Cape Canaveral Air Force Station, Launch Complex 39, Hypergol Maintenance and Checkout Area, Hypergol Module Processing North, Cape Canaveral
Cape Canaveral Air Force Station, Launch Complex 39, Hypergol Maintenance and Checkout Area, Hypergol Module Processing North, Cape Canaveral, Brevard County, FL. Surveyed as HAER FL-8-11-T-1, with a 3,376-word written history.
From the record
“The Hypergol Module Processing North North) is eligible to the National Register of Historic Places in the context of the U.S.”
Written record, HAER FL-8-11-T-1 survey. Machine-read text.
Surveyed by the federal HAER program as HAER FL-8-11-T-1 · the record runs 3376 words · one of 123 surveyed structures published for this county.
Source document
Quoted word for word from HAER FL-8-11-T-1.
Not written, edited or summarised by this site.
The Hypergol Module Processing North North) is eligible to the National Register of Historic Places in the context of the U.S. Space Shuttle Program under Criterion A for its significant associations in the area of Space Exploration. Since it has achieved exceptional national significance in the last 50 years, Criteria Consideration G applies.
HMP North was built in as part of what was originally called the Fluid Test Complex, now called the Hypergol Maintenance and Checkout Area (HMCA), or by its common name, the Hypergol Maintenance Facility Originally called the Environmental Systems Test Building (EST), HMP North refurbished the Space Shuttle s forward Reaction Control System and Orbital Maneuvering System (OMS) pods, performed hypergolic test loading, and hazardous systems tests and checkouts. Report Prepared By: New South Associates, Stone Mountain, Georgia Date: March 14, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HYPERGOL
Maintenance and Checkout Area Hypergol Module Processing North
North) HAER No. PAGE 2 PART
Historical Information
List of Acronyms APU Auxiliary Power Units CIF Central Instrumentation Facility EST Environmental Systems Test Building GN2 Gaseous Nitrogen HAER Historic American Engineering Record He Helium HIM Hardware Interface Module HMCA Hypergol Maintenance and Checkout Area HMF Hypergol Maintenance Facility HMP Hypergol Module Processing ISS International Space Station KSC Kennedy Space Center LCC Launch Control Center LH2 Liquid Hydrogen LO2 Liquid Oxygen LRU Line Replaceable Units MMH Monomethyl Hydrazine NASA National Aeronautics and Space Administration National Register of Historic Places N2 O4 Nitrogen Tetroxide O&C Operations & Checkout OMS Orbital Maneuvering System OPF Orbiter Processing Facility PRF Parachute Refurbishment Facility RCS Reaction Control System SCAPE Self Contained Atmospheric Protective Ensemble SSP Space Shuttle Program TPS Thermal Protection System VAB Vehicle Assembly Building CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HYPERGOL MAINTENANCE AND CHECKOUT AREA HYPERGOL MODULE PROCESSING NORTH North) HAER No.
PAGE 3 A. HMP North and the SSP HMP North was built in as part of the Fluid Test Complex and was originally called the Environmental Systems Test Building (EST). It contained test equipment for spacecraft environmental control, or life support, systems. The facility had two 40 square by 60 high test cells on opposite sides of a central building that contained control rooms on the second floor and equipment storage rooms on the first floor. Each test cell had overhead cranes with hook heights of 45 . There were also pre-installation acceptance laboratories for the validation of spacecraft components on the first floor.1 To support the the Fluid Test Complex facilities were modified in by Pan American Technical Services, Inc. of Cocoa Beach, Florida.
At this time the name of the Fluid Test Complex was changed to the Hypergol Maintenance and Checkout Area and the Environmental Systems Test Building s name was changed to HMP North Changes were made to the interiors of the buildings in the area, especially in the high bay work areas, to refurbish and checkout the Space Shuttle s forward aft OMS pods, hypergolic systems, and other hazardous systems tests and checkouts. Specifically, HMP North was modified to refurbish and checkout the hypergolic fuel modules of the Space Shuttle orbiter s aft OMS pods.2 The OMS pods were attached to either side of the orbiter s upper aft fuselage, and each 1 Pan American World Airways, Inc., Analytical Report, John F. Kennedy Space Center, NASA, Kennedy Space Center, Florida Master Plan.
Master Planning Office, 33. 2 For an explanation of hypergolic propellants as they relate to the see: HAER No. page 4. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HYPERGOL MAINTENANCE AND CHECKOUT AREA HYPERGOL MODULE PROCESSING NORTH North) HAER No. PAGE 4 pod was divided into two compartments containing the OMS engines.3 The RCS and OMS systems worked in tandem on the orbiter to provide thrust for orbital maneuvers and small axis changes. Each RCS contained high-pressure gaseous helium storage tanks, pressure regulation and relief systems, hypergolic fuel and oxidizer tanks, an engine propellant distribution system, and thermal control systems.
The RCS rockets and thrusters provided thrust for attitude (rotational) maneuvers, including pitch, yaw, and roll, and for small velocity changes along the orbiter s axis. Each OMS contained one engine and the hardware needed to pressurize, store, and distribute the hypergolic propellants and oxidizers needed to perform maneuvers.
The OMS engines provided thrust for orbit insertion, orbit circularization, orbit transfer, rendezvous, deorbit, and other orbital maneuvers.4 When the Space Shuttle was docked at the International Space Station (ISS), the OMS engines could be used to push the ISS into a higher orbit.5 HMP North continued to service the orbiter s aft RCS and OMS pods through the end of the The program ended in July of when the crew of Atlantis landed at KSC to complete the program s mission Since the SSP s first launch in the program launched 355 astronauts from sixteen countries. The five shuttles traveled more than 542 million miles and conducted over experiments in the fields of Earth, astronomy, biological, and materials sciences.
The shuttles docked with two space stations, including the Russian Mir and the ISS, and deployed 180 payloads such as satellites and spacecraft. With the return of the final mission, NASA 3 NASA, Reaction Control System, Shuttle Reference Manual, 4 Ibid. 5 Larry Taylor, URS Facilities Manager, interview with author, April 8, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HYPERGOL MAINTENANCE AND CHECKOUT AREA HYPERGOL MODULE PROCESSING NORTH North) HAER No. PAGE 5 Administrator Charles Bolden said, the brave astronauts of are emblematic of the shuttle program skilled professionals from diverse backgrounds who propelled America to continued leadership in space with the shuttle s many successes. 6 B. Physical History 1. Date of Construction 2.
Architect/Engineer Tampa Bay Engineering Company, St. Petersburg, Florida7 3. Builder/Contractor/Supplier Not known 4. Original Plan and Construction HMP North was built in two consecutive phases. The first phase was the construction of the building s main portion, including two 40 square by 60 high test cells on opposite sides of a two-story central building. The central building contained control rooms on the second floor that operated equipment used in the test cells.
The first floor contained two equipment storage rooms, two locker rooms, an office, a mechanical room, and two pre- installation acceptance laboratories for the validation 6 Michael Curie, Kyle Herring, and Candrea Thomas, NASA s Proud Space Shuttle Program Ends With Atlantis Landing, NASA press release, accessed on March 8, 7 Tampa Bay Engineering Company, Fluid Test Complex, Environmental Control Systems Building, construction drawings, March 5, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HYPERGOL MAINTENANCE AND CHECKOUT AREA HYPERGOL MODULE PROCESSING NORTH North) HAER No. PAGE 6 of spacecraft environmental systems components. The test cells had segmented vertical-lift doors on the east and west elevations, and each cell had an overhead crane with a hook height of 45 .
The building had a reinforced concrete frame structure, concrete block walls, and steel high bay doors.8 The second phase of construction occurred immediately after the first and included a one-story, square foot addition to the building s south elevation. The addition had a reinforced concrete frame structure, concrete block walls, and a gently sloping built-up flat roof. Its floor plan contained eight work rooms, a locker room/toilet, and a central corridor. The work rooms included two pre-installation acceptance rooms for coolant systems, one pre-installation acceptance room for water systems, two parts storage/tool crib rooms, a blacklight inspection room, a mechanical equipment room, and an equipment maintenance room.9 5.
Additions and Alterations HMP North was modified for the SSP in The modifications included the building s civil, architectural, structural, mechanical, and electrical systems. Civil site alterations to HMP North included new asphalt pavement, curbs and gutters, drainage grates, storm drains, and site contouring. Architectural changes included partition removal and modification of the original second-floor control rooms, entrance door replacements, new roofing, and a new roof penetration plan to accommodate new ventilation equipment. Structural changes included the installation of new fixed 8 Ibid.
9 NASA, Addition to Manned Spacecraft Environmental Control Systems Building, construction drawings, August CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HYPERGOL MAINTENANCE AND CHECKOUT AREA HYPERGOL MODULE PROCESSING NORTH North) HAER No. PAGE 7 and hinged test stands in each of the building s test cells, which were used to service the shuttle s OMS and RCS systems. Various mechanical and electrical systems were also changed and upgraded throughout the facility.10 PART II. STRUCTURAL/DESIGN/EQUIPMENT INFORMATION A. General Statement 1. Character HMP North was originally used to process and checkout the environmental, or life support, systems of the Gemini and Apollo spacecraft. It was later modified to process and checkout the Space Shuttle s aft RCS and OMS pods.
The concrete-frame and concrete-block building has a pair of high bay work cells on either side of a two-story central building, which contains control rooms and support areas. There is a one-story wing on the south elevation of the building that contains offices, labs, and storage areas. 2. Condition of Fabric The condition of HMP North s fabric is good. The building was regularly maintained throughout its lifespan. It does exhibit minor signs of deterioration such as peeling paint and rust. B.
Descriptions of Interior and Exterior HMP North is a spacecraft test facility with a reinforced concrete frame structure, painted 12 nominal concrete block walls, a reinforced concrete foundation, and a gently 10 Pan American Technical Services, Inc., Fluid Test Complex, Modifications for Shuttle, construction drawings, January CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HYPERGOL MAINTENANCE AND CHECKOUT AREA HYPERGOL MODULE PROCESSING NORTH North) HAER No. PAGE 8 sloping built-up roof. The building has an irregular footprint and has overall dimensions of 128 -0 long (north-south) and 110 -0 wide (east-west). The building contains square feet. The defining features of the building are two high-bay test cells with exterior dimensions of 40 -0 wide x 40 -0 long x 60 -0 high.
The test cells are arranged on the east and west sides of a central two-story building that measures 30 -0 wide x 40 - 0 long. There is a central, one-story projection on the north elevation that measures 30 -0 wide x 13 -0 deep. There is also a one-story concrete-block wing on the south elevation of the building that measures 68 -0 long x 48 - 0 wide. The wing has a gently sloping built-up roof and a concrete foundation. Each test cell features an exterior vertical-lift door that measures 22 -0 wide x 40 -0 high. The doors are equipped with inflatable seals that exclude contaminants and seal the building in case of toxic spills. Other entrances include a number of single and double pedestrian doors on all elevations. There are no windows on the building.
The test cells are equipped with large capacity exhaust systems designed to reduce contaminants and remove toxic fumes from the interior. A large array of ventilation equipment is located on top of the building s two-story portion, between the two test cells exterior walls. Arrayed around the building are a variety of chemical storage tanks, control panels, valves, and pipes that serve the interior testing areas. Just north of the east test cell is a monomethyl hydrazine fuel pump and storage CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HYPERGOL MAINTENANCE AND CHECKOUT AREA HYPERGOL MODULE PROCESSING NORTH North) HAER No. PAGE 9 tank. Likewise, there is a nitrogen tetroxide (N2O4) tank on the north side of the west test cell.
On the south side of the building are four storage tanks that contain gaseous helium and gaseous nitrogen. The interior dimensions of HMP North s two test cells contain 38 -0 x 38 -0 of work space. This space includes service areas that checked out the hypergolic fuel and oxidizer systems used in the Space Shuttle orbiter s aft RCS and OMS pods. Each test cell contains four levels of stationary work platforms arranged in a U-shape around their interior walls. These work levels are spaced at 12 - 0 , 19 -0 , 27 -0 , and 35 -0 above the finished concrete floor. Steel staircases lead from one platform to the next. At the 12 -0 , 19 -0 , and 27 -0 levels there are hinged platforms that were lowered into place around the aft RCS and OMS modules after they were maneuvered into place.
The modules were maneuvered with an overhead 10-ton hydraulic bridge crane with a hook height of 45 . The interior of the central building s first floor contains storage rooms, a break room/kitchen, restroom, a power supply monitor room, lockers, and a gaseous helium/gaseous nitrogen regulator room filled with equipment panels. There is a metal spiral staircase that leads to the second floor. Interior finish materials include suspended acoustic tile ceilings, tile floors, and a combination of drywall and concrete block walls. The interior of the central building s second floor contains the Hardware Interface Module (HIM) room, which was originally a control room for the test cells. The HIM room contains cabinets of computer equipment that control the hardware used in the test cells.
This room has a CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HYPERGOL MAINTENANCE AND CHECKOUT AREA HYPERGOL MODULE PROCESSING NORTH North) HAER No. PAGE 10 raised floor that can be opened to reach the HIM cables and connectors that run under it. C. Operations and Process The operations at HMP North included the refurbishment disassembly/assembly, testing, propellant loading, and pressurization of hypergolic fuel and oxidizer lines of the Space Shuttle orbiter s aft OMS pods, RCS modules, and auxiliary power units (APUs).
The building also houses the Quick Disconnect Laboratory, equipped to service the fuel and oxidizer quick disconnect lines used on the components, and the Thruster Bench Test Lab where OMS/RCS thrusters were refurbished.11 The RCS/OMS pods were moved into the building s test cells through the vertical lift doors. The module on the left (port) side of the orbiter was processed in the west test cell, and the right (starboard) module was processed in the east test cell. Once inside the building and raised into position, the hinged work platforms were lowered into place to allow access to the modules. Each component underwent an inspection and hookup of electrical testing cables and propellant lines. The components thrusters were removed and inspected.
The thrusters regulators and valves were replaced if needed. Residual hypergolic propellants were drained and the systems were flushed and dried. All of the modules line replaceable units (LRUs) were repaired or replaced, followed by an electrical and pneumatic checkout. 11 Sciarini and Tzareff, Hypergol Maintenance Facility North Area, 3. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HYPERGOL MAINTENANCE AND CHECKOUT AREA HYPERGOL MODULE PROCESSING NORTH North) HAER No. PAGE 11 The facility also inspected and repaired the electrical and Thermal Protection Systems on the modules.12 Depending on launch and regular orbiter maintenance down periods, the OMS and RCS module process time varied from one to six months.
Once the systems were revalidated and in proper working order, they were closed out and removed from the test cells and transported to the Orbiter Processing Facility (OPF) for installation.13 At the height of the SSP the number of technicians working in HMP North varied from 15 to The hazardous nature of the toxic hypergolic fuels used in the modules required that technicians wear full-body self-contained atmospheric protective ensemble (SCAPE) suits, and vapor concentration monitors were used throughout the building. PART III. SOURCES OF INFORMATION A. Primary Sources Pan American World Airways, Inc. Analytical Report, John F. Kennedy Space Center, NASA, Kennedy Space Center, Florida Master Plan. On file in the Kennedy Space Center Master Planning Office. B.
Secondary Sources Deming, Joan, and Patricia Slovinac 12 Slovinac and Deming, Hypergolic Maintenance and Checkout Area Historic District, Stan D. Johnson, Senior Systems Technician, interview with author, April 9, 13 Slovinac and Deming, Hypergolic Maintenance and Checkout Area Historic District, Johnson, interview with author, 14 Johnson, interview with author, CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HYPERGOL MAINTENANCE AND CHECKOUT AREA HYPERGOL MODULE PROCESSING NORTH North) HAER No. PAGE 12 Hypergolic Maintenance & Checkout Area Historic District. National Register of Historic Places, draft nomination. On file at the Kennedy Space Center Environmental Management Branch.
CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HYPERGOL MAINTENANCE AND CHECKOUT AREA HYPERGOL MODULE PROCESSING NORTH North) HAER No. PAGE 13 NASA-Wide Survey and Evaluation of Historic Facilities in the Context of the U.S. Space Shuttle Program: Roll-Up Report. Submitted to the National Aeronautics and Space Administration, Environmental Management Branch. Sarasota, Florida: Archaeological Consultants, Inc. February revised July National Aeronautics and Space Administration [NASA] Master Plan. On file in the Kennedy Space Center Master Planning Office. Space Transportation System: Facilities and Operations, Kennedy Space Center, FL. On file at the Kennedy Space Center Archives. Reaction Control System, Shuttle Reference -newsref/sts-rcs.html.
Accessed March 8, NASA Facts Online: Propellants Hypergolic, Accessed August 6, Sciarini, E. Daniel, and Susan S. Tzareff Hypergol Maintenance Facility North Area North) Kennedy Space Center, Florida, Solid Waste Management Unit (SWMU) Assessment Report, PRL (Revision 0) [KSC-TA-7110]. J-BOSC Environmental Health and Services, Environmental Compliance and Public Health Section, Kennedy Space Center. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HYPERGOL MAINTENANCE AND CHECKOUT AREA HYPERGOL MODULE PROCESSING NORTH North) HAER No. PAGE 14 C. Engineering Drawings and Plans Tampa Bay Engineering Co. NASA Merritt Island Launch Area, Merritt Island, FLA., Fluid Test Complex Environmental Control Systems Construction Drawings.
NASA Merritt Island Launch Area, Merritt Island, FLA., Addition to Manned Spacecraft Environmental Control Systems Building. Construction Drawings. D. Early Views Kennedy Space Center. Photograph negative number LOC-63-7252. On file at Kennedy Space Center Archives. Photograph negative number LOC-63-8565. On file at Kennedy Space Center Archives. Photograph negative number LOC-63-9100. On file at Kennedy Space Center Archives. Photograph negative number On file at Kennedy Space Center Archives. Photograph negative number On file at Kennedy Space Center Archives. Photograph negative number On file at Kennedy Space Center Archives. Photograph negative number On file at Kennedy Space Center Archives. Photograph negative number On file at Kennedy Space Center Archives.
CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HYPERGOL MAINTENANCE AND CHECKOUT AREA HYPERGOL MODULE PROCESSING NORTH North) HAER No. PAGE 15 Photograph negative number On file at Kennedy Space Center Archives. E. Interviews Johnson, Stanley D. United Space Alliance. Senior Systems Technician. Interview with author. Taylor, Larry URS Facilities Manager. Interview with author. CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HYPERGOL MAINTENANCE AND CHECKOUT AREA HYPERGOL MODULE PROCESSING NORTH North) HAER No. PAGE 16 aerial photograph of HMCA under construction with HMP North building site in foreground, view south.
(Courtesy Image LOC-63-7252) CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HYPERGOL MAINTENANCE AND CHECKOUT AREA HYPERGOL MODULE PROCESSING NORTH North) HAER No. PAGE 17 view of HMP North under construction, view southwest. (Courtesy Image LOC-63-8565) CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HYPERGOL MAINTENANCE AND CHECKOUT AREA HYPERGOL MODULE PROCESSING NORTH North) HAER No. PAGE 18 aerial view showing the HMCA under construction with HMP North in foreground, view south. (Courtesy Image LOC-63- CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HYPERGOL MAINTENANCE AND CHECKOUT AREA HYPERGOL MODULE PROCESSING NORTH North) HAER No. PAGE 19 aerial view of the HMCA shortly after construction, HMP North in foreground, view south.
(Courtesy Image CAPE CANAVERAL AIR FORCE STATION, LAUNCH COMPLEX 39, HYPERGOL MAINTENANCE AND CHECKOUT AREA HYPERGOL MODULE PROCESSING NORTH North) HAER No. PAGE 20 oblique view of HMP North, view southeast. (Courtesy Image
The federal surveyors worked through Cape Canaveral building by building. These are the other structures
they measured and filed a report on, longest report first.
Written history. Quoted verbatim from HAER FL-8-11-T-1. United States federal work, no copyright under 17 U.S.C. 105.
Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.