the front lobby of the building was renovated and the second floor contractor work area was remodeled.4 B. Historical Context Historic resources associated with NASA s manned spaceflight programs like Apollo and the Space Shuttle are well documented at KSC and CCAFS.

Less well-represented and equally significant are facilities associated with the ELV launch programs, referred to in one NASA publication as the backbone of the space program in Florida. 5 Today, these programs are managed under NASA s LSP that operates Hangar AE. 2 NASA, Construction of Facilities Fiscal Year Modification to Building AE , memorandum ARCH00012173 on file at KSC Archives. 3 NASA, NASA Facts: Launch Vehicle Data Center Kennedy Space Center, 4 Jones Edmunds, Hangar AE Lobby Renovation, construction drawings, February 15, 5 Linda Herridge, ELV Launches Remain Kennedy s Backbone, NASA Kennedy Space Center, available from accessed May 9, CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO.

Page 5 From to the present, NASA has launched hundreds of scientific, Earth-observing, and interplanetary mission 6 satellites into orbit from launch pads at CCAFS. The various spacecraft launched on these missions helped revolutionize scientists understanding of space, Earth, and the universe. Since Hangar AE has been essential to the ELV program as KSC s principal telemetry data processing facility and until was a satellite payload checkout facility. The building continues to house NASA s modern for telemetry communications during unmanned launches. The CCAFS Industrial Area and Hangar AE Hangar AE is one of several NASA buildings located at CCAFS, just east of the Agency s KSC facilities on Merritt Island (Figures 1 and 2).

CCAFS was established in as the Air Force Missile Test Range, later renamed the Eastern Test Range, the nation s first long-range military missile proving ground. The range s Cape Canaveral location had all the characteristics required for missile testing. It was isolated, sparsely populated, and offered an over-water flight range that was relatively free from shipping lanes and inhabited land masses. Also, the islands of the Caribbean and South Atlantic were ideal locations for missile tracking stations. The first launch pads and support facilities were built at CCAFS in and the Banana River Naval Station (later called Patrick Air Force Base) located 16 miles to the south was designated as the range headquarters and support base.

The official name of the missile range was changed several times over the next few decades and gained the nickname 6 National Park Service, History Division, Cape Canaveral Air Force Station, National Historic Landmark Nomination Form, CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO. Page 6 Missile Row after its chain of beach side launch pads, each of which was associated with a specific missile.7 To support the launch facilities, the Air Force built an Industrial Area next to the Banana River, a safe distance to the west of the launch pads. The early CCAFS Industrial Area facilities were austere and largely followed standardized military designs.

This was especially true for the large missile assembly hangars, which shared similar designs that were modified depending on the needs of the individual missile program housed there. Eventually there were 21 missile assembly buildings completed in the CCAFS Industrial Area, each composed of a central high bay flanked by two-story, concrete block wings on either side. Large sliding doors on either end of the high bay provided access for missile components and completed missiles with full-length bridge cranes to move components back and forth in the buildings. Over the years, the standardized forms of the assembly buildings were adapted to meet the needs of increasingly sophisticated missile families.

Missile stages were assembled in the hangars, transported to their associated launch complexes by truck or rail, and then carted up an approach ramp. The final assembly and checkout of the missile was accomplished via a mobile service structure or tower. The single-story, warehouse design of Hangar AE differed somewhat from the other missile assembly buildings in the area. The original gable-roofed central section of Hangar AE was built in by the Air Force to house components of the Mace missile system, which by that time had reached the end of its research and development phase (Figure 3). Historic photographs in the KSC Archives show that the letters AE 7 National Park Service, CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO.

Page 7 stood for Auxiliary Equipment, indicating that the hangar was primarily a storage and support building. The hangar originally had a full-length open bay work area with a two- ton capacity bridge crane as shown in Figure 4. On either side of the high bay were concrete block partition walls that divided the high bay from offices and other support areas on the north and south sides of the building. NASA and Hangar AE The Air Force granted NASA the use of Hangar AE in to use as a new telemetry station for the Agency s emerging unmanned rocket program. The purpose of telemetry is to relay information to engineers about rocket systems that function properly during a launch and those that do not.

Telemetry data are critical to the launch of rockets that cost millions of dollars to manufacture and that reach distances thousands of miles away from the launch site. Data on errant flight events enable engineers to repair problems for the next flight. As one former Hangar AE engineer stated, Project managers who decided to save money by cutting back on telemetry coverage have often regretted it. 8 NASA s goal was to have complete radio reception during all critical events of a rocket flight, including the powered flight phases, stage separations, and reorientations.

At the beginning of the ELV program, NASA and the Air Force maintained a string of telemetry stations along the islands to the southeast of Cape Canaveral, with additional telemetry-equipped ships and airplanes to fill in any gaps in the data.9 8 Hal Greenlee, Ground Control, AMIGA Computing Magazine, August 49. 8 Ibid. 9 Ibid. CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO. Page 8 The birth of what was later called the ELV program occurred in with the launch of the nation s first spacecraft, the Explorer 1 satellite. Launched in response to the Soviet Union s launch of Sputnik 1 on October 4, Explorer 1 lifted off from CCAFS under direction of the U.S.

Army Ballistic Missile Agency on January 31, Launched on a Jupiter-C rocket developed under the direction of Wernher von Braun, the satellite carried a cosmic ray detector designed to measure the radiation environment in Earth orbit. Four more Explorer missions launched in primarily on Delta rockets from Launch Complexes 17 and 26 at CCAFS.10 Central to the Agency s evolving rocket program were the Delta rockets that carried the first Explorer missions. A telemetry station for the early Delta program was first housed in the adjacent Hangar S, which was also served as the CCAFS center of activity for Project Mercury.

The Delta branch operated a small telemetry station built on the ground floor of the Hangar S high bay.11 Built by Douglas Aircraft and managed by NASA s Goddard Space Flight Center, Delta vehicles have carried over 200 of NASA s scientific and communications payloads into orbit and beyond to other planets. Their reliable track record and frequent launch missions gave Delta rockets a reputation as the workhorses of NASA s expendable launch vehicle family. 12 NASA s move into Hangar AE offered more room for a larger telemetry station and office space for project managers and engineers in the adjacent E&O Building.

With its ample space, the Goddard team at Hangar AE installed early computer systems to process the huge volume of 10 Erik Conway, Explorer 1 - History, NASA Jet Propulsion Laboratory, available from accessed May 9, 11 Greenlee, 49. 12 Herridge, CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO. Page 9 telemetry data received via the hangar s two antenna towers on the north and south sides of the building.13 The towers were removed after the construction of the Central Instrumentation Facility (CIF) in the KSC Industrial Area. The CIF became KSC s central telemetry data reception hub for all manned and unmanned launch programs. The data were relayed from the CIF to Hangar AE and then processed in the telemetry computer laboratory shown in Figure 5.

In NASA also moved the management of its new Atlas- Centaur rocket from Marshall Space Flight Center in 14 Huntsville, Alabama, to Hangar AE. The powerful Atlas- Centaur rocket was the launch vehicle for Surveyor 1 in the first U.S. spacecraft to make a soft landing on the Moon.15 The same year it moved the Atlas-Centaur team to Hangar AE, NASA built a 3,600-square foot high-bay spacecraft test area on the west end of the hangar, as shown in historic photographs, Figures The high bay and adjacent support areas were designed to assemble and checkout satellite payloads before launch.

In the high bay test area was upgraded to provide Class cleanliness standards for spacecraft checkout.16 One of the earliest payloads processed in the new high bay was Goddard Space Flight Center s Ranger spacecraft.17 A significant early ELV program, Ranger was 13 Greenlee, 49. 14 Ibid. 15 NASA, Surveyor 1, accessed October 24, 16 Cleanrooms are classified according to the number and size of particles permitted per volume of air, so a Class clean room allows particles per cubic meter. 17 NASA, Master Development Plan for NASA Technical Facilities at AMR [Atlantic Missile Range], Revision II, Launch Facilities Design Group, January 4, on file at KSC Archives. CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO.

Page 10 launched on a Delta vehicle as the first U.S. attempt to get close-up images of the Moon s surface in preparation for the Apollo program. We want to know something about the character of the surface on which the landing is to be made, explained NASA Deputy Administrator Hugh L. Dryden, and obtain just as much information as we can before man actually gets there. 18 The final preparations for Ranger launches, including disassembly, inspection, integrated equipment tests, and flight readiness checks, occurred in the Hangar AE high bay. A photo of the spacecraft in Hangar AE is shown in Figure Equipped with six cameras, the Ranger spacecraft was designed to descend straight down to the Moon s surface and relay images of its surface back to Earth until the moment of impact.

The first six Ranger flights ended in failure, but the seventh was a success.20 NASA continued to modify and expand Hangar AE between and when ownership was officially transferred from the Air Force to NASA.21 In the south wing of Hangar AE was modified with a new Mission Control Center now called the Mission Director s Center or that NASA said was developed for the placement of the Mission Director in a suitable location to conduct complete mission operations. 22 It was here that management personnel communicated with the launch pad and every worldwide site involved in the launch.

As shown in the historic photograph in Figure 10, the front 18 NASA, Lunar Impact: A History of Project Ranger, NASA History Division, last updated available from http://history.nasa.gov/SP- 4210/pages/Ch_7.htm#Ch7_Top, accessed May 9, 19 Ibid., accessed May 9, 20 NASA, Ranger Goddard Space Flight Center, available at accessed May 8, 21 Cape Canaveral Air Force Station (CCAFS), Transfer and Acceptance of Military Real Property Assembly Test Building A-E , Facility No. on file at KSC Real Property Office. 22 NASA, Mission Control Center AE, Goddard Space Flight Center Launch Operations, April 17, memorandum on file at KSC Archives. CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO.

Page 11 of the MCC contained large illuminated displays for viewing plotting boards and closed-circuit televisions, which showed the real-time flight vehicle telemetry information that follows. vehicle flight progress Doppler plot (vehicle velocity) present position or impact prediction tracking station readiness range readiness guidance readiness range count time left to end of window Eastern Standard Time Greenwich Mean Time According to an early facility manual, the status of the entire operation may be interpreted from these displays.

23 The MCC was originally located in what is now Room a communications equipment room, and was nearly identical in function to the current Mission Director s Center in Room By the mid-1960s, Hangar AE was fully equipped to process satellite payloads and process telemetry data for scores of ELV launches through the rest of the decade and beyond. Photograph archives at KSC include several images of Hughes Aircraft Company engineers checking out the Syncom 1 satellite in Hangar AE during January of Launched on a Delta vehicle from Launch Complex 17 in February of that year, Syncom was the first geosynchronous communications satellite, which meant that to an observer on Earth the 23 Ibid. CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO.

Page 12 satellite appeared to stay in the same position in the sky (Figures 11 and Programs launched from CCAFS and associated with Hangar AE from this era included the astronomy, lunar, and planetary missions of the Mariner Pioneer Surveyor and Lunar Orbiter missions.24 Later programs included the Viking missions to Mars and the Voyager missions to the outer planets of the solar system, which launched on Titan III-Centaur launch vehicles. A series of Orbiting Geophysical Observatories (OGOs) were launched from CCAFS in the and on Atlas-Agena and Thor-Agena vehicles.

The Titan-Centaur vehicle was NASA s most powerful unmanned rocket in the chosen to launch missions to study Mars, Jupiter, Saturn, and the Sun.25 Figure 13 shows the Geostationary Operational Environmental Satellite 6 (GOES-6) undergoing checkout in the Hangar AE high bay in The GOES-6 satellite provided meteorological data from a fixed position above Earth.26 Occasionally, Space Shuttle payloads were also processed in the Hangar AE high bay test area.27 Today, Hangar AE continues to house telemetry operations for what NASA now calls its Since the NASA has made it policy to purchase ELV launch services from commercial providers like United Launch Alliance and Lockheed Martin. In this relationship, the commercial providers furnish and 24 NASA, Major NASA Launches, John F.

Kennedy Space Center, June 1, available from accessed May 8, 25 Ibid. 26 NASA, GOES-6 , available from accessed November 4, 27 NASA, Facilities Handbook for Building AE, LSP-UG-411.01, January 5. CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO. Page 13 operate the payload and launch vehicle while NASA provides the launch pad and telemetry facilities. The LSP was established to better manage these relationships and provide the necessary expertise to ensure mission success.28 Conclusion The facilities provided by Hangar AE since enabled the development of NASA s robust and ever-evolving unmanned launch program.

From the first success of Explorer 1 in to the latest scientific missions to Mars, Hangar AE has played a central role in hundreds of ELV launches at CCAFS that revolutionized scientific understanding of Earth, space, and the solar system. By necessity, the building has been continually modified and updated to keep pace with the evolution of rocket technology and telemetry data processing. Nonetheless, it possesses a continuity of mission and function that underscores its historic significance as the home of NASA s Cape Canaveral ELV program. PART II. STRUCTURAL/DESIGN INFORMATION A. General Statement 1. Character: Hangar AE is located on Hangar Road approximately 1 mile south of CCAFS Industry Road (NASA Causeway East).

It is centrally located about 3 miles from several launch pads, including Titan Pad 40, Atlas Complex 36, and Delta Complex 17. The building was first completed as a metal warehouse type building in and acquired by NASA from 28 NASA, NASA Facts: NASA s Launch Services Program, accessed October 24, CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO. Page 14 the Air Force through a NASA/Department of Defense agreement in After NASA acquired it, Hangar AE underwent numerous modifications to expand its payload checkout and test capabilities, including a high bay clean room complex. The original corrugated metal gable-roof portion of the building is still evident, with various later additions on each of its elevations.

The hangar s design contributes to the larger military industrial character of the surrounding CCAFS Industrial Area. In addition to its high bay clean room complex, the building contains a telemetry ground station; an extensive communications center for data, voice, and video; three Launch Vehicle Data Centers the Mission Director s Center and offices for payload and contractor personnel. The building s extensive cabling systems and electronic equipment have been constantly upgraded and improved. The clean room was regularly used until for prelaunch preparations and checkout of payloads launching on ELVs or, occasionally, on the Space Shuttle. The last spacecraft to be processed in the clean room was Swift in 2.

Condition of Fabric: Hangar AE continues to function as NASA s primary ELV telemetry laboratory at CCAFS. It is regularly maintained and in good condition. B. Description Hangar AE is a one-story building with rigid steel frame, a corrugated aluminum gable roof, corrugated aluminum exterior walls, and a concrete foundation. The building has a rectangular footprint that measures 320 -0 x 120 -0 and it CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO. Page 15 has a high bay clean room on the west end. There are projecting concrete block and corrugated aluminum additions that contain entrances and utilities on the north and south elevations. There is a square gable-roof addition next to the entrance on the southeast (front) elevation.

The building is functionally divided into five major areas: the south wing Area), the central bay Area), the north wing Area), the high bay clean room complex Area), and the second floor Area). The main entrance leads into a newly renovated lobby on the east end of the building. Two main corridors run along the north and south sides of the building providing access to the five functional areas. The South Wing The south wing of the building contains the Mission Director s Center (Room the MDC observation area (Room a communications facility for audio, video, and data routing (Room a network interface area (Room the telemetry ground station with display devices (Room and the data processing equipment area (Room The south wing contains no spacecraft customer workspace.

The entire area was designed to provide Mission Directors and their project staff with a central facility from which tests, mission simulations, and launch operations could be conducted. The ground station receives, monitors, and records telemetry data signals from pre-launch checkout through ascent phase and into spacecraft separation and orbital insertion. Video and audio data are transmitted for coordination and visual display. During the pre-launch phase, these data are evaluated to determine the flight CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO. Page 16 readiness of the launch vehicle.

In the post-launch phase, the data are evaluated for a detailed performance review.29 The Central Bay The central bay is primarily a data display area assigned to the three in Rooms and There is also a spacecraft ground servicing equipment (GSE) staging area (Room Each is approximately 780 square-feet in area and has carpeted raised floors, drywall partitions, and acoustical ceiling tiles with drop fluorescent lighting. They have theatrical-style seating with high ceilings and dimmable indirect lighting. Each room has seating for 24 personnel at self-sufficient computer consoles.

Each room has six display screens, including two seven-foot projectors and four plasma screens.30 The North Wing The north wing of the building primarily contains NASA personnel office space, contractor space, and a conference room in Room This area is permanently assigned to NASA and launch operations support contractor personnel. The wing features standard construction with tile covered concrete floors, drywall partition walls, and acoustical tile ceilings with drop fluorescent lighting.31 The High Bay Clean Room Complex The high bay clean room complex on the west end of the building provides Class cleanliness standards and 29 NASA, Facilities Handbook for Building AE, LSP-UG-411.01, January 11. 30 Ibid. 31 Ibid., 7.

CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO. Page 17 supporting anterooms. All rooms comply with clean room standards. The high bay test area has a laminar-flow ventilation system that moves air from east to west. The entire east wall is composed of an air filter grid from floor to ceiling. The west wall, except for the entry door, is a similar air filter grid used for return air. The test area has a concrete floor painted with epoxy and concrete block walls on the north and south sides. The room is well-lit with fluorescent fixtures and is equipped with two wall-mounted cameras viewed on an internal building video system.

There are two overhead cranes in the room, including one 5-ton bridge crane with a 34 hook height and a 2-ton monorail crane with a 39 hook height. Other services in the room include standard wall power, compressed air, and a gaseous nitrogen purge panel.32 There is an airlock on the west end of the high bay used to transfer payloads and service equipment into the clean room. Closed with pneumatically sealed hangar doors, the area had a laminar flow ventilation system that was used to eliminate as much contamination as possible during the transfer process. There are several supporting anterooms to the high bay.

Room is the precision cleaning area where small parts were cleaned and then taken into the test area via an air shower through doors 1420A and Room is a test and storage area open to the high bay test area. It was used for storage and staging of larger parts such as solar panels that could be passed into the main room when needed. Another test and storage area is in Room which was normally locked and not open to the high bay test area. It was used for battery storage and charging or miscellaneous equipment. There is a high bay observation room in a very popular place for management and guests when a payload was present. 32 Ibid., CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO.

Page 18 It was used to observe and control payload testing and is not subject to contamination control.33 The Second Floor The second floor contains another observation area for the below and additional spacecraft customer office cubicles. It is accessed via a set of stairs near the east entry door and there are additional stairs at the west end of the north corridor. C. Operation Hangar AE was mostly considered a customer-operated facility in terms of satellite payload processing in the high bay test area. That is, the commercial customer of NASA s Hangar AE facilities was responsible for its own day-to-day operations in regard to spacecraft arrival, set-up, inspection, and checkout.

The exception to this policy is the overhead crane operations and high bay door opening and closing, which were handled by launch operations support contractor personnel.34 The typical processing flow for spacecraft checkout in the high bay test area began when the payload s associated GSE arrived at Hangar AE. The GSE was moved into the building, set-up, and readied for operations before the spacecraft arrived. After spacecraft arrival and inspection, it was prepared to move into the high bay, also known as the Payload Processing Facility The move was usually made through the airlock into the high bay test area where the payload was configured for launch with the installation of solar panels, antennas, or other items.

Hangar AE was not equipped to perform hazardous fueling operations involving cryogenic or 33 Ibid., 18. 34 Ibid., 3. CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO. Page 19 hypergolic fuels, although it could accommodate initial pressure system checks, propellant system leak tests, and payload functional testing with ground checkout equipment. Following the completion of all required tasks, the payload was readied for the move to the launch pad and mated to the launch vehicle. Normally the exit process was the reverse of the entry procedure.35 D. Site Information Hangar AE is located on Hangar Road between Hangar S and Hangar AM. The building is surrounded on all four sides by paved parking areas and grassy berms that separate it from adjacent buildings.

The surrounding landscape of the CCAFS Industrial Area contains a concentration of missile assembly buildings (hangars), administrative buildings, warehouse/ storage buildings, and other facilities that support NASA and Air Force missions at CCAFS. These facilities were grouped together away from the seaside launch complexes for safety reasons. The area is arranged in a grid shape with most of the hangars arrayed along the east and west sides of Hangar Road and Phillips Parkway. PART III. SOURCES OF INFORMATION A. Primary Sources 1. Architectural Drawings Hardwick & Lee Architects. Missile Assembly Building A- E. Jacksonville, Florida. Construction drawings, 35 Ibid., 2. CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO.

Page 20 National Aeronautics and Space Administration. Assembly Building AE. John F. Kennedy Space Center. Construction drawings, J.E Greiner Company, Consulting Engineers. Alterations to Existing Spacecraft Facilities, Building AE. U.S. Army Engineer District, Canaveral. Construction drawings, AJT & Associates. Modernize Launch Vehicle Data Center, CCAS Hangar AE. Construction drawings, Space Gateway Support. Mission Directors Center Remodel. Construction drawings, Jones Edmunds. Hangar AE Lobby Renovations Phase I. Construction drawings, 2. Historic Views Kennedy Space Center. Aerial View of Hangar AE, Photograph image LOD- Kennedy Space Center Archives. Interior View of Hangar AE, Photograph image LOD-61-7260. Kennedy Space Center Archives.

The Hangar AE Telemetry Laboratory, Photograph image Kennedy Space Center Archives. View of Hangar AE High Bay Under Construction, Photograph image LOD-61-2146. Kennedy Space Center Archives. CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO. Page 21 Hangar AE with High Bay Under Construction, Photograph image LOD-61-2974. Kennedy Space Center Archives. Hangar AE High Bay Under Construction, Photograph image LOD-61-4343. Kennedy Space Center Archives. View of Telemetry Displays and Work Stations in the Hangar AE Mission Control Center circa Photograph image Kennedy Space Center Archives. National Aeronautics and Space Administration. Technicians Make Final Adjustments to the Ranger 3 Spacecraft at Hangar AE.

Source: Lunar Impact: A History of Project Ranger. NASA History Division. B. Secondary Sources Conway, Erik. Explorer 1 History. NASA Jet Propulsion Laboratory. Available from accessed May 9, Greenlee, Hal. Ground Control. AMIGA Computing. August, Herridge, Linda. ELV Launches Remain Kennedy s Backbone. John F. Kennedy Space Center. Available from elvs.html accessed May 9, National Park Service. Cape Canaveral Air Force Station. National Historic Landmark Nomination form. CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO. Page 22 National Aeronautics and Space Administration Master Development Plan for NASA Technical Facilities at AMR [Atlantic Missile Range], Revision II. Launch Facilities Design Group. January On file at the Kennedy Space Center Archives.

Transfer and Acceptance of Military Real Property Assembly Test Building A-E , Facility No. Real Property Record on file at Kennedy Space Center Real Property Office. Real Property Record Missile Assembly Building AE. On file at the Kennedy Space Center Real Property Office. Mission Control Center AE. Goddard Space Flight Center Launch Operations. April 17, Memorandum on file at the Kennedy Space Center Archives. Construction of Facilities Fiscal Year Modification to Building AE . Memorandum ARCH00012173 On file at the Kennedy Space Center Archives. The GOES Program: Geostationary Operational Environmental Satellite (GOES-6) . Available from , accessed November 4, NASA Facts: Launch Vehicle Data Center Kennedy Space Center. Facilities Handbook for Building AE. LSP-UG-411.01.

January Major NASA Launches. Available from orlaunch.pdf, accessed May 8, CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO. Page 23 Ranger Goddard Space Flight Center. Available from accessed May 8, Lunar Impact: A History of Project Ranger. NASA History Division. Last updated Available from accessed May 9, Surveyor 1. Available from =1966-045A, accessed October 24, NASA Facts: NASA s Launch Services Program. Available from sheet_Nov2011.pdf, accessed October 24, C. Likely Sources Not Yet Investigated Research was conducted at KSC and CCAFS using primary and secondary sources.

Sources that were not investigated that may contain secondary information include NASA Headquarters and at the offices of the various architects and contractors that constructed Hangar AE. Additional oral history interviews with other engineers and technicians could also prove useful. PART IV: PROJECT INFORMATION NASA KSC determined that Hangar AE is eligible to the under Criterion A in the area of Space Exploration and has completed HAER documentation of the building, in keeping with the Agency s documentation of other NRHP-listed or eligible properties. New South Associates, Inc., under CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO.

Page 24 contract with InoMedic Health Applications (IHA), a subcontractor to NASA conducted the HAER documentation and historical research for this project in March of David Diener served as the project photographer, David L. Price served as Project Historian, and Mary Beth Reed served as the Principal Investigator. In order to complete the project, New South Associates personnel were allowed full access to the facility, under the supervision of Barbara Naylor, KSC Historic Preservation Officer, and Nancy English, KSC Environmental Specialist. Photographs were taken of the building s interior rooms, exterior, and context.

David Price conducted a limited number of oral interviews with facility managers and personnel and otherwise compiled the historical documentation required for the project. Elaine Liston, KSC Archivist, provided a wealth of information from her office in the KSC Archives Office. CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO. Page 25 APPENDIX: HISTORIC VIEWS CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO. Page 26 Figure 1. USGS quadrangle map showing the location of the Missile Assembly Building AE (Hangar AE), CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO. Page 27 Figure 2.

Aerial photograph showing the location of the Missile Assembly Building AE (Hangar AE) in the Cape Canaveral Air Force Station Industrial Area, CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO. Page 28 Figure 3. Aerial view of Hangar AE, (Courtesy of Kennedy Space Center Archives, Image LOD-61-2195). CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO. Page 29 Figure 4. Interior view of Hangar AE, (Courtesy of Kennedy Space Center Archives, Image LOD-61-7260). CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO. Page 30 Figure 5.

The Hangar AE Telemetry Laboratory, (Courtesy of Kennedy Space Center Archives, Image CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO. Page 31 Figure 6. View of Hangar AE high bay under construction, (Courtesy of Kennedy Space Center Archives, Image LOD-61-2146). CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO. Page 32 Figure 7. Hangar AE with high bay under construction, (Courtesy of Kennedy Space Center Archives, Image LOD-61-2974). CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO. Page 33 Figure 8. Hangar AE high bay under construction, (Courtesy of Kennedy Space Center Archives, Image LOD-61-4343). CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO.

Page 34 Figure 9. Technicians make final adjustments to the Ranger 3 Spacecraft at Hangar AE. (Source: Lunar Impact: A History of Project Ranger, NASA History Division, CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO. Page 35 Figure 10. View of telemetry displays and work stations in the Hangar AE Mission Control Center, circa (Courtesy of Kennedy Space Center Archives, Image CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO. Page 36 Figure 11. Syncom 1, the first geosynchronous communications satellite, undergoes final checkout by Hughes Aircraft Co. engineers in the Hangar AE high bay. (Courtesy of Kennedy Space Center Archives, Image 63-Syncom-18).

CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO. Page 37 Figure 12. Hughes Aircraft Co. engineers conduct final checkout of Syncom 1 satellite in Hangar AE high bay prior to mating to Delta launch vehicle. (Courtesy of Kennedy Space Center Archives, Image 63-Syncom-20). CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO. Page 38 Figure 13. Engineers check out the GOES-6 satellite in Hangar AE high bay, (Courtesy of Kennedy Space Center Archives, Image CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO. Page 39 APPENDIX: TABLE OF UNMANNED LAUNCH OPERATIONS ASSOCIATED WITH HANGAR AE CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO. Page 40 Table 1.

Unmanned Launch Operations Associated with Hangar AE Mission Launch Date Orbit/Status Range THOR ABLE TIROS-1 ETR 1-Apr-60 Earth Orbit (Eastern Test Range) DELTA-1 ECHO-1 ETR 13-May-60 Failed to Orbit DELTA-2 ECHO-1A ETR 12-Aug-60 Earth Orbit DELTA-3 TIROS-2 ETR 23-Nov-60 Earth Orbit DELTA-4 EXPLORER-10 ETR 25-Mar-61 Earth Orbit DELTA-5 TIROS-3 ETR 12-Jul-61 Earth Orbit DELTA-6 EXPLORER-12 ETR 16-Aug-61 Earth Orbit AVT-1 BIG SHOT-1 ETR 15-Jan-62 Ballistic Trajectory DELTA-7 TIROS-4 ETR 8-Feb-62 Earth Orbit DELTA-8 OSO-1 ETR 7-Mar-62 Earth Orbit DELTA-10 TIROS-5 ETR 19-Jun-62 Earth Orbit DELTA-11 TELSTAR-1 ETR 10-Jul-62 Earth Orbit AVT-2 BIG SHOT-2 ETR 18-Jul-62 Ballistic Trajectory DELTA-12 TIROS-6 ETR 18-Sep-62 Earth Orbit DELTA-13 EXPLORER-14 ETR 2-Oct-62 Earth Orbit DELTA-14 EXPLORER-15 ETR 27-Oct-62 Earth Orbit DELTA-15 RELAY-1 ETR 13-Dec-62 Earth Orbit DELTA-16 SYNCOM-1 ETR 14-Feb-63 Geosynchronous Earth Orbit DELTA-17 EXPLORER-17 ETR 3-Apr-63 Earth Orbit DELTA-18 TELSTAR-2 ETR 7-May-63 Earth Orbit DELTA-19 TIROS-7 ETR 19-Jun-63 Earth Orbit DELTA-20 SYNCOM-2 ETR 26-Jul-63 Geosynchronous Earth Orbit DELTA-21 EXPLORER-18 ETR 27-Nov-63 Earth Orbit ATLAS/CENTAUR-2 (PAYLOAD DEMO) ETR 27-Nov-63 Earth Orbit DELTA-22 TIROS-8 ETR 21-Dec-63 Earth Orbit DELTA-23 RELAY-2 ETR 21-Jan-64 Earth Orbit THOR/AGENA-2 ECHO-2 ETR 25-Jan-64 Earth Orbit ATLAS/AGENA-8 RANGER-6 ETR 30-Jan-64 Lunar Impact DELTA-24 EXPLORER-20 BE-A ETR 19-Mar-64 Geosynchronous Earth Orbit ATLAS-263D FIRE-1 ETR 14-Apr-64 Ballistic Trajectory ATLAS/CENTAUR-3 (PAYLOAD DEMO) ETR 30-Jun-64 Failed to Orbit ATLAS/AGENA-9 RANGER-7 ETR 28-Jul-64 Lunar Impact CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO.

Page 41 Table 1.

Unmanned Launch Operations Associated with Hangar AE Mission Launch Date Orbit/Status Range DELTA-25 SYNCOM-3 ETR 19-Aug-64 Geosynchronous Earth Orbit THOR/AGENA-3 NIMBUS-1 WTR 28-Aug-64 Earth Orbit (Western Test Range) ATLAS/AGENA-10 OGO-1 ETR 4-Sep-64 Earth Orbit DELTA-26 EXPLORER-21 ETR 4-Oct-64 Earth Orbit ATLAS/AGENA-11 MARINER-3 ETR 5-Nov-64 Solar Orbit ATLAS/AGENA-12 MARINER-4 ETR 28-Nov-64 Mars Transfer Orbit ATLAS/CENTAUR-4 SURVEYOR-M1 ETR 11-Dec-64 Earth Orbit DELTA-27 EXPLORER-26 ETR 21-Dec-64 Earth Orbit DELTA-28 TIROS-9 ETR 21-Jan-65 Earth Orbit DELTA-29 OSO-2 ETR 3-Feb-65 Earth Orbit ATLAS/AGENA-13 RANGER-8 ETR 17-Feb-65 Lunar Impact ATLAS/CENTAUR-5 SURVEYOR-D1 ETR 3-Mar-65 Failed to Liftoff ATLAS/AGENA-14 RANGER-9 ETR 21-Mar-65 Lunar Impact DELTA-30 INTELSTAT-1 EARLY BIRD ETR 6-Apr-65 Geosynchronous Earth Orbit ATLAS-264D FIRE-2 ETR 22-May-65 Ballistic Trajectory DELTA-31 EXPLORER-28 ETR 29-May-65 Earth Orbit DELTA-32 TIROS-10 ETR 2-Jul-65 Earth Orbit ATLAS/CENTAUR-6 SURVEYOR-D2 ETR 11-Aug-65 Simulated Lunar Orbit DELTA-33 OSO-C ETR 25-Aug-65 Failed to Orbit THOR/AGENA-4 OGO-2 WTR 14-Oct-65 Earth Orbit DELTA-34 EXPLORER-29 ETR 6-Nov-65 Earth Orbit THOR/AGENA-5 ALOUETTE-2 WTR 28-Nov-65 Earth Orbit EXPLORER-31 DELTA-35 PIONEER-6 ETR 16-Dec-65 Solar Orbit DELTA-36 ESSA-1 ETR 3-Feb-66 Earth Orbit DELTA-37 ESSA-2 ETR 28-Feb-66 Earth Orbit ATLAS/CENTAUR-8 SURV.

MASS. MOD ETR 8-Apr-66 Earth Orbit ATLAS/AGENA-15 OAO-1 ETR 8-Apr-66 Earth Orbit THOR/AGENA-15 OAO-1 ETR 8-Apr-66 Earth Orbit THOR/AGENA-6 NIMBUS-2 WTR 15-May-66 Earth Orbit DELTA-38 EXPLORER-32 ETR 25-May-66 Earth Orbit ATLAS/CENTAUR-10 SURVEYOR-1 ETR 30-May-66 Lunar Landing CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO. Page 42 Table 1.

Unmanned Launch Operations Associated with Hangar AE Mission Launch Date Orbit/Status Range ATLAS/AGENA-16 OGO-3 ETR 6-Jun-66 Earth Orbit THOR/AGENA-7 PAGEOS-1 ETR 23-Jun-66 Earth Orbit DELTA-39 EXPLORER-33 ETR 1-Jul-66 Earth Orbit ATLAS/AGENA-17 LUNAR ORBITER-1 ETR 10-Aug-66 Lunar Orbit DELTA-40 PIONEER-7 ETR 17-Aug-66 Solar Orbit ATLAS/CENTAUR-7 SURVEYOR-2 ETR 20-Sep-66 Lunar Trajectory DELTA-41 ESSA-3 WTR 2-Oct-66 Earth Orbit ATLAS/CENTAUR-9 SURVEYOR-SD4 ETR 26-Oct-66 Simulated Lunar Trajectory DELTA-42 INTELSAT II F1 ETR 26-Oct-66 Unstable Earth Orbit ATLAS/AGENA-18 LUNAR ORBITER-2 ETR 6-Nov-66 Lunar Orbit ATLAS/AGENA-19 ATS-1 ETR 6-Dec-66 Geosynchronous Earth Orbit DELTA-44 INTELSAT II-PAC ETR 11-Jan-67 Geosynchronous Earth Orbit DELTA-45 ESSA-4 WTR 26-Jan-67 Earth Orbit ATLAS/AGENA-20 LUNAR ORBITER-3 ETR 4-Feb-67 Lunar Orbit DELTA-46 OSO-3 ETR 8-Mar-67 Earth Orbit DELTA-47 INTELSAT II-ATL ETR 22-Mar-67 Earth Orbit ATLAS/AGENA-21 ATS-2 ETR 5-Apr-67 Earth Orbit ATLAS/CENTAUR-12 SURVEYOR-3 ETR 17-Apr-67 Lunar Landing DELTA-48 ESSA-5 WTR 20-Apr-67 Earth Orbit ATLAS/AGENA-22 LUNAR ORBITER ETR 4-May-67 Lunar Orbit DELTA-49 EXPLORER-34 WTR 24-May-67 Earth Orbit ATLAS/AGENA-23 MARINER-5 ETR 14-Jun-67 Venus Transfer Orbit ATLAS/CENTAUR-11 SURVEYOR-4 ETR 14-Jul-67 Lunar Trajectory THOR/AGENA-8 OGO-4 WTR 18-Jul-67 Earth Orbit DELTA-50 EXPLORER-35 ETR 19-Jul-67 Lunar Orbit ATLAS/AGENA-24 LUNAR ORBITER-5 ETR 1-Aug-67 Lunar Orbit DELTA-51 BIOSATELLITE-2 ETR 7-Sep-67 Earth Orbit ATLAS/CENTAUR-13 SURVEYOR-5 ETR 8-Sep-67 Lunar Landing DELTA-52 INTELSAT II-PAC ETR 28-Sep-67 Geosynchronous Earth Orbit DELTA-53 OSO-4 ETR 18-Oct-67 Earth Orbit ATLAS AGENA-25 ATS-3 ETR 5-Nov-67 Geosynchronous Earth Orbit ATLAS/CENTAUR-14 SURVEYOR-6 ETR 7-Nov-67 Lunar Landing DELTA-54 ESSA-6 WTR 10-Nov-67 Earth Orbit DELTA-55 PIONEER-8 AND ETR 13-Dec-67 Solar Orbit & Earth CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO.

Page 43 Table 1.

Unmanned Launch Operations Associated with Hangar AE Mission Launch Date Orbit/Status Range Orbit ATLAS/CENTAUR-15 SURVEYOR -7 ETR 7-Jan-68 Lunar Landing DELTA-56 GEOS-2 WTR 11-Jan-68 Earth Orbit ATLAS/AGENA-26 OGO-5 ETR 4-Mar-68 Earth Orbit THOR/AGENA-5 NIMBUS-B WTR 18-May-68 Failed to Orbit DELTA-57 EXPLORER-38 WTR 4-Jul-68 Earth Orbit ATLAS/CENTAUR-17 ATS-4 ETR 10-Aug-68 Remained in Transfer Orbit DELTA-58 ESSA-7 WTR 16-Aug-68 Earth Orbit DELTA-59 INTELSAT III-A ETR 18-Sep-68 Failed to Orbit DELTA-60 PIONEER-9 AND TETR-2 ETR 8-Nov-68 Solar Orbit DELTA-61 HEOS-1 ETR 5-Dec-68 Earth Orbit ATLAS/CENTAUR-16 OAO-2 ETR 7-Dec-68 Earth Orbit DELTA-62 ESSA-8 WTR 15-Dec-68 Earth Orbit DELTA-63 INTELSAT III-2 ETR 18-Dec-68 Geosynchronous Earth Orbit DELTA-64 OSO-5 ETR 22-Jan-69 Earth Orbit DELTA-65 ISIS-I WTR 30-Jan-69 Earth Orbit DELTA-66 INTELSAT III-3 ETR 5-Feb-69 Geosynchronous Earth Orbit ATLAS/CENTAUR-20 MARINER-6 ETR 25-Feb-69 Mars Transfer Orbit DELTA-67 ESSA-9 ETR 26-Feb-69 Earth Orbit ATLAS/CENTAUR-19 MARINER-7 ETR 27-Mar-69 Mars Transfer Orbit THOR/AGENA-10 NIMBUS-3 AND WTR 13-Apr-69 Earth Orbit EGRS-13 DELTA-68 INTELSAT III-4 ETR 21-May-69 Geosynchronous Earth Orbit THOR/AGENA-11 OGO-6 WTR 5-Jun-69 Earth Orbit DELTA-69 EXPLORER-41 WTR 21-Jun-69 Earth Orbit DELTA-70 BIOSATELLITE-3 ETR 28-Jun-69 Earth Orbit DELTA-71 INTELSAT III-E ETR 25-Jul-69 Incorrect Orbit DELTA-72 OSO-6 ETR 9-Aug-69 Earth Orbit ATLAS/CENTAUR-18 ATS-5 ETR 12-Aug-69 Geosynchronous Earth Orbit DELTA-73 PIONEER-E and TETR-C ETR 27-Aug-69 Failed to Orbit DELTA-74 SKYNET-I ETR 22-Nov-69 Geosynchronous Earth Orbit DELTA-75 INTELSAT III-6 ETR 14-Jan-70 Geosynchronous Earth Orbit DELTA-76 ITOS-1 and OSCAR-5 WTR 23-Jan-70 Earth Orbit THOR/AGENA-12 SERT-II WTR 3-Feb-70 Earth Orbit CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO.

Page 44 Table 1.

Unmanned Launch Operations Associated with Hangar AE Mission Launch Date Orbit/Status Range DELTA-77 NATOSAT-1 ETR 20-Mar-70 Geosynchronous Earth Orbit THOR/AGENA-13 NIMBUS and TOPO-1 WTR 8-Apr-70 Earth Orbit DELTA-78 INTELSAT III-7 ETR 22-Apr-70 Geosynchronous Earth Orbit DELTA-79 INTELSAT III-8 ETR 23-Jul-70 Earth Orbit DELTA-80 SKYNET-2 ETR 19-Aug-70 Earth Orbit ATLAS/CENTAUR-21 OAO-B ETR 30-Nov-70 Failed to Orbit DELTA-81 NOAA-1 WTR 11-Dec-70 Earth Orbit ATLAS/CENTAUR-25 INTELSAT IV F2 ETR 26-Jan-71 Geosynchronous Earth Orbit DELTA-82 NATOSAT-II ETR 2-Feb-71 Geosynchronous Earth Orbit DELTA-83 EXPLORER-43 ETR 13-Mar-71 Earth Orbit DELTA-84 ISIS-2 WTR 1-Apr-71 Earth Orbit ATLAS/CENTAUR-24 MARINER-8 ETR 9-May-71 Failed to Orbit ATLAS/CENTAR-23 MARINER-9 ETR 30-May-71 Mars Transfer Orbit DELTA-85 OSO-7, TETR-4 ETR 29-Sep-71 Earth Orbit DELTA-86 ITOS-B WTR 21-Oct-71 Failed to Orbit ATLAS/CENTAUR-26 INTELSAT IV F3 ETR 19-Dec-71 Geosynchronous Earth Orbit ATLAS/CENTAUR-28 INTELSAT IV F4 ETR 23-Jan-72 Geosynchronous Earth Orbit DELTA-87 HEOS-2 WTR 31-Jan-72 Earth Orbit ATLAS/CENTAUR-27 PIONEER-10 ETR 2-Mar-72 Jupiter Trajectory DELTA-88 WTR 12-Mar-72 Earth Orbit ATLAS/CENTAUR-29 INTELSAT IV F5 ETR 13-Jun-72 Geosynchronous Earth Orbit DELTA-89 ERTS-1 WTR 23-Jul-72 Earth Orbit ATLAS/CENTAUR-22 OAO-3 ETR 21-Aug-72 Earth Orbit DELTA-90 EXPLORER-47 ETR 23-Sep-72 Earth Orbit DELTA-91 NOAA-2 and OSCAR-6 WTR 15-Oct-72 Earth Orbit DELTA-92 ANIK-1 ETR 10-Nov-72 Geosynchronous Earth Orbit DELTA-93 NIMBUS-5 WTR 11-Dec-72 Earth Orbit ATLAS/CENTAUR-30 PIONEER-11 ETR 5-Apr-73 Earth Orbit DELTA-94 ANIK-II ETR 20-Apr-73 Geosynchronous Earth Orbit DELTA-95 EXPLORER-49 ETR 10-Jul-73 Lunar Orbit DELTA-96 ITOS-E WTR 16-Jul-73 Failed to Orbit ATLAS/CENTAUR-31 INTELSAT IV F7 ETR 23-Aug-73 Geosynchronous Earth Orbit DELTA-97 EXPLORER-50 ETR 26-Oct-73 Earth Orbit ATLAS/CENTAUR-34 MARINER-10 ETR 3-Nov-73 Venus Transfer Orbit CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO.

Page 45 Table 1.

Unmanned Launch Operations Associated with Hangar AE Mission Launch Date Orbit/Status Range DELTA-98 NOAA-3 WTR 6-Nov-73 Earth Orbit DELTA-99 EXPLORER-51 WTR 16-Dec-73 Earth Orbit DELTA-100 SKYNET-IIA ETR 18-Jan-74 Incorrect Orbit TITAN III/CENTAUR-1 VIKING-DS ETR 11-Feb-74 Failed to Orbit (PROOF FLIGHT) DELTA-101 WESTAR-I ETR 13-Apr-74 Geosynchronous Earth Orbit DELTA-102 SMS-I ETR 16-May-74 Geosynchronous Earth Orbit DELTA-103 WESTAR-II ETR 10-Oct-74 Geosynchronous Earth Orbit DELTA-104 NOAA-4, OSCAR-7, WTR 15-Nov-74 Earth Orbit INTASAT ATLAS/CENTRAUR-32 INTELSAT IV ETR 21-Nov-74 Geosynchronous Earth Orbit F8 DELTA-105 SKYNET-II ETR 23-Nov-74 Geosynchronous Earth Orbit TITAN III/CENTAUR-2 HELIOS-I ETR 10-Dec-74 Solar Orbit DELTA-106 SYMPHONIE-1 ETR 19-Dec-74 Geosynchronous Earth Orbit DELTA-107 LANDSAT-2 WTR 22-Jan-75 Earth Orbit DELTA-108 ETR 6-Feb-75 Geosynchronous Earth Orbit ATLAS/CENTRAUR-33 INTELSAT IV ETR 20-Feb-75 Failed To Orbit F6 DELTA-109 GEOS-3 WTR 9-Apr-75 Earth Orbit DELTA-110 ANIK III ETR 7-May-75 Geosynchronous Earth Orbit ATLAS/CENTRAUR-35 INTELSAT IV ETR 22-May-75 Geosynchronous Earth Orbit F1 DELTA-111 NIMBUS-6 WTR 12-Jun-75 Earth Orbit DELTA-112 OSO-8 ETR 21-Jun-75 Earth Orbit DELTA-113 COS-B WTR 9-Aug-75 Earth Orbit TITAN III/CENTAUR-4 VIKING-1 ETR 20-Aug-75 Mars Transfer Orbit DELTA-114 SYMPHONIE-2 ETR 27-Aug-75 Geosynchronous Earth Orbit TITAN III/CENTAUR-3 VIKING-2 ETR 9-Sep-75 Mars Transfer Orbit ATLAS/CENTRAUR-36 INTELSAT IV ETR 26-Sep-75 Geosynchronous Earth Orbit F1 DELTA-115 EXPLORER-54 WTR 6-Oct-75 Earth Orbit DELTA-116 GEOS-1 ETR 16-Oct-75 Geosynchronous Earth Orbit DELTA-117 EXPLORER-55 ETR 20-Nov-75 Earth Orbit DELTA-118 RCA-SATCOM I ETR 12-Dec-75 Geosynchronous Earth Orbit TITAN III/CENTAUR-5 HELIOS-II ETR 15-Jan-76 Solar Orbit CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO.

Page 46 Table 1.

Unmanned Launch Operations Associated with Hangar AE Mission Launch Date Orbit/Status Range DELTA-119 CTS (HERMES) ETR 16-Jan-76 Geosynchronous Earth Orbit ATLAS/CENTRAUR-37 INTELSAT IV ETR 29-Jan-76 Geosynchronous Earth Orbit F2 DELTA-120 MARISAT-1 ETR 19-Feb-76 Geosynchronous Earth Orbit DELTA-121 RCA-SATCOM II ETR 26-Mar-76 Geosynchronous Earth Orbit DELTA-122 NATO III-A ETR 22-Apr-76 Geosynchronous Earth Orbit DELTA-123 LAGEOS WTR 4-May-76 Earth Orbit ATLAS/CENTRAUR-38 COMSTAR-D1 ETR 13-May-76 Geosynchronous Earth Orbit DELTA-124 MARISAT-2 ETR 10-Jun-76 Geosynchronous Earth Orbit DELTA-125 PALAPA-1 ETR 8-Jul-76 Geosynchronous Earth Orbit ATLAS/CENTRAUR-40 COMSTAR-D2 ETR 22-Jul-76 Geosynchronous Earth Orbit DELTA-126 NOAA-5 WTR 29-Jul-76 Earth Orbit DELTA-127 MARISAT-3 ETR 14-Oct-76 Geosynchronous Earth Orbit DELTA-128 NATO III-B ETR 28-Jan-77 Geosynchronous Earth Orbit DELTA-129 PALAPA-2 ETR 10-Mar-77 Geosynchronous Earth Orbit DELTA-130 ESA GEOS-1 ETR 20-Apr-77 Incorrect Earth Orbit ATLAS/CENTRAUR-39 INTELSAT IVA ETR 26-May-77 Geosynchronous Earth Orbit F4 DELTA-131 GOES-B ETR 16-Jun-77 Geosynchronous Earth Orbit DELTA-132 GMS ETR 14-Jul-77 Geosynchronous Earth Orbit ATLAS/CENTRAUR-45 HEAO-1 ETR 12-Aug-77 Earth Orbit TITAN III/CENTAUR-7 VOYAGER-2 ETR 20-Aug-77 Jupiter/Saturn Trajectory DELTA-133 SIRIO ETR 25-Aug-77 Geosynchronous Earth Orbit TITAN III/CENTAUR-6 VOYAGER-1 ETR 5-Sep-77 Jupiter/Saturn Trajectory DELTA-134 OTS ETR 13-Sep-77 Failed to Orbit ATLAS/CENTAUR-43 INTELSAT IVAF5 ETR 29-Sep-77 Failed to Orbit DELTA-135 ISEE A/B ETR 20-Oct-77 Earth Orbit DELTA-136 METEOSAT ETR 22-Nov-77 Geosynchronous Earth Orbit DELTA-137 JAPAN CS (SAKURA-1) ETR 15-Dec-77 Geosynchronous Earth Orbit ATLAS/CENTAUR-46 INTELSAT IVA ETR 7-Jan-78 Geosynchronous Earth Orbit F3 DELTA-138 IUE ETR 26-Jan-78 Geosynchronous Earth Orbit ATLAS/CENTAUR-44 FLTSATCOM-1 ETR 9-Feb-78 Geosynchronous Earth Orbit DELTA-139 LANDSAT-3 WTR 5-Mar-78 Earth Orbit ATLAS/CENTAUR-48 INTELSAT IVA ETR 31-Mar-78 Geosynchronous Earth Orbit F6 CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO.

Page 47 Table 1.

Unmanned Launch Operations Associated with Hangar AE Mission Launch Date Orbit/Status Range DELTA-140 BSE ETR 7-Apr-78 Geosynchronous Earth Orbit DELTA-141 OTS-2 ETR 11-May-78 Geosynchronous Earth Orbit ATLAS/CENTAUR-50 PIONEER VENUS- ETR 20-May-78 Venus Trajectory 1 DELTA-142 GOES-C ETR 16-Jun-78 Geosynchronous Earth Orbit ATLAS/CENTAR-41 COMSTAR-D3 ETR 29-Jun-78 Geosynchronous Earth Orbit DELTA-143 ESA GEOS-2 ETR 14-Jul-78 Geosynchronous Earth Orbit ATLAS/CENTAUR-51 PIONEER VENUS ETR 8-Aug-78 Venus Trajectory PROBE DELTA-144 ISEE-C ETR 12-Aug-78 Solar Orbit DELTA-145 NIMBUS-7 WTR 24-Oct-78 Earth Orbit ATLAS/CENTAUR-52 HEAO-2 ETR 13-Nov-78 Earth Orbit DELTA-146 NATO III-C ETR 19-Nov-78 Geosynchronous Earth Orbit DELTA-147 ANIK B ETR 16-Dec-78 Geosynchronous Earth Orbit DELTA-148 SCATHA ETR 30-Jan-79 Earth Orbit ATLAS/CENTAUR-47 FLTSATCOM-2 ETR 4-May-79 Geosynchronous Earth Orbit DELTA-149 WESTAR-III ETR 10-Aug-79 Geosynchronous Earth Orbit ATLAS/CENTAUR-53 HEAO-3 ETR 20-Sep-79 Earth Orbit DELTA-150 RCA-SATCOM III ETR 7-Dec-79 Earth Orbit ATLAS/CENTAUR-49 FLTSATCOM-3 ETR 17-Jan-80 Geosynchronous Earth Orbit DELTA-151 SMM ETR 14-Feb-80 Earth Orbit DELTA-152 GOES-D ETR 9-Sep-80 Geosynchronous Earth Orbit ATLAS/CENTAUR-57 FLTSATCOM-4 ETR 30-Oct-80 Geosynchronous Earth Orbit DELTA-153 ETR 15-Nov-80 Geosynchronous Earth Orbit ATLAS/CENTAUR-54 INTELSAT V F2 ETR 6-Dec-80 Geosynchronous Earth Orbit ATLAS/CENTAUR-42 COMSTAR-D4 ETR 21-Feb-81 Geosynchronous Earth Orbit DELTA-154 GOES-E ETR 22-May-81 Geosynchronous Earth Orbit ATLAS/CENTAUR-56 INTELSAT V F1 ETR 26-May-81 Geosynchronous Earth Orbit DELTA-155 DE-A/B WTR 3-Aug-81 Earth Orbit ATLAS/CENTAUR-59 FLTSATCOM-5 ETR 6-Aug-81 Geosynchronous Earth Orbit DELTA-156 ETR 24-Sep-81 Geosynchronous Earth Orbit DELTA-157 SME and MICROSAT WTR 6-Oct-81 Earth Orbit DELTA-158 RCA-SATCOM D ETR 20-Nov-81 Geosynchronous Earth Orbit ATLAS/CENTAUR-55 INTELSAT V F3 ETR 15-Dec-81 Geosynchronous Earth Orbit DELTA-159 RCA-SATCOM E ETR 16-Jan-82 Geosynchronous Earth Orbit CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO.

Page 48 Table 1.

Unmanned Launch Operations Associated with Hangar AE Mission Launch Date Orbit/Status Range DELTA-160 WESTAR-IV ETR 26-Feb-82 Geosynchronous Earth Orbit ATLAS/CENTAUR-58 INTELSAT V F4 ETR 5-Mar-82 Geosynchronous Earth Orbit DELTA-161 INSAT-1A ETR 10-Apr-82 Geosynchronous Earth Orbit DELTA-162 WESTAR-V ETR 9-Jun-82 Geosynchronous Earth Orbit DELTA-163 LANDSAT D WTR 16-Jul-82 Earth Orbit DELTA-164 ANIK D1 ETR 28-Aug-82 Geosynchronous Earth Orbit ATLAS/CENTAUR-60 INTELSAT V F5 ETR 28-Oct-82 Geosynchronous Earth Orbit DELTA-165 RCA-SATCOM F ETR 28-Oct-82 Geosynchronous Earth Orbit DELTA-166 IRAS WTR 26-Jan-83 Geosynchronous Earth Orbit DELTA-167 RCA-SATCOM 1R ETR 11-Apr-83 Geosynchronous Earth Orbit DELTA-168 GOES-F ETR 28-Apr-83 Geosynchronous Earth Orbit ATLAS/CENTAUR-61 INTELSAT V F6 ETR 19-May-83 Geosynchronous Earth Orbit DELTA-169 ESA EXOSAT WTR 26-May-83 Earth Orbit DELTA-170 GALAXY-A ETR 28-Jun-83 Geosynchronous Earth Orbit DELTA-171 TELSTAR-3A ETR 28-Jul-83 Geosynchronous Earth Orbit DELTA-172 RCA-G ETR 8-Sep-83 Geosynchronous Earth Orbit DELTA-173 GALAXY-B ETR 22-Sep-83 Geosynchronous Earth Orbit DELTA-174 LANDSAT-D WTR 1-Mar-84 Earth Orbit ATLAS/CENTAUR-62 INTELSAT V F9 ETR 9-Jun-84 Incorrect Earth Orbit DELTA-175 AMPTE ETR 16-Aug-84 Earth Orbit DELTA-176 GALAXY-C ETR 21-Sep-84 Geosynchronous Earth Orbit DELTA-177 NATO III-D ETR 13-Nov-84 Geosynchronous Earth Orbit ATLAS/CENTAUR-63 INTELSAT VA ETR 23-Mar-85 Geosynchronous Earth Orbit F10 ATLAS/CENTAUR-64 INTELSAT VA ETR 30-Jun-85 Geosynchronous Earth Orbit F11 ATLAS/CENTAUR-65 INTELSAT VA ETR 28-Sep-85 Geosynchronous Earth Orbit F12 DELTA-178 GOES-G ETR 3-May-86 Failed to Orbit DELTA-180 SDIO ETR 3-May-86 Earth Orbit ATLAS/CENTAUR-66 FLTSATCOM F7 ETR 5-Dec-86 Geosynchronous Earth Orbit DELTA-179 GOES-H ETR 26-Feb-87 Geosynchronous Earth Orbit DELTA-182 PALAPA-B2P ETR 20-Mar-87 Geosynchronous Earth Orbit ATLAS/CENTAUR-67 FLTSATCOM F6 ETR 27-Mar-87 Failed to Orbit DELTA-181 SDIO ETR 8-Feb-88 Earth Orbit CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO.

Page 49 Table 1.

Unmanned Launch Operations Associated with Hangar AE Mission Launch Date Orbit/Status Range ATLAS/CENTAUR-68 FLTSATCOM F8 ETR 25-Sep-89 Geosynchronous Earth Orbit DELTA-189 COBE WTR 18-Nov-89 Earth Orbit DELTA-195 ROSAT ETR 1-Jun-90 Earth Orbit ATLAS/CENTAUR-69 CRRES ETR 25-Jun-90 Earth Orbit SCOUT-216 REX WTR 29-Jun-91 Earth Orbit DELTA-210 EUVE ETR 7-Jun-92 Earth Orbit SCOUT-215 SAMPEX WTR 3-Jul-92 Earth Orbit DELTA-212 GEOTAIL ETR 24-Jul-92 Earth Orbit TITAN III/CENTAUR-4 MARS ETR 25-Sep-92 Mars Transfer Orbit OBSERVER SCOUT-210 MSTI-1 WTR 21-Nov-92 Earth Orbit SCOUT-217 RADCAL WTR 25-Jun-93 Earth Orbit ATLAS/CENTAUR-73 GOES-1 ETR 14-Apr-94 Geosynchronous Earth Orbit SCOUT-218 MSTI-2 WTR 9-May-94 Earth Orbit DELTA-227 WIND ETR 1-Nov-94 Lunar Orbit ATLAS/CENTAUR-77 GOES-J ETR 23-May-95 Geosynchronous Earth Orbit DELTA-229 RADARSAT WTR 4-Nov-95 Earth Orbit ATLAS/CENTAUR-121 SOHO ETR 2-Dec-95 Solar Transfer Orbit DELTA-230 XTE ETR 30-Dec-95 Earth Orbit DELTA-232 NEAR ETR 17-Feb-96 Heliocentric Orbit DELTA-233 POLAR WTR 24-Feb-96 Earth Orbit PEGASUS-XL TOMS WTR 2-Jul-96 Earth Orbit PEGASUS-XL FAST WTR 21-Aug-96 Earth Orbit PEGASUS-XL SAC-B HETE WFF 4-Nov-96 Failed to Separate S/C (Wallops Flight Facility) DELTA-239 MARS GLOBAL SURVEYOR ETR 7-Nov-96 Mars Transfer Orbit DELTA-240 MARS PATHFINDER ETR 4-Dec-96 Mars Transfer Orbit ATLAS/CENTAUR-79 GOES-K ETR 25-Apr-97 Geosynchronous Earth Orbit DELTA II/MS1a WTR 1-May-97 Not Available DELTA II/THOR ETR 20-May-97 Not Available DELTA II/MS2 WTR 9-Jul-97 Not Available ATLAS/AC133 ETR 28-Jul-97 Not Available PEGASUS/SEASTAR WTR 1-Aug-97 Earth Orbit CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO.

Page 50 Table 1.

Unmanned Launch Operations Associated with Hangar AE Mission Launch Date Orbit/Status Range DELTA II/MS3 WTR 20-Aug-97 Not Available DELTA-247 ACE ETR 25-Aug-97 Solar Orbit DELTA II/ACE ETR 25-Aug-97 Not Available ATLAS/AC146 GE3 ETR 4-Sep-97 Not Available DELTA II/MS4 WTR 26-Sep-97 Not Available ATLAS/ECHOSTAR ETR 5-Oct-97 Not Available TITAN IVB/CENTAUR-21 ETR 15-Oct-97 Saturn Transfer Orbit CASSINI/HUYGENS TITAN/CASSINI ETR 15-Oct-97 Not Available ATLAS/DSCSIII ETR 24-Oct-97 Not Available DELTA II/GPS II-28 ETR 5-Nov-97 Not Available DELTA II/MS5 WTR 8-Nov-97 Not Available ATLAS/AC149 GALAXY ETR 8-Dec-97 Not Available DELTA II/MS6 WTR 19-Dec-97 Not Available ATHENA/LUNAR PROSPECTOR ETR 6-Jan-98 Lunar Orbit DELTA II/SKYNET ETR 9-Jan-98 Not Available ATLAS/AC-109 NRO ETR 29-Jan-98 Not Available DELTA II/GLOBAL STAR 1 ETR 14-Feb-98 Not Available DELTA II/MS7 WTR 18-Feb-98 Not Available PEGASUS-XL SNOE WTR 25-Feb-98 Earth Orbit PEGASUS/SNOE WTR 26-Feb-98 Not Available ATLAS/AC-151/INTELSAT 806 ETR 27-Feb-98 Not Available ATLAS/AC-132/UHF-F8 ETR 16-Mar-98 Not Available DELTA II/MS8 WTR 29-Mar-98 Not Available PEGASUS-XL TRACE WTR 1-Apr-98 Earth Orbit PEGASUS/TRACE WTR 1-Apr-98 Not Available STS-90/NEUROLAB ETR 17-Apr-98 Not Available DELTA II/GLOBAL STAR 2 ETR 24-Apr-98 Not Available TITAN II/NOAA-K WTR 13-May-98 Earth Orbit DELTA II/MS9 WTR 17-May-98 Not Available DELTA III/GALAXY 10 ETR 26-Aug-98 Not Available DELTA II/MS-10 WTR 9-Sep-98 Not Available PEGASUS/ORBCOM 3 WFF 24-Sep-98 Not Available ATLAS/AC-134 HOTBIRD ETR 9-Oct-98 Not Available CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO.

Page 51 Table 1.

Unmanned Launch Operations Associated with Hangar AE Mission Launch Date Orbit/Status Range ATLAS/AC-130 UHF F/O F9 ETR 20-Oct-98 Not Available PEGASUS-XL SCD-2/WING GLOVE ETR 22-Oct-98 Earth Sub-Orbit PEGASUS/SCD-2/WING GLOVE ETR 22-Oct-98 Not Available DELTA II/DEEP SPACE 1 ETR 24-Oct-98 Deep Space Trajectory PEGASUS/SWAS ETR 6-Dec-98 Not Available DELTA II/MARS ORBITER ETR 11-Dec-98 Mission Failure DELTA II/MARS LANDER ETR 3-Jan-99 Mission Failure ATHENA/ROCSAT ETR 26-Jan-99 Not Available DELTA II/STARDUST ETR 7-Feb-99 Comet Sample Mission ATLAS-AC 152/JCSAT-6 ETR 15-Feb-99 Geosynchronous Earth Orbit DELTA II/ARGOS ETR 23-Feb-99 Not Available ATLAS/Eutelsat-W3 ETR 12-Apr-99 Not Available DELTA II/LandSat-7 WTR 15-Apr-99 Earth Orbit DELTA III/ORION ETR 4-May-99 Not Available PEGASUS/Terriers WTR 18-May-99 Mission Failure DELTA II/Globalstar 3 ETR 10-Jun-99 Not Available DELTA II/FUSE ETR 24-Jun-99 Earth Orbit DELTA II/Globalstar 4 ETR 10-Jul-99 Not Available DELTA II/Globalstar 5 ETR 25-Jul-99 Not Available DELTA II/Globalstar 6 ETR 17-Aug-99 Not Available ATLAS/AC 155/ECHOSTAR 5 ETR 23-Sep-99 Not Available DELTA/GRS2R3 ETR 7-Oct-99 Not Available ATLAS/AC 136/UHF/F10 ETR 22-Nov-99 Not Available PEGASUS/Orbcom IV WTR 4-Dec-99 Not Available ATLAS/AC 141/EOS WTR 18-Dec-99 Earth Orbit ATLAS/AC 8 ETR 20-Jan-00 Not Available ATLAS/AC 158/Hispasat IC ETR 3-Feb-00 Not Available DELTA II/Globalstar 7 ETR 8-Feb-00 Not Available DELTA II/IMAGE WTR 25-Mar-00 Earth Orbit ATLAS/AC 137/GOES-L ETR 3-May-00 Geosynchronous Earth Orbit DELTA II/GPSIIR-4 ETR 10-May-00 Not Available ATLAS3A/Eutelsat-W4 ETR 24-May-00 Not Available ATLAS/ AC ETR 29-Jun-00 Earth Orbit ATLAS/ AC 161/ECHOSTAR 6 ETR 14-Jul-00 Not Available CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO.

Page 52 Table 1.

Unmanned Launch Operations Associated with Hangar AE Mission Launch Date Orbit/Status Range DELTA II/GSPIIR5 ETR 16-Jul-00 Not Available DELTA III/DM-F3 ETR 23-Aug-00 Not Available PEGASUS/HETE II ETR 8-Oct-00 Earth Orbit ATLAS/ AC 9 ETR 19-Oct-00 Not Available DELTA II/GPSIIR6 ETR 10-Nov-00 Not Available DELTA II/EO1-SAC-C ETR 21-Nov-00 Earth Orbit ATLAS IIA/MLV11 / AC 157 ETR 5-Dec-00 Not Available DELTA II/GPSIIR7 ETR 30-Jan-01 Not Available TITAN IV/B-41 ETR 2-Feb-01 Not Available DELTA II/MARS Odyssey ETR 7-Apr-01 Mars Orbit DELTA II/GEOLITE ETR 18-May-01 Not Available ATLAS IIAS/ICO-F2 ETR 19-Jun-01 Not Available DELTA II/MAP ETR 30-Jun-01 Earth Orbit ATLAS II/GOES-M ETR 23-Jul-01 Geosynchronous Earth Orbit DELTA II/Genesis ETR 8-Aug-01 Earth Orbit ATLASIIA/2MLV-10/ac162 WTR 8-Sep-01 Not Available TAURUS/QuikTOMS WTR 21-Sep-01 Earth Orbit ATHENA/Kodiak Star ETR 29-Sep-01 Earth Orbit ATLASIIAS/MLV-12 ac/162 ETR 10-Oct-01 Not Available DELTA II/QuickBird-2 WTR 18-Oct-01 Not Available DELTA II/JASON/TIMED WTR 7-Dec-01 Earth Orbit PEGASUS/HESSI ETR 5-Feb-02 Earth Orbit DELTA II/IS-1 ETR 11-Feb-02 Not Available ATLASIIIB/ECHOSTAR VII ETR 21-Feb-02 Not Available ATLAS IIA/TDRS-I ETR 8-Mar-02 Not Available DELTA II/AQUA-EOS ETR 4-May-02 Earth Orbit TITAN II/NOAA-M WTR 24-Jun-02 Earth Orbit DELTA II/CONTOUR ETR 3-Jul-02 Comet Mission ATLAS V/HOTBIRD-6 ETR 21-Aug-02 Not Available ATLAS IIAS/Hispasat ID ETR 18-Sep-02 Not Available DELTA IV/Eutelsat ETR 20-Nov-02 Not Available ATLASIIA/TDRS-J ETR 4-Dec-02 Not Available DELTA II/ICESAT/CHIPSAT WTR 12-Jan-03 Earth Orbit PEGASUS/SORCE ETR 25-Jan-03 Earth Orbit CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO.

Page 53 Table 1.

Unmanned Launch Operations Associated with Hangar AE Mission Launch Date Orbit/Status Range DELTA II/GPSIIR8 ETR 29-Jan-03 Not Available DELTA IV/DSCS-1 ETR 10-Mar-03 Not Available DELTA II/GPSIIR9 ETR 31-Mar-03 Not Available TITAN IV/B-35 ETR 7-Apr-03 Not Available ATLASIIIB/ASIASAT 4 ETR 11-Apr-03 Not Available PEGASUS/GALEX ETR 28-Apr-03 Earth Orbit ATLAS V/HellasSAT ETR 13-May-03 Not Available DELTA II/MER-A ETR 10-Jun-03 Mars Exploration Rover PEGASUS/ORBVIEW-3 WTR 26-Jun-03 Not Available DELTA II/MER-B ETR 7-Jul-03 Mars Exploration Rover ATLAS V/RAINBOW ETR 17-Jul-03 Not Available PEGASUS/SCISat WTR 12-Aug-03 Not Available DELTA II/SIRTF ETR 25-Aug-03 Earth Orbit DELTA IV/DSCS B-6 ETR 29-Aug-03 Not Available TITAN IV/B-36 (Centaur) ETR 9-Sep-03 Not Available ATLAS IIAS/MLV-14 (NROL-18) WTR 2-Dec-03 Not Available ATLAS IIIB/UHF/F11 ETR 17-Dec-03 Not Available DELTA II/GPS IIR-10 ETR 21-Dec-03 Not Available ATLAS IIAS/AMC-10 ETR 5-Feb-04 Not Available TITAN IV/B-39 ETR 14-Feb-04 Not Available ATLAS IIIA/MBSat ETR 13-Mar-04 Not Available DELTA II/GPS IIR-11 ETR 20-Mar-04 Not Available ATLAS IIAS/SUPERBIRD-6 ETR 15-Apr-04 Not Available DELTA II/GP-B WTR 20-Apr-04 Earth Orbit Atlas IIAS/AMC-11 ETR 19-May-04 Not Available TAURUS/ROCSAT WTR 20-May-04 Not Available DELTA II/GPS IIR-12 ETR 23-Jun-04 Not Available DELTA II/AURA WTR 15-Jul-04 Earth Orbit DELTA II/Messenger ETR 3-Aug-04 Mercury Orbit ATLAS IIAS/NROL-22 ETR 31-Aug-04 Not Available DELTA II/GPS IIR-13 ETR 6-Nov-04 Not Available DELTA II/SWIFT ETR 20-Nov-04 Earth Orbit ATLAS V/AMC-16 ETR 17-Dec-04 Not Available DELTA IV H/Heavy Demo ETR 21-Dec-04 Not Available CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO.

Page 54 Table 1.

Unmanned Launch Operations Associated with Hangar AE Mission Launch Date Orbit/Status Range DELTA II/Deep Impact ETR 12-Jan-05 Comet Impact ATLAS IIIB/NROL-23 ETR 3-Feb-05 Not Available ATLAS V/INMARSAT ETR 11-Mar-05 Not Available PEGASUS/DART WTR 15-Apr-05 Mission Failed TITAN IVB/B-30 ETR 29-Apr-05 Not Available DELTA II/NOAA-N WTR 20-May-05 Earth Orbit ATLAS V/MRO ETR 12-Aug-05 Mars Orbit DELTA II/GPS IIR-14 ETR 25-Sep-05 Not Available ATLAS V/PLUTO/New Horizon ETR 19-Jan-06 Jupiter Trajectory PEGASUS/ST-5 ETR 22-Mar-06 Earth Orbit MINOTAUR/OSP-1 COSMIC WTR 15-Apr-06 Not Available ATLAS V/ASTRA 1 KR ETR 20-Apr-06 Not Available DELTA II/CALIPSO/CLOUDSAT WTR 28-Apr-06 Earth Orbit DELTA IV/GOES-N ETR 24-May-06 Geosynchronous Earth Orbit DELTA II/MITEX ETR 21-Jun-06 Not Available DELTA IV/NROL-22 WTR 27-Jun-06 Not Available DELTA II/GPS IIR-15 ETR 25-Sep-06 Not Available DELTA II/STEREO ETR 25-Oct-06 Solar Orbit DELTA IV/DMSP-17 WTR 4-Nov-06 Not Available DELTA-43/BIOSATELLITE-1 ETR 14-Dec-06 Earth Orbit DELTA II/NROL-21 WTR 14-Dec-06 Not Available DELTA II/THEMIS ETR 17-Feb-07 Earth Orbit ATLAS ETR 8-Mar-07 Not Available PEGASUS/AIM WTR 25-Apr-07 Earth Orbit DELTA II/COSMOS-1 WTR 6-Jun-07 Not Available ATLAS V/NROL-30 ETR 15-Jun-07 Not Available DELTA II/PHOENIX ETR 4-Aug-07 Mars Lander DELTA II/WORLDVIEW WTR 18-Sep-07 Not Available DELTA II/DAWN ETR 27-Sep-07 Asteroid Orbit ATLAS -2 ETR 10-Oct-07 Not Available DELTA II/GPS IIR-17 ETR 17-Oct-07 Not Available DELTA IV/DSP-23 ETR 10-Nov-07 Not Available DELTA II/COSMOS-2 WTR 8-Dec-07 Not Available ATLAS V/NROL-24 ETR 10-Dec-07 Not Available CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO.

Page 55 Table 1.

Unmanned Launch Operations Associated with Hangar AE Mission Launch Date Orbit/Status Range DELTA II/GPS IIR-18 ETR 20-Dec-07 Not Available ATLAS V/NROL-28 WTR 13-Mar-08 Not Available DELTA II/GPS IIR-19 ETR 15-Mar-08 Not Available ATLAS V/ICO G1 ETR 14-Apr-08 Not Available DELTA II/GLAST ETR 11-Jun-08 Earth Orbit DELTA II/OSTM WTR 19-Jun-08 Earth Orbit DELTA II/GeoEye-1 WTR 6-Sep-08 Not Available PEGASUS/IBEX WTR 19-Oct-08 Interstellar Trajectory DELTA 336/COSMO-3 WTR 24-Oct-08 Not Available DELTA IV/NROL-26 ETR 17-Jan-09 Not Available DELTA 7320/NOAA-N WTR 6-Feb-09 Earth Orbit TAURUS/OCO WTR 24-Feb-09 Earth Orbit DELTA II/KEPLER ETR 6-Mar-09 Earth Orbit DELTA II/GPS IIR-20 ETR 24-Mar-09 Not Available Atlas ETR 3-Apr-09 Not Available DELTA II/STSS ATRR WTR 5-May-09 Earth Orbit Atlas V/LRO/LCROSS ETR 18-Jun-09 Lunar Orbit DELTA IV/GOES-O ETR 27-Jun-09 Geosynchronous Earth Orbit TBD/CARAVAN-2 WTR 22-Jul-09 Not Available DELTA II/GPS IIR-21 ETR 17-Aug-09 Not Available ATLAS V/PAN ETR 8-Sep-09 Not Available DELTA II/STSS-DEMO ETR 25-Sep-09 Earth Orbit DELTA 344/WorldView-2 WTR 8-Oct-09 Not Available ATLAS WTR 18-Oct-09 Not Available ATLAS V/ARES-1 ETR 28-Oct-09 Not Available ATLAS V/INTELSAT-14 ETR 23-Nov-09 Not Available DELTA IV/WGS-3 ETR 5-Dec-09 Not Available DELTA II/WISE WTR 14-Dec-09 Earth Orbit ATLAS V/SDO ETR 11-Feb-10 Earth Orbit DELTA IV/GOES-P ETR 4-Mar-10 Geosynchronous Earth Orbit ATLAS - OTV ETR 22-Apr-10 Not Available MINOTAUR/HEX-2A WTR 22-Apr-10 Not Available DELTA IV/GPS IIF-01 ETR 27-May-10 Not Available FALCON 9/Dragon Demo FLT 1 ETR 4-Jun-10 Not Available CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO.

Page 56 Table 1.

Unmanned Launch Operations Associated with Hangar AE Mission Launch Date Orbit/Status Range ATLAS V/AEHF-1 ETR 14-Aug-10 Not Available ATLAS V/NROL-41 WTR 20-Sep-10 Not Available DELTA II/COSMO-4 WTR 5-Nov-10 Not Available DELTA IV/NROL-32 ETR 21-Nov-10 Not Available FALCON 9/COTS - Demo 1 ETR 8-Dec-10 Earth Orbit DELTA IV/NROL-49 WTR 20-Jan-11 Not Available TAURUS/GLORY WTR 4-Mar-11 Earth Orbit ATLAS V/OTV-2 ETR 5-Mar-11 Not Available DELTA IV/NROL-27 ETR 11-Mar-11 Not Available ATLAS V/NROL-34 WTR 14-Apr-11 Not Available ATLAS V/SBIRS-GEO-1 ETR 7-May-11 Not Available DELTA II/SAC-D WTR 10-Jun-11 Not Available DELTA IV/GPS IIF-02 ETR 16-Jul-11 Not Available ATLAS V/JUNO ETR 5-Aug-11 Jupiter Trajectory DELTA II/GRAIL ETR 10-Sep-11 Lunar Orbit DELTA II/NPP WTR 28-Oct-11 Earth Orbit ATLAS ETR 26-Nov-11 Mars Trajectory DELTA IV/WGS-4 ETR 19-Jan-12 Not Available ATLAS V/MUOS-1 ETR 24-Feb-12 Not Available DELTA IV/NROL-25 ETR 3-Apr-12 Not Available ATLAS V/AEHF-2 ETR 4-May-12 Not Available FALCON 9/COTS - 2 ETR 22-May-12 Not Available PEGASUS/NuStar WTR 13-Jun-12 Earth Orbit ATLAS V/NROL-38 ETR 20-Jun-12 Not Available DELTA IV/NROL-15 ETR 29-Jun-12 Not Available ATLAS ETR 30-Aug-12 Earth Orbit ATLAS V/NROL-36 WTR 13-Sep-12 Earth Orbit DELTA IV/GPS IIF-3 ETR 4-Oct-12 Not Available FALCON SpaceX-1 ETR 7-Oct-12 Not Available ATLAS V/OTV-3 ETR 11-Dec-12 Not Available ATLAS ETR 30-Jan-13 Geosynchronous Earth Orbit ATLAS WTR 11-Feb-13 Earth Orbit FALCON SpaceX-2 ETR 1-Mar-13 Not Available ATLAS V/SBIRS-GEO-2 ETR 19-Mar-13 Not Available CAPE CANAVERAL AIR FORCE STATION, MISSILE ASSEMBLY BUILDING AE (Hangar AE) HAER NO.

Page 57 Table 1. Unmanned Launch Operations Associated with Hangar AE Mission Launch Date Orbit/Status Range ANTARES/Test Flight WFF 21-Apr-13 Not Available ATLAS IIF-4 ETR 15-May-13 Not Available DELTA IV/WGS-5 ETR 24-May-13 Not Available PEGASUS XL/IRIS WTR 27-Jun-13 Earth Orbit ATLAS V/MUOS-2 ETR 19-Jul-13 Not Available DELTA IV/WGS-06 ETR 7-Aug-13 Not Available DELTA IV/NROL-65 WTR 28-Aug-13 Not Available ANTARES/Cygnus WFF 18-Sep-13 Not Available ATLAS V/AEHF-3 ETR 18-Sep-13 Not Available FALCON 9/Cassiope WTR 29-Sep-13 Not Available DELTA II/THOR III ETR N/D Not Available PEGASUS/STEP-4 WTR N/D Not Available PEGASUS/FORTE Not N/D Not Available Available INTELSAT 80 Not N/D Not Available Available PEGASUS/ORBCOM Not N/D Not Available Available

In context

Cape Canaveral, Florida The place record: every map, photograph and survey of this town.
Brevard County, Florida 134 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Cape Canaveral

24 of 118 records shown

The federal surveyors worked through Cape Canaveral building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Cape Canaveral Air StationHAER FLA,5-CACAN,1-32,823 words
Cape Canaveral Air Force StationHAER FL-8-1232,234 words
Cape Canaveral Air Force StationHAER FL-8-AO27,461 words
Cape Canaveral Air Force StationHAER FL-8-11-B25,294 words
Cape Canaveral Air Force StationHAER FL-8-11-F22,264 words
Cape Canaveral Air Force StationHAER FL-8-11-O19,777 words
Cape Canaveral Air Force StationHAER FL-8-AV18,663 words
Cape Canaveral Air Force StationHAER FL-8-618,475 words
Cape Canaveral Air Force StationHAER FL-8-11-M17,593 words
Cape Canaveral Air Force StationHABS FL-581-A17,410 words
Cape Canaveral Air Force StationHAER FL-8-11-G17,133 words
Cape Canaveral Air Force StationHAER FL-8-11-J16,548 words
Cape Canaveral Air Force StationHABS FL-581-B14,684 words
Cape Canaveral Air Force StationHAER FL-8-11-L13,962 words
Cape Canaveral Air Force StationHABS FL-583-A13,824 words
Cape Canaveral Air Force StationHAER FL-8-11-R13,738 words
Cape Canaveral Air Force StationHABS FL-581-C13,646 words
Cape Canaveral Air Force StationHAER FL-8-713,389 words
Cape Canaveral Air Force StationHAER FL-8-A12,671 words
Cape Canaveral Air Force StationHAER FL-8-11-D12,041 words
Cape Canaveral Air Force StationHAER FL-8-11-K12,011 words
Cape Canaveral Air Force StationHAER FL-8-11-A11,934 words
Cape Canaveral Air Force StationHAER FL-8-11-P11,823 words
Cape Canaveral Air Force StationHAER FL-8-11-S11,622 words

Provenance

  • Written history. Quoted verbatim from HAER FL-8-B. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.