Deer Creek Dam, Tailrace and Tailrace Regulating Gates, 252 feet/62 degrees from Hydroelectric Powerplant (HAER UT-93-B), Charleston

Deer Creek Dam, Tailrace and Tailrace Regulating Gates, 252 feet/62 degrees from Hydroelectric Powerplant (HAER UT-93-B), Charleston, Wasatch County, UT. Surveyed as HAER UT-93-D, with a 618-word written history.

From the record

“Constructed between and the Deer Creek Dam was constructed as the key structure of the Bureau of Reclamation's Provo River Project, the largest water resource development project undertaken in Utah.”

Written record, HAER UT-93-D survey. Machine-read text.

Surveyed by the federal HAER program as HAER UT-93-D · the record runs 618 words · one of 48 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Present Use

65 words

Source document Quoted word for word from HAER UT-93-D. Not written, edited or summarised by this site.

The Deer Creek Dam continues as a key feature of the Provo River Project to maintain a supplemental water supply for agricultural and domestic use in Wasatch, Utah, and Salt Lake Counties. The Deer Creek Reservoir formed by the dam feeds the 42-mile-long Salt Lake Aqueduct and its Terminal Reservoir. The hydroelectric powerplant at the dam generates as much as kilowatts that is locally distributed.

Significance

232 words

Source document Quoted word for word from HAER UT-93-D. Not written, edited or summarised by this site.

Constructed between and the Deer Creek Dam was constructed as the key structure of the Bureau of Reclamation's Provo River Project, the largest water resource development project undertaken in Utah. It was the second largest earth fill dam constructed by Reclamation at the time, and Reclamation's first project intended to provide domestic water. The Provo River Project followed a precedent of 40 Federal reclamation projects that had been or were nearly completed by Its construction was during a significant period of accelerated American infrastructure development founded on technological investment intended to make the West a sustainable, viable, and profitable landscape.

For additional information regarding the construction of the Deer Creek Dam, refer to "Deer Creek Dam CCC Government Camp," HABS No. UT-137. Deer Creek Dam, Tailrace and Tailrace Regulating Gates HAER No. UT-93-D (page 2) Project Statement: This HAER project was undertaken by the Utah Department of Transportation in order to document the historic features of the dam prior to the realignment and improvement of U. S. Highway 189 in the area. Preparation for construction of the Deer Creek portion has been underway since the and the work is expected to begin in The field work, site plan, historical reports, and photographs were prepared by Alpine Archaeological Consultants, Inc., Montrose, Colorado. Jonathon C.

Horn served as the Principal Investigator, and Gianfranco Archimede conducted the fieldwork, historic research, large-format photography, and report preparation.

Written history

217 words

Source document Quoted word for word from HAER UT-93-D. Not written, edited or summarised by this site.

Gianfranco Archimede, Alpine Archaeological Consultants, Inc., April Deer Creek Dam, Tailrace and Tailrace Regulating Gates HAER No. UT-93-D (page 3) Water exiting the Deer Creek Powerplant flows into a riprap-lined canal structure called the tailrace. The tailrace is 260 feet long by 100 feet wide between the powerplant and the tailrace regulating gates. The tailrace was one of the first features constructed in conjunction with the outlet tunnel in to channel water exiting the outlet works back into the Provo River south of the damsite. Although Deer Creek Dam was constructed between and modifications and additions were made to the dam after its completion.

Following the completion of the Salt Lake Aqueduct and the Deer Creek Powerplant in the late the aqueduct's intake gate was situated at the bottom of the tailrace's northwest bank near the powerplant. The concrete tailrace regulation structure installed in contains three gates operated by cables on individual electric motors. The purpose of regulating the water level of the tailrace was to maintain the steady water pressure required to push water through the aqueduct inlet and down the gravity- fed pipeline. The original gates and structure are intact. 1 1 State of Utah Historic Site Form, Utah Office of Preservation, "Deer Creek Reservoir Dam Complex prepared by Michael R. Polk, Sagebrush Archaeological Consultants,

In context

Charleston, Utah The place record: every map, photograph and survey of this town.
Wasatch County, Utah 88 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Charleston

21 records

The federal surveyors worked through Charleston building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Deer Creek DamHAER UT-936,760 words
Deer Creek DamHABS UT-1371,736 words
Deer Creek DamHAER UT-93-A1,734 words
Deer Creek DamHABS UT-137-B1,010 words
Deer Creek DamHABS UT-137-A1,002 words
Deer Creek DamHABS UT-137-C967 words
Deer Creek DamHABS UT-137-L870 words
Deer Creek DamHABS UT-137-J841 words
Deer Creek DamHABS UT-137-M833 words
Deer Creek DamHAER UT-93-E831 words
Deer Creek DamHABS UT-137-K811 words
Deer Creek DamHABS UT-137-F790 words
Deer Creek DamHABS UT-137-G757 words
Deer Creek DamHABS UT-137-E735 words
Deer Creek DamHAER UT-93-F725 words
Deer Creek DamHABS UT-137-D664 words
Deer Creek DamHABS UT-137-H662 words
Deer Creek DamHABS UT-137-I659 words
Deer Creek DamHAER UT-93-B632 words
Deer Creek DamHAER UT-93-G488 words
Deer Creek DamHAER UT-93-C478 words

Provenance

  • Written history. Quoted verbatim from HAER UT-93-D. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.