Central Pacific Transcontinental Railroad, Tunnel No. 25, Milepost 133.09, Applegate
Central Pacific Transcontinental Railroad, Tunnel No. 25, Milepost 133.09, Applegate, Placer County, CA. Surveyed as HAER CAL,31-APGT.V,4-, with a 1,349-word written history.
From the record
“The Central Pacific First Transcontinental Railroad is a segment of the western half of the first transcontinental railroad, built from Sacramento, California to Promontory Summit, Utah between and where it joined the Union Pacific Railroad which had built west from Omaha.”
Written record, HAER CAL,31-APGT.V,4- survey. Machine-read text.
Surveyed by the federal HAER program as HAER CAL,31-APGT.V,4- · the record runs 1349 words · one of 28 surveyed structures published for this county.
Source document
Quoted word for word from HAER CAL,31-APGT.V,4-.
Not written, edited or summarised by this site.
The Central Pacific First Transcontinental Railroad is a segment of the western half of the first transcontinental railroad, built from Sacramento, California to Promontory Summit, Utah between and where it joined the Union Pacific Railroad which had built west from Omaha. For the purpose of the current project, the first transcontinental railroad was found likely to be eligible for the National Register of Historic Places at the national level of significance under Criterion A for its significance in transportation history, in uniting the East and the West, and in the development of the West.
The railroad's period of significance is to from the line's completion in through the years of its role in the settlement and development of the West, to the conclusion of the railroad's achievements in World War II. Tunnel 25 is a contributive element of this property. Report Prepared By: John W. Snyder Co-Principal Preservation Services P.O. Box Sacramento CA CENTRAL PACIFIC TRANSCONTINENTAL RAILROAD, TUNNEL 25 HAER No. CA-201 PageZ
Description
Tunnel 25 is a 763-foot, single track railroad tunnel, with granite ashlar portal faces and wingwalls. As-built, the tunnel was concrete-lined for the first fifty feet in from each portal, with the remainder lined in redwood timber; the railroad has subsequently covered the timbering with shotcrete. The tunnel is on a tangent (no curve) alignment, and carries the tracks of the Union Pacific Railroad's (formerly Southern Pacific) Donner Pass line. H.
Historical Information
Contractors, Utah Construction Company of Ogden built Tunnel 25 (originally numbered Tunnel 11) in as an element of the reconstruction and double-tracking of the original Central Pacific line between Rocklin and Colfax. [For a full history of this line and of this undertaking, see the documentation set for the Central Pacific Transcontinental Railroad (Southern Pacific Overland Route) (Southern Pacific Donner Pass Route), Southern Pacific Donner Pass Route Tunnels, HAER No. CA-196.] After assuming control of the Southern Pacific/Central Pacific and merging them with the Union Pacific in Edward H. Harriman had embarked on a series of huge reconstruction projects system-wide.
One of these was the double-tracking of the original Central Pacific line over Donner Pass, the first segment of which was from Rocklin to Colfax. In connection with this, Harriman also moved the roundhouse and locomotive shop facilities originally built at Rocklin by the Central Pacific, to nearby Roseville where he built a much larger and more modern facility to handle the larger locomotives he was bringing onto the system. Two contracting firms divided the work, with Utah Construction Company building the portion from Colfax west to Clipper Gap, and Erickson & Petterson handling the work from Rocklin east to Clipper Gap. All the tunnels, whether single- or double-track, conformed to Southern Pacific Common Standard plans.
Utah Construction Company built their tunnels by driving two drifts (small pilot tunnels) at the spring line of the final arch. They then drove a third drift at grade level and centered, roofing it with loose timbers. Workers then blasted the "bench", the material between the floor of the upper drifts and the ceiling of the lower drift, then removed some of the lower drift's roof timbers to drop the loose material down into dump cars for removal. At Tunnel 25, proximity of the original line caused problems for the construction crews.
At the west end of the tunnel, the new line was to be in a cut; this, however, was so close to the old line that a shoo-fly (detour) track was built to carry the old line farther to the south to allow working room; this was the only location on the project that required use of a shoo-fly. Still, the working area remained so constrained that steam shovels could not be used without risk of blocking the old line, and rocks were blown onto the shoo-fly track when a powder charge was detonated. Crews therefore excavated the cut by hand, using the "trap" method.
By excavating a pilot drift, loosely timbering its roof, and laying tracks for dump cars along its floor, crews could then keep a continuous line of cars shuttling in and out as they used gravity as an aid to dropping the earth overhead into the cars for removal. When they eventually reached the working face of the tunnel, they excavated it in the manner described above, working from west to east. CENTRAL PACIFIC TRANSCONTINENTAL RAILROAD, TUNNEL 25 HAERNo.CA-201 Page 3 m. SOURCES "Colfax Grade Revision; Southern Pacific" Railway Age Gazette, February Daggett, Stuart. Chapters on the History of the Southern Pacific. New York: Augustus M. Kelley, Publishers, originally published Deverell, William.
Railroad Crossing: California and the Railroad, Berkeley: University of California Press, "E.H. Harriman Is President," The Sacramento Bee, September 30, "Electrification on the Southern Pacific," The Railroad Gazette, September 6, "General News Section," Railway Age Gazette, April 21, June March 17, Hofsommer, Don L. The Southern Pacific, College Station, TX: Texas A&M University Press, Howard, Robert West. Tfie Great Iron Trail: The Story of the First Transcontinental Railroad. New York: G. P. Putnam's Sons, Kraus, George. High Road to Promontory: Budding the Central Pacific across the High Sierra.
Palo Alto: American West Publishing Company, "Millions To Be Expended: Southern Pacific Is to Be Put in Fine Shape," The Sacramento Bee, June 25, "Oil Burning Mallets; Southern Pacific," Railway Age Gazette, 50:24a, June "Railroad Construction," The Railroad Gazette, November 8, December 27, May 5, June Sabin, Edwin L. Building the Pacific Railway. Philadelphia and London: J. B. Lippincott Company, Signor, John R.
to Richard Starzak, Memorandum, "Brief Chronological History of Sierra Tunnels," October 4, "Survey For The Big Tunnel," The Sacramento Bee, August 24, "The Days When The Central Pacific Was Young," Southern Pacific Bulletin, May "The Harriman Influence," The Railroad Gazette, January 11, "The Harriman Investigation," The Railroad Gazette, March 1, "The Interstate Commerce Commission's Report on the Harriman Investigation," The Railroad Gazette, J\Ay 19, CENTRAL PACIFIC TRANSCONTINENTAL RAILROAD, TUNNEL 25 HAER No. CA-201 Page 4 "The Roseville Yards of the Southern Pacific," The Railroad Gazette, December 27, United States Geological Survey. Topographic map. Greenwood, Calif, quadrangle, IS series, (photorevised IV.
PROJECT INFORMATION As a result of the merger of the Union Pacific and Southern Pacific Railroads, a federal undertaking under the jurisdiction of the Surface Transportation Board of the U.S. Department of Transportation, and in order to accommodate freight trains utilizing longer and taller cars and loads-tri-level auto rack cars and cars carrying double-stacked containers, the Union Pacific will need to increase tunnel clearances on the former Southern Pacific Donner Pass Route. The tunnels, built between and are contributing elements of the National Register-eligible Southern Pacific Donner Pass Route Tunnels Historic District. All tunnels have been laser- measured and the railroad will determine clearance needs on a tunnel-by-tunnel basis.
Some, because of curved alignment, will require interior work to allow for longer cars such as tri-level auto rack cars; others, including Tunnel 25, will require both interior and portal work to provide sufficient vertical clearance for "double-stack" container cars. The latter work may impact the character-defining tunnel portals if crown mining of the tunnels (as opposed to lowering the tunnel floors) is selected. Inasmuch as this would cause an adverse effect to the tunnels, Union Pacific has elected to record the tunnels for the Historic American Engineering Record. Documentation was carried out by Preservation Services, John Snyder Field Director and Historian, and Ed Andersen, Photographer. Photos were made in August and research was carried out from August through March
The federal surveyors worked through Applegate building by building. These are the other structures
they measured and filed a report on, longest report first.
Written history. Quoted verbatim from HAER CAL,31-APGT.V,4-. United States federal work, no copyright under 17 U.S.C. 105.
Text capture. Machine-read from the scanned typescript filed with the survey, so spelling and spacing follow the original page.
How this page is made. Documentary passages are quoted from the linked federal record; page labels and counts are clearly marked as site presentation or calculations.