BlockBefore

Central Pacific Transcontinental Railroad, Tunnel No. 24, Milepost 132.9, Applegate

Central Pacific Transcontinental Railroad, Tunnel No. 24, Milepost 132.9, Applegate, Placer County, CA. Surveyed as HAER CAL,31-APGT.V,3-, with a 1,204-word written history.

From the record

“The Central Pacific First Transcontinental Railroad is a segment of the western half of the first transcontinental railroad, built from Sacramento, California to Promontory Summit, Utah between and where it joined the Union Pacific Railroad which had built west from Omaha.”

Written record, HAER CAL,31-APGT.V,3- survey. Machine-read text.

Surveyed by the federal HAER program as HAER CAL,31-APGT.V,3- · the record runs 1204 words · one of 28 surveyed structures published for this county.

Sources: the survey record at the Library of Congress

Significance

1088 words

The headings the report itself prints. Each one jumps to where it begins.

Source document Quoted word for word from HAER CAL,31-APGT.V,3-. Not written, edited or summarised by this site.

The Central Pacific First Transcontinental Railroad is a segment of the western half of the first transcontinental railroad, built from Sacramento, California to Promontory Summit, Utah between and where it joined the Union Pacific Railroad which had built west from Omaha. For the purpose of the current project, the first transcontinental railroad was found likely to be eligible for the National Register of Historic Places at the national level of significance under Criterion A for its significance in transportation history, in uniting the East and the West, and in the development of the West.

The railroad's period of significance is to from the line's completion in through the years of its role in the settlement and development of the West, to the conclusion of the railroad's achievements in World War II. Tunnel 24 is a contributive element of this property. Report Prepared By: John W. Snyder Co-Principal Preservation Services P.O. Box Sacramento CA CENTRAL PACIFIC TRANSCONTINENTAL RAILROAD, TUNNEL 24 HAER No. CA-200 Page 2

Description

Tunnel 24 is a 292-foot, single track railroad tunnel, with granite ashlar portal faces and wingwalls. As-built, the tunnel was concrete-lined for the first fifty feet in from each portal, with the remainder lined in redwood timber; the railroad has subsequently covered the timbering with shotcrete. The tunnel is on a three degree, fifty-two minute right-hand curve, and carries the tracks of the Union Pacific Railroad's (formerly Southern Pacific) Donner Pass line. H.

Historical Information

Contractors, Utah Construction Company of Ogden built Tunnel 24 (originally numbered Tunnel 10) in as an element of the reconstruction and double-tracking of the original Central Pacific line between Rocklin and Colfax. [For a full history of this line and of this undertaking, see the documentation set for the Central Pacific Transcontinental Railroad (Southern Pacific Overland Route) (Southern Pacific Donner Pass Route), Southern Pacific Donner Pass Route Tunnels, HAER No. CA-196.] After assuming control of the Southern Pacific/Central Pacific and merging them with the Union Pacific in Edward H. Harriman had embarked on a series of huge reconstruction projects system-wide.

One of these was the double-tracking of the original Central Pacific line over Donner Pass, the first segment of which was from Rocklin to Colfax. In connection with this, Harriman also moved the roundhouse and locomotive shop facilities originally built at Rocklin by the Central Pacific, to nearby Roseville where he built a much larger and more modern facility to handle the larger locomotives he was bringing onto the system. Two contracting firms divided the work, with Utah Construction Company building the portion from Colfax west to Clipper Gap, and Erickson & Petterson handling the work from Rocklin east to Clipper Gap. All the tunnels, whether single- or double-track, conformed to Southern Pacific Common Standard plans.

Utah Construction Company built their tunnels by driving two drifts (small pilot tunnels) at the spring line of the final arch. They then drove a third drift at grade level and centered, roofing it with loose timbers. Workers then blasted the "bench", the material between the floor of the upper drifts and the ceiling of the lower drift, then removed some of the lower drift's roof timbers to drop the loose material down into dump cars for removal. At Tunnel 24, limestone geology slowed construction to forty-five feet per month, with workers driving the bore from one end only; they completed their work in HI. SOURCES "Colfax Grade Revision; Southern Pacific," Railway Age Gazette, February Daggett, Stuart. Chapters on the History of the Southern Pacific. New York: Augustus M.

Kelley, Publishers, originally published Deverell, William. Railroad Crossing: California and the Railroad, Berkeley: University of California Press, "E.H. Harriman Is President," The Sacramento Bee, September 30, CENTRAL PACIFIC TRANSCONTINENTAL RAILROAD, TUNNEL 24 HAER No. CA-200 Page 3 "Electrification on the Southern Pacific," The Railroad Gazette, September 6, "General News Section," Railway Age Gazette, April 21, June 30, March 17, Hofsommer, Don L. The Southern Pacific, College Station, TX: Texas A&M University Press, Howard, Robert West. The Great Iron Trail: The Story of the First Transcontinental Railroad. New York: G. P. Putnam's Sons, Kxaus, George. High Road to Promontory; Building the Central Pacific across the High Sierra.

Palo Alto: American West Publishing Company, "Millions To Be Expended: Southern Pacific Is to Be Put in Fine Shape," The Sacramento Bee, June "Oil Burning Mallets; Southern Pacific," Railway Age Gazette, 50:24a, June "Railroad Construction," The Railroad Gazette, November December 27, May 5, June 16, Sabin, Edwin L. Building the Pacific Railway. Philadelphia and London: J. B. Lippincott Company, Signor, John R.

to Richard Starzak, Memorandum, "Brief Chronological History of Sierra Tunnels," October 4, "Survey For The Big Tunnel," The Sacramento Bee, August 24, "The Days When The Central Pacific Was Young " Southern Pacific Bulletin, May "The Harriman influence," The Railroad Gazette, January 11, "The Harriman Investigation," The Railroad Gazette, March 1, "The Interstate Commerce Commission's Report on the Harriman Investigation," The Railroad Gazette, July 19, 'The Roseville Yards of the Southern Pacific," The Railroad Gazette, December 27, United States Geological Survey. Topographic map. Greenwood, Calif, quadrangle, series, (photorevised IV.

PROJECT INFORMATION As a result of the merger of the Union Pacific and Southern Pacific Railroads, a federal undertaking under the jurisdiction of the Surface Transportation Board of the U.S. Department of CENTRAL PACIFIC TRANSCONTINENTAL RAILROAD, TUNNEL 24 HAER No. CA-200 Page 4 Transportation, and in order to accommodate freight trains utilizing longer and taller cars and loads-tri-level auto rack cars and cars carrying double-stacked containers, the Union Pacific will need to increase tunnel clearances on the former Southern Pacific Donner Pass Route. Tunnel 24 currently will clear neither type of car. The tunnels, built between and are contributing elements of the National Register-eligible Southern Pacific Donner Pass Route Tunnels Historic District.

All tunnels have been laser-measured and the railroad will determine clearance needs on a tunnel-by-tunnel basis. Some, because of curved alignment, will require interior work to allow for longer cars such as tri-level auto rack cars; others will require both interior and portal work to provide sufficient vertical clearance for "double-stack" container cars. The latter work may impact the character-defining tunnel portals if crown mining of the tunnels (as opposed to lowering the tunnel floors) is selected. Inasmuch as this would cause an adverse effect to the tunnels, Union Pacific has elected to record the tunnels for the Historic American Engineering Record. Documentation was carried out by Preservation Services, John Snyder Field Director and Historian, and Ed Andersen, Photographer.

Photos were made in August and research was carried out from August through March

In context

Applegate, California The place record: every map, photograph and survey of this town.
Placer County, California 357 topographic sheets across the county.
Library of Congress record The original filed report as the survey filed it.

Also surveyed in Applegate

8 records

The federal surveyors worked through Applegate building by building. These are the other structures they measured and filed a report on, longest report first.

SheetStructure SurveyReport
Ponderosa Way BridgeHAER CA-23804,209 words
Central Pacific Transcontinental RailroadHAER CAL,31-APGT.V,7-1,483 words
Central Pacific Transcontinental RailroadHAER CAL,31-APGT.V,4-1,349 words
Central Pacific Transcontinental RailroadHAER CAL,31-APGT.V,6-1,315 words
Central Pacific Transcontinental RailroadHAER CAL,31-APGT.V,2-1,300 words
Central Pacific Transcontinental RailroadHAER CAL,31-APGT.V,5-1,245 words
Central Pacific Transcontinental RailroadHAER CAL,31-APGT.V,8-1,196 words
Central Pacific Transcontinental RailroadHAER CAL,31-APGT.V,1-1,112 words

Provenance

  • Written history. Quoted verbatim from HAER CAL,31-APGT.V,3-. United States federal work, no copyright under 17 U.S.C. 105.
  • Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
  • How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.