Carnegie Hall's name is synonymous world-wide with musical excellence. It is noted for its acoustics as well as its rich musical history. The hall, together with the artists' studios which surround it, constitutes a unique cultural resource of international significance. ADDENDUM TO MUSIC HALL (Carnegie Hall) HABS No. (Page 9)
Historical Information
Carnegie Hall, built by Andrew Carnegie and opened by Peter Ilyich Tchaikovsky in by design and from its inception helped establish New York as the cultural capital of America and a gravitational force for great music worldwide.
Though it has been used to highlight many types of performances, Carnegie Hall's primary mission since its founding has been to present the world's finest musicians - indeed, its original name, still found inscribed above its entrance, was simply "Music Hall." The finished building - designed by William Burnet Tuthill in a modified Italian Renaissance style - contained three performance spaces: the 2,804-seat Carnegie (Main) Hall (now Isaac Stem Auditorium) a 268-seat Chamber Music Hall (now Weill Recital Hall) a 1,200-seat lower-level Recital Hall The lower-level Recital Hall was originally built as a 1,200-seat hall, mid-way in size between the other two.
This space has undergone an almost constant series of changes in use and architectural character beginning only a few years after its opening in and continuing into the and While the other two original concert spaces have continued to be operated directly by Carnegie Hall as musical concert venues, the basement was by and large treated as a commercial space from the mid-l until the present. Throughout that period, it was altered - often and to a great degree - by various outside tenants to meet their changing needs. The original Recital Hall was laid out in a cruciform plan with curved walls at the corners of each arm.
The crossing of the plan was occupied by the main double-height seating area, with the stage located beyond the south arm and arcaded galleries located in the east and west arms. The north arm contained an upper-level balcony with additional seating below. Two vestibules were located at the north end of the galleries, flanking the north arm of the seating area. The Recital Hall was, through economic necessity, forced to veer from its original purpose as early as Alterations to convert the space to a theater, renamed the Carnegie Lyceum, were largely complete by December of that year. Final completion came by when the space was leased to the American Academy of Dramatic Arts. ADDENDUM TO MUSIC HALL (Carnegie Hall) HABS No.
(Page 10) No architectural drawings of the alterations have been found. However, based on written accounts, physical evidence and historic photographs, it has been determined that the alterations were substantial. Significant changes undertaken during this first alteration included the installation of a new raked floor structure added over the original floor, the reduction of the overall capacity from to 820 seats, and the extension of the balcony to provide 13 7 seats, with a new decorative plaster balcony front installed. The removal of the original proscenium and the installation of a new proscenium several feet north resulted in the southernmost arches of the side arcades being cut in half.
Original decorative plasterwork was removed at the stage and adjacent curved walls, and at east and west galleries, and new decorative plaster was installed. As decades passed, the Lyceum slowly deteriorated through age and lack of repair. In the steel beams supporting the balcony were cut and the balcony itself made level. At some unknown point between and 192 7 the seating capacity was reduced from 820 to and in it was further reduced to Between and Kahn and Jacobs proposed a number of alterations, including the removal of portions of the existing ceiling and portions of the balcony, and the infill of the side arches. It is not clear which of these last alterations, if any, were undertaken. In the Lyceum was abandoned by the Academy, and became known as the Carnegie Playhouse.
Considered a haven for off-Broadway dramatists, who were finding it difficult to lease a theater of such a substantial size in Manhattan, the Playhouse was nevertheless allowed to deteriorate further. In the years following Carnegie Hall's last-minute rescue from demolition in the Playhouse was converted again, this time to a 300-seat first-run art film house, and renamed the Carnegie Hall Cinema. In the Cinema was leased by Comico Inc.; in the late Cineplex Odeon became the lessee. Substantial changes occurred during these tenancies, including construction of a projection booth in the balcony, conversion of the stage and backstage areas to a smaller cinema space, and installation of extensive new finishes in the lobby and circulation areas.
Major changes also occurred during this period in connection with Carnegie Hall's work on the main hall, circulation and mechanical systems. Mainly, these ADDENDUM TO MUSIC HALL (Carnegie Hall) HABS No. (Page 11) changed ceilings, spaces and structure in the balcony, inner lobby and east gallery areas.
Descriptive Information
As noted above, alterations have resulted in the loss of much of the original fabric. The original cruciform plan of the Recital Hall has been largely lost to these changes. The east arcade is presently occupied by offices, while the west arcade contains a cafe and lobby for the Cinema. Partitions have been installed within all of the arches, and the original plaster capitals have been removed from the back side of all of the columns in the east arcade. A new proscenium has been installed in front of the proscenium, with the stage and backstage area of the Lyceum now occupied by a Cinema screening room. All of the plasterwork associated with the proscenium has been removed from the southern arches.
The balcony area is now occupied by a projection room; most of the decorative finishes in this space have been removed. Suspended ceilings have been installed throughout much of the historic auditorium space, with much of the original ceiling removed in the process. Surviving historic finishes include decorative plaster on portions of the proscenium and on the east and west arcades, as well at the balcony front and on portions of the ceiling in the main space and in the west gallery. Fragmentary plaster finishes remain in other areas of the Recital Hall, such as the interior walls of the arcades, the ceiling of the east gallery, and the Library. In addition, the curved plaster fronts on the east and west galleries, installed in remain largely intact.
ADDENDUM TO MUSIC HALL (Carnegie Hall) HABS No. (Page 12) SOURCES OF INFORMATION Primary-source materials consulted include drawings, photographs and documents from the Carnegie Hall Archives, the New York City Department of Buildings, the New York Public Library, and the Museum of the City of New York. The documents include: A.
Architectural Drawings
Kahn & Jacobs. Drawings circa and showing proposed changes (some executed) to balcony and other areas. Carnegie Hall Archives. Lawless, Robert E. cinema alteration drawings. Carnegie Hall Archives. Polshek Partnership. Photographs and drawings showing work related to Main Hall restoration and mechanical/circulation renovations. Tuthill, William Burnet. Original floor plan drawing, section rendering and perspective rendering, looking south toward stage. Carnegie Hall Archives. B. HISTORIC VIEWS Undated photographs. ca. In the collection of the Museum of the City of New York. C.
Bibliography
Alteration permits. New York City Department of Buildings, City of New York, Municipal Archives. permits relating to balcony, fire stairs and seating. Certificate of Occupancy. New York City Department of Buildings. Certificate of Occupancy. New York City Department of Buildings. "The New Carnegie Lyceum: A Fire-proof theatre for the Sargent School of Acting." New York Times. December 13, West, Percy. Letter to John C. Travis. October 1, Carnegie Hall Archives. ADDENDUM TO MUSIC HALL (Carnegie Hall) HABS No. (Page 13)
Project Information
Carnegie Hall has restored the two most intact and important of its three original performance spaces. As an integral part of this overall effort, it plans to transform the Recital Hall into a completely new, multipurpose performance, teaching and event space. The changes relating to the restoration and modernization of the Isaac Stem Auditorium (above the Recital Hall) make it impossible to restore the lower level recital hall to its original form. However, what is possible is creating a venue that will reflect its original purpose: a mid-size venue, dedicated to the presentation of musical performances that are not best served by a large, grand space (such as the Isaac Stem Auditorium) or a small, intimate one (such as Weill Recital Hall).
The New Music Hall will provide approximately 600 seats of highly flexible space for a wide variety of musical performances, educational and cultural programs for both adults and children. In addition to the main auditorium, the facility will include circulation and service spaces, and a new exterior entry on Seventh A venue. The hall will be designed to accommodate frequent reconfiguration of spaces, seating and floor levels, and to include state-of-the-art audio and communication technology. Interior finishes will be contemporary rather than historically referential. On the exterior, the project will remove inappropriate later alterations and restore portions of the facade in sympathy with the original design. Prepared by: Christopher P.
Neville Title: Research Associate Affiliation: Higgins & Quasebarth, Historic Preservation Consultants Date: 30 April
The federal surveyors worked through New York building by building. These are the other structures
they measured and filed a report on, longest report first.
Written history. Quoted verbatim from HABS NY,31-NEYO,108-. United States federal work, no copyright under 17 U.S.C. 105.
Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.