The documentation of the Cape Canaveral Air Force Station (CCAFS), Launch Complex 39, Haulover Canal Bridge was conducted in for 1 David Price, Architectural Survey and Evaluation of 45 Facilities That Have Reached the Age of Years, John F. Kennedy Space Center, Brevard County, Florida, survey report, New South Associates, Stone Mountain, GA, 84. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HAULOVER CANAL BRIDGE (John F. Kennedy Space Center) HAER No. Page 2 KSC by ACI, under contract to InoMedic Health Applications (IHA), and in accordance with KSC s Programmatic Agreement Regarding Management of Historic Properties, dated May 18, The field team consisted of architectural historian, Patricia Slovinac (ACI), and independent photographer, Penny Rogo.
Assistance in the field was provided by Barbara Naylor, KSC Historic Preservation Officer, and Nancy English, KSC Cultural Resource Specialist. The written narrative was prepared by Ms. Slovinac; it was edited by Joan Deming, ACI Project Manager; Elaine Liston, KSC Archivist; Ms. Naylor and Ms. English; and Jane Provancha, Environmental Projects-Manager, IHA. The photographs and negatives were processed by Zebra Color, Inc., an independent photography/processing studio. The Scope of Services for the project, which was written based on the Programmatic Agreement, specifies a documentation effort following HAER Level II Standards.
Information for the written narrative was primarily gathered through informal interviews with current NASA and contractor personnel and research materials housed at the KSC Archives Department. A search for historic photographs was also conducted at the Kennedy Institutional Imaging Facility. Selected drawings were provided by KSC s Engineering Documentation Center, which serves as the repository for all facility drawings. It should also be noted that KSC does not periodically produce drawings of their facilities to show current existing conditions. Besides the Haulover Canal Bridge, there are two additional bascule bridges within KSC that were determined eligible for the National Register: the Banana Creek Bridge and the Indian River Bridge.
Because the bascule spans for all three bridges are nearly identical, in compliance with Stipulation V.A.2 of the Programmatic Agreement and at the suggestion of the KSC Historic Preservation Officer, only the Haulover Canal Bridge was fully documented as part of this effort. A brief history of the other two bridges, as well as a discussion of their physical differences, is included in Appendix B. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HAULOVER CANAL BRIDGE (John F. Kennedy Space Center) HAER No. Page 3 LIST OF ACRONYMS ACI Archaeological Consultants, Inc. ACOE U.S.
Army Corps of Engineers AMR Atlantic Missile Range AS Apollo-Saturn CCAFS Cape Canaveral Air Force Station IHA InoMedic Health Applications KSC Kennedy Space Center LC Launch Complex LOC Launch Operations Center LOD Launch Operations Directorate MILA Merritt Island Launch Area MR Mercury-Redstone Marshall Space Flight Center NASA National Aeronautics and Space Administration SA Saturn-Apollo STS Space Transportation System U.S. United States CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HAULOVER CANAL BRIDGE (John F. Kennedy Space Center) HAER No. Page 4 Part I. Historical Information A. Physical History: 1. Date of construction: October 7, through October 1, 2. Architect/Engineer: U.S. Army Corps of Engineers (ACOE)-Canaveral District, Merritt Island, Florida.3 3. Builder: B. B.
McCormick and Sons, Titusville, Florida.4 4. Original plans and construction: For the most part, the Haulover Canal Bridge at the time of documentation resembles the original. The alignment of the bridge has not changed, nor has a majority of its materials. 5. Alterations and additions: Circa the control mechanisms for the bridge were modified.5 In addition, the original windows in the Control House were replaced at an unknown date.6 B. Historical Context: Introduction Following the launch of Sputnik I and Sputnik II, which placed Soviet satellites into Earth s orbit in the attention of the American public turned to space exploration. President Dwight D. Eisenhower initially assigned responsibility for the U.S. Space Program to the Department of Defense.
The Development Operations Division of the Army Ballistic Missile Agency, led by Dr. Wernher von Braun, began to focus on the use of missiles to propel payloads, or even a man, into space. The United States successfully entered the space race with the launch of the Army s scientific satellite Explorer I on January 31, using a modified Jupiter missile named Juno I.7 2 NASA Real Property Record, Haulover Canal Bridge, on file, KSC Real Property Office. 3 U.S. Army Corps of Engineers, Merritt Island, Plans of Proposed Road and Bridge Haulover Canal (to Volusia County Line) (architectural drawings, NASA August on file, KSC Engineering Documentation Center, Florida. 4 NASA Haulover Canal Bridge. 5 NASA Haulover Canal Bridge.
6 It is possible that the windows were replaced in when a tornado hit the area and knocked out two of the windows. Photo Caption, Spaceport News, April 6, 8. 7 Charles D. Benson and William B. Faherty, Gateway to the Moon. Building the Kennedy Space Center Launch Complex (Gainesville, FL: University Press of Florida, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HAULOVER CANAL BRIDGE (John F. Kennedy Space Center) HAER No. Page 5 With the realization that the military s involvement in the space program could jeopardize the use of space for peaceful purposes, President Eisenhower formed NASA on October 1, as a civilian agency with the mission of carrying out scientific aeronautical and space exploration, both manned and unmanned.
At this time, several Army facilities at CCAFS were given to NASA, including various offices and hangars, as well as launch complexes 5, 6, and 26. Within one year of its establishment, NASA had formulated the basics for its first three Manned Space Programs: Project Mercury (ca. Project Gemini (ca. and the Apollo Program (ca. During NASA s formative years, the Agency worked with the Army Ballistic Missile Agency s Development Operations Division, as it provided the Redstone rockets for the early Project Mercury missions and was in the process of developing the Saturn rocket, which would be used for Apollo. The Development Operations Division had maintained its Missile Firing Laboratory, under the direction of Dr. Kurt H.
Debus, at CCAFS since to supervise the experimental launches of the Redstone missile.8 On March 15, President Eisenhower officially transferred the Development Operations Division to NASA, naming the new installation the George C. Marshall Space Flight Center Two months later, the Missile Firing Laboratory oversaw the first test flight of a Redstone modified for Project Mercury, which launched from LC 5 at CCAFS.9 On July 1, the Missile Firing Laboratory, along with the Atlantic Missile Range Operations Office, became the Launch Operations Directorate (LOD) and was absorbed by Over the next two years, the LOD assisted NASA in the launch of five additional Redstone rockets as part of Project Mercury.
This included three test flights (Mercury-Redstone MR-1A, and and two manned launches and which carried Alan B. Shepard, and Virgil I. Gus Grissom to space, respectively. The LOD also launched one test flight for the Apollo Program, Saturn-Apollo (SA)-1 from LC 34 on October 27, the first test flight of the Saturn I vehicle.11 8 Francis E. Jarrett, Jr. and Robert A. Lindemann, Historical Origins of NASA s Launch Operations Center to July 1, (Cocoa Beach, FL: John F. Kennedy Space Center, The Redstone missile, which holds the distinction of being the first operational US ballistic missile, was developed by von Braun s group in the early as an adaptation of the Navaho cruise missile.
The first test of the Redstone occurred at LC 4 at CCAFS on August 20, the missile was declared operational in June Cliff Lethbridge, Redstone Fact Sheet, 9 Kay Grinter, Beach-Abort abort.htm. 10 Benson and Faherty, Gateway, 15, Jarrett and Lindemann, Launch Operations Center, 68. The Atlantic Missile Range Operations Office was a NASA liaison group established in to coordinate the scheduling and use of CCAFS facilities with the Atlantic Missile Range/CCAFS. 11 E. Bell, II, Saturn SA-1, Because the rocket used to launch the Gemini spacecraft was the Air Force s Titan missile, the LOD s support of Project Gemini, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HAULOVER CANAL BRIDGE (John F. Kennedy Space Center) HAER No. Page 6 NASA s John F.
Kennedy Space Center On May 25, sixteen days after the flight of Alan Shepard, President John F. Kennedy charged NASA with putting a man on the Moon by the end of the decade. With the Agency s decision to use the powerful Saturn V launch vehicle, it was apparent that a new launch complex was required, and CCAFS, already with twenty-two launch complexes, did not have the space for new rocket facilities. After an evaluation of nine potential launch sites throughout the U.S. and nearby islands, NASA chose to acquire land on Merritt Island, an undeveloped area west and north of the existing CCAFS missile launching area. By September the initial master plan for what would initially be referred to as NASA s Merritt Island Launch Area (MILA) was completed.
In late NASA began to gain title to the land, with the ACOE acting as purchasing agent. Over acres were acquired by outright purchase, which included several small towns, such as Orsino, Wilson, Heath and Audubon, many farms, citrus groves, and several fish camps. Negotiations with the State of Florida provided submerged lands, resulting in the acquisition of property identified on the original Deed of Dedication. Much of the State-provided land was located south of the Old Haulover Canal and north of the barge canal/terminal facility.12 As work on the Apollo Program progressed, it became clear to NASA Headquarters that the LOD needed to be an independent center.
On March 7, NASA announced the separation of the LOD from and its establishment as an independent field installation, the Launch Operations Center (LOC), effective July 1, Dr. Debus was appointed the Center s first Director.13 The LOC would serve all NASA projects at Cape Canaveral, and would consolidate under a single official all of NASA s operating relationships with the Air Force Commander of AMR [Atlantic Missile Range]. 14 Because of the increase in responsibilities, the LOC acquired new personnel. While most offices, or directorates, remained at CCAFS, crammed in tiny spaces, some groups were forced to find space in buildings throughout the cities of Cape Canaveral and Cocoa Beach.
The various directorates would remain in these facilities until the new buildings at MILA were completed.15 Eventually, MILA incorporated the LOC as part of its jurisdiction; the NASA s second Manned Space Program, was limited to acting as NASA s point of contact with CCAFS and gathering/processing telemetry measurements. 12 Benson and Faherty, Gateway, The Old Haulover Canal, constructed circa is located roughly 0.9 miles southeast of the new Haulover Canal, the latter of which is crossed by the Haulover Canal Bridge. The Old Haulover Canal, which is listed in the National Register of Historic Places, was constructed at the narrowest point of Merritt Island to link the Mosquito Lagoon with the Indian River for watercraft.
This location historically had served as a crossover point between the Lagoon and River, where cargo was carried across the Island prior to the construction of the canal. The Old Haulover Canal was abandoned circa when the new Haulover Canal was built to support larger watercraft. Robert G. Yoder, National Register Nomination: Old Haulover Canal (Washington, DC: National Park Service, 13 Jarrett and Lindemann, Launch Operations Center, 79. 14 Jarrett and Lindemann, Launch Operations Center, 80. 15 Benson and Faherty, Gateway, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HAULOVER CANAL BRIDGE (John F. Kennedy Space Center) HAER No. Page 7 entirety was renamed the John F.
Kennedy Space Center in November following the death of the President.16 A Manned Lunar Landing Program Master Planning Board, which consisted of NASA and Air Force personnel, was established to oversee the development of the new center on Merritt Island. Pan American was hired to complete the master plan for the center; the ACOE served as the LOC s supervisory design and construction agent.17 The master plan, mostly developed between and divided MILA into four functional zones: the launch zone, the launch support zone, the industrial zone, and the general support zone.
The zones were arranged to maximize the protection of people and facilities from the four common types of launch hazards: blast, acoustic, toxic, and nuclear.18 The launch zone consisted of the launch pads and their direct support structures, such as fuel storage facilities, arming towers, and cable terminal buildings; this area was constructed along the shoreline between CCAFS and Playalinda Beach. The launch support zone, or Vehicle Assembly Building Area located roughly 3 miles southwest of the launch zone, included the assembly building, Launch Control Center, and other facilities that directly supported launch activities.
The industrial zone, or Industrial Area, included assembly and checkout facilities, engineering and administrative facilities, such as the Headquarters Building, and employee/center support services. The general support zone contained support structures, such as instrumentation sites, security control buildings, and telemetry receiver areas; these are interspersed throughout the Center.19 Construction of KSC began in when the ACOE and hired contractors began to prepare the swampy land for the required facilities. Canals were dredged, with the sand used to compact and flatten the ground where the launch pads would be built. Surface water was then drained into the canals.
Over the next four years, the majority of the Center s key facilities, such as the VAB, the Launch Control Center, LC 39, Pad A, the barge canal and terminal facility, ordnance storage and laboratory areas, the Crawlerway, the Operations & Checkout Building, the Central Instrumentation Facility, and the Headquarters Building, were completed.20 16 Benson and Faherty, Gateway, 17 Benson and Faherty, Gateway, E.R. Bramlitt, History of Canaveral District (Cape Canaveral, FL: South Atlantic Division, U.S. Army Corps of Engineers, 18 Pan American World Airways, Guided Missiles Range Division, Analytical Report for NASA Merritt Island Launch Area Master Plan, Volume III (Cape Canaveral, FL: Pan American World Airways, Sweetsir Collection, File No.
ARCH00017252, KSC Archives Department, Florida; Pan American World Airways, Guided Missiles Range Division, Analytical Report for NASA Merritt Island Launch Area Master Plan, Volume III (Cape Canaveral, FL: Pan American World Airways, Sweetsir Collection, File No. ARCH00017254, KSC Archives Department, Florida. 19 Pan American World Airways, Merritt Island Launch Area Master Plan, Volume III, 20 Benson and Faherty, Gateway, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HAULOVER CANAL BRIDGE (John F. Kennedy Space Center) HAER No. Page 8 The original master plan for MILA/KSC depicted the planned transportation routes that would provide automobile access to the Center.
The plan showed that at the time of land acquisition, State Road 3/Merritt Island Road (presently called Kennedy Parkway North within the boundaries of KSC and North Courtenay Parkway outside the KSC boundaries) was the main north-south road, and State Road 401 was the main east-west road. These, along with numerous secondary roads that provided access to the former communities and individual properties, amounted to roughly 69 miles of paved road within however, none of the roads was suitable for the projected heavy use. NASA coordinated the rehabilitation of existing roads/construction of new roads with the Florida Department of Transportation (then, the Florida State Road Department); NASA primarily managed those roads within the Center (Figure No.
A- 1) while the Florida Department of Transportation focused on those outside the Center, although there was some overlap.21 The principle components of NASA s efforts were the construction of a new road, Orsino Causeway (presently known as NASA Causeway/NASA Parkway/State Road between U.S. 1 and CCAFS and the renovation of State Road 3. The Orsino Road project included the construction of two bridges: the Indian River Bridge and the Banana River Bridge. The State Road 3 work involved the replacement of an existing wooden bridge over the Haulover Canal with a new bridge.
All three bridges featured nearly identical double-leaf bascule main spans; their key difference was the number of approach spans due to the width of the body of water they crossed.22 During the initial planning phases, NASA considered many options for the Haulover Canal area based on ease of travel (both vehicular and watercraft), potential access restrictions, and cost effectiveness (construction and maintenance). Planners had discussed single- and double-leaf bascule bridges over the canal; maintaining the existing one-lane, hand-operated wood swing bridge; and relocating the Intracoastal Waterway passage.
By July it was decided that a double-leaf bascule bridge would replace the existing bridge, a 5-mile section of roadway between the canal and Volusia County would be rebuilt, and there would be no relocation of the Waterway, because there was no space program that required the action.23 The drawings for the 5-mile segment of State Road 3 and the Haulover Canal Bridge were completed by the ACOE in August bids for their construction were opened on September 21 Pan American World Airways, Merritt Island Launch Area Master Plan, Volume III, Merritt Island Master Plan, (architectural drawings, NASA March 22 The written narrative of this report focuses on the Haulover Canal Bridge.
The history and physical differences of the Indian River Bridge and Banana River Bridge are discussed in Appendix B. 23 C. Bidgood, Course of Action Relative to Area IV Improvements Programmed in FY memo to Lt. Col. R. A. Petrone, July 15, Box 14A.2, Folder No. 77, Land Management Collection, KSC Archives Department, Florida. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HAULOVER CANAL BRIDGE (John F. Kennedy Space Center) HAER No. Page 9 17, The contractor, B. B. McCormick and Sons, commenced construction of the new Haulover Canal Bridge on October 7, (Figure Nos. A-2 through A-5).
The existing bridge remained in operation during the construction.25 On January 1, KSC formally assumed operational and maintenance responsibilities for the Old Haulover Canal bridge and the 5-mile segment of State Road 3 from the canal to the Volusia County line.26 The new bridge was completed and turned over to KSC for occupancy on October 1, around the same time, the old bridge was demolished.27 Since its construction, the Haulover Canal Bridge has carried automobile traffic to and from At first, KSC stationed security guards at the Haulover Canal, requiring anyone who crossed the bridge in the southbound lane to have an access badge.
This restriction was removed on January 3, when KSC moved the guard stations further south, at the intersection between Kennedy Parkway North and State Road The Haulover Canal Bridge has remained as originally designed and constructed only undergoing minor cosmetic or technological modifications. On March 31, a tornado caused some damage to the bridge when it blew away the traffic control gates at the north end and knocked out two windows in the control tower.29 Four years later, in a new generator was installed on the bridge. In the Haulover Canal Bridge served as the test site for an experimental control system that would allow remote operation of the bridge, as well as the Indian River Bridge.
Cameras mounted at the bridge sent images to a control console in the Launch Control Center, located more than 12 miles from the bridge. In addition, microphones and loudspeakers were mounted to the bridge fenders to allow the operator to speak with boaters.30 Ultimately, KSC decided not to pursue remote operation of the bridge. In the mid to late the Haulover Canal Bridge underwent repair and refurbishment, but available sources did not provide details as to what this work entailed.31 In the bridge s 24 ACOE, Plans of Proposed Road and Bridge Haulover Canal; Arming Tower Low Bidder Announced, Spaceport News, September 17, 6. 25 Because of this, the road renovation work required a realignment of an approximate 1.3-mile segment in the vicinity of the Haulover Canal.
The original road was left in place for the public to access the Canal. 26 Haulover Canal Bridge Harbors Rustic Memories, Spaceport News, December 31, 7. 27 New Haulover Bridge Eases Traffic Flow, Spaceport News, October 7, 3; Haulover Canal Bridge. 28 Public Access Restrictions Relaxed, Spaceport News, December 31, 2. 29 Photo Caption. The windows in the Control House may have been replaced at this time, but available sources were not able to confirm this. 30 Remote Control of Bridge Being Tested, Spaceport News, March 3, 1 and 4. 31 NASA Haulover Canal Bridge. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HAULOVER CANAL BRIDGE (John F. Kennedy Space Center) HAER No.
Page 10 north fender required two new timbers that were damaged by a barge.32 In the mid-1990s, the Haulover Canal Bridge received modifications to its control and electrical systems.33 In summer the bridge underwent preventative maintenance and a re-decking.34 NASA s Manned Space Programs Initially, NASA s space program was organized into three phases: Projects Mercury, Gemini, and Apollo. Project Mercury, initiated in was executed in less than five years. Begun in Project Gemini was the intermediate step toward achieving a manned lunar landing, bridging the gap between the short-duration Mercury flights and the long-duration missions proposed for the Apollo Program.
Apollo, the largest and most ambitious of the manned space programs, had as its goal the landing of astronauts on the Moon and their safe return to Earth. Providing the muscle to launch the spacecraft was the Saturn family of heavy vehicles.
Saturn IB rockets were used to launch the early unmanned Apollo test flights and the first manned flight, Apollo 7, which carried astronauts on a ten-day Earth orbital mission.35 Three different launch vehicles were used for Apollo: Saturn I, Saturn IB and Saturn V; and three different launch complexes were involved: LC 34 and LC 37 on CCAFS, and LC 39 on Altogether, thirty-two Saturn flights occurred (seven from LC 34, eight from LC 37, and seventeen from LC 39, Pad A [twelve] and Pad B [five], including Skylab and the Apollo-Soyuz Test Project) during the Apollo era. Of the total thirty-two, fifteen were manned, and of the seven attempted lunar landing missions, six were successful. No major launch vehicle failures of either Saturn IB or Saturn V occurred.
There were two major command/service module failures, one on the ground (Apollo 1) and one on the way to the Moon (Apollo The unmanned Apollo 4 mission, which lifted off on November 9, was the first Saturn V launch and the first launch from LC 39 (Pad A) at The next launch from LC 39 (Pad A) was Apollo 6, on July 14, Beginning with the launch of Apollo 8 on August 14, all manned missions have launched from LC On July 20, the goal of landing a man on 32 Notes Rice Box Folder No. 4, Executive Staff Notes KSC Archives Department, Florida. 33 NASA Haulover Canal Bridge. 34 Haulover Bridge Closed through mid-June, The Daytona Beach-News Journal, May 13, 35 Harry A. Butowsky, Reconnaissance Survey: Man in Space (Washington, DC: National Park Service, 5; Benson and Faherty, Gateway, 5.
36 LC 39 is comprised of two launch pads, Pad A and Pad B. Unless otherwise noted, the term LC 39 refers to both launch pads. 37 NASA, Facts: John F. Kennedy Space Center 82. 38 Apollo 5 launched from CCAFS s LC Apollo 7 launched from LC 34 at Charles D. Benson and William B. Faherty, Moon Launch! A History of the Saturn-Apollo Launch Operations (Gainesville, FL: University Press of Florida, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HAULOVER CANAL BRIDGE (John F. Kennedy Space Center) HAER No. Page 11 the Moon was achieved when Apollo 11 astronauts Neil A. Armstrong, Edwin E. Buzz Aldrin, and Michael Collins successfully executed history s first lunar landing.
Armstrong and Aldrin walked on the surface of the Moon for two hours and thirty-one minutes, and collected 21 kilograms of lunar material. Apollo 17 served as the first night launch in December An estimated people viewed the liftoff from LC 39 Pad A, which was the final launch of the Apollo Program.39 Skylab, an Earth-orbiting mission that was a follow-on to the Apollo Program, served as an early type of space station. With cubic feet of work and living space, it was the largest habitable structure ever placed in orbit at the time. The station achieved several objectives: scientific investigations in Earth orbit (astronomical, space physics, and biological experiments); applications in Earth orbit (Earth resources surveys); and long-duration spaceflight.
Skylab 1 orbital workshop was inhabited in succession by three crews launched in modified Apollo command/service modules (Skylab 2, 3 and 4). Actively used until February Skylab 1 remained in orbit until July 11, when it re-entered Earth s atmosphere over the Indian Ocean and Western Australia after completing orbits.40 The Apollo-Soyuz Test Project of July the final application of the Apollo Program, marked the first international rendezvous and docking in space, and was the first major cooperation between the only two nations engaged in manned space flight, the U.S. and Russia. As the first meeting of two manned spacecraft of different nations in space, and the first docking and visits by astronauts and cosmonauts into the others spacecraft, the event was highly significant.
The Apollo-Soyuz Test Project established workable joint docking mechanisms, taking the first steps toward mutual rescue capability of both Russian and American manned missions in space.41 On January 5, President Richard M. Nixon delivered a speech in which he outlined the end of the Apollo era and the future of a reusable space flight vehicle, the Space Shuttle, which would provide routine access to space. 42 During this speech, President Nixon instructed NASA to proceed with the design and building of a partially reusable Space Transportation System commonly referred to as the Space Shuttle) consisting of a reusable orbiter, three reusable main engines, two reusable solid rocket boosters, and one expendable external liquid fuel tank.
NASA selected KSC as the primary launch and landing site for the Space Shuttle Program. responsible for designing the launch and recovery facilities, was to develop methods for shuttle assembly, checkout, and launch operations.43 39 NASA, Facts, 40 NASA, Facts, 91. 41 NASA, Facts, 96. 42 Marcus Lindroos, ed., President Nixon s Announcement on the Space Shuttle, updated April 14, 43 Linda Neuman Ezell, NASA Historical Databook Volume III Programs and Projects The NASA History Series (Washington, DC: NASA History Office, Table Ray A. Williamson, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HAULOVER CANAL BRIDGE (John F. Kennedy Space Center) HAER No.
Page 12 The first orbiter intended for spaceflight, Columbia, arrived at KSC from Air Force Plant 42, Palmdale, California, in March Originally scheduled for liftoff in late the launch date was delayed by problems with both the main engine components as well as the thermal protection system. Columbia spent 610 days in the Orbiter Processing Facility, another 35 days in the Vehicle Assembly Building and 105 days on LC 39, Pad A, before lifting off on April 12, the first orbital test flight and first Space Shuttle mission, ended with a landing on April 14, at Edwards Air Force Base in California. This launch demonstrated Columbia s ability to fly into orbit, conduct on-orbit operations, and return safely.44 Columbia flew three additional test flights in and all with a crew of two.
The Orbital Test Flight Program ended in July with 95 percent of its objectives accomplished. After the end of the fourth mission, President Reagan declared that with the next flight the Shuttle would be fully operational. During the Space Shuttle Program, 135 missions were launched from The Space Shuttle carried a number of planetary and astronomy missions including the Hubble Space Telescope, the Galileo probe to Jupiter, Magellan to Venus, and the Upper Atmospheric Research Satellite. In addition, a series of Spacelab research missions were flown, which carried dozens of international experiments in disciplines ranging from materials science to plant biology.
Between and NASA conducted a joint U.S./Russian Shuttle-Mir Program as a precursor to construction of the International Space Station. The Shuttle-Mir Program served to acclimate the astronauts to living and working in space. Many of the activities carried out were types they would perform on the International Space Station.45 Construction of the station began in it was completed in The Space Shuttle Program suffered two major setbacks with the tragic losses of the Challenger and Columbia on January 28, and February 1, respectively. Challenger was destroyed 73 seconds after launch due to a faulty O-ring seal in the right solid rocket booster; the crew of seven astronauts all perished.
Columbia was lost because of a breach in the thermal protection system on the leading edge of the left wing, caused by a piece of insulating foam, which separated from the external tank after launch and struck the wing.46 Sixteen minutes prior to its scheduled touchdown at the spacecraft broke apart during reentry over eastern Texas and all seven members of the crew perished. Developing the Space Shuttle, in Exploring the Unknown: Selected Documents in the History of the U.S. Civil Space Program, Volume IV: Accessing Space, ed. John M. Logsdon (Washington, DC: U.S. Printing Office, 44 Dennis R. Jenkins, Space Shuttle, The History of the National Space Transportation System. The First 100 Missions (Cape Canaveral, FL: Specialty Press, 99. 45 Judy A. Rumerman, with Stephen J.
Garber, Chronology of Space Shuttle Flights (Washington, DC: NASA History Division, 3. 46 Columbia Accident Investigation Board, Report, Volume I, (Washington, DC: U.S. Government Printing Office, 25, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HAULOVER CANAL BRIDGE (John F. Kennedy Space Center) HAER No. Page 13 Part II. Structural/Design Information A. General Statement: 1. Character: The Haulover Canal Bridge (Photo Nos. 1, 2, 3) is a double-leaf, steel trunnion bascule bridge with concrete approaches, a concrete substructure, and a concrete control house on its northeast side. The bridge is oriented along a northwest-southeast axis and carries the two-lane, Kennedy Parkway North over the Haulover Canal. 2.
Condition of fabric: The Haulover Canal Bridge is in good condition due to a rehabilitation effort May-September B. Description: The Haulover Canal Bridge has approximate overall dimensions of 225 -3 in length, 54 in width, and 50 in height (above mean sea level); the roadway surface is roughly 32 above mean sea level. It is comprised of one main span, two piers, two approach spans (one to either side of the bascule), two abutments, and one Control House. The main span consists of a double-leaf steel trunnion bascule, which has a width of 33 and measures 142 -9 in length at the road surface (Photo Nos. 3, 6).
The two bascule leafs are identical, with a length of 84 -9 including the road deck portion of the leaf (54 in length), the trunnion section (roughly 16 -6 in length), and the counterweight mechanism (about 14 -3 in length).47 The road deck portion of each leaf is supported by two main girders, six longitudinal stringers, and four lateral stringers. The main girders are positioned on the east and west sides and extend for the entire length of the bascule leaf; they range in depth from 3 -1 , where the two leafs meet, to 6 -6 , at the trunnion, to 4 at the end of the counterweight mechanism. The longitudinal stringers are between the main girders and are spaced roughly 3 -9 on center. The lateral stringers have a spacing of approximately 17 -7 on center.
In the trunnion portion of the bascule leaf, the longitudinal stringers are spaced 3 -9 apart; there are no lateral stringers in this section. In the counterweight mechanism, the longitudinal stringers have a spacing of roughly 6 - 8 on center, and the five lateral supports are spaced roughly 4 -3 on center. Each bascule leaf also has cross bracing, mounted to the underside of the longitudinal stringers, to provide further support for the bridge loads. The top surface of each bascule leaf is comprised of open steel grating in the deck area and a layer of concrete over steel plating in all other areas.
The bascule crosses a 90 channel, on either side of which is an approximately 179 -long arced fender comprised of two-, three-, and seven-bundle concrete piles faced with horizontal timber wales; the purpose of the fenders is to protect the bridge from boats passing through the channel. 47 The counterweight mechanism and trunnion for each bascule leaf rest below the road surface of the approach spans. Together, the two bascule leafs have a total length of 169 -6 . CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HAULOVER CANAL BRIDGE (John F. Kennedy Space Center) HAER No. Page 14 A catwalk extends for the entire length of each fender, and a red navigation light is located at both ends of each fender. The Haulover Canal Bridge has two piers, Pier A and Pier B.
Pier A is located to the northwest and supports the north bascule leaf; Pier B is situated to the southeast, supporting the south bascule leaf (Photo No. 8). Both piers are rectangular in plan, with approximate dimensions of 18 -6 in length, 42 in width, and 34 in height above mean sea level; each pier further extends to roughly 18 below mean sea level, excluding the pilings. The piers are comprised of reinforced concrete and are fitted with niches and spaces (accessed by ladders or doors) for mechanical and electrical equipment. The bascule trunnion and operating machinery are located within one of the niches near the top of each pier.
The centerline of the trunnion is situated approximately 10 -6 from the inner face of its supporting pier and roughly 4 below the road surface (about 27 above mean sea level). The bascule operating machinery is located below the trunnion, roughly 18 above mean sea level (Photo No. 7). The two approach spans are fixed steel girders, each of which measures 41 -3 in length and 33 in width. Each span has a superstructure that consists of a reinforced concrete slab supported by steel girders. The four longitudinal girders are about 2 in height and are spaced at 26 on center. There are three latitudinal girders that are about 1 -9 in height and are spaced so there is one at each end of the approach span and one in the center. The approach spans are supported by the end abutments and main piers.
Each of the two abutments is comprised of three reinforced concrete walls. One of the walls sits adjacent and parallel to the canal and supports the outer end of the approach span; the other two walls extend away from the canal at a 45-degree angle to the waterway. Each wall of the abutments measures 2 -9 thick at the bottom, which rests on a reinforced concrete base that is 2 -5 thick. The wall supporting the approach span tapers to roughly 1 -6 at the top. The other two walls taper to about 1 at the top, and their overall height diminishes towards the outer end. The bridge s Control House, which has approximate overall dimensions of 18 -6 in length, 12 - 9 in width, and 26 -8 in height, is cantilevered off the northeast side of Pier A (Photo Nos.
9, It is constructed of reinforced concrete, features a flat roof, and contains three internal levels. A one-light metal swing door on the southwest elevation provides access to the middle level of the Control House. This level sits approximately 6 above the road surface, is in the form of a trapezium, and has an area of roughly 218 square feet. It is divided into two spaces: an electrical equipment room at the southeast end and a storage area at the northwest end. A ladder in the west corner provides access to the bottom level of the structure, while a ladder in the north corner leads to the top level. The 218 square foot bottom level, which sits roughly 7 below the road surface and also is a trapezium in plan, contains the electrical generator and auxiliary power panel for the bridge.
The rectangular, 168 square foot top level, roughly 9 -5 above the road surface, serves as the control room (Photo No. The control panel for the bascules is located along the southeast wall (Photo No. an L-shaped desk area extends along portions of the CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HAULOVER CANAL BRIDGE (John F. Kennedy Space Center) HAER No. Page 15 southwest and northwest walls. Beginning roughly 3 -8 above the finished floor of this level, the wall material changes to glass panels, which slant outward from the bottom to the top. The two center panels are one-over-one single hung sash windows,48 and the two outer panels are one-light fixed windows. Above the windows, projecting from the exterior wall surface, are extruded aluminum louvers. C.
Mechanicals/Operation: The Haulover Canal Bridge s Control House is manned twenty- four hours a day, seven days a week; the tenders typically prefer to use the automatic controls, rather than the manual controls, to operate the bascule. Additionally, the bascule can be operated from the equipment room, if necessary. When a boat nears the bascule, its captain radios the bridge tender; the call numbers are posted on metal signs attached to the railings. The bridge tender then presses the begin raise sequence button. At this point, the traffic signal for automobiles changes to red, the gate flashers start, and the roadway gongs sound. After checking for traffic, the tender lowers the oncoming traffic gates followed by the offgoing traffic gates, using their individual down buttons.
Once these steps are completed, the tender proceeds with pressing the raise button on the control panel. This initializes the opening process, which includes pulling the lock bars, sounding the horn, and raising the bascule leafs, which take roughly ninety seconds to open to the full 76 degrees.49 Once the boat is past the bridge, the tender begins the lowering process by pressing the begin lower sequence button, and the warning horn sounds five times. After the horn has sounded, the tender presses the lower button, which brings the bascule leafs to their seated position and drives the lock bars. Afterwards, the roadway control gates are raised and the traffic signals are changed to green.50 D. Site Information: The Haulover Canal Bridge is oriented along a northwest-southeast axis.
It carries Kennedy Parkway North over the Haulover Canal, which has a southwest-northeast orientation. The Haulover Canal and Bridge are located outside of the controlled access area of but within the boundaries of the Merritt Island National Wildlife Refuge. A manatee viewing area sits directly northeast of the bridge, and a boat ramp is located roughly to the southwest of the bridge. Paved roads provide access to the manatee viewing area and boat ramp; dirt roads provide access to the northwest and southeast canal shores. 48 Originally, these windows were four-light awning.
49 Paula Eri, Haulover Canal Bridge, Operating Instructions (Florida: Kennedy Space Center, When operating the bridge manually from the Control House, the tender presses different buttons to pull the span locks, raise the bascule leafs, and sound the horn, in that order. Eri, Haulover Canal Bridge, 7. Similarly, when operating the bridge from the equipment room, each step of the process was initiated separately. In addition, the operator had to yell all clear from the room. Eri, Haulover Canal Bridge, 17. 50 Eri, Haulover Canal Bridge, 11. As with the manual raising of the bridge, the manual operations to lower the bridge require separate buttons for each task. Eri, Haulover Canal Bridge, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HAULOVER CANAL BRIDGE (John F.
Kennedy Space Center) HAER No. Page 16 Part III. Sources of Information A. Primary